City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Clarkdale,
AZ Yavapai Co. United States |
Scenic Dr. / Alamos Dr. (34.74635, -112.04608) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). Initially completed with painted splitter islands. Raised splitter islands added 2012-2014. |
American Fork,
UT Utah Co. United States |
E 980 N / N 800 E (40.39768, -111.77392) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | Painted splitter islands. Year Completed estimated (2011-2013). |
Bentonville,
AR Benton Co. United States |
SW Bright Rd. / SW Gator Blvd. / SW Wentworth Ave. (36.32128, -94.23638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Left-only and left-through-right lanes on all four legs. |
Terrebonne,
QC Les Moulins Regional County Municipality Canada |
Chemin Saint-Charles / Allée du Grand-Pic (45.71351, -73.49795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Terrebonne,
QC Les Moulins Regional County Municipality Canada |
Rue d'Angora / Rue de la Portneuf (45.71541, -73.65052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2013). |
Lake Country,
BC Central Okanagan Canada |
Lodge Rd. / Bottom Wood Lake Rd. (50.03469, -119.40189) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2012-2013). |
Severn,
MD Anne Arundel Co. United States |
Milestone Pkwy. / (unknown) (39.14341, -76.75076) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Year Completed estimated (2011-2014). |
Severn,
MD Anne Arundel Co. United States |
Milestone Pkwy. / Clubhouse Dr. (39.14600, -76.74775) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Year Completed estimated (2011-2014). |
Gatineau,
QC Gatineau Canada |
Boulevard de Plateau / Rue de Prado (45.43617, -75.80317) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Gatineau,
QC Gatineau Canada |
Boulevard du Plateau / Boulevard de l'Amérique-Française (45.43494, -75.80516) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2012 | Southeast leg stubbed. |
San Marcos,
TX Hays Co. United States |
Cheatham St. / Rio Vista St. (29.88237, -97.92609) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
San Marcos,
TX Hays Co. United States |
Cheatham St. / Riverside Dr. (29.87879, -97.93104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Spring,
TX Harris Co. United States |
Mossy Oaks Rd. / Energy Dr. (30.09722, -95.43843) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane) |
2012 | |
Edmundston,
NB Madawaska Canada |
Grey Rock Rd. / 15 Août Rd. / Rte 2 EB Ramps (47.37064, -68.30398) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Montgomery,
AL Montgomery Co. United States |
Aum Dr. / Brown Springs Rd. (32.37307, -86.17992) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2013). |
Winnipeg,
MB Division 11 Canada |
(unknown) / (unknown) (49.83988, -97.21409) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Right-turn-only lane on north leg; right-turn bypass lane on east leg. |
Winnipeg,
MB Division 11 Canada |
(unknown) / (unknown) (49.84052, -97.21910) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Right-turn-only lane on north leg. |
North Highlands,
CA Sacramento Co. United States |
Freedom Park Dr. / 32nd St. (38.67592, -121.39216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | |
North Highlands,
CA Sacramento Co. United States |
Freedom Park Dr. / 34th St. / Dudley Blvd. (38.67588, -121.38752) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | |
Moses Lake,
WA Grant Co. United States |
S Balsam St. / E 4th Ave. (47.13056, -119.27474) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Rubonia,
FL Manatee Co. United States |
Haben Blvd. / 12th Ave. E (27.51603, -82.55261) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2012 | |
Summerfield,
MD Prince George's Co. United States |
Saint Josephs Dr. / Grove Hurst Ln. (38.91969, -76.84060) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane) |
2012 | |
Knoxville,
TN Knox Co. United States |
Town Center Blvd. / Boardwalk Blvd. / I-140 EB Off-ramp (35.86049, -84.07767) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Year Completed estimated (2012-2013). |
Jefferson,
GA Jackson Co. United States |
GA 11 / GA 124 (34.09190, -83.61570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2012 | Painted splitter islands. Year Completed estimated (2011-2013). |
Sea Pines,
SC Beaufort Co. United States |
78 Dunnagans Alley (32.15734, -80.75987) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Platte City,
MO Platte Co. United States |
MO-N / NW 136 St. / Humphreys Rd. (39.33927, -94.77933) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Ann Arbor,
MI Washtenaw Co. United States |
State St. / Ellsworth Rd. (42.22942, -83.73902) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.7958 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Chico,
CA Butte Co. United States |
First St. / Salem St. (39.72980, -121.84300) |
Other Existing |
All-Way Yield None |
2 Approaches 1 Driveways 18.3704 |
Other (At-Grade) Single-Lane |
2012 | Hybrid mini-roundabout / "drop off circle" at major bike/ped entrance into Chico State University. Completed 2012. ICD estimated from Google Maps linework. |
Duluth,
GA Gwinnett Co. United States |
Lawrenceville St. / Irvindale Rd. (34.00639, -84.15111) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.5531 |
Other (At-Grade) Single-Lane |
2012 | Oval shape. ICD estimated from Google Maps linework. |
(unincorporated),
GA Gwinnett Co. United States |
Rabbit Hill Rd. / Rabbit Hill Park entrance (33.99940, -83.92819) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.7144 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
(unincorporated),
MI Oakland Co. United States |
Martin Pkwy. / M-5 / Pontiac Trl. (42.55450, -83.44852) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 69.5029 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Fort Bragg,
CA Mendocino Co. United States |
Hwy 1 / Simpson Ln. (39.41239, -123.80830) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.5958 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Truckee,
CA Nevada Co. United States |
Hwy 89 / Prosser Dam Rd. / Alder Dr. (39.34531, -120.17300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.2574 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Warrensburg,
MO Johnson Co. United States |
SR 13 / Old SR 13 / NW 435 Rd. (38.82513, -93.74133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9401 |
Other (At-Grade) Single-Lane |
2012 | Functional Class: Arterial ICD estimated from Google Maps linework. |
Fermanagh Township,
PA Juniata Co. United States |
SR 35 / SR 3002 (40.56470, -77.39610) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.9211 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Middle Smithfield Township,
PA Monroe Co. United States |
US 209 / SR 1019 (41.03390, -75.12340) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.4508 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Bensalem,
PA Bucks Co. United States |
Trevose Rd. / Somerton Rd. (40.13440, -74.99160) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.4801 |
Other (At-Grade) Single-Lane |
2012 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Meridian,
ID Ada Co. United States |
Records Ave. / Elden Gray St. (43.62166, -116.34700) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.5835 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Keene,
NH Cheshire Co. United States |
NH 12A (Maple Ave.) / Court St. / Old Walpole Rd. (42.96305, -72.30895) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 29.7161 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
W. 106th St. / Ditch Rd. (39.94146, -86.18407) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 29.3022 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
W. 106th St. / Shelborne Rd. (39.94108, -86.22241) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.1221 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
E. 151st St. / Cool Creek Park Rd. (40.00753, -86.12267) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.5071 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Acworth,
GA Cobb Co. United States |
County Line Rd. / Burnt Hickory Rd. (33.99833, -84.72916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.6557 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Marietta,
GA Cobb Co. United States |
Fairground St. / Allgood Rd. / Chicopee Dr. (33.96695, -84.53750) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.7632 |
Other (At-Grade) Single-Lane |
2012 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Tavares,
FL Lake Co. United States |
Main St. / Sinclair Ave. (28.80227, -81.73129) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.3041 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Lacy Rd. / Cheryl Pkwy. (43.00643, -89.39114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9225 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Lacy Rd. / Haight Farm Rd. (43.00164, -89.39327) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6727 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
River Falls,
WI Pierce Co. United States |
Cascade Ave. / 6th St. (44.85409, -92.61926) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.2533 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
River Falls,
WI Pierce Co. United States |
Cascade Ave. / 2nd St. (44.85418, -92.62532) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4799 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
CTH G (Main Ave.) / US 41 NB Ramps (44.45238, -88.08887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | |
De Pere,
WI Brown Co. United States |
CTH G (Main St.) / US 41 SB Ramps (44.45374, -88.09212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.5943 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | ICD estimated from Google Maps linework. |
Suamico,
WI Brown Co. United States |
School Ln. (CTH B) / Velp Ave. (CTH HS) (44.63452, -88.05177) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7946 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Barksdale,
WI Bayfield Co. United States |
STH 13 / US 2 WB Ramps (46.58774, -90.95454) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9645 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / Gillingham Rd. / Bergstrom Rd. (44.15643, -88.48816) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5587 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 SB Ramps (44.15623, -88.48662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1274 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 NB Ramps (44.15602, -88.48505) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.4139 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / W Bell St. / Harrison St. (44.15568, -88.48331) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1298 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Tallahassee,
FL Leon Co. United States |
Miccosukee Rd. / Fleischmann Rd. (30.47602, -84.21957) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.8503 |
Other (At-Grade) Single-Lane |
2012 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave. (44.03278, -88.57778) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 89.2999 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Series of 4 roundabouts. Opened June 18, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St. (44.03244, -88.58758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9435 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / Klondike Dr. (44.59813, -90.18018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.6235 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. Free-flow right-turn bypass lane with acceleration lane. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / CTH BB (44.62490, -90.18009) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3017 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened November 2012. Free-flow right-turn bypass lane into added lane. ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114-STH 55 / Stommel Rd. (44.19113, -88.28387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5360 |
Other (At-Grade) Single-Lane |
2012 | Opened September 24, 2012. ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 EB Ramps (42.75151, -88.95509) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 96.4701 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 WB Ramps (42.75172, -88.95537) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 99.1008 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Evans,
GA Columbia Co. United States |
Ronald Reagan Dr. / (unknown) (33.54462, -82.12749) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.8855 |
Other (At-Grade) Single-Lane |
2012 | Oval shape. Functional Class: Local ICD estimated from Google Maps linework. |
Kihei,
HI Maui Co. United States |
Piikea Ave. / Liloa Dr. (20.75081, -156.44990) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5056 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Sugar Land,
TX Fort Bend Co. United States |
Imperial Blvd. / Stadium Dr. (29.62548, -95.64404) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.5662 |
Other (At-Grade) Multilane (2 Lane) |
2012 | Primary access to a minor league baseball stadium. ICD estimated from Google Maps linework. |
Lethbridge,
AB Alberta Canada |
Mauretania Rd. / (unknown) (49.67145, -112.90948) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Merging right-turn bypass lane on west leg. |
Lethbridge,
AB Alberta Canada |
Keystone Terr. / Coalbanks Gate / Silkstone Rd. W (49.66938, -112.90330) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2012 | Merging right-turn bypass lane on north leg. |
Lethbridge,
AB Alberta Canada |
Coalbanks Link / Silkstone Rd. (49.67028, -112.89758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Lethbridge,
AB Alberta Canada |
Garry Station Port W / Aquitania Blvd W (49.68692, -112.91273) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | Merging right-turn bypass lane on north leg. |
Lethbridge,
AB Alberta Canada |
Lasalle Rd. W / Aquitania Blvd. (49.68758, -112.90981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Lethbridge,
AB Alberta Canada |
Caledonia Blvd. / Aquitania Blvd. (49.67775, -112.90634) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Lethbridge,
AB Alberta Canada |
Britannia Blvd. W / Mauretania Rd. W (49.67305, -112.91026) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Salem,
CT New London Co. United States |
Rte 85 (Hartford Rd.-New London Rd.) / Rte 82 (E Haddam Rd.-Norwich Rd.) (41.47662, -72.26473) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.1084 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Bryan,
TX Brazos Co. United States |
Old College Rd. / College Main St. (30.62699, -96.35515) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 24.6653 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Lethbridge,
AB Alberta Canada |
Edith Emma Coe Rd. N / Mildred Dobbs Blvd. / Jessie Ursenbach Way N (49.73267, -112.83091) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Lethbridge,
AB Alberta Canada |
Mildred Dobbs Blvd. / Jesse Robinson Close N (49.73043, -112.82899) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Lethbridge,
AB Alberta Canada |
Mildred Dobbs Blvd. / Lettice Perry Rd. N (49.72947, -112.82776) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Anchorage,
AK Anchorage United States |
Huffman Rd. / Huffman Park Dr. / Brandon St. (61.10862, -149.85617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3143 |
Other (At-Grade) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |
Anchorage,
AK Anchorage United States |
Huffman Rd. / Seward Hwy SB Ramps (61.10854, -149.85175) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0848 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane) |
2012 | ICD estimated from Google Maps linework. |