|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
Kostanjevica na Krasu,
Miren-Kostanjevica Slovenia |
SR 614 (Miren) / (unknown) (45.89908, 13.61504) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Borovlyanskiy sel'skiy sovet,
Minsk Province Minskiy rayon Belarus |
Aviatsionnaya / (Wright Brothers St.) (53.95852, 27.66416) |
Unknown Existing |
Unknown None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
|
Minsk,
Minsk Minsk Belarus |
Stalietava / Zaporozhskaya / Filimonava (53.90697, 27.63042) |
Roundabout Existing |
All-Way Yield Pedestrian Signal (red-yellow-green to drivers) |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
|
Minsk,
Minsk Minsk Belarus |
Maksima Bahdanovica / Arlouskaja / Surganova (53.93130, 27.57690) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
|
Herning,
Middle Jutland Herning Denmark |
Vesterholmvej / Gullestrupvej (56.15784, 8.96920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Århus,
Middle Jutland Århus Denmark |
Ormslevvej / Klokkeskovvej / Byvænget (56.12862, 10.11565) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Århus,
Middle Jutland Århus Denmark |
Ormslevvej / Jarlsmindevej (56.12847, 10.12520) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Brabrand,
Middle Jutland Århus Denmark |
Silkeborgvej / Herningmotorvejen (56.15248, 10.07507) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Horsens,
Middle Jutland Horsens Denmark |
Torstedalle / Thorsvej / Langballe / Kvartetvej (55.84926, 9.81540) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute O1 (Lægårdvej - Enghavevej) / Stationsvej / Lægårdvej (56.36256, 8.62117) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Randers,
Middle Jutland Randers Denmark |
Primærrute 16-Primærrute 21 (Ringvej Syd) / E45 (Nordjyske Motorvej) NB Ramps / Sekundærrute 511 (Tulipvej) / Stånumvej / Merkurvej (56.41388, 10.07852) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
|
Viborg,
Middle Jutland Viborg Denmark |
Primærrute 16-Primærrute 13 (Nordre Ringvej) / Primærrute 13 (Aalborgvej) / Indre Ringvej (56.47475, 9.41660) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Merging right-turn bypass lane on north leg. | |
|
Viborg,
Middle Jutland Viborg Denmark |
Primærrute 16 (Nordre Ringvej) / Houlkærvej (56.47208, 9.44476) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Holstebro,
Middle Jutland Holstebro Denmark |
Sekundærrute 189 (Skivevej) / Primærrute 18 (Holstebromotorvejen) WB Ramps (56.38708, 8.65517) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
|
Holstebro,
Middle Jutland Holstebro Denmark |
Sekundærrute 189 (Skivevej) / Primærrute 18 (Holstebromotorvejen) WB Ramps / (parking) (56.38505, 8.65214) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
|
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Primærrute 18 (Holstebromotorvejen) WB Ramps (56.36871, 8.72131) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
|
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Primærrute 18 (Holstebromotorvejen) EB Ramps (56.36814, 8.71820) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
|
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Østre Ringvej / Sletten (56.36332, 8.67574) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Silkeborg,
Middle Jutland Silkeborg Denmark |
Primærrute 46 (Nørreskov Bakke) / Nordre Højmarksvej / Østre Højmarksvej (56.19847, 9.59181) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Silkeborg,
Middle Jutland Silkeborg Denmark |
Nordre Højmarksvej / Sejling Hedevej / Kejlstrupvej (56.19849, 9.55834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Silkeborg,
Middle Jutland Silkeborg Denmark |
Nordre Højmarksvej / Høje Kejlstrupvej / (parking) (56.19747, 9.54622) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Silkeborg,
Middle Jutland Silkeborg Denmark |
Primærrute 52 (Viborgvej) / Nordre Højmarksvej (56.19552, 9.52550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Herning,
Middle Jutland Herning Denmark |
Sekundærrute 195 (Dronningens Blvd.) / Primærrute 15 Ramps / Snejbjergvej (56.11757, 8.90629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
|
Ringkøbing,
Middle Jutland Denmark |
Primærrute 15 (Vestre Ringvej - Nordre Ringvej) / Primærrute 16 (Holstebrovej) (56.10564, 8.25936) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Silkeborg,
Middle Jutland Silkeborg Denmark |
Sekundærrute 195 (Skærskovhedevej) / Herningmotorvejen / Funder Dalgårdsvej (56.14664, 9.45466) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Århus,
Middle Jutland Århus Denmark |
Christian X's Vej / Jyllands Allé / (parking) (56.12205, 10.17032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Grenå,
Middle Jutland Denmark |
Østerbrogade / N.P. Josiassens Vej (56.41399, 10.88659) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
||
|
Grenå,
Middle Jutland Denmark |
Kannikegade / Østerbrogade / Rosengade / Stationsvej (56.41342, 10.87920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Orion,
MI Oakland Co. United States |
Baldwin Rd. / (parking) (42.72527, -83.30757) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | West leg is for athletic club; east leg is for a small strip mall. A fountain is featured in the circle. |
|
Orion,
MI Oakland Co. United States |
Baldwin Rd. / Maybee Rd. (42.72884, -83.30775) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Yield-controlled right-turn bypass lane on east leg. West leg enters into a residential subdivision local road. |
|
Orion,
MI Oakland Co. United States |
Baldwin Rd. / Waldon Rd. (42.73619, -83.30805) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | |
|
Orion,
MI Oakland Co. United States |
E Flint St. / Orion Rd. / Miller Rd. (42.78398, -83.23184) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | |
|
Independence,
MI Oakland Co. United States |
Sashabaw Rd. / Oak Hill Rd. (42.79422, -83.37240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | West leg is unpaved away from roundabout. |
|
Swartz Creek,
MI Genesee Co. United States |
Grand Blanc Rd. / Morrish Rd. (42.91289, -83.83040) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://swartzcreekview.mihomepaper.com/articles/traffic-circle-construction-underway-bridge-work-set-to-begin/ |
|
Columbus,
MI St. Clair Co. United States |
Gratiot Ave. / Palms Rd. (42.85156, -82.63709) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.thetimesherald.com/story/news/2021/09/29/roundabout-palms-gratiot-open-traffic-week-columbus-twp/5913286001/ |
|
Traverse City,
MI Grand Traverse Co. United States |
Parsons Rd. / Airport Access Rd. (44.75181, -85.58162) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
|
Traverse City,
MI Grand Traverse Co. United States |
M-37 / Vance Rd. (44.65747, -85.65622) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
|
Swartz Creek,
MI Genesee Co. United States |
Grand Blanc Rd. / Linden Rd. (42.91411, -83.77008) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
|
Traverse City,
MI Grand Traverse Co. United States |
Hammond Rd. E / Four Mile Rd. N (44.71542, -85.53638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2021 | https://www.record-eagle.com/news/local_news/winding-down-hammond-4-mile-roundabout-opens/article_8b0055ae-0ffa-11ec-99ed-8be394157c49.html |
|
Rochester,
MI Oakland Co. United States |
E Avon Rd. / Dequindre Rd. (42.67168, -83.09685) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Bridge to the east and roundabout at Avon and Dequindre is under construction November 2021. http://www.rcocweb.org/606/Avon-Road-Dequindre-to-23-Mile-Road The one driveway is a utility drive. Note: Popular Cider mill is to the east as well with another roundabout planed for 2022 at Dequindre and 23 Mile Rd. |
|
Shelby Township,
MI Macomb Co. United States |
E Avon Rd. / 23 Mile Rd. (42.67368, -83.09389) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Roundabout constructed after completion of bridge and roundabout to the west is completed. |
|
China,
MI St. Clair Co. United States |
Fred W Moore Hwy. / Wadhams Rd. (42.81537, -82.55479) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2019-2022). |
|
Novi,
MI Oakland Co. United States |
Gateway Rd. / Woodstone Ln. (42.52271, -83.49676) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Wixom,
MI Oakland Co. United States |
W Chambers St. / Johanna Ware W (42.52579, -83.53382) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Belmont,
MI Kent Co. United States |
Seven Mile Rd. NE / Brewer Ave. NE (43.07137, -85.57053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2006-2009). |
|
Portage,
MI Kalamazoo Co. United States |
Zylman Ave. / Coxs Dr. (42.19367, -85.55061) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | Replaced offset T-intersections. Year Completed estimated (2018-2020). |
|
Auburn Hills,
MI Oakland Co. United States |
Pioneer Dr. / Meadow Brook Rd. (42.66857, -83.21853) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2018 | Previous T-intersection shifted to east. |
|
Auburn Hills,
MI Oakland Co. United States |
N Squirrel Rd. / Squirrel Ct. (42.63475, -83.22058) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Yield-controlled right-turn bypass lane on north leg. |
|
Clinton Township,
MI Macomb Co. United States |
Partridge Creek Blvd. / Scoter Ln. / Montage (42.62068, -82.94597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Opened with unstriped circulatory roadway. Marked with two circulating lanes throughout even though side streets are single-lane entries. Combination of concentric and exit striping added 2019-2020. |
|
Clinton Township,
MI Macomb Co. United States |
Partridge Creek Blvd. / Hawk Ln. / Montage (42.62063, -82.94027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Opened with unstriped circulatory roadway. North leg added 2015-2016. Marked with two circulating lanes throughout even though side streets are single-lane entries. Combination of concentric and exit striping added 2019-2020. |
|
Southfield,
MI Oakland Co. United States |
Franklin Rd. / W Eleven Mile Rd. (42.48636, -83.29104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2018). |
|
Northville,
MI Wayne Co. United States |
Yellowstone Dr. / Johnson Creek Dr. (42.40412, -83.52414) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2005 | |
|
Northville,
MI Wayne Co. United States |
Carriage Way / Glacier Rd. (42.40220, -83.53576) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
|
Northville,
MI Wayne Co. United States |
Johnson Creek Dr. / (park entrance) (42.39610, -83.51860) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
|
Lansing,
MI Ingham Co. United States |
Forest Rd. / Collins Rd. (42.70389, -84.49795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | |
|
Waterford,
MI Oakland Co. United States |
Skippter Dr. / (parking) (42.65920, -83.38892) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. Within shopping mall property. | |
|
Sister Lakes,
MI Washtenaw Co. United States |
N Bay Dr. / Timmins Dr. / Chapleau Dr. (42.26417, -83.79140) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on three legs. | |
|
Grand Blanc,
MI Genesee Co. United States |
E Grand Blanc Rd. / Embury Rd. (42.91693, -83.64652) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.abc12.com/news/grand-blanc-road-reopens-following-roundabout-construction-project/article_39b8087a-3083-5a44-b841-c1872cfd8918.html. |
|
Monroe,
MI Monroe Co. United States |
Laplaisance Rd. / I-75 NB On-Ramp (41.87651, -83.39471) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | https://www.monroenews.com/story/news/traffic/2021/12/03/new-bridge-roundabouts-laplaisance-rd-open/8836648002/ Plan is to move NB offramp to the roundabout at some tuture time. |
|
Monroe,
MI Monroe Co. United States |
Laplaisance Rd. / I-75 SB Ramps (41.87817, -83.39577) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | https://www.monroenews.com/story/news/traffic/2021/12/03/new-bridge-roundabouts-laplaisance-rd-open/8836648002/ |
|
Bay City,
MI Bay Co. United States |
MacKinaw Rd. / US 10 WB Ramps (43.59677, -83.99239) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
|
Bay City,
MI Bay Co. United States |
MacKinaw Rd. / US 10 EB Ramps (43.59527, -83.99235) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
|
Davison,
MI Genesee Co. United States |
Lapeer Rd. / Oak Rd. (43.01793, -83.49786) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://davisonindex.mihomepaper.com/articles/new-roundabout-opens/ |
|
Green Oak Township,
MI Livingston Co. United States |
Whitmore Lake Rd. / Silver Lake Rd. / US 23 SB Ramps (42.46683, -83.75719) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 1 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | |
|
Westwood,
MI Kalamazoo Co. United States |
N Drake Rd. / Squires Dr. / W H Ave. (42.31852, -85.64814) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.mlive.com/news/kalamazoo/2024/08/new-roundabout-opens-near-kalamazoo-school.html |
|
Augusta Township,
MI Washtenaw Co. United States |
Whittaker Rd. / Willis Rd. (42.15726, -83.60088) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/photo.php?fbid=960810756074083&set=a.249859160502583&type=3. |
|
Tompkins Township,
MI Jackson Co. United States |
Springport Rd. / Minard Rd. (42.33710, -84.54673) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.mlive.com/news/jackson/2024/09/new-roundabout-opens-in-northern-jackson-county.html |
|
Ishpeming,
MI Marquette Co. United States |
US 41-M-28 / Lakeshore Dr. (46.49855, -87.68279) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.michigan.gov/mdot/news-outreach/pressreleases/2024/10/22/major-work-on-us-41-m-28-roundabout-project-in-ishpeming |
|
Washington,
MI Macomb Co. United States |
Van Dyke Ave. / Campground Rd. (42.73402, -83.03617) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=tFHwV5OfDwc |
|
Green Oak Township,
MI Livingston Co. United States |
Silver Lake Rd. / US 23 NB Ramps / Fieldcrest Dr. (42.46717, -83.75473) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Combined a previous all-way stop and two-way stop into one roundabout. https://www.facebook.com/GreenOakPolice/videos/as-a-follow-up-to-our-previous-post-about-using-the-fieldcrest-roundabout-check-/988342009671510/ |
|
Saugatuck,
MI Allegan Co. United States |
Blue Star Hwy. / Old Allegan Rd. (42.65455, -86.19046) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/cityofsaugatuck/posts/pfbid02RhgzGHQSRQtD2w4Z8zHJCDmkc7Lf1jGgz22zex43fFEpErow9awqsaULZPqrYKMal |
|
Ann Arbor,
MI Washtenaw Co. United States |
Broadway St. / (unknown) / (parking) (42.29022, -83.73723) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | |
|
Swartz Creek,
MI Genesee Co. United States |
Morrish Rd. / Lennon Rd. (42.98619, -83.83103) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=MVfZ3Y8ySsk |
|
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / I-75 NB Ramps (42.00419, -83.31263) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
|
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / Newport Rd. / I-75 SB Ramps (42.00705, -83.31515) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Yield-controlled right-turn bypass lane on southwest leg. Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
|
Genoa Township,
MI Livingston Co. United States |
Challis Rd. / Bauer Rd. (42.54205, -83.81326) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | West leg of Challis Road realigned to south at roundabout. https://www.livingstondaily.com/story/news/local/community/genoa-township/2024/09/02/roundabout-at-challis-bauer-roads-in-genoa-township-now-open/75001158007/ |
|
South Haven,
MI Allegan Co. United States |
Blue Star Hwy. / N Shore Dr. (42.42646, -86.25553) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2006-2011). |
|
Independence,
MI Oakland Co. United States |
Clintonville Rd. / Waldon Rd. (42.73447, -83.34991) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=7dLM3y1e23U |
|
South Haven,
MI Van Buren Co. United States |
Wells St. / N Bailey Ave. (42.41050, -86.26416) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2007 | Painted splitter islands. Previously offset T-intersections. Year Completed estimated (2006-2007). |
|
Ann Arbor,
MI Washtenaw Co. United States |
Red Oak Rd. / Mixtwood St. (42.29141, -83.76042) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Oval shaped. No splitter islands. https://www.mlive.com/news/ann-arbor/2023/11/ann-arbor-installs-another-mini-neighborhood-traffic-roundabout.html |
|
Ann Arbor,
MI Washtenaw Co. United States |
W Madison St. / Mount Vernon Ave. / Mount Pleasant Ave. / Eberwhite Blvd. (42.27355, -83.76147) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Pedestrian crossings adjacent to circulatory roadway on west, north, and east legs. https://www.mlive.com/news/ann-arbor/2023/10/check-out-ann-arbors-new-mini-neighborhood-roundabout-now-open-to-traffic.html |
|
Commerce,
MI Oakland Co. United States |
Wixom Rd. / Sleeth Rd. / Wixom Trl. (42.58138, -83.56045) |
Roundabout Unknown |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2026 | 2026 construction. |
|
Bruce,
MI Macomb Co. United States |
33 Mile Rd. / McKay Rd. (42.81797, -83.00023) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2019). |
|
Gaylord,
MI Otsego County United States |
S Otsego Ave. (I-75 Business) / McCoy Rd. W (45.00258, -84.67734) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.michigan.gov/mdot/news-outreach/pressreleases/2024/07/03/traffic-changes-for-i-75-bl-south-otsego-ave-project-in-gaylord-start-july-9 |
|
Mason,
MI Ingham Co. United States |
W Columbia Rd. / N Eifert Rd. / S Eifert Rd. (42.58207, -84.54266) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | Year Completed estimated (2023-2025). https://www.tiktok.com/@joshreviewsmason/video/7531497202968022285?_r=1&_t=ZT-8yML2KDMZT5 |
|
Parma,
MI Jackson Co. United States |
W Michigan Ave. / I-94 EB Ramps (42.26564, -84.61940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
|
Parma,
MI Jackson Co. United States |
W Michigan Ave. / Norton Rd. / I-94 WB Ramps (42.26653, -84.62125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Combined two intersections. https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
|
Manistee,
MI Manistee Co. United States |
1st St. / Beach Rd. (44.24639, -86.34069) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.0728 |
Other (At-Grade) Single-Lane |
2014 | |
|
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. N / Cass Rd. (44.69811, -85.61832) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | Railroad crossing on east leg 65 ft from circulatory roadway; controlled by yield sign. https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
|
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 EB Ramps (42.27461, -84.38325) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
|
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 WB Entrance Ramp (42.27627, -84.38357) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
|
Jackson,
MI Jackson Co. United States |
N Elm Ave. / Seymour Rd. / Rosehill Rd. (42.27724, -84.38398) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
|
Macomb,
MI Macomb Co. United States |
25 Mile Rd. / Romeo Plank Rd. / Garfield Rd. (42.70077, -82.95901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Year Completed estimated (2021-2022). |
|
Salem Township,
MI Washtenaw Co. United States |
N Territorial Rd. E / Pontiac Trl. (42.36546, -83.65682) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.wcroads.org/wcrc-project/pontiac-tr-n-territorial-rd-roundabout/ |
|
Northville,
MI Washtenaw Co. United States |
Eight Mile Rd. / Currie Rd. (42.43382, -83.59039) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.rcocweb.org/529/Currie-Road-COMPLETE |
|
Green Oak Township,
MI Livingston Co. United States |
Winans Lake Rd. / Rickett Rd. (42.46413, -83.76620) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.whmi.com/news/article/roundabout-rickett-winans |
|
Independence,
MI Oakland Co. United States |
Knob Hill Circle (42.73975, -83.37107) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
||
|
Independence,
MI Oakland Co. United States |
S Baldwin Rd, / Clarkston Rd. / W Clarkston Rd. (42.76543, -83.31409) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Elliptical shaped. Opened August 2024. https://www.rcocweb.org/675/Baldwin-RoadClarkston-Road-Roundabout-Op |
|
Scio Township ,
MI Washtenaw Co. United States |
W Liberty Rd. / Zeeb Rd. (42.26934, -83.83817) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.mlive.com/news/ann-arbor/2022/09/new-roundabout-near-ann-arbor-opens-after-weeks-of-construction.html |
|
Manistee Township,
MI Manistee Co. United States |
US 31 / M-22 (44.28494, -86.24281) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://upnorthlive.com/news/local/roundabout-opens-in-manistee-township |