City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Menasha,
WI Winnebago Co. United States |
Racine Rd / US 10 Ramps (44.21780, -88.44526) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 52.2141 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2016 | ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
Racine Road Connector / US 10 WB Ramps (44.22103, -88.44994) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways 45.3638 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2017 | ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / CTH AP (Plank Rd.) (44.22174, -88.36319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0923 |
Other (At-Grade) Single-Lane |
2007 | Opened November 2007. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / Midway Rd. (44.22892, -88.36319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.2323 |
Other (At-Grade) Multilane (2 Lane) |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane) |
2011 | ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
Appleton Rd. / US 10 EB Ramps (44.23334, -88.42408) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.2101 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2016 | Yield-controlled right-turn bypass lane on west leg. ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
Appleton Rd. / US 10 WB Ramps (44.23458, -88.42393) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.6320 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2016 | Yield-controlled right-turn bypass lane on east leg. ICD estimated from Google Maps linework. |
Menasha,
WI Winnebago Co. United States |
CTH CB / Mutual Way (44.23560, -88.49555) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane) |
2018 | |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / CTH AP (Plank Rd.) (44.23572, -88.36309) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9297 |
Other (At-Grade) Multilane (2 Lane) |
2008 | ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH LP (Lake Park Rd.) / S Kensington Dr. (44.23956, -88.36281) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.0922 |
Other (At-Grade) Single-Lane |
2007 | Opened October 2007. ICD estimated from Google Maps linework. |
Harrison,
WI Calumet Co. United States |
STH 55 (Crooks Ave.-Friendship Dr.) / CTH KK (Calumet St.) (44.24297, -88.27441) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.3469 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Redmond,
OR Deschutes Co. United States |
Canal Blvd. / Canal Dr. / 27th St. / Wells Rd. (44.24421, -121.19900) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.7901 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Montpelier,
VT Washington Co. United States |
US 2 (E Montpelier Rd.) / US 302 (River St.) (44.24660, -72.54959) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 2 Driveways 35.0775 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
CTH N (S Washington St.) / Emons Rd. / Buchanan Rd. (44.25141, -88.32418) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.6527 |
Other (At-Grade) Single-Lane |
2007 | Opened August 2007. ICD estimated from Google Maps linework. |
Manistee,
MI Manistee Co. United States |
Lakeshore Dr. / Monroe St. / Cottage Ln. (44.25355, -86.33302) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 45.3388 |
Other (At-Grade) Single-Lane |
1992 | Before 1993. No splitter islands on east leg. ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
E John St. / E South River St. (44.25623, -88.38274) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 30.7947 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Buchanan,
WI Outagamie Co. United States |
E College Ave. / Debruin Rd. (44.25703, -88.29306) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 47.9023 |
Other (At-Grade) Multilane (2 Lane) |
2016 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
Eisenhower Dr. / Van Roy Rd. (44.25724, -88.34704) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.6374 |
Other (At-Grade) Multilane (2 Lane) |
2015 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Buchanan,
WI Outagamie Co. United States |
E College Ave. / Eisenhower Dr. (44.25832, -88.34698) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 58.1658 |
Other (At-Grade) Multilane (3+ Lane) |
2015 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
CTH CE (College Ave.) / CTH KK (Walter Ave.-E John St.) (44.25859, -88.38350) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2026 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Redmond,
OR Deschutes Co. United States |
SW Canal Blvd. / SW Pumice Ave. (44.26004, -121.18150) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Mini-roundabout |
2020 | https://ktvz.com/videos/2020/11/19/redmonds-first-mini-roundabout-draws-controversy/ |
Kimberly,
WI Outagamie Co. United States |
S Railroad St. / W Kennedy Ave. (44.26087, -88.33906) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 17.1068 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). ICD estimated from Google Maps linework. |
Odessa,
ON Lennox and Addington Canada |
CR 2 / CR 4 (44.26179, -76.77489) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.4898 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Montpelier,
VT Washington Co. United States |
Keck Circle (Main St. / Spring St.) (44.26283, -72.57178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.6594 |
Other (At-Grade) Single-Lane |
1995 | Main Street Middle School located one block NE of roundabout. ICD estimated from Google Maps linework. |
Nicollet,
MN Nicollet Co. United States |
461st Ave. / US 14 EB Ramps (44.26470, -94.19047) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Teardrop shape. Year Completed estimated (2016-2018). |
Nicollet,
MN Nicollet Co. United States |
461st Ave. / US 14 WB Ramps (44.26645, -94.19045) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Year Completed estimated (2016-2018). |
Greenville,
WI Outagamie Co. United States |
CTH CB / W Atlantis Dr. (44.26703, -88.50680) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane) |
2019 | |
Kingston,
ON Frontenac Canada |
Cataraqui Wood Dr. / Holden St. (44.26729, -76.58991) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 23.9470 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Kingston,
ON Frontenac Canada |
Cataraqui Woods Dr. / Woodhaven Dr. (44.26739, -76.59501) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 24.8022 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Dale,
WI Outagamie Co. United States |
US 45 / STH 96 (Wisconsin Rd.) (44.27234, -88.73946) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.0622 |
Other (At-Grade) Single-Lane |
2018 | date: https://www.whby.com/2018/04/15/roundabout-project-to-start-at-hwys-45-96/# ICD estimated from Google Maps linework. |
Kingston,
ON Frontenac Canada |
Centennial Dr. / Venture Dr. (44.27265, -76.55935) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.6137 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Zumbrota,
MN Goodhue Co. United States |
180th Ave. / County 10 Blvd. / US 52 EB Ramps (44.28087, -92.67098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Year Completed estimated (2015-2018). |
Grand Chute,
WI Outagamie Co. United States |
N Bluemound Dr. / Tri-Park Way (44.28158, -88.45652) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.0419 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Zumbrota,
MN Goodhue Co. United States |
180th Ave. / S Main St. / E 18th St. / US 52 WB Ramps (44.28223, -92.66933) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Year Completed estimated (2015-2018). |
Grand Chute,
WI Outagamie Co. United States |
N Bluemound Dr. / W Glenpark Dr. (44.28499, -88.45678) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.6196 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
CR CB / Greenville Dr. / Wally Way (44.28549, -88.50618) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4894 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
Prineville,
OR Crook Co. United States |
OR 126 / SW Tom McCall Rd. (44.28555, -120.88834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7340 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Greenville,
WI Outagamie Co. United States |
STH 15 / CTH CB (Greenville Dr.) (44.28721, -88.50600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.1525 |
Other (At-Grade) Multilane (2 Lane) |
2013 | Opened August 2013. ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
W Northland Ave. / N Richmond St. (44.28730, -88.41580) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7326 |
Other (At-Grade) Multilane (3+ Lane) |
2018 | Year Completed estimated (2017-2018). ICD estimated from Google Maps linework. |
Grand Chute,
WI Outagamie Co. United States |
Olde Casaloma Dr. / W Converters Dr. / N Victory Dr. (44.28936, -88.47671) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.1971 |
Other (At-Grade) Unknown |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / Hyland Ave. (44.29221, -88.26390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.6150 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Sisters,
OR Deschutes Co. United States |
US 20 / W Barclay Dr. / W McKinney Butte Rd. (44.29574, -121.55960) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.7417 |
Other (At-Grade) Multilane (2 Lane) |
2017 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / Gertrude St. / Maloney Rd. (44.29752, -88.27006) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0145 |
Other (At-Grade) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
Wanamingo,
MN Goodhue Co. United States |
STH 60 / STH 57 (Main St.) (44.29785, -92.79077) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://kdhlradio.com/wanamingo-roundabout-opens-tomorrow-morning/ |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / I-41 NB Ramps (44.29871, -88.27147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.1587 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Delanglade St.) / I-41 SB Ramps (44.30008, -88.27294) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.4315 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2018 | ICD estimated from Google Maps linework. |
Peterborough,
ON Peterborough Canada |
Parkhill Rd. / Brealey Dr. / Ackison Rd. (44.30094, -78.38307) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2020 | Replaced two T-intersections. https://www.mykawartha.com/news-story/10292278-get-ready-peterborough-the-parkhill-road-roundabout-is-open/ |
Appleton,
WI Outagamie Co. United States |
Evergreen Dr. / Providence Ln. (44.30159, -88.36140) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.6257 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
Evergreen Dr. / Lightning Dr. (44.30166, -88.36722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4804 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
Evergreen Dr. / French Rd. (44.30169, -88.35349) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0447 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
Evergreen Dr. / Gateway Dr. (44.30178, -88.37136) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4804 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 NB Ramps (44.30463, -88.24939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.6070 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 SB Ramps (44.30645, -88.24948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.8965 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
Augusta,
ME Kennebec Co. United States |
US 202 / Rte. 17 / Rte. 11 / Rte. 27 (44.31047, -69.77929) |
Rotary Existing |
Unknown Unknown |
5 Approaches 0 Driveways 71.7881 |
Other (At-Grade) Multilane (2 Lane) |
ICD estimated from Google Maps linework. | |
Greenleaf,
WI Brown Co. United States |
STH 32-STH 57 (Greenleaf Rd.) / STH 96 (Day St.) (44.31343, -88.09599) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.3285 |
Other (At-Grade) Single-Lane |
2007 | Opened August 31, 2007. ICD estimated from Google Maps linework. |
Augusta,
ME Kennebec Co. United States |
Cony Circle (Rte. 9 / Rte. 100 / Rte. 17 / Rte. 105) (44.31622, -69.76796) |
Roundabout Existing |
Unknown Unknown |
5 Approaches 0 Driveways 55.5448 |
Other (At-Grade) Multilane (2 Lane) |
2009 | Converted from old traffic circle to roundabout. Previously controlled by circle ICD estimated from Google Maps linework. |
New Ulm,
MN Brown Co. United States |
N Highland Ave. / Oak St. (44.31628, -94.48602) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 13.6726 |
Other (At-Grade) Mini-roundabout |
2019 | https://newulmeagle.com/16324/uncategorized/new-year-new-roundabout/ ICD estimated from Google Maps linework. |
Grand Chute,
WI Outagamie Co. United States |
E Edgewood Dr. / N Lightning Dr. (44.31650, -88.36852) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.31723974656583%2C-88.38383077985048&z=14. |
(unincorporated),
WI Outagamie Co. United States |
CTH A / CTH JJ (44.31701, -88.44591) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.1627 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Brookings,
SD Brookings Co. United States |
Jackrabbit Ave. / University Blvd. (44.31866, -96.77810) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.0160 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Brookings,
SD Brookings Co. United States |
Research Park Way / Miller Park Way (44.32074, -96.76604) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 37.5967 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2003-2009). ICD estimated from Google Maps linework. |
New Ulm,
MN Brown Co. United States |
US 14 / Front St. Connector (44.32395, -94.45755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2020). Replaced ramps of PARCLO AB interchange. https://www.isginc.com/portfolio/us-highway-14-roundabout |
Wrightstown,
WI Brown Co. United States |
STH 96 (High St.) / Turner St. (44.32438, -88.16021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.5944 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
New Ulm,
MN Brown Co. United States |
US 14 / Palmer Ave. (44.32630, -94.51347) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.4282 |
Other (At-Grade) Single-Lane |
2012 | High-speed approaches. ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
Broadway St. / Main St. (44.32745, -88.16800) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 51.2624 |
Other (At-Grade) Single-Lane |
2015 | At-grade rail crossing on north leg. ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
County Line Rd. / Golf Course Rd. / Broadway St. / Lock Rd. (44.32815, -88.19128) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.4268 |
Other (At-Grade) Single-Lane |
2015 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.327271862015316%2C-88.1974894025879&z=14 ICD estimated from Google Maps linework. |
Barrie,
ON Simcoe Canada |
Live Eight Way / Park Place Blvd. / (parking) (44.33760, -79.68131) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane) |
2011 | Year Completed estimated (2011-2013). |
Barrie,
ON Simcoe Canada |
N Village Way / Live Eight Way (44.34121, -79.68023) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2014 | |
Waterbury,
VT Washington Co. United States |
US 2 / VT 100 (44.34144, -72.75923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.1459 |
Other (At-Grade) Single-Lane |
2014 | Completion year estimated. ICD estimated from Google Maps linework. |
Waupaca,
WI Waupaca Co. United States |
STH 22 / STH 54 (Royalton St.) (44.35154, -89.03481) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.7229 |
Other (At-Grade) Multilane (2 Lane) |
2008 | Right turn bypass lane. Opened September 2008. ICD estimated from Google Maps linework. |
(unincorporated),
WI Outagamie Co. United States |
STH 76 / CTH O (44.35172, -88.53697) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.1389 |
Other (At-Grade) Single-Lane |
2010 | Opened September 24, 2010. High-speed approach roadways. ICD estimated from Google Maps linework. |
Augusta,
ME Kennebec Co. United States |
Rte 3 / I-95 NB Ramps (44.35353, -69.78083) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.1156 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2013 | ICD estimated from Google Maps linework. |
Augusta,
ME Kennebec Co. United States |
Rte 3 / I-95 SB Ramps / Old Belgrade Rd. (44.35796, -69.78470) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.1121 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2013 | ICD estimated from Google Maps linework. |
Lawrence,
WI Brown Co. United States |
Lost Dauphin Rd. (CTH D) / Hickory Rd. (44.37573, -88.13582) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.37572660404294%2C-88.13766541271974&z=17. |
Wisconsin Rapids,
WI Wood Co. United States |
STH 54 (2nd Ave.) / Gaynor Ave. / 17th Ave. (44.38025, -89.84447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.3874 |
Other (At-Grade) Multilane (2 Lane) |
2004 | Opened September 2004. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Wisconsin Rapids,
WI Wood Co. United States |
Baker St. / Market St. / 1st St. N (44.39281, -89.82266) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.7394 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Arenzano,
Liguria Genoa Italy |
Via di Francia / Via Don Minzoni (44.40047, 8.68009) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane) |
||
Mesick,
MI Wexford Co. United States |
W M-115 Hwy. / N 13 Rd. (44.40366, -85.69952) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.1033 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Blue Hill,
ME Hancock Co. United States |
Beech Hill Rd. / Mines Rd. / Tenney Hill / South St. (44.40825, -68.59763) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4214 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Barrie,
ON Simcoe Canada |
Governors Dr. / Ring Rd. (44.41354, -79.66887) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Multilane (2 Lane) |
2011 | East and west legs have painted splitter islands. Concentric striped circulatory roadway. Year Completed estimated (2009-2013). |
Ledgeview,
WI Brown Co. United States |
Heritage Rd. / Monroe Rd. (44.41810, -88.02942) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.3300 |
Other (At-Grade) Multilane (2 Lane) |
2015 | ICD estimated from Google Maps linework. |
Genoa,
Liguria Genoa Italy |
Via degli Stivatori / Via dei Rallisti (44.42614, 8.76779) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
||
De Pere,
WI Brown Co. United States |
Monroe Rd. / Ledgeview Rd. / Oak Ridge Cir. (44.42652, -88.02331) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.2642 |
Other (At-Grade) Multilane (2 Lane) |
2015 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Heritage Rd. / S Broadway St. (44.42806, -88.05654) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0285 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lane on east leg. Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Greenleaf Rd. / Heritage Rd. (44.42854, -88.06892) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2333 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Northfield,
MN Rice Co. United States |
CSAH 46 (Bagley Ave.) / CSAH 1 (Millersburg Blvd.) (44.42858, -93.30185) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.3804 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / PDQ Dr. / Mid Valley Dr. (44.43032, -88.11939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9379 |
Other (At-Grade) Single-Lane |
2010 | Series of 6 roundabouts. Opened November 22, 2010. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.7308 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2011 | Series of 6 roundabouts. Opened September 2011. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Suburban Dr. (44.43055, -88.08604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4090 |
Other (At-Grade) Single-Lane |
2004 | One of two roundabouts on an arterial street that separates a residential neighborhood from a business park. Many trucks traveling to and from the business park pass through this intersection each day, and the roundabout serves as an attractive entrance to the neighborhood and park. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / S 9th St. / W Matthew Dr. (44.43063, -88.09529) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8205 |
Other (At-Grade) Single-Lane |
2004 | Second of two roundabouts on an arterial street separating residential neighborhood from a business park. Many trucks pass through this intersection each day. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.3491 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2011 | Series of 6 roundabouts. Opened September 2011. Circular central island. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Lawrence Dr. (44.43083, -88.10675) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7605 |
Other (At-Grade) Multilane (2 Lane) |
2010 | Series of 6 roundabouts. Opened November 2, 2010. ICD estimated from Google Maps linework. |
Genoa,
Liguria Genoa Italy |
Via Borzoli / (unknown) (44.43204, 8.86229) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Ledgeview,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / Monroe Rd. (CTH GV) (44.43271, -88.01631) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0532 |
Other (At-Grade) Multilane (2 Lane) |
2009 | Opened October 15, 2009. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / East River Dr. (44.43684, -88.02830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7306 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Swan roundabout and is located in a residential area. Roundabout is near East De Pere Middle School and De Pere High School. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / Swan Rd. (44.43908, -88.03475) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0241 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Libal roundabout and is surrounded by businesses and East De Pere Middle School. Roundabout serves as the entrance to a medical clinic. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Chicago St. (CTH G) / Libal St. (44.44026, -88.03812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8455 |
Other (At-Grade) Single-Lane |
2001 | Roundabout surrounded by homes, businesses, East De Pere Middle School, and De Pere High School. Roundabout serves as main entrance to the high school. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
Northfield,
MN Rice Co. United States |
STH 246 (Division St. S) / Jefferson Pkwy. (44.44068, -93.16070) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Pedestrian tunnels under all four legs. https://www.ci.northfield.mn.us/1070/Highway-246-and-Jefferson-Parkway-Inters |
Williston,
VT Chittenden Co. United States |
Maple Tree Pl. / Sycamore Dr. (44.44349, -73.10966) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.1697 |
Other (At-Grade) Single-Lane |
2001 | Completed November 2001. Major shopping area, road part of the planned ring road around Taft Corner. Functional Class: Local ICD estimated from Google Maps linework. |