City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
North Salt Lake,
UT Davis Co. United States |
Orchard Dr. / E Eaglegate Dr. (40.83459, -111.91224) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | Crosswalks next to circulatory roadway. Year Completed estimated (2010-2011). |
London,
ON Middlesex Canada |
Morgan Ave. / Morgan Crescent / Singleton Ave. (42.93441, -81.27261) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2011). Splitter islands added 2015. |
Jefferson City,
MO Cole Co. United States |
Ellis Blvd. / Tanner Bridge Rd. (38.55085, -92.18866) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | Elliptical shape. ICD = 135 ft x 125 ft. Skewed intersection. Right-turn bypass lane due to skew on west leg. Year Completed estimated (2010-2011). |
Youngsville,
LA Lafayette Par. United States |
Fortune Rd. / Bonin Rd. (30.12382, -92.00743) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.5852 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). ICD estimated from Google Maps linework. |
Morrisville,
NC Wake Co. United States |
Market Center Dr. / Village Market Pl. (35.80699, -78.81617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8065 |
Other (At-Grade) Single-Lane |
2011 | ICD = 140 ft. Year Completed estimated (2010-2013). ICD estimated from Google Maps linework. |
Durham,
NC Durham Co. United States |
Windrush Ln. / Callandale Ln. (35.95677, -78.83138) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.2023 |
Other (At-Grade) Single-Lane |
2011 | Splitter islands added in 2015. ICD = 100 ft. ICD estimated from Google Maps linework. |
Durham,
NC Durham Co. United States |
Nova Glen Dr. / DPS Middle School Entrance (36.10940, -78.89156) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2011 | Painted splitter islands. Year Completed estimated (2010-2013). |
Las Cruces,
NM Dona Ana Co. United States |
N Main St. / N Water St. / N Church St. (32.31404, -106.77979) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.3465 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Laurinburg,
NC Scotland Co. United States |
US 501 Business (Johns Rd.) / Lauchwood Dr. (34.75125, -79.46361) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2011). ICD estimated from Google Maps linework. |
Saratoga Springs,
UT Utah Co. United States |
W Aspen Hills Blvd. / N 400 W (40.39159, -111.92595) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). |
Central City,
AZ Maricopa Co. United States |
E Madison St. / (parking) (33.44625, -111.98911) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | Accommodates WB-67 truck deliveries to the Phoenix Sky Train terminal. Part of Phoenix Sky Harbor off-site parking facility. Year Completed estimated (2011-2012). |
Cumming,
GA Forsyth Co. United States |
Aquatic Cir. / (parking) (34.22443, -84.10920) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2011 | |
Clayton,
NC Johnston Co. United States |
Springbrook Ave. / Medspring Dr. (35.62890, -78.50615) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 33.0058 |
Other (At-Grade) Single-Lane |
2011 | Uncontrolled. ICD estimated from Google Maps linework. |
Basalt,
CO Eagle Co. United States |
Willits Ln. / E Valley Rd. (39.38865, -107.08520) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.7680 |
Other (At-Grade) Single-Lane |
2011 | https://www.aspentimes.com/news/willits-lane-roundabout-due-for-work/ https://www.gouldconstruction.com/willits-lane-east-valley-road-roundabout-2/ ICD estimated from Google Maps linework. |
Fayetteville,
NC Cumberland Co. United States |
Campbell Ave. / Cook St. / Holt Williamson St. (35.04286, -78.87015) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 21.5121 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). No splitter islands. ICD estimated from Google Maps linework. |
Loveland,
CO Larimer Co. United States |
Harrison Ave. / W 65th St. (40.45845, -105.08018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9844 |
Other (At-Grade) Single-Lane |
2011 | Right-turn bypass lane on east leg. ICD estimated from Google Maps linework. |
Collingwood,
ON Simcoe Canada |
Poplar Sideroad / High St. (44.47572, -80.22881) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9406 |
Other (At-Grade) Multilane (2 Lane) |
2011 | ICD estimated from Google Maps linework. |
Kitchener,
ON Waterloo Canada |
Huron Rd. / Strasburg Rd. (43.39217, -80.46629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.2050 |
Other (At-Grade) Multilane (2 Lane) |
2011 | Year Completed estimated (2010-2012). ICD estimated from Google Maps linework. |
Middleton,
ID Canyon Co. United States |
Emmett Rd. / Willis Rd. (43.72082, -116.65264) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.8843 |
Other (At-Grade) Multilane (2 Lane) |
2011 | Year Completed estimated (2010-2011). ICD estimated from Google Maps linework. |
Middleton,
ID Canyon Co. United States |
Emmett Rd. / 9th St. (43.71535, -116.65284) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.4355 |
Other (At-Grade) Multilane (2 Lane) |
2011 | Year Completed estimated (2010-2011). ICD estimated from Google Maps linework. |
Windsor,
ON Essex Canada |
Mill St. / Felix Ave. / Ryan St. (42.30012, -83.07024) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.2675 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). ICD estimated from Google Maps linework. |
Ribeira Grande,
Azores Portugal |
Rua de Nossa Senhora de Fatima (Rte 1A) / (unknown) (37.81172, -25.57273) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.2342 |
Other (At-Grade) Multilane (2 Lane) |
2011 | Under construction in 2010 from Google. ICD estimated from Google Maps linework. |
Woodland,
CA Yolo Co. United States |
Miekle Ave. / Marston Dr. (38.64444, -121.73614) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.1860 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Carrollton,
GA Carroll Co. United States |
GA 16 (Newnan Rd.) / Education Dr. (33.56571, -85.04510) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8215 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2010-2012). ICD estimated from Google Maps linework. |
Thorburn,
NS Pictou Canada |
Rte 4 / Rte 104 EB Ramps (45.59173, -62.51598) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 43.4591 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Year Completed estimated (2010-2013). ICD estimated from Google Maps linework. |
Thorburn,
NS Pictou Canada |
Rte 4 / School Rd. / Rte 104 WB Ramps (45.59326, -62.51587) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4579 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Year Completed estimated (2010-2013). ICD estimated from Google Maps linework. |
Union,
MO Franklin Co. United States |
Independence Dr. / W Main St. (38.44642, -91.02549) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.7385 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2012-2013). https://www.unionmissouri.org/document_center/talk_of_the_town_winter_2013.pdf ICD estimated from Google Maps linework. |
Kitchener,
ON Waterloo Canada |
Huron Rd. / Woodbine Ave. (43.38310, -80.48326) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.1366 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
Park City,
UT Summit Co. United States |
W Ute Blvd. / Uintah Way (40.72449, -111.54245) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1103 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Year Completed estimated (2011-2013). ICD estimated from Google Maps linework. |
Overland Park,
KS Johnson Co. United States |
Carson St. / Payton Dr. / Kobe Dr. (38.88090, -94.66183) |
Other Existing |
Uncontrolled None |
4 Approaches 0 Driveways 26.9621 |
Other (At-Grade) Single-Lane |
2012 | No yield signs or other control but otherwise typical roundabout geometry. ICD estimated from Google Maps linework. |
Provo,
UT Utah Co. United States |
S 1350 E / 300 S (40.22981, -111.63524) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0901 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Spanish Fork,
UT Utah Co. United States |
1120 E / 200 N (40.11232, -111.63496) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 56.6309 |
Other (At-Grade) Single-Lane |
2012 | No splitter islands. ICD estimated from Google Maps linework. |
West Jordan,
UT Salt Lake Co. United States |
Jordan Line Pkwy. / Station View Way (40.59354, -111.97048) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.2072 |
Other (At-Grade) Single-Lane |
2012 | Bus transit center. Concrete pavement. ICD estimated from Google Maps linework. |
Ivins,
UT Washington Co. United States |
Snow Canyon Pkwy. / Snow Canyon Dr. / S Docena Dr. (37.16869, -113.65365) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.2134 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Fayetteville,
NC Cumberland Co. United States |
Plantation Garden Blvd. / Scotch Hall Way / Harmony Hall Way (35.09671, -78.97316) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 1 Driveways 38.1100 |
Other (At-Grade) Single-Lane |
2012 | Gated community. Parking along circulatory roadway. ICD estimated from Google Maps linework. |
Orange,
CA Orange Co. United States |
Designer Dr. / City Blvd. E (33.78117, -117.89081) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.7879 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2013). ICD estimated from Google Maps linework. |
Raleigh,
NC Wake Co. United States |
Concord St. / ME Valentine Dr. (35.78880, -78.67778) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Mini-roundabout |
2012 | Year Completed estimated (2010-2013). |
Sugar Hill,
GA Gwinnett Co. United States |
W Broad St. NE / Whitehead Rd. (34.10860, -84.03845) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2012 | Pedestrian crossings at edge of circulatory roadway. |
Williamsburg,
VA Williamsburg City Co. United States |
Battery Blvd. / Commonwealth Ave. (37.25257, -76.66771) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Through arrows only on northeast entry even though lanes marked within roundabout as LT, LT-TH. Entry appears to have been modified by removing left-turn pavement marking arrows on entry and replacing with through arrows. No lane use signs. Year Completed estimated (2011-2014). 21442 |
Montgomery,
TX Montgomery Co. United States |
Woodforest Pkwy. / Woodforest Blvd. / Spyglass Park Ln. (30.27643, -95.55388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Fredericton,
NB York Canada |
Cliffe St. / Two Nations Crossing (45.98259, -66.61218) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | |
San Francisco,
CA San Francisco Co. United States |
Mission Bay Dr. / Mission Bay Blvd. / Owens St. / Channel St. (37.77048, -122.39599) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 78.3588 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
London,
ON Middlesex Canada |
Singleton Ave. / Morgan Ave. (42.93793, -81.27158) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
London,
ON Middlesex Canada |
Callingham Dr. / Meadowlands Way (43.03489, -81.29534) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2010-2013). Splitter islands added 2016-2019. (streetview) 21442 |
Waterloo,
ON Waterloo Canada |
Davenport Rd. / Old Abbey Rd. / (shopping center) (43.49957, -80.52551) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2012 | Right-turn-only leg on north leg. Year Completed estimated (2011-2012). |
Clarkdale,
AZ Yavapai Co. United States |
Scenic Dr. / Alamos Dr. (34.74635, -112.04608) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). Initially completed with painted splitter islands. Raised splitter islands added 2012-2014. |
Las Vegas,
NV Clark Co. United States |
Fox Hill Dr. / Paseo Breeze Dr. (36.16713, -115.36480) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
American Fork,
UT Utah Co. United States |
E 980 N / N 800 E (40.39768, -111.77392) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | Painted splitter islands. Year Completed estimated (2011-2013). |
Summerfield,
MD Prince George's Co. United States |
Saint Josephs Dr. / Grove Hurst Ln. (38.91969, -76.84060) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane) |
2012 | |
Severn,
MD Anne Arundel Co. United States |
Milestone Pkwy. / (unknown) (39.14341, -76.75076) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Year Completed estimated (2011-2014). |
Severn,
MD Anne Arundel Co. United States |
Milestone Pkwy. / Clubhouse Dr. (39.14600, -76.74775) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Year Completed estimated (2011-2014). |
Lake Country,
BC Central Okanagan Canada |
Lodge Rd. / Bottom Wood Lake Rd. (50.03469, -119.40189) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2012-2013). |
Terrebonne,
QC Les Moulins Regional County Municipality Canada |
Chemin Saint-Charles / Allée du Grand-Pic (45.71351, -73.49795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Terrebonne,
QC Les Moulins Regional County Municipality Canada |
Rue d'Angora / Rue de la Portneuf (45.71541, -73.65052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2013). |
Bentonville,
AR Benton Co. United States |
SW Bright Rd. / SW Gator Blvd. / SW Wentworth Ave. (36.32128, -94.23638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Left-only and left-through-right lanes on all four legs. |
Gatineau,
QC Gatineau Canada |
Boulevard de Plateau / Rue de Prado (45.43617, -75.80317) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Gatineau,
QC Gatineau Canada |
Boulevard du Plateau / Boulevard de l'Amérique-Française (45.43494, -75.80516) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2012 | Southeast leg stubbed. |
San Marcos,
TX Hays Co. United States |
Cheatham St. / Rio Vista St. (29.88237, -97.92609) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
San Marcos,
TX Hays Co. United States |
Cheatham St. / Riverside Dr. (29.87879, -97.93104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Spring,
TX Harris Co. United States |
Mossy Oaks Rd. / Energy Dr. (30.09722, -95.43843) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane) |
2012 | |
Edmundston,
NB Madawaska Canada |
Grey Rock Rd. / 15 Août Rd. / Rte 2 EB Ramps (47.37064, -68.30398) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Montgomery,
AL Montgomery Co. United States |
Aum Dr. / Brown Springs Rd. (32.37307, -86.17992) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2013). |
Winnipeg,
MB Division 11 Canada |
(unknown) / (unknown) (49.83988, -97.21409) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Right-turn-only lane on north leg; right-turn bypass lane on east leg. |
Winnipeg,
MB Division 11 Canada |
(unknown) / (unknown) (49.84052, -97.21910) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Right-turn-only lane on north leg. |
North Highlands,
CA Sacramento Co. United States |
Freedom Park Dr. / 32nd St. (38.67592, -121.39216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | |
North Highlands,
CA Sacramento Co. United States |
Freedom Park Dr. / 34th St. / Dudley Blvd. (38.67588, -121.38752) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | |
Moses Lake,
WA Grant Co. United States |
S Balsam St. / E 4th Ave. (47.13056, -119.27474) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Rubonia,
FL Manatee Co. United States |
Haben Blvd. / 12th Ave. E (27.51603, -82.55261) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2012 | |
Jefferson,
GA Jackson Co. United States |
GA 11 / GA 124 (34.09190, -83.61570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2012 | Painted splitter islands. Year Completed estimated (2011-2013). |
Knoxville,
TN Knox Co. United States |
Town Center Blvd. / Boardwalk Blvd. / I-140 EB Off-ramp (35.86049, -84.07767) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Year Completed estimated (2012-2013). |
Platte City,
MO Platte Co. United States |
MO-N / NW 136 St. / Humphreys Rd. (39.33927, -94.77933) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Sea Pines,
SC Beaufort Co. United States |
78 Dunnagans Alley (32.15734, -80.75987) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Fitchburg,
WI Dane Co. United States |
Lacy Rd. / Cheryl Pkwy. (43.00643, -89.39114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9225 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Lacy Rd. / Haight Farm Rd. (43.00164, -89.39327) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6727 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
CTH G (Main Ave.) / US 41 NB Ramps (44.45238, -88.08887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | |
De Pere,
WI Brown Co. United States |
CTH G (Main St.) / US 41 SB Ramps (44.45374, -88.09212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.5943 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | ICD estimated from Google Maps linework. |
Barksdale,
WI Bayfield Co. United States |
STH 13 / US 2 WB Ramps (46.58774, -90.95454) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9645 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Suamico,
WI Brown Co. United States |
School Ln. (CTH B) / Velp Ave. (CTH HS) (44.63452, -88.05177) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7946 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
River Falls,
WI Pierce Co. United States |
Cascade Ave. / 6th St. (44.85409, -92.61926) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.2533 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
River Falls,
WI Pierce Co. United States |
Cascade Ave. / 2nd St. (44.85418, -92.62532) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4799 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Tallahassee,
FL Leon Co. United States |
Miccosukee Rd. / Fleischmann Rd. (30.47602, -84.21957) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.8503 |
Other (At-Grade) Single-Lane |
2012 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / Gillingham Rd. / Bergstrom Rd. (44.15643, -88.48816) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5587 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 SB Ramps (44.15623, -88.48662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1274 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 NB Ramps (44.15602, -88.48505) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.4139 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / W Bell St. / Harrison St. (44.15568, -88.48331) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1298 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave. (44.03278, -88.57778) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 89.2999 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Series of 4 roundabouts. Opened June 18, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St. (44.03244, -88.58758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9435 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / Klondike Dr. (44.59813, -90.18018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.6235 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. Free-flow right-turn bypass lane with acceleration lane. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / CTH BB (44.62490, -90.18009) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3017 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened November 2012. Free-flow right-turn bypass lane into added lane. ICD estimated from Google Maps linework. |