7370 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways Functional Class /
LaneType
Year Completed Comments
Kennebunk, ME
York
United States
Fletcher (Rte 35)/Storer St.
(43.39060, -70.54562)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2003 Completed Fall 2003. Legs at 6, 8, and 10 oclock, plus a driveway.
Epping, NH
Rockingham
United States
US 4/Rte. 125
(43.14910, -71.00666)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2003 Constructed November 2003 as part of new shopping mall.
Nashua, NH
Hillsborough
United States
Main St./Daniel Webster Hwy
(42.73883, -71.45838)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Unknown
2003 Located near Rivier College, 1/4 mile north of Exit 3 of the Everett Turnpike.
Colorado Springs, CO
El Paso
United States
Newport Rd./Vapor Trl.
(38.80787, -104.72680)
Roundabout
Existing
Unknown
Unknown
3 Approaches
0 Driveways
Other
Single-Lane
2002 Y-shaped intersection.
Colorado Springs, CO
El Paso
United States
Rockhurst Blvd./University Park Blvd.
(38.91005, -104.78980)
Roundabout
Existing
Unknown
Unknown
3 Approaches
0 Driveways
Other
Single-Lane
1998
Colorado Springs, CO
El Paso
United States
Rockhurst Blvd./Montebello Dr.
(38.90582, -104.78980)
Roundabout
Existing
Unknown
Unknown
4 Approaches
0 Driveways
Other
Single-Lane
2000
Colorado Springs, CO
El Paso
United States
Collegiate Dr./Michael Dr.
(38.89928, -104.78230)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2001
Colorado Springs, CO
El Paso
United States
Kettle Drum St./Antelope Ridge Dr.
(38.90673, -104.68530)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2006
Colorado Springs, CO
El Paso
United States
Carefree Cir./New Center Pl.
(38.87741, -104.71720)
Roundabout
Existing
Unknown
Unknown
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2003
Colorado Springs, CO
El Paso
United States
Cedar Creek View/(parking lot)
(38.85572, -104.72340)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2002
Colorado Springs, CO
El Paso
United States
Treeline View/Stately View
(38.87351, -104.86560)
Roundabout
Existing
Unknown
Unknown
3 Approaches
0 Driveways
Other
Single-Lane
2003
Spokane, WA
Spokane
United States
Crestline Rd./Lincoln St.
(47.72944, -117.37920)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2006 Opened September 2006.
Colorado Springs, CO
El Paso
United States
Brainard Dr./Squirreltail Dr.
(38.96376, -104.74410)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2000
Colorado Springs, CO
El Paso
United States
(parking lot #1)
(39.01388, -104.81080)
Roundabout
Removed
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2013 Originally built 2004. Removal date estimated (2011-2015).
Draper, UT
Salt Lake
United States
Vestry Rd./Rocky Mouth Ln.
(40.48996, -111.87390)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
1996
Orem, UT
Utah
United States
E 850 North/N Palisade Dr.
(40.31273, -111.66490)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2001
Acoma Indian Reservation, NM
McKinley
United States
SH 30/I-40 WB Ramps
(35.07505, -107.56110)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps
Unknown
2010 Series of 3 roundabouts
Greensboro, NC
Guilford
United States
Lake Jeanette Rd./Bass Chapel Rd./N. Elm St.
(36.14622, -79.81002)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2006 This location currently meets traffic signal warrants. We are installing the roundabout instead of a traffic signal. Previously controlled by stop sign Functional Class: Minor Arterial
Greenbelt, MD
Prince Georges
United States
Hanover Pkwy./Village Park Dr./Schrom Hills Community Park entrance
(38.98378, -76.87333)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
1998 Year Completed estimated (1994-2001).
Superior, CO
Boulder
United States
5th Ave./Center Dr.
(39.95764, -105.17190)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
1999 Serves Costco and Target as part of 750,000 square foot shopping center. Functional Class: Local
Princeton, NJ
Mercer
United States
Faculty Rd./Elm Dr.
(40.33888, -74.65523)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2001 This roundabout is on University owned roads open to the public. There is a second roundabout similar in dimensions upstream on Elm Drive. Close to an at-grade rail crossing. Previously controlled by one-way stop Functional Class: Collector
Portsmouth, VA
N/A
United States
Crawford St./Bart St.
(36.83202, -76.29770)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2007
Colorado Springs, CO
El Paso
United States
Chapel Hills Dr./Divot Trl.
(38.97569, -104.77560)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Multilane (2 Lane)
2002 Functional Class: Arterial
Boulder, CO
Boulder
United States
St. Johns St./New Haven Ct. (Hampton Circle)
(40.04742, -105.24740)
Roundabout
Existing
Unknown
Unknown
4 Approaches
0 Driveways
Other
Single-Lane
1997
Carson City, NV
Carson City
United States
5th St./Edmonds
(39.16090, -119.72790)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
1999 Suburban
Hinesville, GA
Liberty
United States
Washington Ave./Memorial Dr.
(31.84992, -81.59570)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2010
Brookfield, WI
Waukesha
United States
Barker Rd. (CTH Y)/North Ave. (CTH M)
(43.06136, -88.16629)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2010 Functional Class: Arterial
Lakewood, CO
Jefferson
United States
Allison Pkwy./Civic Center
(39.70906, -105.08630)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
Other
Single-Lane
1999
Lakewood, CO
Jefferson
United States
Arbutus Dr./W. 2nd Pl.
(39.71649, -105.14750)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2001 Functional Class: Collector
Coral Gables, FL
Miami-Dade
United States
Ponce de Leon Blvd./Greco Ave./Ruiz Ave.
(25.73047, -80.25832)
Roundabout
Existing
All-Way Yield
Unknown
6 Approaches
0 Driveways
Other
Multilane (2 Lane)
2002
Hilton Head, SC
Beaufort
United States
US 278/Pope Ave./Greenwood Dr./William Hilton Pkwy.
(32.15560, -80.76283)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2000 Converted rotary with large diameter. Right turn bypass lanes on all legs. Conversion Year Completed estimated (1994-2005).
Carmel, IN
Hamilton
United States
River Rd./East 131st St./Longest Dr.
(39.97910, -86.05145)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
1995 Completed mid 1990s. Previously controlled by one-way stop Functional Class: Local
Carmel, IN
Hamilton
United States
Gray Rd./106th St.
(39.94151, -86.08847)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2003 Under construction in December 2002; completed January 2003. Intersection closed until completion. Construction cost $430,000 per Indianapolis Star article authored by Bill Ruthhart (12/05/2002). Functional Class: Arterial
Carmel, IN
Hamilton
United States
Spring Mill Rd./W. 131st St.
(39.97776, -86.16474)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2007 Construction planned for Spring 2003 per article in The Indianapolis Star (12/05/2002). Functional Class: Arterial
Carmel, IN
Hamilton
United States
Spring Mill Rd./W. 136th St.
(39.98505, -86.16485)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2005 Construction planned for Spring 2003 per article in The Indianapolis Star (12/05/2002). Functional Class: Arterial
Carmel, IN
Hamilton
United States
Old Meridian St./Pennsylvania St.
(39.96787, -86.15519)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2008 Construction planned for Summer 2003 per article in The Indianapolis Star (12/05/2002).
Carmel, IN
Hamilton
United States
Old Meridian St./131st (Main) St.
(39.97806, -86.14577)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2007 Construction planned for Summer 2003 per article in The Indianapolis Star (12/05/2002).
Bettendorf, IA
Scott
United States
53rd Ave./Middle Rd.
(41.57538, -90.46408)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2002 Right turn bypass lanes striped within roundabout. Construction cost ~$865,000. Information from website: http://www.bettendorf.lib.ia.us/publicworks/roundabout.html
Johnson City, NY
Broome
United States
Rte. 201/Riverside Dr./Floral Ave.
(42.10674, -75.96615)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2005 http://www.dot.state.ny.us/reg/r9/cur_project/circle/about/index.html Previously controlled by rotary
Raleigh, NC
Wake
United States
Pullen Rd./Stinson Dr.
(35.78457, -78.66421)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2002 Located on campus of North Carolina State University. Completed November 2002. Used to have Pedestrian signal located upstream of roundabout (removed in 2006) Previously controlled by one-way stop Functional Class: Local
Lenexa, KS
Johnson
United States
67th St./Gleason Rd.
(39.00723, -94.86295)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2002 Built as part of extension of both streets -- road originally curved from the north to the east. Completed October 2002. Functional Class: Collector
Colorado Springs, CO
El Paso
United States
Chapel Hills Dr./Royal Pine Dr.
(38.98067, -104.77060)
Roundabout
Existing
Unknown
Unknown
4 Approaches
0 Driveways
Other
Single-Lane
2002
Reno, NV
Washoe
United States
Wedekind Rd./Clear Acre Ln.
(39.55157, -119.78930)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
1999 Previously controlled by two-way stop
Lake Oswego, OR
Clackamas
United States
Stafford Rd./Rosemont Rd.
(45.39300, -122.69020)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2005 Previously controlled by two-way stop Functional Class: Arterial
(unincorporated), OR
Clackamas
United States
Stafford Rd./Borland Rd.
(45.37472, -122.70240)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Multilane (2 Lane)
2009 Estimated completion 2007. Functional Class: Arterial
Urbana, MD
Frederick
United States
Bennett Creek Ave./Bennett Creek Blvd.
(39.32256, -77.34935)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2000
Chattanooga, TN
Hamilton
United States
US 41 - US 76 - SR 8 (Westside Dr.)/29th St.
(35.00944, -85.27164)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2001 Completed September 26, 2001. The intersection is located at the western portal of the Bachman Tunnel, a two-lane tunnel through Missionary Ridge, connecting Chattanooga with the City of East Ridge, Tennessee. Previously controlled by two-way stop Functional Class: Arterial
Williston, VT
Chittenden
United States
Maple Tree Pl./Sycamore Dr.
(44.44349, -73.10966)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other
Single-Lane
2001 Completed November 2001. Major shopping area, road part of the planned ring road around Taft Corner. Functional Class: Local
Bend, OR
Deschutes
United States
SW Industrial Way/Wall St.
(44.05050, -121.31750)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2003 Wall St. is one-way southbound into the roundabout. Roundabout is raindrop-shaped to prevent eastbound to northbound movements. Dogbone/peanut shape. Previously controlled by one-way stop Functional Class: Collector
Bend, OR
Deschutes
United States
SW Industrial Way/Bond St.
(44.05040, -121.31630)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other
Single-Lane
2003 Bond St. is one-way northbound out of the roundabout. Roundabout has raindrop-shaped central island, as no westbound to southbound movements are needed. Dogbone/peanut shape. Functional Class: Collector

Page 137 of 148