City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Lincoln,
NE Lancaster Co. United States |
Norris Ln. / Allen Rd. (40.73926, -96.64874) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | |
Lincoln,
NE Lancaster Co. United States |
Pony Hill Ct. / S 53rd Street Ct. (40.73628, -96.64731) |
Other Existing |
Uncontrolled None |
3 Approaches 4 Driveways 28.6512 |
Other (At-Grade) Single-Lane |
2000 | |
Lincoln,
NE Lancaster Co. United States |
Augusta Dr. / Glenneagle Ct. (40.76271, -96.60008) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.1373 |
Other (At-Grade) Single-Lane |
2000 | No splitter islands. Northeast leg stubbed. Driveway removed and southeast leg added in 2021. |
Lincoln,
NE Lancaster Co. United States |
Augusta Dr. / Troon Dr. (40.76126, -96.60395) |
Other Existing |
All-Way Yield None |
3 Approaches 2 Driveways 34.1373 |
Other (At-Grade) Single-Lane |
2000 | No splitter islands on south or east legs. Clear evidence in aerial photo of U-turns in front of central island. Driveways added in 2014. |
Lincoln,
NE Lancaster Co. United States |
S 93rd Pl. / Medinah Dr. (40.75693, -96.59438) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 34.4421 |
Other (At-Grade) Single-Lane |
2006 | No splitter island on west leg. |
Lincoln,
NE Lancaster Co. United States |
Brummond Dr. / O'Malley Dr. (40.73324, -96.67625) |
Other Existing |
Uncontrolled None |
4 Approaches 0 Driveways 26.8221 |
Other (At-Grade) Single-Lane |
2000 | East leg added in 2008. |
(unincorporated),
NE Douglas Co. United States |
Northern Hills Dr. / N 182nd St. / N 182nd Creek (41.37520, -96.19863) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2008 | Traversable splitter islands. |
Columbus,
NE Platte Co. United States |
41st Ave. / Discoverer Dr. (41.45678, -97.37745) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2015 | |
Lincoln,
NE Lancaster Co. United States |
E Pershing Rd. / Kings Hwy. (40.78010, -96.69289) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
1926 | |
Lincoln,
NE Lancaster Co. United States |
Kings Hwy. / Grimsby Ln. (40.78011, -96.69413) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
1926 | |
Lincoln,
NE Lancaster Co. United States |
S Pershing Rd. / Grimsby Ln. (40.77786, -96.69414) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 24.9936 |
Other (At-Grade) Single-Lane |
1926 | |
Lincoln,
NE Lancaster Co. United States |
S Pershing Rd. / E Pershing Rd. (40.77781, -96.69291) |
Other Existing |
Uncontrolled None |
2 Approaches 2 Driveways 25.6032 |
Other (At-Grade) Single-Lane |
1926 | |
Plattsmouth,
NE Cass Co. United States |
US 34 / 8th Ave. / 2nd Ave. / (parking) (41.00229, -95.90650) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2008 | Yielding right-turn bypass lane on west leg. |
Lincoln,
NE Lancaster Co. United States |
N 86th St. / Garland St. (40.83451, -96.60401) |
Other Existing |
Uncontrolled None |
4 Approaches 0 Driveways 33.8325 |
Other (At-Grade) Single-Lane |
2007 | West leg stubbed. |
Lincoln,
NE Lancaster Co. United States |
Wilderness Ridge Dr. / Wilderness Woods Pl. / Stone Creek Loop (40.72525, -96.69140) |
Other Existing |
Uncontrolled None |
4 Approaches 0 Driveways 58.5216 |
Other (At-Grade) Single-Lane |
2002 | No splitter islands on west or south legs. |
Hastings,
NE Adams Co. United States |
S Technical Blvd. / E Military Dr. (40.57940, -98.32650) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2011 | |
Sidney,
NE Cheyenne Co. United States |
Outfitter Way / Anna Dr. (41.11520, -102.96810) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2016 | Elliptical shaped. ICD = 115 ft x 105 ft. |
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 EB Ramps (40.68931, -96.62932) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Lincoln,
NE Lancaster Co. United States |
Saltillo Rd. / S 70th St. (40.69710, -96.62531) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.4840 |
Other (At-Grade) Single-Lane |
2021 | |
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 WB Ramps (40.69162, -96.62914) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9973 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Chalco,
NE Sarpy Co. United States |
Meadows Pkwy. / Meadow Ridge Rd. (41.17162, -96.13438) |
Other Existing |
Other None |
3 Approaches 1 Driveways 82.6008 |
Other (At-Grade) Single-Lane |
1979 | Mix of stop and yield control on entry. |
Lincoln,
NE Lancaster Co. United States |
Holdrege St. / N 104th St. (40.82767, -96.57822) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.lincoln.ne.gov/City/Departments/LTU/LTU-Projects/LOTM/Projects/Growth/104th-and-Holdrege |
Hickman,
NE Lancaster Co. United States |
S 68th St. / Hickman Rd. (40.62515, -96.62933) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.facebook.com/photo/?fbid=457338483244753&set=ecnf.100069058155212 https://www.hickman.ne.gov/vnews/display.v/ART/62acd7b6a8725 |
Lincoln,
NE Lancaster Co. United States |
Holdrege St. / Cedar Cove Rd. (40.82790, -96.59731) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Cedar Cove was previously a gravel road with no stop sign. Year Completed estimated (2021-2022). |
Lincoln,
NE Lancaster Co. United States |
W Holdrege St. / W Partridge Ln. (40.82819, -96.79292) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Lincoln,
NE Lancaster Co. United States |
W Holdrege St. / NW 50th St. (40.82822, -96.78975) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Lincoln,
NE Lancaster Co. United States |
A St. / S 89th St. (40.79883, -96.59931) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2021 | |
Lincoln,
NE Lancaster Co. United States |
A St. / S 94th St. (40.79880, -96.59348) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Lincoln,
NE Lancaster Co. United States |
Van Dorn St. / S 87th St. (40.78424, -96.60261) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Lincoln,
NE Lancaster Co. United States |
Van Dorn St. / S 91st St. / Big Timber Rd. (40.78422, -96.59548) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | |
Lincoln,
NE Lancaster Co. United States |
S 40th St. / Wilderness Hills Blvd. (40.71914, -96.66346) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Lincoln,
NE Lancaster Co. United States |
Rokeby Rd. / S 73rd Ave. (40.71184, -96.62136) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Lincoln,
NE Lancaster Co. United States |
Rokeby Rd. / Friedman Rd. (40.71183, -96.61568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Lincoln,
NE Lancaster Co. United States |
Yankee Hill Rd. / S 44th St. (40.72623, -96.65865) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.klkntv.com/lincolns-yankee-hill-road-reopens-after-more-than-a-year/ |
Lincoln,
NE Lancaster Co. United States |
Yankee Hill Rd. / S 48th St. (40.72625, -96.65407) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.klkntv.com/lincolns-yankee-hill-road-reopens-after-more-than-a-year/ |
Lincoln,
NE Lancaster Co. United States |
Yankee Hill Rd. / S 50th St. (40.72629, -96.64915) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.klkntv.com/lincolns-yankee-hill-road-reopens-after-more-than-a-year/ |
(unincorporated),
NE Sarpy Co. United States |
S 180th St. / Cornhusker Rd. (41.16150, -96.19661) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Grand Island,
NE Hall Co. United States |
W Old Potash Hwy. / Claude Rd. (40.91712, -98.38794) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.facebook.com/garysautoinc/videos/the-roundabout-at-claude-road-and-old-potash-is-getting-closer-but-stilltake-a-l/1828703987312477/ |
Lincoln,
NE Lancaster Co. United States |
S Folsom St. / W Palm Canyon St. (40.75232, -96.73030) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2022 | Striped out shoulder on right side of north and south entries. https://www.lincoln.ne.gov/City/Departments/LTU/LTU-Projects/LOTM/Projects/Growth/Folsom-at-Old-Cheney |
Gretna,
NE Sarpy Co. United States |
S 180th St. / Lincoln Rd. (41.15455, -96.19669) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Gretna,
NE Sarpy Co. United States |
S 180th St. / Camelback Ave. (41.15770, -96.19688) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Lincoln,
NE Lancaster Co. United States |
S 70th St. / Carger Ln. (40.70352, -96.62537) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | |
Lincoln,
NE Lancaster Co. United States |
S Coddington Ave. / W A St. (40.79914, -96.74940) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Yield-controlled right-turn bypass lanes on north and south legs. Add-lane right-turn bypass lane on east leg. Designed for future expansion to 2x2 configuration. Year Completed estimated (2022-2023). |
Scottsbluff,
NE Scotts Bluff Co. United States |
12th Ave. / Winter Creek Dr. (41.87724, -103.64779) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0037 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2014-2019). |
Grand Island,
NE Hall Co. United States |
N Broadwell Ave. / State St. / Eddy St (40.93841, -98.35889) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Per news report, project cost around $4 million. https://www.kmvt.com/video/2023/09/29/five-points-roundabout-now-open-grand-island/. https://www.grand-island.com/departments/public-works/engineering/2019-planned-projects/five-points-intersection-improvement-2018-p-2 |
Grand Island,
NE Hall Co. United States |
N North Rd. / State St. / Cannon Rd. (40.93856, -98.39770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | https://theindependent.com/news/local/new-roundabout-planned-in-2021-for-state-and-north-intersection-in-grand-island/article_77f82b40-4989-11eb-bcd1-93eba12d8586.html |
Grand Island,
NE Hall Co. United States |
N North Rd. / W Faidley Ave. (40.92305, -98.39735) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | https://www.ksnblocal4.com/2023/04/27/progress-grand-island-north-road-construction/ |
Lincoln,
NE Lancaster Co. United States |
W Holdrege St. / W Chitwood Ln. (40.82831, -96.78397) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2022 | Elliptical shaped. ICD = 105 ft x 90 ft. South leg stubbed. Year Completed estimated (2021-2023). |
Lincoln,
NE Lancaster Co. United States |
Hohensee Dr. / State Hill Dr. / Greystone Rd. (40.72329, -96.66071) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Norfolk,
NE Madison Co. United States |
N 1st St. / W Braasch Ave. (42.03401, -97.40699) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=SkdQ3giXn8g |
Fremont,
NE Dodge Co. United States |
US 77 (Fremont Southeast Beltway) / S Downing St. (41.40772, -96.47361) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Inglewood,
NE Dodge Co. United States |
US 77 / S Broad St. / S Main St. (41.40986, -96.49868) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Left-through-right and right-turn-only lanes on northwest leg. Year Completed estimated (2023-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 NB Ramps / Old Highway 8 (41.40473, -96.44391) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 SB Ramps (41.40474, -96.44633) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024). |
Omaha,
NE Douglas Co. United States |
S 201st Ave. / C St. (41.22340, -96.22902) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2004-2006). |
Omaha,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / George B Lake Pkwy. (41.22537, -96.22721) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2004-2005). |
Omaha,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / 197th St. (41.25016, -96.22379) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). |
Lincoln,
NE Lancaster Co. United States |
W A St. / S Folsom St. (40.79911, -96.73022) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.lincoln.ne.gov/City/Departments/LTU/LTU-Projects/Projects/West-A-Street-Improvement-Project (video shows the roundabout at about 1:45) |
Omaha,
NE Douglas Co. United States |
Grebe St. / N 126th St. (41.33402, -96.11002) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2005-2009). |
Omaha,
NE Douglas Co. United States |
Read St. / N 126th St. (41.32377, -96.11005) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1999-2003). |
Bennington,
NE Douglas Co. United States |
Kilpatrick Pkwy. / Young St. (41.33283, -96.18653) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). |
Bennington,
NE Douglas Co. United States |
N HWS Cleveland Blvd. (41.33694, -96.16799) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2006-2009). |
Elkhorn,
NE Douglas Co. United States |
N HWS Cleveland Blvd. / Sprague St. (41.29581, -96.18682) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (1999-2003). |
Elkhorn,
NE Douglas Co. United States |
N 183rd St. / George Miller Pkwy. (41.29895, -96.20290) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Elkhorn,
NE Douglas Co. United States |
N 189th St. / Sahler St. (41.29569, -96.21044) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2014). |
Elkhorn,
NE Douglas Co. United States |
N 189th St. / Bedford Ave. (41.28897, -96.21167) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2017 | |
Elkhorn,
NE Douglas Co. United States |
Big Elk Pkwy. / N 185th St. / Bedford Ave. (41.28766, -96.20485) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2019 | |
Elkhorn,
NE Douglas Co. United States |
Big Elk Pkwy. / N 182nd Ave. / Emmet St. (41.28828, -96.20098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2020 | |
Elkhorn,
NE Douglas Co. United States |
Emmet St. (41.28813, -96.18910) |
Other Existing |
Unknown Unknown |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Elkhorn,
NE Douglas Co. United States |
HWS Cleveland Blvd. / Harney St. (41.25526, -96.22319) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). |
Elkhorn,
NE Douglas Co. United States |
Brookstone Meadows Plaza (41.25322, -96.23221) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Elkhorn,
NE Douglas Co. United States |
S HWS Cleveland Blvd. / Emile St. (41.25294, -96.22244) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (1999-2003). |
Elkhorn,
NE Douglas Co. United States |
S 188th St. / Marcy St. (41.25070, -96.20884) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Elkhorn,
NE Douglas Co. United States |
S 193rd St. / S 194th St. / C St. (41.22337, -96.21732) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (1999-2003). |
Elkhorn,
NE Douglas Co. United States |
George B Lake Pkwy. / Nina St. (41.22276, -96.23790) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Elkhorn,
NE Douglas Co. United States |
Blue Sage Dr. / Vinton St. (41.23012, -96.24218) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2020 | |
Elkhorn,
NE Douglas Co. United States |
Vinton St. / S 205th St. (41.22866, -96.23605) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Elkhorn,
NE Douglas Co. United States |
Blue Sage Dr. / Grover St. (41.22729, -96.24664) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Elkhorn,
NE Douglas Co. United States |
S 213th St. / I St. (41.21572, -96.24816) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2020). |
Omaha,
NE Sarpy Co. United States |
S 186th St. / Chandler St. (41.18404, -96.20711) |
Other Existing |
Unknown Unknown |
3 Approaches 8 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Hershey,
NE Lincoln Co. United States |
S Lincoln Ave. / Link 56C (41.15482, -101.00331) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2016 | https://www.knopnews2.com/content/news/Hershey-viaduct-opens-to-the-public-403897556.html |
Grand Island,
NE Hall Co. United States |
W Old Potash Hwy. / Wilmar Ave. (40.91702, -98.38177) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | https://nebraska.tv/news/local/grand-island-old-potash-highway-construction-update-roundabout-281 |
Grand Island,
NE Hall Co. United States |
S Adams St. / (school access) / (school access) (40.90437, -98.34699) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2018 | https://www.grand-island.com/departments/public-works/engineering/2018-completed-projects/adams-street-paving-project-no-2016-p-2 |
Roca,
NE Lancaster Co. United States |
Saltillo Rd. / US 77 (S 12th St.) NB Ramps / S 14th St. (40.69740, -96.70305) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Roca,
NE Lancaster Co. United States |
Saltillo Rd. / US 77 (S 12th St.) SB Ramps / Shrine Way (40.69716, -96.70783) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Omaha,
NE Douglas Co. United States |
Crown Point Ave. / (east school access) (41.31280, -96.03877) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 25.9080 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | Year Completed estimated (2020-2021). |
Omaha,
NE Douglas Co. United States |
Crown Point Ave. / (west school access) (41.31253, -96.04291) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 25.9080 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | Year Completed estimated (2020-2021). |
Mandan,
ND Morton Co. United States |
Old Red Trl. NE / Collins Ave. / Hwy 1806 (46.84308, -100.89301) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.facebook.com/CityofMandan/posts/the-new-roundabout-at-the-intersection-of-collins-ave-old-red-trail-and-hwy-1806/4909144435769104/ |
Osgood,
ND Cass Co. United States |
Rocking Horse Circle (46.80800, -96.88756) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
Buildings and parking in central island. | |
Beulah,
ND Mercer Co. United States |
ND 49 / ND 200 (47.29909, -101.78564) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.youtube.com/watch?v=7BE9V4BbT2E |
Fargo,
ND Cass Co. United States |
63rd Ave. S / 38th St. S (46.79147, -96.84836) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2021 | |
Bismarck,
ND Burleigh Co. United States |
N 19th St. / E Calgary Ave. (46.84530, -100.76220) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | Painted splitter islands. https://us1033.com/bismarcks-first-mini-roundabout-is-now-open-people-are-freakin/. https://www.youtube.com/watch?v=6m3XF49XU4Q. |
New Town,
ND Mountrail Co. United States |
ND 23 / ND 8 (47.97788, -102.34376) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2023 | |
Mandaree,
ND McKenzie Co. United States |
ND 22 / ND 73 (47.77889, -102.71784) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2023 | |
Fargo,
ND Cass Co. United States |
41st Ave. S / 41st St. SW (46.81658, -96.84783) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 31.3944 |
Other (At-Grade) Single-Lane |
2006 | No splitter islands. |
Horace,
ND Cass Co. United States |
CR 17 S / 64 Ave. S (46.78960, -96.90300) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2023 | |
Bismarck,
ND Burleigh Co. United States |
Ash Coulee Dr. / Valley Dr. (46.85492, -100.80461) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | |
Williston,
ND Williams Co. United States |
26th St. W / 9th Ave. W (48.16873, -103.63658) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2022 | Right-turn-only leg on west leg. |
Williston,
ND Williams Co. United States |
26th St. E / E Dakota Pkwy. (48.16880, -103.60741) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | |
Fargo,
ND Cass Co. United States |
23rd Ave. S / 41st St. S (46.84327, -96.84778) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2018-2020). |