30352 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Brevard, NC
Transylvania Co.
United States
US 64-US 276 (Asheville Hwy.) / Rustling Woods Dr.
(35.26900, -82.71022)
Roundabout
Existing
All-Way Yield
Rectangular Rapid Flashing Beacon (RRFB)
3 Approaches
0 Driveways
53.3400
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Year Completed estimated (2021-2023).
West Frankfort, IL
Franklin Co.
United States
SR 149 / Ken Gray Blvd. / West Frankfort Plaza
(37.89743, -88.95243)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2023).
Ottawa, ON
Ottawa
Canada
Greenbank Rd. / Half Moon Bay Rd.
(45.25555, -75.73742)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-lane w/ Traversable Central Island
2022 Year Completed estimated (2021-2023).
Glenwood Springs, CO
Garfield Co.
United States
Airport Rd / MIdland Rd / Four Mile Rd / (unknown)
(39.50807, -107.31691)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2021 Year Completed estimated (2021-2023).
Elk River, MN
Sherburne Co.
United States
Twin Lakes Rd. NW / Tyler St. / Twin Lakes Pkwy.
(45.31576, -93.54120)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2021-2023).
Elk River, MN
Sherburne Co.
United States
Twin Lakes Rd. NW / Line Ave. / 185th Ave. NW
(45.30775, -93.54880)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2021-2023).
Lincoln, NE
Lancaster Co.
United States
Wilderness Hills Blvd. / Hohensee Dr.
(40.72236, -96.66957)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
44.1960
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2021-2023).
Lincoln, NE
Lancaster Co.
United States
Wilderness Hills Blvd. / Tree Line Dr.
(40.71977, -96.66724)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
44.1960
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2023).
Lincoln, NE
Lancaster Co.
United States
S 40th St. / Tiger Lily Rd.
(40.70815, -96.66347)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2023).
Marion, OH
Marion Co.
United States
SR 309 (Harding Hwy. W) / Marion-Williamsport Rd.
(40.60438, -83.16986)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2021-2023).
Greeley, CO
Weld Co.
United States
W C St. / N 35th Ave.
(40.43739, -104.73495)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
47.2440
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 Year Completed estimated (2021-2023).
Timnath, CO
Larimer Co.
United States
Weitzel St. / Swetsville Zoo Rd.
(40.51930, -104.98815)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 Year Completed estimated (2021-2023).
Marion, OH
Marion Co.
United States
SR 98 (Columbus-Sandusky Rd. S) / SR 529 (Marion-Cardington Rd. E)
(40.54939, -83.05017)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2021-2024).
Sevierville, TN
Sevier Co.
United States
Gateway Blvd / Buc-ee's Blvd. (north)
(35.98354, -83.60111)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2021-2024).
Lexington, SC
Lexington Co.
United States
Saint Peters Church Rd. / Old Cherokee Rd. (east)
(34.00324, -81.30397)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
38.1000
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2021-2025).
Hamilton, ON
Hamilton
Canada
Hwy 52 / Hwy 403 WB Ramps
(43.20276, -80.04528)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Year Completed estimated (2021-2025).
Hamilton, ON
Hamilton
Canada
Hwy 52 / Hwy 430 EB Ramps
(43.19974, -80.04435)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
45.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Year Completed estimated (2021-2025).
Calgary, AB
Division 6
Canada
148 Ave. NW / Carrington Blvd. NW
(51.18699, -114.08880)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023).
Aurora, CO
Arapahoe Co.
United States
Copperleaf Blvd. / Radcliff Pkwy.
(39.63537, -104.72624)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 Year Completed estimated (2022-2023).
Davidson, NC
Cabarrus Co.
United States
SR 3 (Mooresville Rd.) / Odell School Rd.
(35.48835, -80.75930)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
41.1480
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023).
Wade, NC
Cumberland Co.
United States
Wade-Stedman Rd. / I-95 NB Ramps
(35.15849, -78.71481)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Year Completed estimated (2022-2023).
Wade, NC
Cumberland Co.
United States
Wade-Stedman Rd. / I-95 SB Ramps
(35.15945, -78.71772)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Year Completed estimated (2022-2023).
Columbia, MO
Boone Co.
United States
Nocona Pkwy. / Artemis Dr.
(38.89292, -92.28649)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Bentonville, AR
Benton Co.
United States
Watertower Rd. / SE 8th St.
(36.36477, -94.17059)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Year Completed estimated (2022-2023).
Clarksville, TN
Montgomery Co.
United States
Kirkwood Rd. / Campus Dr.
(36.56643, -87.20339)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
48.7680
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Bordentown, NJ
Burlington Co.
United States
Dunns Mill Rd. / (unknown)
(40.13178, -74.71894)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
1 Driveways
41.1480
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Colorado Springs, CO
El Paso Co.
United States
Tutt Blvd. / Greenway Pl. / (parking)
(38.88292, -104.71469)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.5760
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Cedar Rapids, IA
Linn Co.
United States
6th St. SW / Commerce Park Dr. / (parking)
(41.88168, -91.67595)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
53.3400
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Maple Grove, MN
Hennepin Co.
United States
101st Ave. N / Troy Ln. N
(45.13846, -93.51193)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Ramara, ON
Simcoe
Canada
Hwy 12 / CR 169 / Concession Road 6
(44.57153, -79.18908)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023).
Missoula, MT
Missoula Co.
United States
Mullan Rd. / Mary Jane Blvd.
(46.88725, -114.05372)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Year Completed estimated (2022-2023).
(unincorporated), NE
Sarpy Co.
United States
S 180th St. / Cornhusker Rd.
(41.16150, -96.19661)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023).
Woodstock, GA
Cherokee Co.
United States
Wiley Bridge Rd. / Cox Rd.
(34.09392, -84.43287)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Anoka, MN
Anoka Co.
United States
Green Haven Rd. / Jacob Ln. / US 10-US 169 WB Ramps
(45.20655, -93.40067)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2022 Year Completed estimated (2022-2023).
Anoka, MN
Anoka Co.
United States
W Main St. / US 10-US 169 EB Ramps / Church St.
(45.20504, -93.40072)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2022 Year Completed estimated (2022-2023).
Freedom, PA
Beaver Co.
United States
SR 989 (Dunlap Hill Rd.) / Freedom Crider Rd.
(40.67684, -80.19046)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Unknown
2022 Year Completed estimated (2022-2023).
Cumming, GA
Cherokee Co.
United States
Holbrook Campground Rd. / Birmingham Hwy. / County Line Rd.
(34.21315, -84.27118)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023).
Austin, TX
Travis Co.
United States
Ausblick Ave. / Peafowl St.
(30.14491, -97.71121)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
44.1960
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023).
Austin, TX
Travis Co.
United States
Ausblick Ave. / Turaco Trl.
(30.14320, -97.70775)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
44.1960
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023).
Gretna, NE
Sarpy Co.
United States
S 180th St. / Camelback Ave.
(41.15770, -96.19688)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
57.9120
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2023 Year Completed estimated (2022-2023).
Harmony, PA
Butler Co.
United States
Little Creek Rd. / Mercer Rd.
(40.81106, -80.12356)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Liberty Lake, WA
Spokane Co.
United States
E Mission Ave. / Kramer Pkwy.
(47.67143, -117.12235)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023).
Edina, MN
Hennepin Co.
United States
Eden Ave. / Arcadia Ave. / Normandale Rd. (STH 100 Frontage Rd.)
(44.90952, -93.35224)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.4320
Other (At-Grade)
Single-lane w/ Traversable Central Island
2023 Year Completed estimated (2022-2023).
Marmaduke, AR
Greene Co.
United States
US 49 (S 3rd St.) / SR 34
(36.18693, -90.38488)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-lane w/ Traversable Central Island
2023 Year Completed estimated (2022-2023). November 2022: https://www.youtube.com/watch?v=LurUNtZaU7w May 2023: https://www.youtube.com/watch?v=Kmntt4a_kvI
Indianapolis, IN
Marion Co.
United States
Southeastern Ave. / S Rural St.
(39.76005, -86.11647)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2023 Year Completed estimated (2022-2023). https://citybase-cms-prod.s3.amazonaws.com/409ceae3cbb8413497ef98823962c8d0.pdf
Perdido Key, FL
Escambia Co.
United States
SR 292 (Perdido Key Dr.) / Johnson Beach Rd.
(30.29923, -87.42787)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2023). https://www.facebook.com/studio850/videos/perdido-key-roundabout-taking-shapesafer-speeds-and-reduced-congestion-are-goals/2442958579185514/
Newport, MI
Monroe Co.
United States
Swan Creek Rd. / I-75 NB Ramps
(42.00419, -83.31263)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/.
Armington, MT
Cascade Co.
United States
US 87-SR 200 / US 89 / (parking)
(47.34909, -110.89673)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023). https://www.youtube.com/watch?v=7jSH18jbyKc
Senoia, GA
Coweta County
United States
GA 16 / Old Hwy. 85
(33.29895, -84.59109)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023). Intersection shifted approximately 450 ft to the east.
Shelby, NC
Cleveland Co.
United States
NC-150 (Cherryville Rd.) / Shelby Bypass EB Ramps
(35.31324, -81.49081)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
48.7680
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2022-2024).
Shelby, NC
Cleveland Co.
United States
NC-150 (Cherryville Rd.) / Shelby Bypass WB Ramps
(35.31432, -81.48908)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
48.7680
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2022-2024).
Mason, OH
Warren Co.
United States
US 42 / Mason Morrow Millgrove Rd.
(39.37785, -84.27915)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2022-2024).
Mason, OH
Warren Co.
United States
US 42 / Bethany Rd.
(39.37696, -84.28220)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2022-2024).
Farragut, TN
Knox Co.
United States
Iron Plow Dr. / Branch Hook Rd. / Wagon Hitch Rd. (west)
(35.84614, -84.18296)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.4320
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2024).
Farragut, TN
Knox Co.
United States
Iron Plow Dr. / Branch Hook Rd. / Wagon Hitch Rd. (east)
(35.84531, -84.18085)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.4320
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2024).
Canton, OH
Stark Co.
United States
Champions Gateway / George Halas Dr.
(40.82371, -81.39960)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
51.8160
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 Year Completed estimated (2022-2024).
Edmonton, AB
Division 11
Canada
(unknown) / 28 Ave. SW
(53.41041, -113.55315)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
55.0000
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2022-2024).
Mount Pleasant, SC
Charleston Co.
United States
Lexington Dr. / All American Blvd.
(32.86559, -79.78774)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
24.3840
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024)
Selma, NC
Johnston Co.
United States
W Providence Blvd. / Absher Rd.
(35.52057, -78.28225)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Natick, MA
Middlesex Co.
United States
N Main St. / Pine St.
(42.31412, -71.36044)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
28.9560
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Hugo, MN
Washington Co.
United States
US 61 (Forest Blvd. N) / 159th St. N
(45.17901, -92.98769)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Oakdale, MN
Washington Co.
United States
40th St. N / Helmo Ave. N
(45.00596, -92.95083)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2023-2024).
Santa Fe, NM
Santa Fe Co.
United States
Beckner Rd. / Calle de la Alegria
(35.62406, -106.00463)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Lincoln, NE
Lancaster Co.
United States
Saltillo Rd. / S 77th St.
(40.69733, -96.61606)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Ashland, NE
Saunders Co.
United States
US 6 / SR 66
(41.03366, -96.36444)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
53.3400
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2023-2024).
Wentzville, MO
St. Charles Co.
United States
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd.
(38.80935, -90.87713)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Year Completed estimated (2023-2024).
Post Falls, ID
Kootenai County
United States
E 4th Ave. / N Idaho St.
(47.71101, -116.93727)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Burnside, NS
Halifax
Canada
Burnside Dr. / Akerley Blvd.
(44.72910, -63.58599)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Year Completed estimated (2023-2024).
Kannapolis, NC
Cabarrus Co.
United States
SR 3 (Mooresville Rd.) / Miller St. / Franklin Ave.
(35.49574, -80.63904)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Year Completed estimated (2023-2024).
Bear, DE
New Castle Co.
United States
Denny Rd. / Lexington Pkwy. / Airdrie Dr.
(39.57173, -75.74234)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
27.4320
Other (At-Grade)
Single-lane w/ Traversable Central Island
2024 Year Completed estimated (2023-2024).
Town of Maine, WI
Marathon Co.
United States
CR K / CR WW
(45.02727, -89.69047)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Hurricane, UT
Washington Co.
United States
100 N / 700 W / Birchview Ln.
(37.17802, -113.30065)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2023-2024).
(unincorporated), GA
Paulding Co.
United States
Seven Hills Blvd. / Blackberry Run Dr. / Bent Leaf Dr.
(34.02534, -84.78221)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
50.2920
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2023-2024).
Maple Grove, MN
Hennepin Co.
United States
101st Ave. N / Lawndale Ln.
(45.13832, -93.50388)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2023-2024).
Antigonish, NS
Antigonish
Canada
Hwy. 4 (Old Hwy. 104) / Hwy. 7
(45.61419, -61.99859)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Kaukauna, WI
Outagamie Co.
United States
CR JJ / N Freedom Rd (CR N)
(44.31559, -88.31282)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
41.1480
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Augusta, GA
Richmond Co.
United States
GA 88 (Patterson Rd.) / Bath Edie Rd.
(33.31721, -82.16339)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Greenfield, IN
Hancock Co.
United States
N CR 700W / W CR 200N
(39.80860, -85.93402)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Williamston, SC
Anderson Co.
United States
Cherokee Rd. / Joe Black Rd.
(34.63816, -82.52482)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2023-2024).
Scottsdale, AZ
Maricopa Co.
United States
N Hayden Rd. / E Raintree Dr.
(33.61963, -111.90776)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
56.3880
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Year Completed estimated (2023-2024). https://ww2.scottsdaleaz.gov/construction/project-list/raintree
Edina, MN
Hennepin Co.
United States
Interlachen Blvd./ Blake Rd.
(44.91393, -93.38343)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
27.4320
Other (At-Grade)
Single-lane w/ Traversable Central Island
2023 Year Completed estimated (2023-2024). https://www.youtube.com/watch?v=dm2G51ZohRY
Hortonville, WI
Outagamie Co.
United States
STH 15 / CR T
(44.34801, -88.67547)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2023-2024). https://projects.511wi.gov/wis15expand/full-project-overview/
(unincorporated), CO
Jefferson Co.
United States
US 40 / CR 65 / I-70 WB Exit Ramp
(39.71621, -105.39166)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects.
Bozeman, MT
Gallatin Co.
United States
Baxter Ln. / Collonwood Rd. / Harper Puckett Rd.
(45.70022, -111.10372)
Roundabout
Existing
All-Way Yield
Pedestrian Hybrid Beacon (PHB, HAWK)
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024). https://www.kbzk.com/news/local-news/baxter-lane-ready-to-reopen-for-traffic-this-week-after-months-of-construction.
Oak Level Township, NC
Nash Co.
United States
Sunset Ave. / Arrow Rd.
(35.97106, -77.89111)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
48.7680
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2023-2024). https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html.
Santa Fe, NM
Santa Fe Co.
United States
Rabbit Rd. / Falcon Way
(35.62208, -105.99127)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024). https://www.santafecountynm.gov/news/detail/county-celebrates-early-completion-of-landmark-ne-se-connector-roads-project.
McDonough, GA
Henry Co.
United States
Racetrack Rd. / Iris Lake Rd. / Iris Lake Village Rd.
(33.43047, -84.12372)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2025).
Bettendorf, IA
Scott Co.
United States
Middle Rd. / Competition Dr.
(41.59159, -90.45915)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2024 Year Completed estimated (2023-2025).
Mason, MI
Ingham Co.
United States
W Columbia Rd. / N Eifert Rd. / S Eifert Rd.
(42.58207, -84.54266)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-lane w/ Traversable Central Island
2025 Year Completed estimated (2023-2025). https://www.tiktok.com/@joshreviewsmason/video/7531497202968022285?_r=1&_t=ZT-8yML2KDMZT5
Wahoo, NE
Saunders Co.
United States
US 77 / SR 109 / CR 16
(41.23454, -96.60263)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2025 Year Completed estimated (2024-2025).
Belton, MO
Cass County
United States
S Mullen Rd. / E Cambridge Rd.
(38.79909, -94.51296)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2025 Year Completed estimated (2024-2025).
Rehoboth, MA
Bristol Co.
United States
US 44 (Winthrop St.) / Rte 118 (Anawan St. / Bay State Rd.)
(41.85467, -71.23881)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
44.1960
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2024-2025).
Kitchener, ON
Waterloo
Canada
Wilson Ave. / Goodrich Dr.
(43.41558, -80.44236)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
180.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2025 Year Completed estimated (2024-2025).
Hudson, WI
St. Croix Co.
United States
CR A / McCutcheon Rd.
(45.00325, -92.67544)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2024-2025).
Boiling Springs, SC
Spartanburg County
United States
Clark Rd. / Seay Rd.
(35.05945, -82.01234)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2024-2025). https://www.wspa.com/news/local-news/look-alive-more-road-work-coming-to-the-upstate/
Höör, Skåne County
Höör
Sweden
Gamla torg / Bygatan / Ågatan / Storgatan
(55.93052, 13.54751)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.0000
Other (At-Grade)
Single-Lane
1970 Year Completed estimated (before 1975).
Höör, Skåne County
Höör
Sweden
Malmövägen / Frostavallsvägen / Ystadvägen
(55.93599, 13.55519)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
85.0000
Other (At-Grade)
Single-Lane
1978 Year Completed estimated (before 1980).
Hörby, Skåne County
Hörby
Sweden
Rte 13 / Ringsjövägen
(55.84953, 13.64542)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
85.0000
Other (At-Grade)
Single-Lane
1980 Year Completed estimated (before 1985).
Fresno, CA
Fresno Co.
United States
E El Paso Ave. / El Camino
(36.84721, -119.78884)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
1996 Year Completed estimated (before 1998).
Redding, CA
Shasta Co.
United States
Teton Dr. / Crescent Moon Dr. / Crescent Moon Ct.
(40.56422, -122.41552)
Traffic Calming Circle
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
23.5899
Other (At-Grade)
Single-Lane
1997 Year completed estimated (before 1998). Pedestrian ramps into circulatory roadway. ICD estimated from Google Maps linework.