City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 EB Ramps (43.06063, -88.44229) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9046 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 WB Ramps (43.06174, -88.44228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1203 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / CTH DR (Delafield Rd.) (43.05922, -88.44241) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.6506 |
Other (At-Grade) Single-Lane |
2011 | Opened August 11, 2011. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / Pabst Farms Blvd. / CTH DR (43.06441, -88.44336) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.3731 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Genesee,
WI Waukesha Co. United States |
STH 83 / STH 59 (Genesee Rd.) (42.95798, -88.36010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.4592 |
Other (At-Grade) Single-Lane |
2011 | Opened October 7, 2011. ICD estimated from Google Maps linework. |
Genesee,
WI Waukesha Co. United States |
STH 83 / CTH X (Saylesville Rd.) / Fields Crossing Dr. (42.93302, -88.34619) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.1073 |
Other (At-Grade) Single-Lane |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
US 141 / Military Rd. (44.54792, -88.04733) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.8554 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 18, 2011. ICD estimated from Google Maps linework. |
Pulaski,
WI Brown Co. United States |
STH 32 (S Wisconsin St.) / CTH B (Crest Dr.) (44.65709, -88.22159) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.4779 |
Other (At-Grade) Single-Lane |
2011 | Opened September 6, 2011. ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
STH 54 (W Mason St.) / CTH J (Seminary Rd.) (44.50105, -88.19372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7030 |
Other (At-Grade) Single-Lane |
2011 | Opened November 2011. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Washburn St. (44.01085, -88.58483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 SB Ramps (44.01089, -88.58318) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 NB Ramps (44.01078, -88.58145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Koeller St. (44.01079, -88.57978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
US 45 / US 41 SB Ramps (44.06074, -88.57443) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Tallahassee,
FL Leon Co. United States |
Weems Rd. / Easterwood Dr. (30.45154, -84.22405) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.8283 |
Other (At-Grade) Single-Lane |
2011 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Amelia Island,
FL Nassau Co. United States |
SR A1A / David Gregory Dr. (30.56414, -81.45299) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.7665 |
Other (At-Grade) Single-Lane |
2011 | Functional Class: Arterial ICD estimated from Google Maps linework. |
Lafayette,
LA Lafayette Par. United States |
Lafayette St. / Young St. / Iberia St. (30.10199, -91.99055) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1972 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Sarasota,
FL Sarasota Co. United States |
Main St. / Central Ave. / S Pineapple Ave. (27.33642, -82.54263) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 23.3410 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Sheboygan,
WI Sheboygan Co. United States |
CTH EE / CTH OK (43.70249, -87.74506) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9907 |
Other (At-Grade) Single-Lane |
2011 | Opened July 28, 2011. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / CTH S (Mineral Point Rd.) (43.06030, -89.53722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.2298 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened June 27, 2011. ICD estimated from Google Maps linework. |
Madison,
WI Dane Co. United States |
CTH M (Pleasant View Rd.) / Valley View Rd. / Junction Rd. (43.04614, -89.53278) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.1149 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened July 17, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH EZ (39th Ave.) (42.52248, -87.85383) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.5327 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened August 8, 2011. ICD estimated from Google Maps linework. |
Pleasant Prairie,
WI Kenosha Co. United States |
STH 165 (104th St.) / CTH ML (Springbrook Rd.) (42.52253, -87.86031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.8919 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 7, 2011. Yield-controlled right-turn bypass lanes. ICD estimated from Google Maps linework. |
Mukwonago,
WI Waukesha Co. United States |
STH 83 / CTH I (River Rd.) (42.92252, -88.34597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.3560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 23, 2011. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / CTH TT (43.11198, -89.19907) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.2597 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 WB Ramps (43.11037, -89.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.6200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 EB Ramps (43.10877, -89.19923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3649 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
St. Croix Falls,
WI Polk Co. United States |
