City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Northfield,
MN Rice Co. United States |
STH 246 (Division St. S) / Jefferson Pkwy. (44.44068, -93.16070) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Pedestrian tunnels under all four legs. https://www.ci.northfield.mn.us/1070/Highway-246-and-Jefferson-Parkway-Inters |
Buffalo,
MN Wright Co. United States |
STH 25 (Lake Blvd. S) / Settlers Pkwy. (45.16208, -93.86793) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.5799 |
Other (At-Grade) Single-Lane |
2015 | https://northwrightcounty.today/2015/04/highway-25-reconstruction-creates-havoc-in-buffalo/ ICD estimated from Google Maps linework. |
Mayer,
MN Carver Co. United States |
STH 25 (Mayer Blvd.) / 7th St. / 62nd St. (44.89120, -93.88554) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Skewed intersection. https://www.hometownsource.com/sun_patriot/mayer-premieres-new-roundabout-on-hwy-25/article_fdc7a910-4598-58ad-a60c-967e9892573b.html |
Portland,
WI Monroe Co. United States |
STH 27 / STH 33 (43.74201, -90.79387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2016 | |
Sheboygan Falls,
WI Sheboygan Co. United States |
STH 28 / STH 32 (43.71747, -87.81612) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1180 |
Other (At-Grade) Single-Lane |
2006 | Opened September 2006. High speed approach roadways. ICD estimated from Google Maps linework. |
Waconia,
MN Carver Co. United States |
STH 284 / Sparrow Rd. (44.83273, -93.78841) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.7262 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Village of Belleview,
WI Brown Co. United States |
STH 29 (Kewaunee Rd.) / S Huron Rd. / Cottage Rd. (44.44412, -87.91760) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3168 |
Other (At-Grade) Single-Lane |
2019 | ICD estimated from Google Maps linework. |
Alexandria,
MN Douglas Co. United States |
STH 29 / CR 28 / CR 87 (45.83127, -95.38801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1054 |
Other (At-Grade) Single-Lane |
2015 | Merge-type right-turn bypass lanes on east and north legs. ICD estimated from Google Maps linework. |
River Falls,
WI Pierce Co. United States |
STH 29-STH 35 (Cemetary Rd.) / S Wasson Ln. / 945th St. (44.84085, -92.60852) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 42.3430 |
Other (At-Grade) Single-Lane |
2006 | Opened October 25, 2006. ICD estimated from Google Maps linework. |
River Falls,
WI Pierce Co. United States |
STH 29-STH 35 (Cemetary Rd.) / STH 65 (44.84100, -92.60223) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.5772 |
Other (At-Grade) Multilane (2 Lane) |
2010 | Opened July 2010. ICD estimated from Google Maps linework. |
Farmington,
MN Dakota Co. United States |
STH 3 (Chippendale Ave.) / 195th St. W / 190th St. W (44.67382, -93.13663) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5204 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Inver Grove Heights,
MN Dakota Co. United States |
STH 3 / Amana Trl. (44.83743, -93.08530) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.8048 |
Other (At-Grade) Multilane (2 Lane) |
2010 | ICD estimated from Google Maps linework. |
Oronoco,
MN Olmsted Co. United States |
STH 31 / Wazuweeta Rd. (44.18054, -92.58227) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.5385 |
Other (At-Grade) Multilane (2 Lane) |
2014 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH B (44.15364, -87.66055) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.4174 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH Q (44.15357, -87.67864) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7037 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
(unincorporated),
WI Manitowoc Co. United States |
STH 310 / CTH R (44.15350, -87.70831) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7037 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. High-speed approach roadways. ICD estimated from Google Maps linework. |
Pulaski,
WI Brown Co. United States |
STH 32 (S Wisconsin St.) / CTH B (Crest Dr.) (44.65709, -88.22159) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.4779 |
Other (At-Grade) Single-Lane |
2011 | Opened September 6, 2011. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 32 / Happy Ln. (43.74707, -87.81985) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.2369 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Gillett,
WI Oconto Co. United States |
STH 32 / STH 22 / Daly Creek Rd. (44.89609, -88.24677) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.3787 |
Other (At-Grade) Single-Lane |
2012 | Rural, high-speed approaches. ICD estimated from Google Maps linework. |
Greenleaf,
WI Brown Co. United States |
STH 32-STH 57 (Greenleaf Rd.) / STH 96 (Day St.) (44.31343, -88.09599) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.3285 |
Other (At-Grade) Single-Lane |
2007 | Opened August 31, 2007. ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mayville,
WI Dodge Co. United States |
STH 33 / CR P (43.43082, -88.45031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.washingtoncountyinsider.com/dodge-county-highway-p-and-wi-33-roundabout-nears-completion-by-ron-naab/ |
Cloquet,
MN Carlton Co. United States |
STH 33 / I-35 Ramps / Frontage Rd. (46.69239, -92.45712) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.4067 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
STH 33 / US 12 EB Ramps (43.51449, -89.78516) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7080 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
STH 33 / US 12 WB Ramps (43.51445, -89.78288) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5741 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
STH 35 / CR E / STH 64 SB Ramps (45.05953, -92.78237) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.4002 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
St Joseph,
WI St. Croix Co. United States |
STH 35 / Main St. (45.05597, -92.79070) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.4031 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Onalaska,
WI La Crosse Co. United States |
STH 35 / Mason St. (43.90999, -91.24578) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.3007 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Onalaska,
WI La Crosse Co. United States |
STH 35 / Riders Club Rd. / Sunset Vista Rd. (43.90711, -91.24497) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.0236 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Siren, Village of,
WI Burnett Co. United States |
STH 35 / STH 70 (45.81636, -92.36347) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.1060 |
Other (At-Grade) Multilane (2 Lane) |
2015 | ICD estimated from Google Maps linework. |
Caledonia,
WI Racine Co. United States |
STH 38 / CTH K (Northwestern Ave.) (42.75957, -87.86417) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.9524 |
Other (At-Grade) Multilane (2 Lane) |
2007 | Opened November 2007. Right-turn bypass lane. ICD estimated from Google Maps linework. |
Sevastopol,
WI Door Co. United States |
STH 4 / STH 57 / Egg Harbor Rd. (44.85354, -87.34650) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1138 |
Other (At-Grade) Multilane (2 Lane) |
2016 | https://www.greenbaypressgazette.com/story/news/local/door-co/news/2016/06/24/door-countys-first-roundabout-opens/86338626/ ICD estimated from Google Maps linework. |
Chaska,
MN Carver Co. United States |
STH 41 (N Chestnut St.-Hazeltine Blvd.) / Lyman Blvd. (44.84905, -93.59701) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.swnewsmedia.com/chaska_herald/news/local/highway-41-to-reopen-this-weekend-with-new-roundabout-at-lyman-boulevard/article_c9bc706b-49d8-5a8c-8286-e7b9d6127258.html |
Eyota,
MN Olmsted Co. United States |
STH 42 / CSAH 9 (44.02093, -92.24900) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2018 | |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH JJ (43.81919, -87.79837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3314 |
Other (At-Grade) Single-Lane |
2009 | High-speed approach roadways. Opened October 2009. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / CTH Y (43.80647, -87.78098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9247 |
Other (At-Grade) Multilane (2 Lane) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / I-43 NB Ramps (43.79261, -87.76325) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0714 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2007 | Opened November 2007. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / I-43 SB Ramps (43.79406, -87.76523) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9673 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2007 | Opened November 2007. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 ICD estimated from Google Maps linework. |
Manitowoc,
WI Manitowoc Co. United States |
STH 42 / Maritime Dr. / Waldo Blvd. (44.10825, -87.64308) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.4448 |
Other (At-Grade) Multilane (2 Lane) |
2019 | Completed November 8, 2019. https://projects.511wi.gov/waldo/full-project-overview/ ICD estimated from Google Maps linework. |
Sturgeon Bay,
WI Door Co. United States |
STH 42 / Michigan St. (44.83499, -87.34712) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.8168 |
Other (At-Grade) Multilane (2 Lane) |
2016 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.829603204967256%2C-87.35688177363386&z=12 ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / Vanguard Dr. (Walmart entrance) (43.79655, -87.76846) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.5517 |
Other (At-Grade) Multilane (2 Lane) |
2007 | Opened November 2007. Roundabout serves Wal-mart retail center. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 Functional Class: Arterial ICD estimated from Google Maps linework. |
Keshena,
WI Menominee Co. United States |
STH 47-STH 55 / Standing Pines Dr. (44.85970, -88.62769) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 26.2441 |
Other (At-Grade) Multilane (2 Lane) |
2018 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.859088195652475%2C-88.62733226609475&z=17 ICD estimated from Google Maps linework. |
Cologne,
MN Carver Co. United States |
STH 5 / Orchard Rd. (44.82925, -93.82348) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2017 | Rural. Year Completed estimated (2017-2018). |
Lake Geneva,
WI Walworth Co. United States |
STH 50 / US 12 EB Ramps (42.59368, -88.41081) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.9954 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
Lake Geneva,
WI Walworth Co. United States |
STH 50 / US 12 WB Ramps (42.59455, -88.40682) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.6181 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
STH 53 / Old Town Hall Rd. / Scully Rd. (44.76384, -91.41872) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.4875 |
Other (At-Grade) Multilane (2 Lane) |
2008 | Opened October 2008. ICD estimated from Google Maps linework. |
Wisconsin Rapids,
WI Wood Co. United States |
STH 54 (2nd Ave.) / Gaynor Ave. / 17th Ave. (44.38025, -89.84447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.3874 |
Other (At-Grade) Multilane (2 Lane) |
2004 | Opened September 2004. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
STH 54 (W Mason St.) / CTH J (Seminary Rd.) (44.50105, -88.19372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7030 |
Other (At-Grade) Single-Lane |
2011 | Opened November 2011. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Harrison,
WI Calumet Co. United States |
STH 55 (Crooks Ave.-Friendship Dr.) / CTH KK (Calumet St.) (44.24297, -88.27441) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.3469 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / Gertrude St. / Maloney Rd. (44.29752, -88.27006) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0145 |
Other (At-Grade) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / Hyland Ave. (44.29221, -88.26390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.6150 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / I-41 NB Ramps (44.29871, -88.27147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.1587 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / I-41 SB Ramps (44.30008, -88.27294) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.4315 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / CTH M (42.76886, -88.91364) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.5632 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / E Richardson Springs Rd. / N Goede Rd. (42.83490, -89.02549) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.3008 |
Other (At-Grade) Single-Lane |
2016 | Previously had I-39 NB Ramps attached; these have been relocated to new roundabout to the west of this roundabout. ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / I-39 NB Ramps (42.83577, -89.02705) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.5420 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Fulton,
WI Rock Co. United States |
STH 59 / I-39 SB Ramps (42.83635, -89.02979) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.4238 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 EB Ramps (42.76903, -88.92298) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.3166 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 WB Ramps (42.76911, -88.92484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.8236 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / CTH G (Division Rd.) (43.32329, -88.12235) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.0990 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Rubicon,
WI Dodge Co. United States |
STH 60 / CTH P (43.32538, -88.45889) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.5730 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Wanamingo,
MN Goodhue Co. United States |
STH 60 / STH 57 (Main St.) (44.29785, -92.79077) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://kdhlradio.com/wanamingo-roundabout-opens-tomorrow-morning/ |
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Merrill,
WI Lincoln Co. United States |
STH 64 (1st St. E) / N Center Ave. (45.18173, -89.68332) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5152 |
Other (At-Grade) Single-Lane |
2010 | Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Marinette,
WI Marinette Co. United States |
STH 64 (Hall Ave.) / STH 180 / CTH T (45.09968, -87.66032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.8788 |
Other (At-Grade) Single-Lane |
2010 | Opened November 17, 2010. ICD estimated from Google Maps linework. |
Pound, Village of,
WI Marinette Co. United States |
STH 64 / US 141 NB Ramps (45.10885, -88.01804) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.8889 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Pound, Village of,
WI Marinette Co. United States |
STH 64 / US 141 SB Ramps (45.10962, -88.02036) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 37.0876 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Kiel,
WI Manitowoc Co. United States |
STH 67 / CTH AA (E Park Ave.-Rockville Rd.) (43.92072, -88.02247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.4329 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Kiel,
WI Manitowoc Co. United States |
STH 67-STH 32 / STH 57 (43.90986, -88.02251) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.0446 |
Other (At-Grade) Multilane (2 Lane) |
2009 | Opened November 13, 2009. Functional Class: Arterial ICD estimated from Google Maps linework. |
(unincorporated),
MN Carver Co. United States |
STH 7 / CTH 10 (44.90543, -93.81859) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.0628 |
Other (At-Grade) Single-Lane |
2008 | Rural. ICD estimated from Google Maps linework. |
(unincorporated),
MN Carver Co. United States |
STH 7 / STH 25 (44.90572, -93.86993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.9839 |
Other (At-Grade) Single-Lane |
2009 | Rural. ICD estimated from Google Maps linework. |
Chisholm,
MN St. Louis Co. United States |
STH 73 / Iron World Rd. (47.48252, -92.89623) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0430 |
Other (At-Grade) Single-Lane |
2017 | https://www.duluthnewstribune.com/news/4344903-new-chisholm-roundabout-open. ICD estimated from Google Maps linework. |
Moose Lake,
MN Carlton Co. United States |
STH 73 / Moose Lake Rd. (46.43462, -92.76169) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.7475 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Lannon,
WI Waukesha Co. United States |
STH 74 (Main St.) / CTH V (Townline Dr.) / McLaughlin Rd. (43.13902, -88.18408) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.3459 |
Other (At-Grade) Multilane (2 Lane) |
2008 | Opened November 15, 2008. ICD estimated from Google Maps linework. |
(unincorporated),
WI Outagamie Co. United States |
STH 76 / CTH O (44.35172, -88.53697) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.1389 |
Other (At-Grade) Single-Lane |
2010 | Opened September 24, 2010. High-speed approach roadways. ICD estimated from Google Maps linework. |
Mukwonago,
WI Waukesha Co. United States |
STH 83 / CTH I (River Rd.) (42.92252, -88.34597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.3560 |
Other (At-Grade) Multilane (2 Lane) |
2011 | Opened October 23, 2011. ICD estimated from Google Maps linework. |
Genesee,
WI Waukesha Co. United States |
STH 83 / CTH X (Saylesville Rd.) / Fields Crossing Dr. (42.93302, -88.34619) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.1073 |
Other (At-Grade) Single-Lane |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Genesee,
WI Waukesha Co. United States |
STH 83 / STH 59 (Genesee Rd.) (42.95798, -88.36010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.4592 |
Other (At-Grade) Single-Lane |
2011 | Opened October 7, 2011. ICD estimated from Google Maps linework. |
Genesee,
WI Waukesha Co. United States |
STH 83 / Sunset Dr. (42.98855, -88.38001) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.4401 |
Other (At-Grade) Single-Lane |
2015 | Yield-controlled right-turn bypass lane on north leg. ICD estimated from Google Maps linework. |
Princeton,
MN Mille Lacs Co. United States |
STH 95 / 21st Ave. N (CR 39) (45.57682, -93.60428) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 44.3066 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Grant,
MN Washington Co. United States |
STH 96 (Dellwood Rd.) / Manning Ave. (45.07956, -92.86320) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0106 |
Other (At-Grade) Single-Lane |
2016 | Right-turn-only lane on south leg. http://www.startribune.com/are-roundabouts-really-safer-than-traditional-intersections/561251111/ ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
STH 96 (High St.) / Turner St. (44.32438, -88.16021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.5944 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Gothenburg,
Vastra Gotaland County Gothenburg Sweden |
Stigbergsliden / Johannesplatsen (57.69915, 11.94049) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 31.9104 |
Other (At-Grade) Single-Lane |
Tram through central island. ICD estimated from Google Maps linework. | |
Burnaby,
BC Greater Vancouver Canada |
Still Creek Dr. / Eastbrook Pkwy. (49.26183, -123.00155) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2019 | https://www.allroadsconstruction.com/vancouver-area-road-building-asphalt-paving-milling-projects/city-of-burnaby-still-creek-drive-at-eastbrook-parkway-roundabout |
New Milford,
CT Litchfield Co. United States |
Still River Dr. / Pickett District Rd. / Lanesville Rd. (41.54029, -73.41615) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2018 | |
(unincorporated),
FL Hillsborough Co. United States |
Still River Dr. / Still Creek Dr. (27.86976, -82.35546) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.3437 |
Other (At-Grade) Single-Lane |
2001 | ICD estimated from Google Maps linework. |
Plain City,
UT Weber Co. United States |
Stillcreek Pkwy. / 3020 N (41.31462, -112.06052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2006-2009). |
Orono,
ME Penobscot Co. United States |
Stillwater Ave. / Forest Ave. (44.89217, -68.70227) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.8442 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |