City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Neenah,
WI Winnebago Co. United States |
Castle Oak Dr. / Marathon Ave. (44.14932, -88.47024) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.1380 |
Other (At-Grade) Single-Lane |
2016 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.14891305159338%2C-88.47012163076346&z=16. ICD estimated from Google Maps linework. |
Fond du Lac,
WI Fond Du Lac Co. United States |
W Pioneer Rd. / S Military Rd. (43.76131, -88.47064) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9914 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=43.760977353650404%2C-88.47475648794119&z=15. ICD estimated from Google Maps linework. |
Sturgeon Bay,
WI Door Co. United States |
STH 42 / Michigan St. (44.83499, -87.34712) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.8168 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.829603204967256%2C-87.35688177363386&z=12 ICD estimated from Google Maps linework. |
Sevastopol,
WI Door Co. United States |
STH 4 / STH 57 / Egg Harbor Rd. (44.85354, -87.34650) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | https://www.greenbaypressgazette.com/story/news/local/door-co/news/2016/06/24/door-countys-first-roundabout-opens/86338626/ ICD estimated from Google Maps linework. |
Rhinelander,
WI Oneida Co. United States |
US 8 / STH 47 / W Kemp St. (US 8 Business) (45.63082, -89.43805) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.2639 |
Other (At-Grade) Single-Lane |
2019 | https://starjournalnow.com/2019/08/08/rhinelanders-new-roundabout-opens-for-business-soon/ ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Oakridge Rd. / CR CB (44.18512, -88.50515) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.2479 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | https://fox11online.com/news/local/new-roundabout-legacy-of-victim-killed-in-town-of-neenah-crash ICD estimated from Google Maps linework. |
Eau Claire,
WI Eau Claire Co. United States |
State St. / Hamiton Ave. (44.78565, -91.49619) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | Opened October 25, 2019. https://www.eauclairewi.gov/our-city/construction-projects/future-projects/state-street |
Eau Claire,
WI Eau Claire Co. United States |
State St. / MacArthur Ave. (44.78927, -91.49616) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | https://www.eauclairewi.gov/our-city/construction-projects/future-projects/state-street |
Eau Claire,
WI Eau Claire Co. United States |
State St. / E Lexington Blvd. (44.79197, -91.49592) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 39.6240 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Merging right-turn bypass lane on east leg. W Lexington Blvd meets State St just south of the roundabout and is controlled by a stop sign. https://www.eauclairewi.gov/our-city/construction-projects/future-projects/state-street |
Wauwatosa,
WI Milwaukee Co. United States |
N Swan Blvd. / Discovery Pkwy. (43.05192, -88.03430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | https://www.wauwatosa.net/Home/Components/News/News/1708/166 |
Wauwatosa,
WI Milwaukee Co. United States |
Discovery Pkwy. / (parking lot) (43.04809, -88.03138) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 1 Driveways 29.6749 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2014). ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Cardinal Ln. (CTH EB) (44.59090, -88.08430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.7684 |
Other (At-Grade) Single-Lane |
1999 | Roundabout is near Forest Glen Elementary School, Lineville Intermediate School, and Bay Port High School. Completed October 1999. http://www.co.brown.wi.us/Planning/roundabouts.html Functional Class: Arterial ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Rockwell Ln. (44.59080, -88.08880) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.0674 |
Other (At-Grade) Single-Lane |
1999 | Roundabout is adjacent to Lineville Intermediate School, Middle School, and High School. School did not allow pedestrian crossings prior to roundabout due to unsafe conditions, now allows crossings using crossing guard. Completed October 1999. http://www.co.brown.wi.us/Planning/roundabouts.html Previously controlled by one-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2011 | Series of 6 roundabouts. Yield-controlled right-turn bypass lane on south leg; merging right-turn bypass lane on east leg. Opened September 2011. Circular central island. |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Koeller St. (44.01805, -88.58098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
De Pere,
WI Brown Co. United States |
Grant St. (CTH EE) / Lawrence Dr. (44.44511, -88.09367) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8430 |
Other (At-Grade) Single-Lane |
2008 | Opened September 30, 2008. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 SB Ramps (44.52418, -88.08284) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9811 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 NB Ramps (44.52415, -88.08103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.4266 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Mason St. (STH 32-STH 54) / S. Taylor St. (44.52414, -88.07916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4266 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Shawano Ave. (STH 29) / Taylor St. (44.53461, -88.07319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3783 |
Other (At-Grade) Multilane (3+ Lane) |
2011 | Opened September 2011. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Glendale Ave. / Hillcrest Heights (44.56551, -88.09801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9305 |
Other (At-Grade) Single-Lane |
2008 | Opened August 1, 2008. ICD estimated from Google Maps linework. |
Milwaukee,
WI Milwaukee Co. United States |
S. 6th St. / W. Virginia St. / Florida St. (43.02698, -87.91770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.7816 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2002 | Built as terminal of new bridge. Signal located downstream approximately 150-200 feet away (estimated) that queues back through roundabout during weekday p.m. peak. No lane designations on approach. Functional Class: Arterial ICD estimated from Google Maps linework. |
Wisconsin Rapids,
WI Wood Co. United States |
STH 54 (2nd Ave.) / Gaynor Ave. / 17th Ave. (44.38025, -89.84447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.3874 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened September 2004. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 SB Ramps (44.30645, -88.24948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.8965 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
Brookfield,
WI Waukesha Co. United States |
Barker Rd. (CTH Y) / North Ave. (CTH M) (43.06136, -88.16629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9042 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Washburn St. (44.01808, -88.58321) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
West Bend,
WI Washington Co. United States |
Paradise Dr. / CTH G (43.39770, -88.16100) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.5053 |
Other (At-Grade) Single-Lane |
2003 | Completed September 18, 2003 Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Oconomowoc,
WI Waukesha Co. United States |
Wisconsin Ave. / Lake Dr. (43.11224, -88.43968) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.1314 |
Other (At-Grade) Single-Lane |
2002 | Opened October 15, 2002. Previously controlled by one-way stop Functional Class: Local ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
CTH J / US 41 NB Ramps (44.30463, -88.24939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.6070 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Opened October 11, 2010. ICD estimated from Google Maps linework. |
Kiel,
WI Manitowoc Co. United States |
STH 67-STH 32 / STH 57 (43.90986, -88.02251) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.0446 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened November 13, 2009. Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Chicago St. (CTH G) / Libal St. (44.44026, -88.03812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.8455 |
Other (At-Grade) Single-Lane |
2001 | Roundabout surrounded by homes, businesses, East De Pere Middle School, and De Pere High School. Roundabout serves as main entrance to the high school. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / Swan Rd. (44.43908, -88.03475) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.0241 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Libal roundabout and is surrounded by businesses and East De Pere Middle School. Roundabout serves as the entrance to a medical clinic. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Airport Dr. (STH 172) / Airport Entrance (44.49569, -88.12467) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.1882 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 2011. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Dickinson Rd. (CTH G) / East River Dr. (44.43684, -88.02830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7306 |
Other (At-Grade) Single-Lane |
2001 | Roundabout is slightly east of the Chicago/Swan roundabout and is located in a residential area. Roundabout is near East De Pere Middle School and De Pere High School. Completed August 2001. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Airport Dr. (STH 172) / S. Pine Tree Rd. (44.49955, -88.14986) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.2968 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Belmont Rd. / Belle Plane Rd. (44.58361, -88.09459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.9671 |
Other (At-Grade) Single-Lane |
2000 | Roundabout was constructed in center of residential subdivision south of Lineville Road. Roundabout is slightly smaller than the Lineville roundabouts. Completed August 2000. http://www.co.brown.wi.us/Planning/roundabouts.html Functional Class: Local ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Velp Ave. (CTH HS) / Woodale Ave. (CTH EB) (44.57293, -88.07800) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3300 |
Other (At-Grade) Single-Lane |
2002 | Roundabout Located near industrial park, rail line, and the Mountain-Bay Recreational Trail. Roundabout is at the intersection of two county highways and is slightly larger than the roundabouts built in 1999 and 2001 in Howard and De Pere. Completed August 2002. http://www.co.brown.wi.us/Planning/roundabouts.html. Fatal crash June 5, 2011. 11861-05. Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Grant St. (CTH EE) / S 9th St. (44.44506, -88.09000) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.4324 |
Other (At-Grade) Single-Lane |
2003 | Roundabout located within residential neighborhood that also contains a few small businesses and a fire station. One of the fire station driveways directly accesses the roundabout. Completed August 2003. http://www.co.brown.wi.us/Planning/roundabouts.html ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Suburban Dr. (44.43055, -88.08604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4090 |
Other (At-Grade) Single-Lane |
2004 | One of two roundabouts on an arterial street that separates a residential neighborhood from a business park. Many trucks traveling to and from the business park pass through this intersection each day, and the roundabout serves as an attractive entrance to the neighborhood and park. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / S 9th St. / W Matthew Dr. (44.43063, -88.09529) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8205 |
Other (At-Grade) Single-Lane |