US 8 / 208th St. (45.39731, -92.58540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2548 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened March 8, 2011. ICD estimated from Google Maps linework. |
Lannon,
WI Waukesha Co. United States |
CTH V (Town Line Rd.) / W Good Hope Rd. (43.14820, -88.18388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0124 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Deforest,
WI Dane Co. United States |
Savannah Dr. / Williamsburg Way (43.19280, -89.31834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0536 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
W 121st St. / Shelbourne Rd. (39.96279, -86.22161) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2011 | |
Carmel,
IN Hamilton Co. United States |
W 126th St. / Shelbourne Rd. (39.96992, -86.22144) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2011 | |
Fishers,
IN Hamilton Co. United States |
E 106th St. / Lantern Rd. (39.94202, -86.01386) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Santa Cruz,
CA Santa Cruz Co. United States |
Pacific Ave. / Center St. / W. Cliff Dr. (36.96490, -122.02620) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4453 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114 / CTH N (44.20024, -88.32381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0987 |
Other (At-Grade) Single-Lane |
2011 | High-sped approach roadways. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A EB Ramps (34.63499, -112.39830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 52.0821 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A WB Ramps (34.63643, -112.39710) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.0985 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Malta,
NY Saratoga Co. United States |
Rte 9 / Stonebreak Rd. (42.96317, -73.79144) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.4560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Malta,
NY Saratoga Co. United States |
Luther Forest Blvd. / Rte 67 (42.94714, -73.78510) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9691 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Boscawen,
NH Merrimack Co. United States |
US 4 (King St.) / Tremont St. (43.29130, -71.59523) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2011 | Merging right-turn bypass lane on south leg. |
Londonderry,
NH Rockingham Co. United States |
Raymond Wieczorek Dr. / Airport Rd. (42.92660, -71.44580) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 62.9654 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | At Manchester-Boston Regional Airport. ICD estimated from Google Maps linework. |
Londonderry,
NH Rockingham Co. United States |
Raymond Wieczorek Dr. / Commerce Ave. / Sparks Ave. (42.92134, -71.44384) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 52.4756 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | At Manchester-Boston Regional Airport. ICD estimated from Google Maps linework. |
Durham,
NC Durham Co. United States |
Windrush Ln. / Callandale Ln. (35.95677, -78.83138) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways 23.2023 |
Unknown Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Durham,
NC Durham Co. United States |
E. Geer St. / Avondale Dr. / Grove St. (36.00385, -78.88342) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.0532 |
Other (At-Grade) Single-Lane |
2011 | Yield-controlled right-turn bypass lane in NW quadrant. ICD estimated from Google Maps linework. |
Amsterdam,
NY Fulton Co. United States |
Rte 29 / Rte 30 (43.04745, -74.21695) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.0217 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Queensbury,
NY Warren Co. United States |
(unknown) / (unknown) (43.33112, -73.68898) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 24.3251 |
Other (At-Grade) Single-Lane |
2011 | On high school campus. ICD estimated from Google Maps linework. |
Buffalo,
NY Erie Co. United States |
Audubon Pkwy. / Lee Rd. (43.00547, -78.78589) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.4296 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Grand Island,
NY Erie Co. United States |
Rte 324 / Staley Rd. (43.00727, -78.94897) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.8083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Greenfield,
IN Hancock Co. United States |
W 100 N / W McKenzie Rd. / N Meridian Rd. (39.79893, -85.80213) |
Roundabout Existing |
Unknown Unknown |
4 Approaches 0 Driveways 36.7039 |
Other (At-Grade) Single-Lane |
2011 | Year completed estimated (2010-2012). ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
W 96th St. / N Augusta Dr. (39.92622, -86.22490) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | On boundary between Carmel and Indianapolis and between Hamilton County and Marion County. |
Carmel,
IN Hamilton Co. United States |
W 96th St. / Shelbourne Rd. (39.92613, -86.22202) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | On boundary between Carmel and Indianapolis and between Hamilton County and Marion County. |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Fall Creek Rd. (39.92678, -85.97557) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Single-Lane |
2011 | On boundary between Fishers and Indianapolis and between Hamilton County and Marion County. Year completed estimated (2010-2012). |
Sugar Land,
TX Fort Bend Co. United States |
Museum Square Dr. / Savannah Heights Blvd. (29.59595, -95.65056) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2011 | Small neighborhood entry roundabout. |
Pincher Creek,
AB Alberta Canada |
Hwy 6 / Hwy 507 / Hewetson Ave. (49.49569, -113.94799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4405 |
Other (At-Grade) Single-Lane |
2011 | https://canada.constructconnect.com/joc/news/others/2011/06/pincher-creek-alberta-installs-18-million-roundabout-joc044949w ICD estimated from Google Maps linework. |
Lethbridge,
AB Alberta Canada |
Canyon Pkwy. / Canyons Estates Ln. W (49.65468, -112.85376) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2005-2012). |
Morrisville,
NC Durham Co. United States |
Shakespeare Dr. / Gallery Ln. (35.89091, -78.82948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.9621 |
Other (At-Grade) Single-Lane |
2011 | No splitter islands. Completed between 2010 and 2013 ICD estimated from Google Maps linework. |
Ann Arbor,
MI Washtenaw Co. United States |
Geddes Rd. / US 23 NB Ramps (42.27440, -83.67437) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | |
Ann Arbor,
MI Washtenaw Co. United States |
Geddes Rd. / US 23 SB Ramps (42.27450, -83.67833) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Add-lane right-turn bypass lane in northwest quadrant. |
Ann Arbor,
MI Washtenaw Co. United States |
Geddes Rd. / Earhart Rd. (42.27460, -83.68216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2011 | At Concordia College campus. |
Lethbridge,
AB Alberta Canada |
Aquitania Blvd. / (unknown) (49.67393, -112.90283) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2011 | Merging right-turn bypass lanes on north and south legs. |
College Station,
TX Brazos Co. United States |
Arrington Rd. / Private Dr. A / Private Dr. C (30.55915, -96.26419) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2011 | Original approaches on Arrington Rd were completed in 2009. The other two legs providing access to the retail developments were added by 2011. |
Huntersville,
NC Mecklenburg Co. United States |
Ramah Church Rd. / Stumptown Rd. / Freedom Valley Dr. (35.42208, -80.83161) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.0642 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Randleman,
NC Randolph Co. United States |
High Point St. / Wal-Mart Entrance (35.82218, -79.82375) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.8942 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Randleman,
NC Randolph Co. United States |
High Point St. / Tigers Den Rd. (35.82388, -79.81889) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 35.8303 |
Other (At-Grade) Single-Lane |
2011 | Entrance to high school and commercial development. ICD estimated from Google Maps linework. |
Randleman,
NC Randolph Co. United States |
High Point St. / W Academy St. (35.82311, -79.82117) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.8622 |
Other (At-Grade) Single-Lane |
2011 | Right-turn-only lanes on all four legs. ICD estimated from Google Maps linework. |
Trinity,
NC Randolph Co. United States |
Finch Farm Rd. / Kennedy Rd. (35.84139, -80.01801) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.8224 |
Other (At-Grade) Single-Lane |
2011 | Yield-controlled right-turn bypass lane on south leg. ICD estimated from Google Maps linework. |
Trinity,
NC Randolph Co. United States |
Finch Farm Rd. / Old Mountain Rd. (35.84301, -80.02249) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.0446 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Reidsville,
NC Rockingham Co. United States |
N Scales St. / Wentworth St. (36.36995, -79.66576) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.6588 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Spring Lake,
NC Harnett Co. United States |
Coopers Creek Ave. / Aspen Ave. (35.25332, -78.96793) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 129.7147 |
Other (At-Grade) Single-Lane |
2011 | No splitter islands. ICD estimated from Google Maps linework. |
Lillington,
NC Harnett Co. United States |
Leslie Campbell Ave. / Main St. / Marshbanks St. (35.40706, -78.73753) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.0175 |
Other (At-Grade) Single-Lane |
2011 | Previous control type estimated. ICD estimated from Google Maps linework. |
Cheyenne,
WY Laramie Co. United States |
Prairie Center Cir. / Archer Pkwy. (41.15361, -104.65583) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 49.4597 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Year completed estimated (2009-2012). ICD estimated from Google Maps linework. |
Cheyenne,
WY Laramie Co. United States |
Prairie Center Cir. / Thunder Rd. (41.15011, -104.66369) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 52.1603 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Year completed estimated (2009-2012). ICD estimated from Google Maps linework. |
Cheyenne,
WY Laramie Co. United States |
Prairie Center Cir. / Bullseye Blvd. (41.15082, -104.64450) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.2604 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Year completed estimated (2009-2012). ICD estimated from Google Maps linework. |
Valdese,
NC Burke Co. United States |
Lovelady Dr. / Carolina Mills / Kathy Dr. (35.76165, -81.54178) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.0743 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Conover,
NC Catawba Co. United States |
County Home Rd. / Northern Drive NW (35.73230, -81.22260) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.8411 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
CSAH 14 (Douglas Dr.) / 117th Ave. (45.16629, -93.36066) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3667 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Moorhead,
MN Clay Co. United States |
US 75 / CSAH 12 (60th Ave S) (46.80399, -96.76775) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.8757 |
Other (At-Grade) Single-Lane |
2011 | High-speed approaches in rural area. ICD estimated from Google Maps linework. |
St Paul,
MN Ramsey Co. United States |
Frost Ave. / Parkway Dr. / E Shore Dr. (44.99925, -93.05696) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.4702 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / Valley View Rd. (44.87647, -93.33203) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.3145 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Portage,
MI Kalamazoo Co. United States |
Texas Dr. / W Milham Rd. / S 12th St. (42.23030, -85.64826) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.7206 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Fargo,
ND Cass Co. United States |
25th St. S / 58th Ave. S (46.79563, -96.81897) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.9702 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Fargo,
ND Cass Co. United States |
25th St. S / 64th Ave. S (46.78913, -96.81928) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7934 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Fargo,
ND Cass Co. United States |
25th St. S / 70th Ave. S (46.78182, -96.81941) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.1603 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
West Fargo,
ND Cass Co. United States |
4th St. E / 36th Ave. E (46.82611, -96.89348) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1276 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
West Fargo,
ND Cass Co. United States |
4th St. E / 26th Ave. E (46.84058, -96.89382) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.9192 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Goose Creek,
SC Berkeley Co. United States |
Parish Farms Dr. / 1st Ave. / Van Buren Dr. (33.05534, -80.10269) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0357 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). ICD estimated from Google Maps linework. |
Quebec,
QC Quebec Canada |
Rue des Bienfaits / Rue du Chevalet / Rue Coursol (46.84132, -71.32403) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.5659 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). ICD estimated from Google Maps linework. |
Prairie Township,
OH Franklin Co. United States |
S Grener Ave. / Old Grener Ave. (39.95164, -83.12259) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.2134 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2011-2012). ICD estimated from Google Maps linework. |
Hampton,
NB Kings Canada |
Main St. / Centennial Rd. / Crawford St. (45.52585, -65.82720) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9998 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). ICD estimated from Google Maps linework. |
Milton,
ON Halton Canada |
Scott Blvd. / Willet Terr. / Dymott Ave. (43.48676, -79.86895) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.4619 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2013). ICD estimated from Google Maps linework. |
Langley,
BC Greater Vancouver Canada |
202 St. / Trans-Canada Hwy HOV Ramps (49.16182, -122.66008) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.9920 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Roundabout in between and below freeway lanes, serving HOV lanes via left-hand ramps on the freeway. Fourth leg (EB onramp and WB offramp) closed off. Year Completed estimated (2008-2013). ICD estimated from Google Maps linework. |
Abbotsford,
BC Fraser Valley Canada |
Clearbrook Rd. / Marshall Rd. / Trans-Canada Hwy EB Ramps (49.03566, -122.33757) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.4984 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | http://www.minnowlake.ca/Roundabouts_in_Canada_2013%20(1).pdf ICD estimated from Google Maps linework. |
Tucson,
AZ Pima Co. United States |
E Tucson Marketplace Blvd. / (parking lot) (32.18277, -110.94868) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.5196 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Oak Creek/Cudahy,
WI Milwaukee Co. United States |
E College Ave. / S Ace Industrial Dr. (42.92994, -87.88328) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2257 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Inglewood,
ON Peel Canada |
Olde Base Line Rd. / Horseshoe Hill Rd. / Dixie Rd. (43.82979, -79.88310) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3251 |
Other (At-Grade) Single-Lane |
2011 | Replaced offset T-intersections. https://canada.constructconnect.com/dcn/news/others/2011/10/fermar-paving-builds-first-roundabout-in-peel-region-ontario-dcn047241w ICD estimated from Google Maps linework. |
Calgary,
AB Alberta Canada |
Sage Valley Dr. NW / Sage Berry Way NW (51.18022, -114.15696) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.6964 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2008-2011). ICD estimated from Google Maps linework. |
Calgary,
AB Alberta Canada |
Evanston Dr. NW / Evansridge Dr. NW / Evansridge Link NW (51.17364, -114.12159) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.6960 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |