City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Brattleboro,
VT Windham Co. United States |
Rte 9 / Rte 5 (42.88500, -72.55670) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1999 | Adjacent to I-89. Heavy truck volume (>7%). |
Durango,
CO La Plata Co. United States |
Wilson Gulch Dr. / Three Springs Blvd. (37.23339, -107.82310) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / I-87 NB Ramps (42.97052, -73.80057) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Painted spiral next to central island. Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / I-87 SB Ramps (42.97024, -73.80309) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Painted spiral next to central island. Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / US 9 (42.97116, -73.79296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / Kelch Dr. / Blacksmith Dr. (Malta Commons) (42.97068, -73.79804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Part of a series of 5 roundabouts. |
Kingston,
NY Ulster Co. United States |
I-587 / Rte 28 / I-87 Ramps / Washington Ave. (41.94362, -74.02840) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2000 | A 600 ft diameter traffic circle was replaced by 200 ft diameter roundabout. At Exit 19 from I-87. I-587 terminates in roundabout. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / W 11th St. (40.41889, -104.84990) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | 4 roundabouts in series; 6 in vicinity. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / W. 16th St. (40.41505, -104.85090) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | 4 roundabouts in series; 6 in vicinity. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / Con Agra Dr. (40.41138, -104.85200) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | 4 roundabouts in series; 6 in vicinity. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / W 18th St. (40.40869, -104.85120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | 4 roundabouts in series; 6 in vicinity. |
Greeley,
CO Weld Co. United States |
W 18th St. / Promontory Cir. / (parking) (40.41203, -104.85840) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Part of 6 in vicinity. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / W 16th St. / (parking) (40.41524, -104.85540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Part of 6 in vicinity. |
Carmel,
IN Hamilton Co. United States |
Hazel Dell Pkwy. / E 126th St. (39.97119, -86.07069) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1998 | |
Carmel,
IN Hamilton Co. United States |
Hazel Dell Pkwy. / E 131st St. (39.97845, -86.07054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1998 | Built in late 1990s.Converted to multilane 2010-2012. Right-turn-only lane on west leg; left-turn-only lane on east leg. |
Carmel,
IN Hamilton Co. United States |
Old Meridian St. / Pennsylvania St. (39.96796, -86.15526) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2008 | |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Washburn St. (44.01808, -88.58321) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
Lee,
NH Rockingham Co. United States |
US 4 / Rte 125 (43.14910, -71.00666) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | Constructed November 2003 as single-lane rotary as part of new shopping mall. Converted to multilane roundabout in 2015. First multilane roundabout conversion in New Hampshire. |
Brighton,
MI Livingston Co. United States |
Village Place Blvd. / Green Oak Dr. / Fieldcrest Dr. (42.50573, -83.75296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Oshkosh,
WI Winnebago Co. United States |
Jackson St. / Murdock Ave. (44.03947, -88.54265) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | |
Revere,
MA Suffolk Co. United States |
Copeland Circle [Rte 60 (Squire Rd.) / US 1 Ramps] (42.43008, -71.01710) |
Rotary Existing |
Unknown Unknown |
4 Approaches 0 Driveways 381.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
Retrofitted (November 2018) with multi-lane approaches/departures on the Route 1 ramps and roundabout style pavement markings and signs within the circulating roadway. ICD = 1250 ft x 880 ft. 21442 | |
Indianapolis,
IN Hendricks Co. United States |
Dan Jones Rd. / Morris St. (CR 100 South) (39.74842, -86.38113) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2007 | Merging right-turn bypass lane on east leg. |
Abbotsford,
BC Fraser Valley Regional District Canada |
Mt Lehman Rd. / Old Yale Rd. / Hwy 1 WB Entrance Ramp (49.05889, -122.38131) |
Roundabout Removed |
All-Way Yield None |
3 Approaches 0 Driveways 44.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2022 | Roundabout (multilane, 2x2) constructed 2006 to replace a two-way stop intersection. Roundabout replaced with traffic signal in 2022. |
Carmel,
IN Hamilton Co. United States |
W 116th St. / Spring Mill Rd. (39.95610, -86.16467) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | Built initially as single-lane roundabout; expanded to two-lane roundabout in 2013-2014. |
Carmel,
IN Hamilton Co. United States |
W 116th St. / N Illinois St. (39.95615, -86.16245) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | |
Carmel,
IN Hamilton Co. United States |
N Illinois St. / W Carmel Dr. / Hamilton Crossing Blvd. (39.97234, -86.16048) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Skewed intersection. |
Carmel,
IN Hamilton Co. United States |
W Main St. / N Illinois St. (39.97783, -86.16228) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | |
Oshkosh,
WI Winnebago Co. United States |
US 45 / Fernau Ave. / Lake Butte des Morts Dr. (44.05513, -88.57150) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened August 24, 2010. |
Cabazon,
CA Riverside Co. United States |
Apache Trl. / Thunder Rd. / Seminole Dr. / I-10 WB Ramps (33.92192, -116.80610) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 79.2480 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2008 | Opened July 11, 2008. http://www.pe.com/localnews/rivcounty/stories/PE_News_Local_S_circle21.46d763e.html. |
The Villages,
FL Sumter Co. United States |
Morse Blvd. / Bonita Blvd. (28.87963, -81.96627) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Olympia,
WA Thurston Co. United States |
Jefferson St SE / 14th Ave. SE (47.03555, -122.89581) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Double-left turn from north leg; double-right turn from south leg. October 2010. |
Carmel,
IN Hamilton Co. United States |
Clay Terrace Blvd. / (parking lots) (north) (39.99816, -86.12993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Part of shopping center. |
Carmel,
IN Hamilton Co. United States |
Clay Terrace Blvd. / (parking lots) (south) (39.99489, -86.12909) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Part of shopping center. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. NB Ramps (39.96208, -86.11313) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. SB Ramps (39.96198, -86.11397) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 116th St. / Keystone Pkwy. NB Ramps (39.95663, -86.11353) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2009 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 106th St. / Pennsylvania St. (39.94167, -86.15559) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2008 | Yield-controlled right-turn bypass lane on west leg. Painted spirals next to central island. |
Richfield,
MN Hennepin Co. United States |
66th St. / Portland Ave. (44.88355, -93.26782) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2009 | Opened to traffic late fall 2008, finished 2009. Changes to signing and striping made August 2011. 21442 |
Hilliard,
OH Franklin Co. United States |
Main St. / Cemetery Rd. (40.02993, -83.16123) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Circulatory roadway striping modified 2014-2015. Roundabout modifications to signs & striping occurred in 2019. Raised crosswalks were also installed as part of the project. |
Ottawa,
ON City of Ottawa Canada |
Longfields Dr. / Cambrian Rd. / Golflinks Dr. (45.25633, -75.72810) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Yield-controlled right-turn bypass lane on north leg. |
Venice,
FL Sarasota Co. United States |
Jacaranda Blvd. / Venice Ave. (27.09950, -82.38444) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 79.2480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | Modified 2017 to change lane configuration and address crash issues. 21442 |
South Bend,
IN St. Joseph Co. United States |
Douglas Rd. / Twyckenham Dr. (41.70880, -86.22773) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Washburn St. (44.01085, -88.58483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 SB Ramps (44.01089, -88.58318) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 NB Ramps (44.01078, -88.58145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Koeller St. (44.01079, -88.57978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
US 45 / US 41 SB Ramps (44.06074, -88.57443) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Fishers,
IN Hamilton Co. United States |
E 106th St. / Lantern Rd. (39.94202, -86.01386) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Avoca Borough,
PA Luzerne Co. United States |
SR 315 / I-81 SB Ramps (41.33392, -75.73889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 65.5320 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2016 | |
Carmel,
IN Hamilton Co. United States |
Towne Rd. / W 96th St. (39.92673, -86.20283) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | |
Notre Dame,
IN St. Joseph Co. United States |
Douglas Rd. / Moreau Dr. (41.70933, -86.23394) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Year Completed estimated (2011-2015). |
South Bend,
IN St. Joseph Co. United States |
Douglas Rd. / Juniper Rd. (41.71270, -86.23662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Year Completed estimated (2011-2015). |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 NB Ramps (39.97797, -86.15668) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 SB Ramps (39.97787, -86.15802) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
Old Merdian St. / W. 136th St. / Eglin Dr. / Rohrer Rd. (39.98577, -86.14240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2014 | Replaced three-way stop-controlled intersection with one uncontrolled leg. |
Carmel,
IN Hamilton Co. United States |
Range Line Rd. / Carmel Dr. (39.96149, -86.12697) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | |
Frisco,
TX Denton Co. United States |
Rockhill Pkwy. / Teel Pkwy. / PGA Pkwy. (33.21099, -96.86814) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | . |
Idaho Falls,
ID Bonneville Co. United States |
E Lincoln Rd. / E Hitt Rd. (N 25th) (43.51143, -111.98410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2001 | Right-turn-only lane on west leg. Year Completed estimated (1992-2003). Converted from single-lane to multilane in 2018. 21442 |
Bentonville,
AR Benton Co. United States |
N Walton Blvd. / I-49 SB Ramps (36.41346, -94.22015) |
Roundabout Removed |
All-Way Yield Unknown |
4 Approaches 0 Driveways 91.4400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2016 | Roundabout constructed in 2016. Removed 2020-2021 to reconfigure interchange as a single-point diamond interchange with a different mainline alignment. Circulatory roadway in front of south leg had a through-right arrow in the left circulating lane and a fishhook through arrow with a dot in the right lane. |
Carmel,
IN Hamilton Co. United States |
W 106th St. / Towne Rd. (39.94132, -86.20314) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2017 | RRFB added: https://content.govdelivery.com/accounts/INCARMEL/bulletins/37421df |
Avon,
IN Hendricks Co. United States |
Satori Pkwy. / Dr Charles Nelson Dr. / (parking) (39.76453, -86.36925) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | |
Rosmalen,
North Brabant 's-Hertogenbosch Netherlands |
De Blauwe Sluisweg / Het Hooghemaal (51.72721, 5.34612) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 65.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Turbo roundabout. Grade-separated bike path intersecting in central island below roadway. Right-turn-only lanes on east and west legs. | |
Rockford,
TN Blount Co. United States |
Pellissippi Pl. / (unknown) (35.79925, -83.93118) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | Year Completed estimated (2014-2016). |
Eersel,
North Brabant Eersel Netherlands |
N397 / Molenweg / Eindhovenseweg (51.36687, 5.32618) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 79.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Retrofitted into a turbo roundabout. 21442 | |
Lake Point,
UT Tooele Co. United States |
Saddleback Blvd. / Sunset Rd. (40.68168, -112.25544) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2019 | Year Completed estimated (2017-2020). |
Delta,
BC Greater Vancouver Canada |
Tilbury Connector / Progress Way / 80 St. / (unknown) / (unknown) (49.14014, -123.00090) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 68.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | |
Sarasota,
FL Sarasota Co. United States |
US 41 (Tamiami Trl.) / Fruitville Rd. (27.33888, -82.54680) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2020 | Lane dividers using striping and raised pavement markers. Yield-controlled right-turn bypass lanes on south and east legs. https://www.heraldtribune.com/story/news/local/sarasota/2020/11/27/fruitville-roundabout-open-city-leaders-urge-motorists-slow-down/6398860002/ |
Cayey,
PR Cayey United States |
Hwy 1 / Fernadez Garcia Avenida / Calle Emérito Cordero (18.10442, -66.16434) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 170.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2017 | Year Completed estimated (2015-2017). |
Cayey,
PR Monte Llano United States |
Hwy 1 / Calle Tito Figueroa (Hwy 7715) / (unknown) (18.11612, -66.14562) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 200.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | Year Completed estimated (2015-2017). |
Cayey,
PR Cayey United States |
Hwy 15 (Calle Evaristo Vázquez) / Calle José M. Puente / (unknown) (18.11231, -66.16328) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 170.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2019 | Concentric circulatory roadway markings. Year Completed estimated (2018-2019). |
DeLand,
FL Volusia Co. United States |
Dr Martin L King Jr Blvd. / Orange Camp Rd. (28.98454, -81.26459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | |
Yuzhno-Sakhalinsk,
Sakhalin Yuzhno-Sakhalinsk Russia |
prospekt Mira / ulitsa Zima / ulitsa Borisa Yegorova (46.91118, 142.74712) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Novosibirsk,
Novosibirsk Novosibirsk Russia |
Bol'shaya ulitsa / Svetlaya ulitsa (55.03005, 82.80407) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Yurga,
Kemerovo Yurga Russia |
Kuzbasskiy prospekt / prospekt Pobedy (55.70358, 84.90605) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Tomsk,
Tomsk Tomsk Russia |
ulitsa 79-y Gvardeyskoy divizii / ulitsa Govorova (56.50861, 84.98302) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Tomsk,
Tomsk Tomsk Russia |
Kolarovskiy trakt / Bogashevskiy trakt Ramps (56.44101, 84.99093) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Berëzovka,
Krasnoyarsk Beryozovsky District Russia |
M53 / ulitsa Druzhby (56.05423, 93.10278) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Belogorsk,
Amur Belogorsk Russia |
ulitsa Lenina / Severnaya ulitsa (50.91804, 128.47370) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Yuzhno-Sakhalinsk,
Sakhalin Yuzhno-Sakhalinsk Russia |
ulitsa Aeroport / (parking) (46.88696, 142.72841) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Voronezh,
Voronezh Voronezh Russia |
ulitsa Matrosova / Krasnoznamennaya ulitsa (51.63577, 39.17231) |
Unknown Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Voronezh,
Voronezh Voronezh Russia |
Vyborgskaya ulitsa / P298 Ramps (51.63805, 39.20975) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Perm,
Perm Perm Russia |
1-ya Mulyanskaua ulitsa / Ocherskaya ulitsa / Tramvaynaya ulitsa / ulitsa Krasina (58.00034, 56.13293) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Perm,
Perm Perm Russia |
shosse Kosmonavtov / ulitsa Arkhitektora Sviyazeva (57.96835, 56.14981) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Lokhovskoye,
Irkutsk Cheremkhovsky District Russia |
P255 / (unknown) (53.13525, 102.94594) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Sevastopol,
Sevastopol Sebastopol Ukraine |
prospekt Gerovey Stalingrada / prospekt Oktaybr'skoy revolyutsil / ulitsa Admirala Fadeyeva / Lotchykiv vulytsia (44.59562, 33.45186) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Novokuznetsk,
Kemerovo Novokuznetsk Russia |
Transportnaya ulitsa / Oktyabr'skiy prospekt / Kondomskoye shosse (53.74469, 87.15699) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Novokuznetsk,
Kemerovo Novokuznetsk Russia |
Transportnaya ulitsa / (unknown) (53.75382, 87.17719) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Tsentral'noye,
Kemerovo Novokuznetsky District Russia |
Beregovaya ulitsa / Tsentral'noye ulitsa (53.76826, 87.37682) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Myski,
Kemerovo Myski Russia |
Sovetskaya ulitsa / Olimpiyskaya ulitsa (53.71630, 87.79651) |
Other Existing |
Other Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Circulating traffic yields to entering traffic. | |
Mezhdurechensk,
Kemerovo Mezhdurechensky District Russia |
prospekt Shakhterov / Internatsional'naya ulitsa (53.69340, 88.05630) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Mezhdurechensk,
Kemerovo Mezhdurechensky District Russia |
Internatsional'naya ulitsa / prospekt 50 let Komsomola (53.69350, 88.06004) |
Unknown Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Abakan,
Khakassia Abakan Russia |
P257 / ulitsa Krylova (53.73132, 91.40443) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Abakan,
Khakassia Abakan Russia |
M54 / prospekt Druzhby Narodov / ulitsa Severnaya damba (53.74757, 91.41196) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Smolenka,
Zabaykalsky Krai Chitinsky District Russia |
M58-AH30 (avtodoroga Amur) / Karpovskiy trakt / Zarechnaya ulitsa (52.13261, 113.48928) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Zabaykal’sk,
Zabaykalsky Krai Zabaykalsky District Russia |
A166 (avtodoroga Chita - Zabaykal'sk) / (unknown) (49.65653, 117.37391) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Barnaul,
Altai Krai Barnaul Russia |
A349 / poselok Sibirskiy Sadovod SNT (53.26871, 83.72848) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Kalininskiy,
Khakassia Ust-Abakansky District Russia |
M54 (avtodoroga Yenisey) / Traktovaya ulitsa (53.77174, 91.39238) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Kyzyl,
Tuva Kyzyl Russia |
ulitsa Kalinina / Moskovskaya ulitsa (51.70165, 94.40651) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Kyzyl,
Tuva Kyzyl Russia |
ulitsa Kalinina / Magistral'naya ulitsa / ulitsa Shul'dum (51.70452, 94.43449) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Kyzyl,
Tuva Kyzyl Russia |
Moskovskaya ulitsa / ulitsa Salchaka Toka / Rovenskaya ulitsa (51.70664, 94.40644) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |