City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Wixom,
MI Oakland Co. United States |
W Chambers St. / Johanna Ware W (42.52579, -83.53382) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Sault Saint Marie,
MI Chippewa Co. United States |
E Easterday Ave. / Seymour St. (46.49161, -84.33749) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.sooleader.com/local-news/easterday-avenue-is-now-open-7815510 |
Sault Saint Marie,
MI Chippewa Co. United States |
E Easterday Ave. / Minneapolis St. (46.49157, -84.34587) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.sooleader.com/local-news/easterday-avenue-is-now-open-7815510 |
Woodstock Township,
MI Lenawee Co. United States |
US 127 / US 223 (42.03792, -84.34974) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Right-turn-only lane on northwest leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2023/04/06/roundabout-and-resurfacing-project-in-lenawee-county-begins-monday |
Traverse City,
MI Grand Traverse Co. United States |
Potter Rd. W / Garfield Rd. N (44.68621, -85.58211) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.record-eagle.com/news/local_news/garfield-potter-roundabout-to-open-early/article_cb929e8a-28fa-11ef-8e2e-9354ed76a563.html |
Battle Creek,
MI Calhoun Co. United States |
Hill Brady Rd. / Skyline Dr. (42.30946, -85.26929) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/kalamazoo/2023/10/17m-roundabout-to-open-next-month-near-battle-creek-airport-national-guard-base.html |
Green Oak Township,
MI Livingston Co. United States |
Silver Lake Rd. / US 23 NB Ramps / Fieldcrest Dr. (42.46717, -83.75473) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Combined a previous all-way stop and two-way stop into one roundabout. https://www.facebook.com/GreenOakPolice/videos/as-a-follow-up-to-our-previous-post-about-using-the-fieldcrest-roundabout-check-/988342009671510/ |
Scio Township,
MI Washtenaw Co. United States |
Miller Rd. / N Zeeb Rd. (42.31011, -83.83946) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.wcroads.org/wcrc-project/miller-rd-and-zeeb-rd-roundabout/ |
Saugatuck,
MI Allegan Co. United States |
Blue Star Hwy. / Old Allegan Rd. (42.65455, -86.19046) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/cityofsaugatuck/posts/pfbid02RhgzGHQSRQtD2w4Z8zHJCDmkc7Lf1jGgz22zex43fFEpErow9awqsaULZPqrYKMal |
Orion Township,
MI Oakland Co. United States |
Orion Rd. / Stoney Creek Rd. (42.77560, -83.22117) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=SCHUqTp-aNI |
Ypsilanti,
MI Washtenaw Co. United States |
Whittaker Rd. / Bemis Rd. (42.17317, -83.60141) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | https://www.wcroads.org/wcrc-project/bemis-rd-whittaker-rd-roundabout/ |
Clyde,
MI St. Clair Co. United States |
M-136 (North Rd. - Keewahdin Rd.) / North Rd. (43.03759, -82.52593) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Project cost $1.2 million. https://content.govdelivery.com/accounts/MIDOT/bulletins/35beb0e |
Farwell,
MI Clare Co. United States |
W Surrey Rd. / Old State Ave. (43.85765, -84.86697) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://clarecrc.com/roundabout-is-now-open/ |
Boardman,
MI Grand Traverse Co. United States |
Webster St. / Franklin St. (44.76060, -85.61118) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
1999 | https://www.record-eagle.com/archives/two-traffic-circles-going-in-this-fall/article_f3f9d4b6-9a9a-5faa-8100-8de9872bbcad.html |
Boardman,
MI Grand Traverse Co. United States |
Webster St. / Wellington St. (44.76059, -85.61351) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
1999 | https://www.record-eagle.com/archives/two-traffic-circles-going-in-this-fall/article_f3f9d4b6-9a9a-5faa-8100-8de9872bbcad.html |
Harrison Township,
MI Macomb Co. United States |
Sail Rd. / Metro Pkwy. (42.57551, -82.79958) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.5008 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Built as part of parking lot reconfiguration. Painted splitter islands. No speed control on north leg. |
Harrison Township,
MI Macomb Co. United States |
Metro Pkwy. / Sail Rd. (42.57735, -82.79673) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2013 | Built as part of parking lot reconfiguration. Painted splitter islands. Through bypass lane on northwestbound approach. |
Jackson,
MI Jackson Co. United States |
Springport Rd. / Rives Junction Rd. (42.28667, -84.46228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/jackson/2023/04/new-roundabout-coming-soon-to-jackson-county-intersection.html |
Milton Township,
MI Cass Co. United States |
Redfield Rd. / Gumwood Rd. (41.76808, -86.18377) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Opened October 5, 2023. https://www.leaderpub.com/2023/10/05/after-13-years-of-discussion-roundabout-officially-opens-in-milton-township/. |
Spring Arbor,
MI Jackson Co. United States |
Dearing Rd. / McCain Rd. (42.23292, -84.54088) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Peanut shaped. https://www.mlive.com/news/jackson/2023/09/it-looks-like-a-peanut-but-its-really-jacksons-newest-roundabout.html. |
Gaines Township,
MI Kent Co. United States |
84th St. SE / Kalamazoo Ave. SE (42.81188, -85.62476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/grand-rapids/2023/08/roundabout-the-first-of-its-kind-in-kent-county-opens-ahead-of-schedule.html. |
Saginaw,
MI Saginaw Co. United States |
Pierce Rd. / S Entrance Dr. (43.50866, -83.96070) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | Entrance to Saginaw Valley State University. Year Completed estimated (2011-2014). |
Saginaw,
MI Saginaw Co. United States |
Davis Rd. / College Dr. (43.51453, -83.95585) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
2008 | Right-turn-only arrows and legend on each entry. https://www.mlive.com/news/saginaw/2008/09/svsu_calms_traffic_in_effort_t.html. |
Lake Eastbrook,
MI Kent Co. United States |
Lake Eastbrook Blvd. SE / Sparks Dr. SE (42.91585, -85.57470) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2022 | |
Creston,
MI Kent Co. United States |
Monroe Ave. NW / Knapp St. NE / Riverside Park Dr. NE (42.99924, -85.67037) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2014 | https://www.mlive.com/news/grand-rapids/2013/06/4_roundabouts_cycle_track_plan.html |
Byron Center,
MI Kent Co. United States |
84th St. SE / Kalamazoo Ave. SE (42.81191, -85.62478) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/grand-rapids/2023/08/roundabout-the-first-of-its-kind-in-kent-county-opens-ahead-of-schedule.html |
Bellwood Estates,
MI Oakland Co. United States |
Bell Rd. / Coventry Woods Ln. (42.49306, -83.27073) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.3944 |
Other (At-Grade) Single-Lane |
2017 | Circulating edge line extensions across exits. |
Beverly Hills,
MI Oakland Co. United States |
Greenfield Rd. / Normandy Rd. / Beverly Rd. (42.52471, -83.20409) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Opened August 26, 2023. https://www.rcocweb.org/655/GreenfieldNormandy-Beverly-Roundabout-CO |
White Lake,
MI Oakland Co. United States |
Elizabeth Lake Rd. / Oxbow Lake Rd. (42.64128, -83.48775) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.rcocweb.org/619/Elizabeth-Lake-Road-Roundabouts-White-La |
White Lake,
MI Oakland Co. United States |
Elizabeth Lake Rd. / Teggerdine Rd. (42.64243, -83.49436) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.rcocweb.org/619/Elizabeth-Lake-Road-Roundabouts-White-La |
Midland,
MI Midland Co. United States |
N Waldo Rd. / E Monroe Rd. (43.68353, -84.18736) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Opened September 1, 2023. https://www.ourmidland.com/news/article/waldo-monroe-roundabout-open-traffic-sept-1-18308702.php |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 EB Ramps (42.27461, -84.38325) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 WB Entrance Ramp (42.27627, -84.38357) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / Seymour Rd. / Rosehill Rd. (42.27724, -84.38398) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Manistee,
MI Manistee Co. United States |
1st St. / Beach Rd. (44.24639, -86.34069) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.0728 |
Other (At-Grade) Single-Lane |
2014 | |
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. N / Cass Rd. (44.69811, -85.61832) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | Railroad crossing on east leg 65 ft from circulatory roadway; controlled by yield sign. https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
Holland,
MI Ottawa Co. United States |
Westshore Mall / (parking) (42.81319, -86.08626) |
Other Existing |
Unknown None |
3 Approaches 0 Driveways 26.8221 |
Other (At-Grade) Single-Lane |
2021 | Entrance to The Shops at Westshore shopping mall |
Kalamazoo,
MI Kalamazoo Co. United States |
Parkview Ave. / S 11th St. (42.25981, -85.65816) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/kalamazoo/2023/08/2-new-roundabouts-opening-friday-in-kalamazoo-county.html |
Kalamazoo,
MI Kalamazoo Co. United States |
Parkview Ave. / S 12th St. (42.25979, -85.65421) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/kalamazoo/2023/08/2-new-roundabouts-opening-friday-in-kalamazoo-county.html |
Sturgis,
MI St. Joseph Co. United States |
E Lafayette Rd. / N Franks Ave. (41.81055, -85.39875) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.sturgisjournal.com/story/news/local/2023/07/14/sturgis-roundabout-open/70413258007/ |
Macomb,
MI Macomb Co. United States |
25 Mile Rd. / Romeo Plank Rd. / Garfield Rd. (42.70077, -82.95901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Year Completed estimated (2021-2022). |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / I-94 EB Ramps (42.26564, -84.61940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / Norton Rd. / I-94 WB Ramps (42.26653, -84.62125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Combined two intersections. https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Manistee Township,
MI Manistee Co. United States |
US 31 / M-22 (44.28494, -86.24281) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://upnorthlive.com/news/local/roundabout-opens-in-manistee-township |
Green Oak Township,
MI Livingston Co. United States |
Winans Lake Rd. / Rickett Rd. (42.46413, -83.76620) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.whmi.com/news/article/roundabout-rickett-winans |
Scio Township ,
MI Washtenaw Co. United States |
W Liberty Rd. / Zeeb Rd. (42.26934, -83.83817) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.mlive.com/news/ann-arbor/2022/09/new-roundabout-near-ann-arbor-opens-after-weeks-of-construction.html |
Salem Township,
MI Washtenaw Co. United States |
N Territorial Rd. E / Pontiac Trl. (42.36546, -83.65682) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.wcroads.org/wcrc-project/pontiac-tr-n-territorial-rd-roundabout/ |
Northville,
MI Washtenaw Co. United States |
Eight Mile Rd. / Currie Rd. (42.43382, -83.59039) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.rcocweb.org/529/Currie-Road-COMPLETE |
Independence,
MI Oakland Co. United States |
Knob Hill Circle (42.73975, -83.37107) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
||
Independence,
MI Oakland Co. United States |
S Baldwin Rd, / Clarkston Rd. / W Clarkston Rd. (42.76543, -83.31409) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Elliptical shaped. Opened August 2024. https://www.rcocweb.org/675/Baldwin-RoadClarkston-Road-Roundabout-Op |
Farmington Hills,
MI Oakland Co. United States |
Orchard Lake Rd. / (shopping center entrances) (42.52448, -83.35994) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Southfield,
MI Oakland Co. United States |
Coral Bells Dr. / Windflower Dr. / Violet Dr. (42.51039, -83.22182) |
Other Unknown |
Unknown None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
South Lyon,
MI Oakland Co. United States |
Nine Mile Rd. / Currie Rd. (42.44831, -83.59180) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Opened November 21, 2022. |
Ann Arbor,
MI Washtenaw Co. United States |
E Ann St / Observatory St. / (hospital access) (42.28240, -83.73114) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 3 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Novi,
MI Oakland Co. United States |
W 9 Mile Rd. / Taft Rd. (42.45158, -83.49410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.candgnews.com/news/novi-council-approves-lighting-for-new-roundabout-635 |
Buena Vista,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 SB Ramps (43.41453, -83.89324) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on north leg. Replaced cloverleaf interchange. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Saginaw,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 NB Ramps (43.41447, -83.88874) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Replaced cloverleaf interchange. Merging right-turn bypass lane on east leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. S / Beitner Rd. / River Rd. W (44.67776, -85.62668) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.4048 |
Other (At-Grade) Single-Lane |
2022 | https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Gerald Ave. (42.63809, -83.09578) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Harrison Ave. (42.63763, -83.09821) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Cadillac,
MI Wexford Co. United States |
Plett Rd. / E 13th St. (44.26695, -85.39646) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2012 | https://www.9and10news.com/2012/08/13/city-of-cadillac-gets-new-driving-maneuver-at-intersection/ |
Cadillac,
MI Wexford Co. United States |
E Division St. / Crosby Rd. (44.25260, -85.37770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://www.cadillacnews.com/news/new-roundabout-at-crosby-division-opened-to-traffic/article_2ed78a18-40c4-11ec-8a2e-bb7590311039.html |
Standish,
MI Arenac Co. United States |
US 23 / M-13 (43.95018, -83.96713) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2022 | Grade separation replaced with roundabout. https://www.upnorthvoice.com/news/2022/03/us-23-at-standish-to-undergo-major-construction-this-summer-2/ |
South Haven,
MI Van Buren Co. United States |
Wells St. / N Bailey Ave. (42.41050, -86.26416) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2007 | Painted splitter islands. Previously offset T-intersections. Year Completed estimated (2006-2007). |
Ann Arbor,
MI Washtenaw Co. United States |
Broadway St. / (unknown) / (parking) (42.29022, -83.73723) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | |
Swartz Creek,
MI Genesee Co. United States |
Morrish Rd. / Lennon Rd. (42.98619, -83.83103) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=MVfZ3Y8ySsk |
Washington,
MI Macomb Co. United States |
Van Dyke Ave. / Campground Rd. (42.73402, -83.03617) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=tFHwV5OfDwc |
Silkeborg,
Middle Jutland Silkeborg Denmark |
Primærrute 46 (Nørreskov Bakke) / Nordre Højmarksvej / Østre Højmarksvej (56.19847, 9.59181) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Nordre Højmarksvej / Sejling Hedevej / Kejlstrupvej (56.19849, 9.55834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Nordre Højmarksvej / Høje Kejlstrupvej / (parking) (56.19747, 9.54622) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Primærrute 52 (Viborgvej) / Nordre Højmarksvej (56.19552, 9.52550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Herning,
Middle Jutland Herning Denmark |
Sekundærrute 195 (Dronningens Blvd.) / Primærrute 15 Ramps / Snejbjergvej (56.11757, 8.90629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Ringkøbing,
Middle Jutland Denmark |
Primærrute 15 (Vestre Ringvej - Nordre Ringvej) / Primærrute 16 (Holstebrovej) (56.10564, 8.25936) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Sekundærrute 195 (Skærskovhedevej) / Herningmotorvejen / Funder Dalgårdsvej (56.14664, 9.45466) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Århus,
Middle Jutland Århus Denmark |
Christian X's Vej / Jyllands Allé / (parking) (56.12205, 10.17032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Grenå,
Middle Jutland Denmark |
Østerbrogade / N.P. Josiassens Vej (56.41399, 10.88659) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
||
Grenå,
Middle Jutland Denmark |
Kannikegade / Østerbrogade / Rosengade / Stationsvej (56.41342, 10.87920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Århus,
Middle Jutland Århus Denmark |
Ormslevvej / Klokkeskovvej / Byvænget (56.12862, 10.11565) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Århus,
Middle Jutland Århus Denmark |
Ormslevvej / Jarlsmindevej (56.12847, 10.12520) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Brabrand,
Middle Jutland Århus Denmark |
Silkeborgvej / Herningmotorvejen (56.15248, 10.07507) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Herning,
Middle Jutland Herning Denmark |
Vesterholmvej / Gullestrupvej (56.15784, 8.96920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Randers,
Middle Jutland Randers Denmark |
Primærrute 16-Primærrute 21 (Ringvej Syd) / E45 (Nordjyske Motorvej) NB Ramps / Sekundærrute 511 (Tulipvej) / Stånumvej / Merkurvej (56.41388, 10.07852) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Viborg,
Middle Jutland Viborg Denmark |
Primærrute 16-Primærrute 13 (Nordre Ringvej) / Primærrute 13 (Aalborgvej) / Indre Ringvej (56.47475, 9.41660) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Merging right-turn bypass lane on north leg. | |
Viborg,
Middle Jutland Viborg Denmark |
Primærrute 16 (Nordre Ringvej) / Houlkærvej (56.47208, 9.44476) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Sekundærrute 189 (Skivevej) / Primærrute 18 (Holstebromotorvejen) WB Ramps (56.38708, 8.65517) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Sekundærrute 189 (Skivevej) / Primærrute 18 (Holstebromotorvejen) WB Ramps / (parking) (56.38505, 8.65214) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Primærrute 18 (Holstebromotorvejen) WB Ramps (56.36871, 8.72131) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Primærrute 18 (Holstebromotorvejen) EB Ramps (56.36814, 8.71820) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Østre Ringvej / Sletten (56.36332, 8.67574) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute O1 (Lægårdvej - Enghavevej) / Stationsvej / Lægårdvej (56.36256, 8.62117) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Horsens,
Middle Jutland Horsens Denmark |
Torstedalle / Thorsvej / Langballe / Kvartetvej (55.84926, 9.81540) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Minsk,
Minsk Minsk Belarus |
Stalietava / Zaporozhskaya / Filimonava (53.90697, 27.63042) |
Roundabout Existing |
All-Way Yield Pedestrian Signal (red-yellow-green to drivers) |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Minsk,
Minsk Minsk Belarus |
Maksima Bahdanovica / Arlouskaja / Surganova (53.93130, 27.57690) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Borovlyanskiy sel'skiy sovet,
Minsk Province Minskiy rayon Belarus |
Aviatsionnaya / (Wright Brothers St.) (53.95852, 27.66416) |
Unknown Existing |
Unknown None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Kostanjevica na Krasu,
Miren-Kostanjevica Slovenia |
SR 614 (Miren) / (unknown) (45.89908, 13.61504) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Natori City,
Miyagi Pref. Japan |
Sogodai (38.20813, 140.80908) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Natori City,
Miyagi Pref. Japan |
Sogodai (38.20477, 140.80778) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Natori City,
Miyagi Pref. Japan |
Sogodai (38.20206, 140.80672) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Natori City,
Miyagi Pref. Japan |
Sogodaihigashi (38.21103, 140.81667) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Higashimatsushima City,
Miyagi Pref. Japan |
Omagari Shimodai (38.41179, 141.24126) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |