City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Truth Or Consequences,
NM Sierra Co. United States |
N Date St. / Smith St. / (parking) (33.14880, -107.24658) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Aerial video (from Aug 2023) of partially built roundabout here: https://www.youtube.com/watch?v=Uuj6HQxQhlI |
Truth Or Consequences,
NM Sierra Co. United States |
N Date St. / New School Rd. (33.14983, -107.24616) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Aerial video (from Aug 2023) of partially built roundabout here: https://www.youtube.com/watch?v=Uuj6HQxQhlI |
Rochester,
NH Strafford Co. United States |
Strafford Square: N Main St. / Washington St. / Walnut St. (43.30538, -70.98423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://news.rochesternh.gov/city-of-rochester-prepares-to-open-strafford-square-roundabout-provides-update-to-motorists/ |
Milton,
GA Fulton Co. United States |
Hopewell Rd. / Bethany Bend (34.11595, -84.29449) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://www.facebook.com/100064619502449/posts/480597040770942 |
Clifton,
NJ Passaic Co. United States |
Valley Rd. / Great Notch Rd. / US 46-SR 3 WB Exit Ramp (40.87171, -74.18939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.northjersey.com/story/news/transportation/2023/10/31/route-46-and-route-3-construction-in-passaic-county-nearly-done/71330652007/ |
Oranjestad,
Aruba |
Rte 1A-1B (L G Smith Blvd.) / Belgiëstraat (12.52656, -70.04779) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Pos Chikito,
Aruba |
Rontonde Tromp: Rte 1A-1B / Sabana Basora (12.46603, -69.96580) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Oranjestad,
Aruba |
Rte 1A-1B / Caya Imelda Catharina Eckmeyer-Bermudez (12.55317, -70.05115) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Turbo roundabout. | |
Oranjestad,
Aruba |
Rte 8A-8B / Rte 2A-2B (12.53743, -70.03101) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Turbo roundabout. | |
Oranjestad,
Aruba |
Rte 1A-1B / L G Smith Blvd. / Stadionweg (12.50879, -70.02737) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Blue Ash,
OH Hamilton Co. United States |
Plainfield Rd. / Peppermill Ln. / Reed-Hartman Hwy. (39.23083, -84.39482) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | RRFB on all four legs. https://www.blueash.com/departments/public_works/hunt_plainfield.php |
Fort Worth,
TX Tarrant Co. United States |
Heritage Trace Pkwy. / Citadel Way (32.91452, -97.32102) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2020). |
Jefferson Township,
OH Franklin Co. United States |
Reynoldsburg New Albany Rd. / Havens Rd. (40.02985, -82.81429) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://www.facebook.com/groups/dullmensclub/posts/1361459861177218/ |
Bradenton,
FL Manatee Co. United States |
Port Harbor Pkwy. / Whistler Glen / Van Gogh Cove (27.50351, -82.43686) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | ICD = 155 ft x 135 ft. |
Tallahassee,
FL Leon Co. United States |
Welaunee Blvd. / (unknown) (30.48513, -84.21913) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Yield-controlled right-turn bypass lane on north leg. |
Tallahassee,
FL Leon Co. United States |
Welaunee Blvd. / (unknown) (30.48574, -84.21336) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Saint Lucie West,
FL St. Lucie Co. United States |
Tradition Pkwy. / (unknown) (27.27040, -80.45863) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Zionsville,
IN Boone Co. United States |
W Oak St. / S 800 E (39.94965, -86.31676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://youarecurrent.com/2024/02/15/new-roundabout-opens-at-zionsville-intersection/ |
(unincorporated),
TX Fort Bend Co. United States |
Jordan Ranch Blvd. / Tamarron Point (29.72889, -95.90213) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | |
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / Pilgrim St. (39.36208, -78.04223) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | At-grade rail crossing approximately 200 ft east. Year Completed estimated (2021-2023). |
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / I-81 SB Ramps / Arden-Nollville Rd. (39.36247, -78.04925) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.journal-news.net/news/local-news/official-phase-one-of-i-81-inwood-bypass-nearly-done/article_87d020ff-2d39-5835-8d9a-c25afa4402ea.html |
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / I-81 NB Ramps (39.36263, -78.04701) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.journal-news.net/news/local-news/official-phase-one-of-i-81-inwood-bypass-nearly-done/article_87d020ff-2d39-5835-8d9a-c25afa4402ea.html |
Frisco,
TX Denton Co. United States |
Fields Pkwy. / Edmonds St. (33.20027, -96.85311) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3296 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
Frisco,
TX Denton Co. United States |
Fields Pkwy. / Verde Meadows Dr. (33.19984, -96.84935) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
Wesley Chapel,
FL Pasco Co. United States |
Curley Rd. / Snowberry Way (28.27006, -82.28450) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Wesley Chapel,
FL Pasco Co. United States |
Curley Rd. / Infinite Dr. (28.26532, -82.28842) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Wesley Chapel,
FL Pasco Co. United States |
Country Point Blvd. / Rolling Green Dr. / Pointe O'Woods Dr. / Five Farms Ave. / Fresh Meadow Way (28.22135, -82.31412) |
Rotary Existing |
All-Way Yield None |
5 Approaches 0 Driveways 68.8845 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Weaving sections between legs. | |
Wesley Chapel,
FL Pasco Co. United States |
Yaupon Ln. / Anise Dr. (28.19582, -82.33506) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Northwest and northeast legs stubbed. Right-turn-only lane on southeast leg forming second circulating lane. |
Bloomington,
IN Monroe Co. United States |
W Woodyard Rd. / N Curry Pike / W Hunter Valley Rd. (39.19027, -86.58242) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3877 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Series of 2 roundabouts. Striped out spiral in circulatory roadway. https://www.heraldtimesonline.com/story/news/traffic/2022/03/03/work-2-6-m-double-roundabout-bloomington-start-next-week/9332294002/ |
Chaska,
MN Carver Co. United States |
STH 41 (N Chestnut St.) / Peavey Rd. (44.84105, -93.59896) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://www.swnewsmedia.com/chaska_herald/news/local/news_briefs/the-highway-41-and-peavey-road-roundabout-is-complete/article_f6380990-8fb7-11ee-badc-03f570cc07d0.html |
Maidenhead,
England Windsor And Maidenhead United Kingdom |
A4 / A4094 (Ray Mead Rd.) (51.52395, -0.70372) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Dedworth,
England Windsor And Maidenhead United Kingdom |
B3022 (Winkfield Rd.) / Legoland Windsor (51.46308, -0.64514) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Fort Riley,
KS Geary Co. United States |
Henry Dr. / Marshall Rd. (39.04386, -96.77208) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Turbo roundabout. Merging right-turn bypass lane on south leg. Year Completed estimated (2020-2022) |
Fort Riley,
KS Riley Co. United States |
Trooper Dr. / Apennines Dr. (39.10394, -96.81859) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Vail,
CO Eagle Co. United States |
Vail Rd. / I-70 EB Ramps / South Frontage Rd. (39.64355, -106.37810) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1995 | Completed October 1995. Circular central island. |
Vail,
CO Eagle Co. United States |
Chamonix Rd. / I-70 WB Ramps / North Frontage Rd. (39.62828, -106.42120) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | |
Avon,
CO Eagle Co. United States |
Avon Rd. / I-70 WB Ramps (39.63782, -106.52080) |
Roundabout Existing |
All-Way Yield Active Pedestrian Warning (flashing yellow) |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | Highway ref. pt. 70-166.62. Raindrop shaped. |
Avon,
CO Eagle Co. United States |
Avon Rd. / I-70 EB Ramps (39.63683, -106.52170) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1997 | Highway ref. pt. 70-166.62. Raindrop shaped. |
Avon,
CO Eagle Co. United States |
Avon Rd. / Beaver Creek Blvd. (39.63528, -106.52220) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 68.5800 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1997 | Right-turn-only lane on north leg. Elliptical shaped. Skewed intersection. ICD = 225 ft x 160 ft. |
Avon,
CO Eagle Co. United States |
Avon Rd. / Benchmark Rd. (39.63425, -106.52220) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1997 | Originally had raindrop shape with locked gate access across south leg for emergency vehicles only. Redesigned and reopened May 2007 with full access. 21442 |
Avon,
CO Eagle Co. United States |
Avon Rd. / US 6 (39.63110, -106.52260) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1997 | Highway ref. pt. 6-170.04. Right-turn-only lane on east leg. |
Cottonwood,
AZ Yavapai Co. United States |
AZ 89A / Verde Heights Dr. (34.73999, -112.03740) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2009 | Series of 5 roundabouts. |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Koeller St. (44.01805, -88.58098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
Carlsbad,
CA San Diego Co. United States |
Legoland Dr. / Armada Dr. (33.13229, -117.31660) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1999 | Unstriped circulatory roadway. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
Ellicott City,
MD Howard Co. United States |
MD 104 (Waterloo Rd.) / MD 100 WB Ramps (39.22470, -76.80600) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
1999 | |
Brattleboro,
VT Windham Co. United States |
Rte 9 / Rte 5 (42.88500, -72.55670) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1999 | Adjacent to I-89. Heavy truck volume (>7%). |
Durango,
CO La Plata Co. United States |
Wilson Gulch Dr. / Three Springs Blvd. (37.23339, -107.82310) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / I-87 NB Ramps (42.97052, -73.80057) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Painted spiral next to central island. Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / I-87 SB Ramps (42.97024, -73.80309) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Painted spiral next to central island. Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / US 9 (42.97116, -73.79296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Part of a series of 5 roundabouts. |
Malta,
NY Saratoga Co. United States |
Rte 67 (Dunning St.) / Kelch Dr. / Blacksmith Dr. (Malta Commons) (42.97068, -73.79804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Part of a series of 5 roundabouts. |
Kingston,
NY Ulster Co. United States |
I-587 / Rte 28 / I-87 Ramps / Washington Ave. (41.94362, -74.02840) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2000 | A 600 ft diameter traffic circle was replaced by 200 ft diameter roundabout. At Exit 19 from I-87. I-587 terminates in roundabout. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / W 11th St. (40.41889, -104.84990) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | 4 roundabouts in series; 6 in vicinity. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / W. 16th St. (40.41505, -104.85090) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | 4 roundabouts in series; 6 in vicinity. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / Con Agra Dr. (40.41138, -104.85200) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | 4 roundabouts in series; 6 in vicinity. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / W 18th St. (40.40869, -104.85120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | 4 roundabouts in series; 6 in vicinity. |
Greeley,
CO Weld Co. United States |
W 18th St. / Promontory Cir. / (parking) (40.41203, -104.85840) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Part of 6 in vicinity. |
Greeley,
CO Weld Co. United States |
Promontory Cir. / W 16th St. / (parking) (40.41524, -104.85540) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Part of 6 in vicinity. |
Carmel,
IN Hamilton Co. United States |
Hazel Dell Pkwy. / E 126th St. (39.97119, -86.07069) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1998 | |
Carmel,
IN Hamilton Co. United States |
Hazel Dell Pkwy. / E 131st St. (39.97845, -86.07054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
1998 | Built in late 1990s.Converted to multilane 2010-2012. Right-turn-only lane on west leg; left-turn-only lane on east leg. |
Carmel,
IN Hamilton Co. United States |
Old Meridian St. / Pennsylvania St. (39.96796, -86.15526) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2008 | |
Oshkosh,
WI Winnebago Co. United States |
CTH E (Witzel Ave.) / Washburn St. (44.01808, -88.58321) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened September 24, 2010. |
Lee,
NH Rockingham Co. United States |
US 4 / Rte 125 (43.14910, -71.00666) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | Constructed November 2003 as single-lane rotary as part of new shopping mall. Converted to multilane roundabout in 2015. First multilane roundabout conversion in New Hampshire. |
Brighton,
MI Livingston Co. United States |
Village Place Blvd. / Green Oak Dr. / Fieldcrest Dr. (42.50573, -83.75296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Oshkosh,
WI Winnebago Co. United States |
Jackson St. / Murdock Ave. (44.03947, -88.54265) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | |
Revere,
MA Suffolk Co. United States |
Copeland Circle [Rte 60 (Squire Rd.) / US 1 Ramps] (42.43008, -71.01710) |
Rotary Existing |
Unknown Unknown |
4 Approaches 0 Driveways 381.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
Retrofitted (November 2018) with multi-lane approaches/departures on the Route 1 ramps and roundabout style pavement markings and signs within the circulating roadway. ICD = 1250 ft x 880 ft. 21442 | |
Indianapolis,
IN Hendricks Co. United States |
Dan Jones Rd. / Morris St. (CR 100 South) (39.74842, -86.38113) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2007 | Merging right-turn bypass lane on east leg. |
Abbotsford,
BC Fraser Valley Regional District Canada |
Mt Lehman Rd. / Old Yale Rd. / Hwy 1 WB Entrance Ramp (49.05889, -122.38131) |
Roundabout Removed |
All-Way Yield None |
3 Approaches 0 Driveways 44.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2022 | Roundabout (multilane, 2x2) constructed 2006 to replace a two-way stop intersection. Roundabout replaced with traffic signal in 2022. |
Carmel,
IN Hamilton Co. United States |
W 116th St. / Spring Mill Rd. (39.95610, -86.16467) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | Built initially as single-lane roundabout; expanded to two-lane roundabout in 2013-2014. |
Carmel,
IN Hamilton Co. United States |
W 116th St. / N Illinois St. (39.95615, -86.16245) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | |
Carmel,
IN Hamilton Co. United States |
N Illinois St. / W Carmel Dr. / Hamilton Crossing Blvd. (39.97234, -86.16048) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Skewed intersection. |
Carmel,
IN Hamilton Co. United States |
W Main St. / N Illinois St. (39.97783, -86.16228) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | |
Oshkosh,
WI Winnebago Co. United States |
US 45 / Fernau Ave. / Lake Butte des Morts Dr. (44.05513, -88.57150) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Opened August 24, 2010. |
Cabazon,
CA Riverside Co. United States |
Apache Trl. / Thunder Rd. / Seminole Dr. / I-10 WB Ramps (33.92192, -116.80610) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 79.2480 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2008 | Opened July 11, 2008. http://www.pe.com/localnews/rivcounty/stories/PE_News_Local_S_circle21.46d763e.html. |
The Villages,
FL Sumter Co. United States |
Morse Blvd. / Bonita Blvd. (28.87963, -81.96627) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Olympia,
WA Thurston Co. United States |
Jefferson St SE / 14th Ave. SE (47.03555, -122.89581) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Double-left turn from north leg; double-right turn from south leg. October 2010. |
Carmel,
IN Hamilton Co. United States |
Clay Terrace Blvd. / (parking lots) (north) (39.99816, -86.12993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Part of shopping center. |
Carmel,
IN Hamilton Co. United States |
Clay Terrace Blvd. / (parking lots) (south) (39.99489, -86.12909) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Part of shopping center. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. NB Ramps (39.96208, -86.11313) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. SB Ramps (39.96198, -86.11397) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 116th St. / Keystone Pkwy. NB Ramps (39.95663, -86.11353) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2009 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 106th St. / Pennsylvania St. (39.94167, -86.15559) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2008 | Yield-controlled right-turn bypass lane on west leg. Painted spirals next to central island. |
Richfield,
MN Hennepin Co. United States |
66th St. / Portland Ave. (44.88355, -93.26782) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2009 | Opened to traffic late fall 2008, finished 2009. Changes to signing and striping made August 2011. 21442 |
Hilliard,
OH Franklin Co. United States |
Main St. / Cemetery Rd. (40.02993, -83.16123) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Circulatory roadway striping modified 2014-2015. Roundabout modifications to signs & striping occurred in 2019. Raised crosswalks were also installed as part of the project. |
Ottawa,
ON City of Ottawa Canada |
Longfields Dr. / Cambrian Rd. / Golflinks Dr. (45.25633, -75.72810) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Yield-controlled right-turn bypass lane on north leg. |
Venice,
FL Sarasota Co. United States |
Jacaranda Blvd. / Venice Ave. (27.09950, -82.38444) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 79.2480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | Modified 2017 to change lane configuration and address crash issues. 21442 |
South Bend,
IN St. Joseph Co. United States |
Douglas Rd. / Twyckenham Dr. (41.70880, -86.22773) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Washburn St. (44.01085, -88.58483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 SB Ramps (44.01089, -88.58318) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 NB Ramps (44.01078, -88.58145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / S Koeller St. (44.01079, -88.57978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
US 45 / US 41 SB Ramps (44.06074, -88.57443) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Fishers,
IN Hamilton Co. United States |
E 106th St. / Lantern Rd. (39.94202, -86.01386) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2011 | |
Avoca Borough,
PA Luzerne Co. United States |
SR 315 / I-81 SB Ramps (41.33392, -75.73889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 65.5320 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2016 | |
Carmel,
IN Hamilton Co. United States |
Towne Rd. / W 96th St. (39.92673, -86.20283) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | |
Notre Dame,
IN St. Joseph Co. United States |
Douglas Rd. / Moreau Dr. (41.70933, -86.23394) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Year Completed estimated (2011-2015). |
South Bend,
IN St. Joseph Co. United States |
Douglas Rd. / Juniper Rd. (41.71270, -86.23662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Year Completed estimated (2011-2015). |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 NB Ramps (39.97797, -86.15668) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 SB Ramps (39.97787, -86.15802) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |