9888 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways Functional Class /
LaneType
Year Completed Comments
New Berlin, WI
Waukesha
United States
CTH Y (Racine Ave.)/I-43 SB Ramps
(42.93426, -88.15884)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Opened November 2009.
New Berlin, WI
Waukesha
United States
Moorland Rd. (CTH O)/I-43 SB Ramps
(42.95341, -88.10897)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2008 Opened November 2008.
Emporia, KS
Lyon
United States
I-35/US 50 Connector
(38.41494, -96.22918)
Roundabout
Existing
All-Way Yield
None
0 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2008 New interchange configuration. Half double-lane, half triple-lane. Opened November 2008.
Emporia, KS
Lyon
United States
US 50 Connector/US 50
(38.41225, -96.22947)
Roundabout
Existing
All-Way Yield
None
0 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2008 New interchange configuration. Half double-lane, half triple-lane. Opened November 2008.
Lawrence, KS
Douglas
United States
I-70/Exit 204
(38.99456, -95.22959)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011 Replaced trumpet interchange.
Grass Valley, CA
Nevada
United States
E. Main St./Idaho-Maryland Rd./SR 20 WB Ramps
(39.22168, -121.05380)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2008
Bellingham, WA
Whatcom
United States
Northwest Ave./I-5 NB Ramp
(48.78500, -122.50420)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010 RT bypass lane on southbound approach.
Yakima, WA
Yakima
United States
E. Valley Mall Blvd./I-82 EB Ramps
(46.56298, -120.47290)
Roundabout
Existing
Unknown
Unknown
5 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2010
Yakima, WA
Yakima
United States
E. Valley Mall Blvd./I-82 WB Ramps
(46.56298, -120.47170)
Roundabout
Existing
Unknown
Unknown
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011
Cheyenne, WY
Laramie
United States
High Plains Rd./I-25 SB Ramps
(41.06202, -104.87730)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010
Cheyenne, WY
Laramie
United States
High Plains Rd./I-25 NB Ramps
(41.06046, -104.87620)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010 Only 3 of the 5 approaches are currently in service. One is under construction for the new Southeast Wyoming Welcome Center. The last is a future extension of High Plains to the east.
Cheyenne, WY
Laramie
United States
Vandehei Ave./I-25 NB Ramps/Hynds Blvd.
(41.18365, -104.83710)
Roundabout
Existing
All-Way Yield
None
6 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011 Previously controlled by one-way stop
Cheyenne, WY
Laramie
United States
Vandehei Ave./I-25 SB Ramps/Bishop Blvd.
(41.18365, -104.83900)
Roundabout
Existing
All-Way Yield
None
6 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011 Previously controlled by one-way stop
Blaine, WA
Whatcom
United States
I-5 SB Ramps/Peace Portal Dr./Marine Dr.
(48.99723, -122.75250)
Roundabout
Existing
All-Way Yield
At-Grade Rail Crossing Gates (controlling approach only)
4 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010 May 2010. Roundabout is ~200 ft from railroad crossing.
Blaine, WA
Whatcom
United States
I-5 NB Ramps/D St./2nd St.
(48.99810, -122.75140)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010 May 2010.
Burlington, WA
Skagit
United States
Chuckanut Dr. (SR 11)/I-5 SB Ramps/Josh Wilson Rd.
(48.48586, -122.33860)
Roundabout
Existing
All-Way Yield
None
0 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010 September 2010.
Burlington, WA
Skagit
United States
Chuckanut Dr. (SR 11)/I-5 NB Ramps/Old Hwy 99
(48.48357, -122.33550)
Roundabout
Existing
All-Way Yield
None
0 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2010 October 2010.
Carmel, IN
Hamilton
United States
E 136th St./Keystone Pkwy NB Ramps
(39.98598, -86.11404)
Roundabout
Existing
All-Way Yield
Metering Signal
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2009 Part of tight diamond interchange with raindrop shape central island. Northbound ramp from Keystone Pkwy has a metering signal (PHB) that activates during peak hours when triggered by a long westbound queue. Eastbound approach has a metering signal (PHB) that activates during peak hours when triggered by a long northbound queue.
Carmel, IN
Hamilton
United States
E 136th St./Keystone Pkwy SB Ramps
(39.98581, -86.11488)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2009 Part of tight diamond interchange with raindrop shape central island.
Carmel, IN
Hamilton
United States
E 126th St./Keystone Pkwy NB Ramps
(39.97122, -86.11223)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Part of tight diamond interchange with raindrop shape central island.
Carmel, IN
Hamilton
United States
E 126th St./Keystone Pkwy SB Ramps
(39.97122, -86.11327)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Part of tight diamond interchange with raindrop shape central island.
Carmel, IN
Hamilton
United States
E Carmel Dr./Keystone Pkwy NB Ramps
(39.96208, -86.11313)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2010 Part of tight diamond interchange with raindrop shape central island.
Carmel, IN
Hamilton
United States
E Carmel Dr./Keystone Pkwy SB Ramps
(39.96198, -86.11397)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2010 Part of tight diamond interchange with raindrop shape central island.
Carmel, IN
Hamilton
United States
E 116th St./Keystone Pkwy NB Ramps
(39.95663, -86.11353)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Part of tight diamond interchange with raindrop shape central island.
Carmel, IN
Hamilton
United States
E 116th St./Keystone Pkwy SB Ramps
(39.95665, -86.11430)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Part of tight diamond interchange with raindrop shape central island.
Carmel, IN
Hamilton
United States
E 106th St./Keystone Pkwy NB Ramps
(39.94169, -86.11259)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Part of tight diamond interchange with raindrop shape central island.
Carmel, IN
Hamilton
United States
E 106th St./Keystone Pkwy SB Ramps
(39.94140, -86.11354)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Part of tight diamond interchange with raindrop shape central island.
Rice Lake, WI
Barron
United States
CTH O (18 1/2 Ave.)/US 53 NB Ramps
(45.47319, -91.75753)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2006 Opened June 1, 2006
Rice Lake, WI
Barron
United States
CTH O (18 1/2 Ave.)/US 53 SB Ramps
(45.47325, -91.76021)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2006 Opened June 1, 2006
Richfield, WI
Washington
United States
STH 145/US 41 SB Ramps
(43.28170, -88.19557)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development.
Richfield, WI
Washington
United States
STH 145/US 41 NB Ramps
(43.28247, -88.19345)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development.
Richfield, WI
Washington
United States
STH 145/US 45 SB Ramps
(43.28387, -88.18716)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2009 Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development.
Richfield, WI
Washington
United States
STH 145/US 45 NB Ramps
(43.28380, -88.18485)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2009 Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development.
Grand Junction, CO
Mesa
United States
24 Rd./I-70 WB Ramps
(39.11454, -108.60820)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2006
Grand Junction, CO
Mesa
United States
24 Rd./I-70 EB Ramps
(39.11333, -108.60820)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2006
Pilot Mountain, NC
Surry
United States
NC 268/US 52 EB Ramps
(36.37565, -80.48758)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Unknown
2010
Pilot Mountain, NC
Surry
United States
NC 268/US 52 WB Ramps
(36.37640, -80.48578)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Unknown
2010
Cleveland, OH
Cuyahoga
United States
Quigley Rd./W. 14th St./I-71 NB Offramp/I-71 SB Onramp
(41.46614, -81.69114)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2006 Opened August 21, 2006.
Watertown, WI
Jefferson
United States
W Main St. (STH 19)/STH 26 NB Ramps
(43.19772, -88.76607)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010
Watertown, WI
Jefferson
United States
W Main St. (STH 19)/STH 26 SB Ramps
(43.19772, -88.76804)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010
Watertown, WI
Dodge
United States
BUS 26 (N Church St.)/STH 16 WB Ramps/Provimi Rd.
(43.21918, -88.73837)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011
Watertown, WI
Dodge
United States
BUS 26 (N Church St.)/STH 16 EB Ramps
(43.21605, -88.73625)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011
Watertown, WI
Jefferson
United States
CTH Y (S Church St.)/STH 26 NB Ramps
(43.15562, -88.74126)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011
Watertown, WI
Jefferson
United States
CTH Y (S Church St.)/STH 26 SB Ramps
(43.15450, -88.74223)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011
Anderson, CA
Shasta
United States
Factory Outlets Dr./I-5 NB Ramps/Locust St./Deschutes Rd.
(40.43782, -122.28600)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2013 Freeway off-ramp added with roundabout. Previously controlled by one-way stop
Oshkosh, WI
Winnebago
United States
W. 9th Ave./US 41 SB Ramps
(44.01089, -88.58318)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011
Oshkosh, WI
Winnebago
United States
W. 9th Ave./US 41 NB Ramps
(44.01078, -88.58145)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011
Oshkosh, WI
Winnebago
United States
US 45/US 41 SB Ramps
(44.06074, -88.57443)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011
Neenah, WI
Winnebago
United States
Breezewood Ln./US 41 SB Ramps
(44.15623, -88.48662)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (3+ Lane)
2012 Opened October 12, 2012.
Neenah, WI
Winnebago
United States
Breezewood Ln./US 41 NB Ramps
(44.15602, -88.48505)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (3+ Lane)
2012 Opened October 12, 2012.
Barksdale, WI
Bayfield
United States
STH 13/US 2 WB Ramps
(46.58774, -90.95454)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2012
De Pere, WI
Brown
United States
CTH G (Main St.)/US 41 NB Ramps
(44.45217, -88.88771)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2012
De Pere, WI
Brown
United States
CTH G (Main St.)/US 41 SB Ramps
(44.45374, -88.09212)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (3+ Lane)
2012
Summit, WI
Waukesha
United States
CTH P (N Sawyer Rd.)/I-94 EB Ramps
(43.06063, -88.44229)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011 Opened November 23, 2011.
Summit, WI
Waukesha
United States
CTH P (N Sawyer Rd.)/I-94 WB Ramps
(43.06174, -88.44228)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011 Opened November 23, 2011.
Middleton, WI
Dane
United States
Parmenter St./US 12 WB Off-Ramp/Discovery Dr.
(43.10221, -89.51196)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2006 Opened October 2006.
(unincorporated), WI
Sauk
United States
Reedsburg Rd./US 12 WB Ramps
(43.53249, -89.78612)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010
(unincorporated), WI
Sauk
United States
Reedsburg Rd./US 12 EB Ramps
(43.53258, -89.78800)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010
(unincorporated), WI
Sauk
United States
STH 33/US 12 WB Ramps
(43.51445, -89.78288)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010
(unincorporated), WI
Sauk
United States
STH 33/US 12 EB Ramps
(43.51449, -89.78516)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2010
Cottage Grove, WI
Dane
United States
CTH N/I-94 WB Ramps
(43.11037, -89.19930)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011 Series of 3 roundabouts.
Cottage Grove, WI
Dane
United States
CTH N/I-94 EB Ramps
(43.10877, -89.19923)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011 Series of 3 roundabouts.
Oconto, WI
Oconto
United States
STH 22 (Charles St.)/US 41 NB Ramps
(44.89208, -87.89580)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2009 Opened October 7, 2009.
Oconto, WI
Oconto
United States
STH 22 (Charles St.)/US 41 SB Ramps
(44.89205, -87.90080)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2009 Opened October 7, 2009.
Hudson, WI
Saint Croix
United States
Hanley Rd./STH 35 NB Ramps
(44.94889, -92.69390)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2005 Right-turn bypass lane. Opened October 21, 2005.
Hudson, WI
Saint Croix
United States
Hanley Rd./STH 35 SB Ramps
(44.94890, -92.69675)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2005 Right-turn bypass lane. Opened October 21, 2005.
Milton, WI
Rock
United States
STH 59/STH 26 EB Ramps
(42.76903, -88.92298)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2009 Opened October 2009.
Milton, WI
Rock
United States
STH 59/STH 26 WB Ramps
(42.76911, -88.92484)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2009 Opened October 2009.
Beloit, WI
Rock
United States
E Hart Rd./I-43 NB Ramps
(42.53960, -88.94841)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Opened October 2009. Series of 3 roundabouts. Right turn bypass lane.
Beloit, WI
Rock
United States
E Hart Rd./I-43 SB Ramps
(42.54142, -88.94933)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Opened October 2009. Series of 3 roundabouts. Right turn bypass lane.
(unincorporated), WI
Sauk
United States
CTH BD (Fern Dell Rd.)/US 12 EB Ramps
(43.55774, -89.77940)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2010 Series of 4 roundabouts.
(unincorporated), WI
Sauk
United States
CTH BD (Fern Dell Rd.)/US 12 WB Ramps
(43.55867, -89.78077)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2010 Series of 4 roundabouts.
Oregon, WI
Dane
United States
STH 138/US 14 WB Ramps
(42.91764, -89.36607)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011
Oregon, WI
Dane
United States
STH 138/US 14 EB Ramps
(42.91774, -89.36817)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011
Oregon, WI
Dane
United States
CTH MM/US 14 EB Ramps
(42.95128, -89.37859)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2012 Series of 3 roundabouts.
Oregon, WI
Dane
United States
CTH MM/US 14 WB Ramps
(42.95272, -89.37769)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2012 Series of 3 roundabouts.
Oshkosh, WI
Winnebago
United States
STH 21 (Omro Rd.)/US 41 SB Ramps
(44.03272, -88.58319)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (3+ Lane)
2012 Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts.
Oshkosh, WI
Winnebago
United States
STH 21 (Omro Rd.)/US 41 NB Ramps
(44.03271, -88.58178)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (3+ Lane)
2012 Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts.
Roberts, WI
Saint Croix
United States
STH 65/I-94 EB Ramps
(44.95862, -92.55999)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2013 Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed.
Roberts, WI
Saint Croix
United States
STH 65/I-94 WB Ramps
(44.96036, -92.55952)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2013 Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed.
Jackson, WI
Washington
United States
STH 60/US 45 NB Ramps
(43.32441, -88.18568)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2012 Opened November 2012.
Jackson, WI
Washington
United States
STH 60/US 45 SB Ramps
(43.32437, -88.18747)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2012 Opened November 2012.
Janesville, WI
Rock
United States
N Harmony Town Hall Rd./STH 26 EB Ramps
(42.75151, -88.95509)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2012
Janesville, WI
Rock
United States
N Harmony Town Hall Rd./STH 26 WB Ramps
(42.75172, -88.95537)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2012
Cottage Grove, MN
Washington
United States
Jamaica Ave./US 10-US 61 EB Ramps/W Point Douglas Rd.
(44.81452, -92.93504)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2007
Cottage Grove, MN
Washington
United States
Jamaica Ave./US 10-US 61 WB Ramps
(44.81586, -92.93379)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2007
Prescott, AZ
Yavapai
United States
Grande Dame Pkwy./SR 89A EB Ramps
(34.63499, -112.39830)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011
Prescott, AZ
Yavapai
United States
Grande Dame Pkwy./SR 89A WB Ramps
(34.63643, -112.39710)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2011
Mesa, AZ
Maricopa
United States
E McKellips Rd./Loop 202 SB Ramps
(33.45145, -111.67100)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2007
Mesa, AZ
Maricopa
United States
E McKellips Rd./Loop 202 NB Ramps
(33.45142, -111.66850)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2007
Edwards, CO
Eagle
United States
Edwards Access Rd./Beard Creek Rd./I-70 WB Ramps
(39.64991, -106.58720)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2010
Edwards, CO
Eagle
United States
Edwards Access Rd./I-70 EB Ramps
(39.64891, -106.58780)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2010
Avoca Borough, PA
Luzerne
United States
William St./I-81 SB Ramps
(41.33570, -75.73790)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2015
Avoca Borough, PA
Luzerne
United States
SR 315/I-81 SB Ramps
(41.33380, -75.73930)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2016 Previously controlled by yield
Avoca Borough, PA
Luzerne
United States
SR 315/I-81 NB Ramps/Navy Way Rd.
(41.33429, -75.73450)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2015 Previously controlled by yield. Fifth leg is departure only to I-81 NB on-ramp.
Moon Township, PA
Allegheny
United States
SR 3070/Resurrection Rd./I-376 SB Ramps
(40.48070, -80.20240)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011 Previously controlled by two-way stop
Warrensburg, MO
Johnson
United States
SR 13/US 50 WB Ramps
(38.77480, -93.68554)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011
Warrensburg, MO
Johnson
United States
SR 13/US 50 EB Ramps
(38.77151, -93.68568)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011
Carmel, IN
Hamilton Co.
United States
Clay Terrace Blvd./Circle Dr./Rangeline Rd./US 31 SB Off-Ramp
(39.99264, -86.12840)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2012
Carmel, IN
Hamilton Co.
United States
E Main St./Keystone Pkwy. SB Ramps
(39.97844, -86.11319)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Multilane (2 Lane)
2009 Year Completed estimated (2008-2010).