8197 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways Functional Class /
LaneType
Year Completed Comments
Málaga, Andalusia
Málaga
Spain
Calle Navarro Ledesma/Calle Alicia Alonso
(36.72251, -4.48685)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
Málaga, Andalusia
Málaga
Spain
Calle Navarro Ledesma/Calle Mencia Calderon
(36.72364, -4.48375)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
Málaga, Andalusia
Málaga
Spain
Avenida Pintor Rodrigo Vivar/Avenida Escritor Antonio Soler/Avenida Maria Victoria Atencia
(36.72463, -4.48776)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
Málaga, Andalusia
Málaga
Spain
Calle María Victoria Atencia/Calle Jorge E. Loring Oyarzabal
(36.72569, -4.48491)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
Málaga, Andalusia
Málaga
Spain
Calle María Victoria Atencia, 1
(36.72666, -4.48015)
Roundabout
Existing
Other
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
One stop-controlled entry.
Málaga, Andalusia
Málaga
Spain
Calle Navarro Ledesma/Calle Andromeda
(36.72434, -4.47604)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
Málaga, Andalusia
Málaga
Spain
Calle Navarro Ledesma/Calle Eolo/Calle Escritora Josefina Aldecoa
(36.72430, -4.47456)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
Málaga, Andalusia
Málaga
Spain
Calle Navarro Ledesma/Avenida José Ribera
(36.72428, -4.47310)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
Málaga, Andalusia
Málaga
Spain
Avenida José Ribera/Calle de Carmen Laforet
(36.72282, -4.47270)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
Málaga, Andalusia
Málaga
Spain
Avenida Pintor Manuel Barbadillo/Calle Navarro Ledesma
(36.72456, -4.47083)
Signalized Roundabout/Circle
Existing
Signal
Unknown
4 Approaches
0 Driveways
Other
Multilane (3+ Lane)
Málaga, Andalusia
Málaga
Spain
Avenida del Editor Anget Cafferena/Calle Juan Frances Bosca/Avenida Pintor Manuel Barbadillo
(36.72647, -4.47164)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (3+ Lane)
Málaga, Andalusia
Málaga
Spain
Avenida de Lope de Vega/Avenida Pintor Manuel Barbadillo
(36.73068, -4.46846)
Signalized Roundabout/Circle
Existing
Signal
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
South Bend, IN
St. Joseph Co.
United States
W Angela Blvd./Riverside Dr.
(41.69334, -86.26413)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2011
Sioux Falls, SD
Minnehaha
United States
Career Ave./University Center entrance
(43.59985, -96.78073)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Unknown
2008
Warrenton, VA
Fauquier Co.
United States
Vint Hill Pkwy./Watson Ct./Farm Station Rd.
(38.74607, -77.67465)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Single-Lane
2017 Fauquier County constructed a roundabout as part of the Vint Hill small area plan and new roadway alignments for Vint Hill Parkway/Watson & Weeks Roads.
Covington, LA
St. Tammany Par.
United States
LA-1085/Ochsner Blvd./Francis Rd.
(30.46681, -90.15044)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2014 Year Completed estimated (2013-2014).
Fairview, CA
Alameda Co.
United States
Fairview Ave./Five Canyons Pkwy./East Ave. (Star Ridge Rd.)
(37.67520, -122.03220)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
1998 https://www.sfgate.com/bayarea/article/COMMUTER-CHRONICLES-IN-A-ROUNDABOUT-WAY-The-2975842.php
Olathe, KS
Johnson Co.
United States
N Hedge Ln./N Spruce St.
(38.88567, -94.85044)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2015 Replaced older roundabout when new roadway (Hedge Ln.) added.
Olathe, KS
Johnson
United States
Indian Wells Dr./Spruce St.
(38.88568, -94.85022)
Roundabout
Removed
All-Way Yield
None
2 Approaches
0 Driveways
Other
Single-Lane
2002 Replaced in 2015 with new roundabout in location shifted slightly to west.
Kings Beach, CA
Placer Co.
United States
N Lake Blvd./Coon St.
(39.23589, -120.02207)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2014
Kings Beach, CA
Placer Co.
United States
N Lake Blvd./Bear Ave./Brook Ave./(beach parking)
(39.23681, -120.02465)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2014
Winters, CA
Yolo Co.
United States
SR 128 (E Grant Ave.)/Walnut Ln./(parking lot)
(38.52629, -121.96733)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2018 Year Completed estimated (2017-2018).
Lakeport, CA
Lake Co.
United States
Todd Rd./Parallel Dr.
(39.03226, -122.92521)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
1998 Year Completed estimated (1993-2003).
Kansas City, MO
Jackson Co.
United States
Ward Pkwy./W Meyer Blvd./W 63rd Terr./W 64th St.
(39.01282, -94.60234)
Other
Existing
Other
Unknown
5 Approaches
0 Driveways
Other
Multilane (3+ Lane)
Fountain in central island. No control on Ward Pkwy; stop signs on other approaches.
North Liberty, IA
Johnson Co.
United States
North Liberty Rd. NE/Dubuque St. NE
(41.73359, -91.57568)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2016 https://northlibertyiowa.org/2016/09/26/trail-closure-on-dubuque-street-trail-roundabout-nearing-completion/#
West Friendship, MD
Howard Co.
United States
MD 32 Northbound Ramps & Burntwoods Rd & Andrea Dr
(39.27136, -76.98301)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2008
Glenelg, MD
Howard Co.
United States
Burntwoods Rd & Ten Oaks Rd
(39.27315, -76.98805)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2008
Glenelg, MD
Howard Co.
United States
MD 32 & Ten Oaks Rd & Pfefferkorn Rd
(39.27612, -76.98641)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2008
Glenwood, MD
Howard Co.
United States
Burntwoods Rd & Sharp Rd
(39.27686, -77.00454)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2006
Columbia, MO
Boone
United States
Business Loop 70/I-70 WB Ramps/Creasy Springs Rd.
(38.96655, -92.35241)
Roundabout
Removed
All-Way Yield
Unknown
5 Approaches
0 Driveways
Freeway Ramps
Single-Lane
1996 First roundabout in Missouri by Missouri DOT. Originally built in 1996 per article: https://www.voxmagazine.com/news/all-about-roundabouts-in-columbia/article_93724b2b-8b20-5228-b4de-315c5c3d2004.html. Replaced with roundabout to immediate west.
Columbia, MO
Boone Co.
United States
Business Loop 70/I-70 WB On-Ramp
(38.96647, -92.35328)
Roundabout
Existing
All-Way Yield
Unknown
2 Approaches
1 Driveways
Freeway Ramps
Multilane (2 Lane)
2016 Replaced older roundabout that was built in 1996.
Saint-Jérôme, QC
La Rivière-du-Nord Regional County Municipality
Canada
Rue Lamontagne/Rue de Montigne O
(45.77599, -74.05012)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Single-Lane
Year Completed unknown (before 2009).
St-Jean-Sur-Richelieu, QC
Le Haut-Richelieu Regional County Municipality
Canada
Rue des Colibris/(parc access)
(45.35948, -73.28314)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Other
Single-Lane
2012 Year Completed estimated (2011-2013).
Conway, NH
Carroll Co.
United States
North-South Rd/(Walmart parking)
(44.01823, -71.10901)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2014 https://www.nh.gov/dot/org/projectdevelopment/highwaydesign/roundabouts/documents/nh_roundabouts_list_details_web_version.pdf
Lancaster, NH
Coos Co.
United States
US 2 (Main St.)/US 3
(44.49690, -71.57632)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2016 https://www.nh.gov/dot/org/projectdevelopment/highwaydesign/roundabouts/documents/nh_roundabouts_list_details_web_version.pdf
Warner, NH
Merrimack Co.
United States
Rte 103/(shopping center parking)/(service station)
(43.28882, -71.83340)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2016 https://www.nh.gov/dot/org/projectdevelopment/highwaydesign/roundabouts/documents/nh_roundabouts_list_details_web_version.pdf
Sherbrooke, QC
Sherbrooke
Canada
Boulevard Industriel/Boulevard de Portland/Boulevard René-Lévesque
(45.39569, -71.98464)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2016 Grade-separated path for pedestrians and bicyclists: https://translate.google.com/translate?hl=en&sl=fr&u=https://www.ville.sherbrooke.qc.ca/salle-de-presse/actualites/dossiers-municipaux/prolongement-du-boulevard-de-portland/ Connected to Boulevard René-Lévesque in 2018: https://translate.google.com/translate?hl=en&sl=fr&u=https://www.ville.sherbrooke.qc.ca/salle-de-presse/actualites/dossiers-municipaux/construction-du-boulevard-rene-levesque
Sherbrooke, QC
Sherbrooke
Canada
Rue Henri-Labonne/Boulevard René-Lévesque
(45.37523, -71.99868)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Other
Single-Lane
2018 https://translate.google.com/translate?hl=en&sl=fr&u=https://www.ville.sherbrooke.qc.ca/salle-de-presse/actualites/dossiers-municipaux/construction-du-boulevard-rene-levesque/ shows 2 other roundabouts on Boulevard René-Lévesque.
Macon, GA
Bibb Co.
United States
Oglethorpe St./College St.
(32.83378, -83.64483)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2014 Year Completed estimated (2013-2015).
Concord, NH
Merrimack Co.
United States
Manor Rd./Abbott Rd.
(43.26455, -71.57352)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Single-Lane
2018 https://www.nh.gov/dot/org/projectdevelopment/highwaydesign/roundabouts/documents/nh_roundabouts_list_details_web_version.pdf
Pascagoula, MS
Jackson Co.
United States
Hospital Rd./Old Mobile Hwy.
(30.36849, -88.53333)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2017 http://cityofpascagoula.com/482/Hospital-Road-Improvements
Tallahassee, FL
Leon Co.
United States
Bannerman Rd./Beech Ridge Trl.
(30.56320, -84.21951)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2015 Year Completed estimated (2014-2015).
Tacoma, WA
Pierce Co.
United States
E 29th St./E 30th St./E 28th St.
(47.23811, -122.40505)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2018
Upper Allen Township, PA
Cumberland Co.
United States
W Lisburn Rd./Grantham Rd.
(40.16298, -76.99018)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
1 Driveways
Other
Single-Lane
2018 https://www.abc27.com/news/top-video/new-traffic-circle-opens-in-upper-allen_20181003215307/1495637846
Berthoud, CO
Larimer Co.
United States
N Berthoud Pkwy./Woodcock St.
(40.34689, -105.09527)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2017 Fourth approach stubbed. Year Completed estimated (2016-2017).
Cranberry Township, PA
Butler Co.
United States
N Boundary Rd./Marshall Rd.
(40.72428, -80.10002)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Single-Lane
2016
Gettysburg, PA
Adams Co.
United States
Lincoln Square (Chamberburg St./York St./Carlisle St./Baltimore St.)
(39.83092, -77.23112)
Other
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other
Single-Lane
Diagonal parking around circulatory roadway; pedestrian access to center island; no splitter islands.
Concord, VA
Campbell Co.
United States
Village Hwy./Doss Rd./Spring Mill Rd.
(37.33438, -78.98112)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2018 Year Completed estimated (2017-2019).
West Henderson, NV
Clark Co.
United States
Bicentennial Pkwy./Via Inspirada
(35.94042, -115.13329)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Other
Multilane (2 Lane)
2018 Peanut shape.
Sherbrooke, QC
Sherbrooke
Canada
Route 112/Autoroute 610
(45.42954, -71.82424)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Freeway Ramps
Single-Lane
2011 Free-flowing right-turn bypass lanes on all legs. Year Completed estimated (2010-2012).

Page 139 of 164