2004 | Second of two roundabouts on an arterial street separating residential neighborhood from a business park. Many trucks pass through this intersection each day. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Kendall Ave. / Grand Ave. (43.07145, -89.43156) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
1997 | |
Madison,
WI Dane Co. United States |
New Washburn Way / Dandaneau Trl. / Chautauqua Trl. (43.04669, -89.51501) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways 13.9650 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Madison,
WI Dane Co. United States |
Glenway St. / Hillcrest Dr. (43.06437, -89.43896) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways 11.3433 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Oshkosh,
WI Winnebago Co. United States |
Jackson St. / Murdock Ave. (44.03947, -88.54265) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | |
Bellevue,
WI Brown Co. United States |
US 141 / Allouez Ave. (44.45882, -87.95038) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4753 |
Other (At-Grade) Single-Lane |
2007 | Railroad is ~110 feet from roundabout. Seasonal summaer crossing and maybe 1 train per day for a short duration. Opened November 2, 2007. ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Perimeter St. (43.01009, -89.72186) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5667 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Brookwood Dr. (43.00978, -89.71380) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8068 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Telmark Pkwy. (43.00933, -89.71098) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.6540 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / Ridgeview Rd. / Lillehammer Ln. (43.00663, -89.70390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.4418 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Mount Horeb,
WI Dane Co. United States |
Springdale St. / STH 78 / STH 92 (43.01007, -89.73044) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9333 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Series of five roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Thompson Dr. / STH 30 EB Off-Ramp (43.10506, -89.30066) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.0073 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened October 22, 2004. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Thompson Dr. / STH 30 WB On-Ramp / Commercial Ave. (43.10643, -89.30084) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9822 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Opened October 22, 2004. ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / I-43 NB Ramps (43.79261, -87.76325) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0714 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / I-43 SB Ramps (43.79406, -87.76523) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9673 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
STH 42 / Vanguard Dr. (Walmart entrance) (43.79655, -87.76846) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.5517 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Opened November 2007. Roundabout serves Wal-mart retail center. http://www.sheboygan-press.com/apps/pbcs.dll/article?AID=/20071028/SHE0101/710280468/1973 Functional Class: Arterial ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
8th St. / Indiana Ave. (43.74340, -87.71295) |
Other Existing |
Unknown Unknown |
5 Approaches 0 Driveways 56.9471 |
Other (At-Grade) Unknown |
ICD estimated from Google Maps linework. | |
Sheboygan Falls,
WI Sheboygan Co. United States |
STH 28 / STH 32 (43.71747, -87.81612) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1180 |
Other (At-Grade) Single-Lane |
2006 | Opened September 2006. High speed approach roadways. ICD estimated from Google Maps linework. |
Rice Lake,
WI Barron Co. United States |
CTH O (18 1 / 2 Ave.) / 19th St. (45.47333, -91.76556) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.3129 |
Other (At-Grade) Single-Lane |
2005 | Opened October 25, 2005. ICD estimated from Google Maps linework. |
Rice Lake,
WI Barron Co. United States |
CTH O (18 1 / 2 Ave.) / US 53 NB Ramps (45.47319, -91.75753) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5006 |
Freeway Ramps (Grade-Separated) Single-Lane |
2006 | Opened June 1, 2006 ICD estimated from Google Maps linework. |
Rice Lake,
WI Barron Co. United States |
CTH O (18 1 / 2 Ave.) / US 53 SB Ramps (45.47325, -91.76021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5005 |
Freeway Ramps (Grade-Separated) Single-Lane |
2006 | Opened June 1, 2006 ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 41 SB Ramps (43.28170, -88.19557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.3868 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 41 NB Ramps (43.28247, -88.19345) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7780 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / Cabela Way (43.28377, -88.18944) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9939 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. Functional Class: Arterial ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 45 SB Ramps (43.28387, -88.18716) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.5606 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 45 NB Ramps (43.28380, -88.18485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4301 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Greenleaf,
WI Brown Co. United States |
STH 32-STH 57 (Greenleaf Rd.) / STH 96 (Day St.) (44.31343, -88.09599) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.3285 |
Other (At-Grade) Single-Lane |
2007 | Opened August 31, 2007. ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
Eaton Rd. (CTH JJ) / Ontario Rd. (44.46616, -87.92782) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.6846 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Bellevue,
WI Brown Co. United States |
