City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
New Berlin,
WI Waukesha United States |
CTH Y (Racine Ave.)/I-43 SB Ramps (42.93426, -88.15884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Opened November 2009. |
New Berlin,
WI Waukesha United States |
Moorland Rd. (CTH O)/I-43 SB Ramps (42.95341, -88.10897) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2008 | Opened November 2008. |
Emporia,
KS Lyon United States |
I-35/US 50 Connector (38.41494, -96.22918) |
Roundabout Existing |
All-Way Yield None |
0 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2008 | New interchange configuration. Half double-lane, half triple-lane. Opened November 2008. |
Emporia,
KS Lyon United States |
US 50 Connector/US 50 (38.41225, -96.22947) |
Roundabout Existing |
All-Way Yield None |
0 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2008 | New interchange configuration. Half double-lane, half triple-lane. Opened November 2008. |
Lawrence,
KS Douglas United States |
I-70/Exit 204 (38.99456, -95.22959) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | Replaced trumpet interchange. |
Grass Valley,
CA Nevada United States |
E. Main St./Idaho-Maryland Rd./SR 20 WB Ramps (39.22168, -121.05380) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2008 | |
Bellingham,
WA Whatcom United States |
Northwest Ave./I-5 NB Ramp (48.78500, -122.50420) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | RT bypass lane on southbound approach. |
Yakima,
WA Yakima United States |
E. Valley Mall Blvd./I-82 EB Ramps (46.56298, -120.47290) |
Roundabout Existing |
Unknown Unknown |
5 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2010 | |
Yakima,
WA Yakima United States |
E. Valley Mall Blvd./I-82 WB Ramps (46.56298, -120.47170) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | |
Cheyenne,
WY Laramie United States |
High Plains Rd./I-25 SB Ramps (41.06202, -104.87730) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | |
Cheyenne,
WY Laramie United States |
High Plains Rd./I-25 NB Ramps (41.06046, -104.87620) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | Only 3 of the 5 approaches are currently in service. One is under construction for the new Southeast Wyoming Welcome Center. The last is a future extension of High Plains to the east. |
Cheyenne,
WY Laramie United States |
Vandehei Ave./I-25 NB Ramps/Hynds Blvd. (41.18365, -104.83710) |
Roundabout Existing |
All-Way Yield None |
6 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | Previously controlled by one-way stop |
Cheyenne,
WY Laramie United States |
Vandehei Ave./I-25 SB Ramps/Bishop Blvd. (41.18365, -104.83900) |
Roundabout Existing |
All-Way Yield None |
6 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | Previously controlled by one-way stop |
Blaine,
WA Whatcom United States |
I-5 SB Ramps/Peace Portal Dr./Marine Dr. (48.99723, -122.75250) |
Roundabout Existing |
All-Way Yield At-Grade Rail Crossing Gates (controlling approach only) |
4 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | May 2010. Roundabout is ~200 ft from railroad crossing. |
Blaine,
WA Whatcom United States |
I-5 NB Ramps/D St./2nd St. (48.99810, -122.75140) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | May 2010. |
Burlington,
WA Skagit United States |
Chuckanut Dr. (SR 11)/I-5 SB Ramps/Josh Wilson Rd. (48.48586, -122.33860) |
Roundabout Existing |
All-Way Yield None |
0 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | September 2010. |
Burlington,
WA Skagit United States |
Chuckanut Dr. (SR 11)/I-5 NB Ramps/Old Hwy 99 (48.48357, -122.33550) |
Roundabout Existing |
All-Way Yield None |
0 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2010 | October 2010. |
Carmel,
IN Hamilton United States |
E 136th St./Keystone Pkwy NB Ramps (39.98598, -86.11404) |
Roundabout Existing |
All-Way Yield Metering Signal |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2009 | Part of tight diamond interchange with raindrop shape central island. Northbound ramp from Keystone Pkwy has a metering signal (PHB) that activates during peak hours when triggered by a long westbound queue. Eastbound approach has a metering signal (PHB) that activates during peak hours when triggered by a long northbound queue. |
Carmel,
IN Hamilton United States |
E 136th St./Keystone Pkwy SB Ramps (39.98581, -86.11488) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2009 | Part of tight diamond interchange with raindrop shape central island. |
Carmel,
IN Hamilton United States |
E 126th St./Keystone Pkwy NB Ramps (39.97122, -86.11223) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Part of tight diamond interchange with raindrop shape central island. |
Carmel,
IN Hamilton United States |
E 126th St./Keystone Pkwy SB Ramps (39.97122, -86.11327) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Part of tight diamond interchange with raindrop shape central island. |
Carmel,
IN Hamilton United States |
E Carmel Dr./Keystone Pkwy NB Ramps (39.96208, -86.11313) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2010 | Part of tight diamond interchange with raindrop shape central island. |
Carmel,
IN Hamilton United States |
E Carmel Dr./Keystone Pkwy SB Ramps (39.96198, -86.11397) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2010 | Part of tight diamond interchange with raindrop shape central island. |
Carmel,
IN Hamilton United States |
E 116th St./Keystone Pkwy NB Ramps (39.95663, -86.11353) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Part of tight diamond interchange with raindrop shape central island. |
Carmel,
IN Hamilton United States |
E 116th St./Keystone Pkwy SB Ramps (39.95665, -86.11430) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Part of tight diamond interchange with raindrop shape central island. |
Carmel,
IN Hamilton United States |
E 106th St./Keystone Pkwy NB Ramps (39.94169, -86.11259) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Part of tight diamond interchange with raindrop shape central island. |
Carmel,
IN Hamilton United States |
E 106th St./Keystone Pkwy SB Ramps (39.94140, -86.11354) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Part of tight diamond interchange with raindrop shape central island. |
Rice Lake,
WI Barron United States |
CTH O (18 1/2 Ave.)/US 53 NB Ramps (45.47319, -91.75753) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2006 | Opened June 1, 2006 |
Rice Lake,
WI Barron United States |
CTH O (18 1/2 Ave.)/US 53 SB Ramps (45.47325, -91.76021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2006 | Opened June 1, 2006 |
Richfield,
WI Washington United States |
STH 145/US 41 SB Ramps (43.28170, -88.19557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. |
Richfield,
WI Washington United States |
STH 145/US 41 NB Ramps (43.28247, -88.19345) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. |
Richfield,
WI Washington United States |
STH 145/US 45 SB Ramps (43.28387, -88.18716) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. |
Richfield,
WI Washington United States |
STH 145/US 45 NB Ramps (43.28380, -88.18485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. |
Grand Junction,
CO Mesa United States |
24 Rd./I-70 WB Ramps (39.11454, -108.60820) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2006 | |
Grand Junction,
CO Mesa United States |
24 Rd./I-70 EB Ramps (39.11333, -108.60820) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2006 | |
Pilot Mountain,
NC Surry United States |
NC 268/US 52 EB Ramps (36.37565, -80.48758) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Unknown |
2010 | |
Pilot Mountain,
NC Surry United States |
NC 268/US 52 WB Ramps (36.37640, -80.48578) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Unknown |
2010 | |
Cleveland,
OH Cuyahoga United States |
Quigley Rd./W. 14th St./I-71 NB Offramp/I-71 SB Onramp (41.46614, -81.69114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2006 | Opened August 21, 2006. |
Watertown,
WI Jefferson United States |
W Main St. (STH 19)/STH 26 NB Ramps (43.19772, -88.76607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | |
Watertown,
WI Jefferson United States |
W Main St. (STH 19)/STH 26 SB Ramps (43.19772, -88.76804) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | |
Watertown,
WI Dodge United States |
BUS 26 (N Church St.)/STH 16 WB Ramps/Provimi Rd. (43.21918, -88.73837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | |
Watertown,
WI Dodge United States |
BUS 26 (N Church St.)/STH 16 EB Ramps (43.21605, -88.73625) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | |
Watertown,
WI Jefferson United States |
CTH Y (S Church St.)/STH 26 NB Ramps (43.15562, -88.74126) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | |
Watertown,
WI Jefferson United States |
CTH Y (S Church St.)/STH 26 SB Ramps (43.15450, -88.74223) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | |
Anderson,
CA Shasta United States |
Factory Outlets Dr./I-5 NB Ramps/Locust St./Deschutes Rd. (40.43782, -122.28600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2013 | Freeway off-ramp added with roundabout. Previously controlled by one-way stop |
Oshkosh,
WI Winnebago United States |
W. 9th Ave./US 41 SB Ramps (44.01089, -88.58318) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | |
Oshkosh,
WI Winnebago United States |
W. 9th Ave./US 41 NB Ramps (44.01078, -88.58145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | |
Oshkosh,
WI Winnebago United States |
US 45/US 41 SB Ramps (44.06074, -88.57443) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | |
Neenah,
WI Winnebago United States |
Breezewood Ln./US 41 SB Ramps (44.15623, -88.48662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (3+ Lane) |
2012 | Opened October 12, 2012. |
Neenah,
WI Winnebago United States |
Breezewood Ln./US 41 NB Ramps (44.15602, -88.48505) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (3+ Lane) |
2012 | Opened October 12, 2012. |
Barksdale,
WI Bayfield United States |
STH 13/US 2 WB Ramps (46.58774, -90.95454) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2012 | |
De Pere,
WI Brown United States |
CTH G (Main St.)/US 41 NB Ramps (44.45217, -88.88771) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2012 | |
De Pere,
WI Brown United States |
CTH G (Main St.)/US 41 SB Ramps (44.45374, -88.09212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (3+ Lane) |
2012 | |
Summit,
WI Waukesha United States |
CTH P (N Sawyer Rd.)/I-94 EB Ramps (43.06063, -88.44229) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | Opened November 23, 2011. |
Summit,
WI Waukesha United States |
CTH P (N Sawyer Rd.)/I-94 WB Ramps (43.06174, -88.44228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | Opened November 23, 2011. |
Middleton,
WI Dane United States |
Parmenter St./US 12 WB Off-Ramp/Discovery Dr. (43.10221, -89.51196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2006 | Opened October 2006. |
(unincorporated),
WI Sauk United States |
Reedsburg Rd./US 12 WB Ramps (43.53249, -89.78612) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | |
(unincorporated),
WI Sauk United States |
Reedsburg Rd./US 12 EB Ramps (43.53258, -89.78800) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | |
(unincorporated),
WI Sauk United States |
STH 33/US 12 WB Ramps (43.51445, -89.78288) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | |
(unincorporated),
WI Sauk United States |
STH 33/US 12 EB Ramps (43.51449, -89.78516) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2010 | |
Cottage Grove,
WI Dane United States |
CTH N/I-94 WB Ramps (43.11037, -89.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | Series of 3 roundabouts. |
Cottage Grove,
WI Dane United States |
CTH N/I-94 EB Ramps (43.10877, -89.19923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | Series of 3 roundabouts. |
Oconto,
WI Oconto United States |
STH 22 (Charles St.)/US 41 NB Ramps (44.89208, -87.89580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2009 | Opened October 7, 2009. |
Oconto,
WI Oconto United States |
STH 22 (Charles St.)/US 41 SB Ramps (44.89205, -87.90080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2009 | Opened October 7, 2009. |
Hudson,
WI Saint Croix United States |
Hanley Rd./STH 35 NB Ramps (44.94889, -92.69390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2005 | Right-turn bypass lane. Opened October 21, 2005. |
Hudson,
WI Saint Croix United States |
Hanley Rd./STH 35 SB Ramps (44.94890, -92.69675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2005 | Right-turn bypass lane. Opened October 21, 2005. |
Milton,
WI Rock United States |
STH 59/STH 26 EB Ramps (42.76903, -88.92298) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock United States |
STH 59/STH 26 WB Ramps (42.76911, -88.92484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2009 | Opened October 2009. |
Beloit,
WI Rock United States |
E Hart Rd./I-43 NB Ramps (42.53960, -88.94841) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. |
Beloit,
WI Rock United States |
E Hart Rd./I-43 SB Ramps (42.54142, -88.94933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. |
(unincorporated),
WI Sauk United States |
CTH BD (Fern Dell Rd.)/US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2010 | Series of 4 roundabouts. |
(unincorporated),
WI Sauk United States |
CTH BD (Fern Dell Rd.)/US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2010 | Series of 4 roundabouts. |
Oregon,
WI Dane United States |
STH 138/US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | |
Oregon,
WI Dane United States |
STH 138/US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | |
Oregon,
WI Dane United States |
CTH MM/US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2012 | Series of 3 roundabouts. |
Oregon,
WI Dane United States |
CTH MM/US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2012 | Series of 3 roundabouts. |
Oshkosh,
WI Winnebago United States |
STH 21 (Omro Rd.)/US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. |
Oshkosh,
WI Winnebago United States |
STH 21 (Omro Rd.)/US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. |
Roberts,
WI Saint Croix United States |
STH 65/I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. |
Roberts,
WI Saint Croix United States |
STH 65/I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. |
Jackson,
WI Washington United States |
STH 60/US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2012 | Opened November 2012. |
Jackson,
WI Washington United States |
STH 60/US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2012 | Opened November 2012. |
Janesville,
WI Rock United States |
N Harmony Town Hall Rd./STH 26 EB Ramps (42.75151, -88.95509) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2012 | |
Janesville,
WI Rock United States |
N Harmony Town Hall Rd./STH 26 WB Ramps (42.75172, -88.95537) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2012 | |
Cottage Grove,
MN Washington United States |
Jamaica Ave./US 10-US 61 EB Ramps/W Point Douglas Rd. (44.81452, -92.93504) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2007 | |
Cottage Grove,
MN Washington United States |
Jamaica Ave./US 10-US 61 WB Ramps (44.81586, -92.93379) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2007 | |
Prescott,
AZ Yavapai United States |
Grande Dame Pkwy./SR 89A EB Ramps (34.63499, -112.39830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | |
Prescott,
AZ Yavapai United States |
Grande Dame Pkwy./SR 89A WB Ramps (34.63643, -112.39710) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2011 | |
Mesa,
AZ Maricopa United States |
E McKellips Rd./Loop 202 SB Ramps (33.45145, -111.67100) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2007 | |
Mesa,
AZ Maricopa United States |
E McKellips Rd./Loop 202 NB Ramps (33.45142, -111.66850) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2007 | |
Edwards,
CO Eagle United States |
Edwards Access Rd./Beard Creek Rd./I-70 WB Ramps (39.64991, -106.58720) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2010 | |
Edwards,
CO Eagle United States |
Edwards Access Rd./I-70 EB Ramps (39.64891, -106.58780) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2010 | |
Avoca Borough,
PA Luzerne United States |
William St./I-81 SB Ramps (41.33570, -75.73790) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2015 | |
Avoca Borough,
PA Luzerne United States |
SR 315/I-81 SB Ramps (41.33380, -75.73930) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2016 | Previously controlled by yield |
Avoca Borough,
PA Luzerne United States |
SR 315/I-81 NB Ramps/Navy Way Rd. (41.33429, -75.73450) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2015 | Previously controlled by yield. Fifth leg is departure only to I-81 NB on-ramp. |
Moon Township,
PA Allegheny United States |
SR 3070/Resurrection Rd./I-376 SB Ramps (40.48070, -80.20240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | Previously controlled by two-way stop |
Warrensburg,
MO Johnson United States |
SR 13/US 50 WB Ramps (38.77480, -93.68554) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | |
Warrensburg,
MO Johnson United States |
SR 13/US 50 EB Ramps (38.77151, -93.68568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Single-Lane |
2011 | |
Carmel,
IN Hamilton Co. United States |
Clay Terrace Blvd./Circle Dr./Rangeline Rd./US 31 SB Off-Ramp (39.99264, -86.12840) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2012 | |
Carmel,
IN Hamilton Co. United States |
E Main St./Keystone Pkwy. SB Ramps (39.97844, -86.11319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps Multilane (2 Lane) |
2009 | Year Completed estimated (2008-2010). |