Eaton Rd. (CTH JJ) / Cottage Rd. / Huron Rd. (44.46617, -87.91737) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.1275 |
Other (At-Grade) Single-Lane |
2005 | Completed summer 2005. Right-turn bypass lane on NW quadrant. ICD estimated from Google Maps linework. |
Allouez,
WI Brown Co. United States |
Allouez Ave. (CTH O) / Libal St. (44.47738, -88.01638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.8612 |
Other (At-Grade) Single-Lane |
2006 | Opened July 1, 2006. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Glendale Ave. / Pinecrest Rd. (44.56910, -88.11016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.0779 |
Other (At-Grade) Single-Lane |
2005 | Completed summer 2005. Skewed intersection. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / PDQ Dr. / Mid Valley Dr. (44.43032, -88.11939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9379 |
Other (At-Grade) Single-Lane |
2010 | Series of 6 roundabouts. Opened November 22, 2010. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Lawrence Dr. (44.43083, -88.10675) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7605 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 6 roundabouts. Opened November 2, 2010. ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
Evergreen Dr. / Gateway Dr. (44.30178, -88.37136) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4804 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
Evergreen Dr. / Lightning Dr. (44.30166, -88.36722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4804 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
Evergreen Dr. / Providence Ln. (44.30159, -88.36140) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.6257 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Appleton,
WI Outagamie Co. United States |
Evergreen Dr. / French Rd. (44.30169, -88.35349) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0447 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Harrison,
WI Calumet Co. United States |
US 10 / CTH N (44.21305, -88.32317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.3854 |
Other (At-Grade) Single-Lane |
2008 | Fatal crash January 8, 2012. 11861-05. Opened October 2008. ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
W Main St. (STH 19) / STH 26 NB Ramps (43.19772, -88.76607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3091 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
W Main St. (STH 19) / STH 26 SB Ramps (43.19772, -88.76804) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.6971 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Watertown,
WI Dodge Co. United States |
BUS 26 (N Church St.) / STH 16 WB Ramps / Provimi Rd. (43.21918, -88.73837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.5177 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Dodge Co. United States |
BUS 26 (N Church St.) / STH 16 EB Ramps (43.21605, -88.73625) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.2976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
E Horseshoe Rd. / CTH T (43.19009, -88.76381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.2185 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
E Horseshoe Rd. / CTH A (Milford St.) (43.16401, -88.76087) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2014 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
E Horseshoe Rd. / Jefferson Rd. (43.15839, -88.74851) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.3640 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
Jefferson Rd. / CTH Y (43.15325, -88.75062) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5944 |
Other (At-Grade) Single-Lane |
2010 | Near railroad crossing. ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
CTH Y (S Church St.) / STH 26 NB Ramps (43.15562, -88.74126) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7217 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
CTH Y (S Church St.) / STH 26 SB Ramps (43.15450, -88.74223) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3362 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
BUS 26 (S Church St.) / High Rd. (43.16088, -88.73526) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.8169 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Winnebago St. / N 6th St. / Division St. (43.09783, -89.35031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.5463 |
Other (At-Grade) Single-Lane |
2008 | Opened June 2008. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Observatory Dr. / Walnut St. (43.07660, -89.42510) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.4917 |
Other (At-Grade) Single-Lane |
2008 | Opened November 8, 2008. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
Blackwolf Dr. / Samuel Dr. (43.07136, -89.53336) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0463 |
Other (At-Grade) Single-Lane |
2001 | Functional Class: Local ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Washburn St. (44.01085, -88.58483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 SB Ramps (44.01089, -88.58318) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 NB Ramps (44.01078, -88.58145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Koeller St. (44.01079, -88.57978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
US 45 / US 41 SB Ramps (44.06074, -88.57443) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / Tullar Rd. (44.15640, -88.49503) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.1352 |
Other (At-Grade) Single-Lane |
2005 | Right turn bypass lane on east leg. Opened September 2005. Functional Class: Arterial ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / Gillingham Rd. / Bergstrom Rd. (44.15643, -88.48816) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5587 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 SB Ramps (44.15623, -88.48662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1274 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |