City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Champlin,
MN Hennepin Co. United States |
117th Ave. / Business Park Blvd. (45.16656, -93.38891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5244 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
Business Park Blvd. / Emery Pkwy. (45.16798, -93.38905) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3656 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
109th Ave. / Goose Lake Rd. / Zachary Ln. (45.15226, -93.42163) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.3217 |
Other (At-Grade) Single-Lane |
2006 | Posted speed on mainline approach 45 mph. Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Maple Grove,
MN Hennepin Co. United States |
Norwood Ln. / 85th Pl. (45.10971, -93.43961) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.6737 |
Other (At-Grade) Single-Lane |
2006 | Intersection of local and collector street in residential development. Functional Class: Collector ICD estimated from Google Maps linework. |
Brooklyn Park,
MN Hennepin Co. United States |
Seltzer Pkwy. / Neddersen Pkwy. / Founders Pkwy. (45.11604, -93.36655) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.4547 |
Other (At-Grade) Single-Lane |
1995 | Will be a 4th leg in future (Tessman Pkwy.). Functional Class: Collector ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
Minnehaha Ave. / Godfrey Pkwy. (44.91655, -93.21317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1384 |
Other (At-Grade) Single-Lane |
2001 | ICD estimated from Google Maps linework. |
Maple Grove,
MN Hennepin Co. United States |
Jonquil Ln. / 85th Ave. (45.10938, -93.43398) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 57.3175 |
Other (At-Grade) Single-Lane |
2001 | Mountable splitter islands, driverways in circle, parking in circle, pedestrian amenity in central island. Functional Class: Local ICD estimated from Google Maps linework. |
Brooklyn Park,
MN Hennepin Co. United States |
108th Ave. / Regent Ave. / Perry Dr. (45.15072, -93.34499) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0071 |
Other (At-Grade) Single-Lane |
2005 | No splitter islands. Functional Class: Local ICD estimated from Google Maps linework. |
Richfield,
MN Hennepin Co. United States |
66th St. / Portland Ave. (44.88355, -93.26782) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2009 | Opened to traffic late fall 2008, finished 2009. Changes to signing and striping made August 2011. 21442 |
Richfield,
MN Hennepin Co. United States |
66th St. / Richfield Pkwy. (17th Ave.) (44.88351, -93.25011) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6192 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Completed August 2007. First roundabout in Richfield. Double left turn for southbound left turn. Serves Target shopping center. ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
28th Ave. S / Lindau Ln. (44.85662, -93.23253) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.1781 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / Valley View Rd. (44.87647, -93.33203) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.3145 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / (west parking entrance) (44.87635, -93.32676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.2365 |
Other (At-Grade) Single-Lane |
2007 | Series of 3 roundabouts as part of road diet. ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / (central parking entrance) (44.87637, -93.32523) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.7755 |
Other (At-Grade) Single-Lane |
2007 | Series of 3 roundabouts as part of road diet. ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / (east parking entrance) (44.87636, -93.32317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.2365 |
Other (At-Grade) Single-Lane |
2007 | Series of 3 roundabouts as part of road diet. ICD estimated from Google Maps linework. |
Excelsior,
MN Hennepin Co. United States |
TH 7 / Kings Point Rd. (44.89091, -93.70470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.1523 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Pedestrian tunnel. ICD estimated from Google Maps linework. |
Osseo,
MN Hennepin Co. United States |
Zachary Ln. N / TH 610 EB Ramps / 96th Ave. (45.12930, -93.42241) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.5566 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Osseo,
MN Hennepin Co. United States |
Zachary Ln. N / TH 610 WB Ramps (45.13128, -93.42254) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.6568 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Osseo,
MN Hennepin Co. United States |
Elm Creek Blvd. / 99th Ave. / James Deane Blvd. / TH 610 WB Off-Ramp (45.13323, -93.44083) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3403 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Osseo,
MN Hennepin Co. United States |
Jewel Ln. / 72nd Ave. N (45.08544, -93.49850) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.5140 |
Other (At-Grade) Single-Lane |
2008 | No splitter islands on three legs. ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
CSAH 14 (Douglas Dr.) / 117th Ave. (45.16629, -93.36066) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3667 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Saint Louis Park,
MN Hennepin Co. United States |
Louisiana Ave S / TH 7 EB Ramps / W Lake St. (44.93713, -93.36925) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.1811 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
Saint Louis Park,
MN Hennepin Co. United States |
Louisiana Ave. S / TH 7 WB Ramps (44.93821, -93.36965) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.9623 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
Saint Louis Park,
MN Hennepin Co. United States |
Louisiana St. S / Walker St. (44.93923, -93.37002) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1982 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
W River Rd. / E Hayden Lake Rd. (45.18068, -93.38559) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2014 | |
Richmond,
VA Henrico Co. United States |
N. Lombardy St. / School Rd. / Admiral St. (37.55981, -77.45100) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.5627 |
Other (At-Grade) Single-Lane |
2005 | Serves as entrance to Virgina Union University. ICD estimated from Google Maps linework. |
Richmond,
VA Henrico Co. United States |
Monument Ave. / Allen Ave. (37.55384, -77.46020) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 74.8004 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Richmond,
VA Henrico Co. United States |
Stuart Circle (37.55246, -77.45788) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 35.9806 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Glen Allen,
VA Henrico Co. United States |
Opaca Ln. / Westward Pl. (37.68253, -77.57561) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.4657 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2014-2016). ICD estimated from Google Maps linework. |
Henrico,
VA Henrico Co. United States |
Towne Center W Blvd. / Blue Ocean Ln. (37.65881, -77.62729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.3107 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Glen Allen,
VA Henrico Co. United States |
Greenwood Rd. / Woodman Rd. (37.67146, -77.48272) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2020 | Add-lane right-turn bypass lane on west leg; yield-controlled right-turn-only lane on south leg. https://www.facebook.com/henricova/videos/159967112559967/?redirect=false |
Varina,
VA Henrico Co. United States |
New Market Village Blvd. / New Market Village Pkwy. (37.48323, -77.36220) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
No splitter islands. | |
(unincorporated),
VA Henrico Co. United States |
Darbytown Rd. / Turner Rd. (37.45112, -77.29935) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Quick build with plastic central island. Peanut shaped. https://www.youtube.com/watch?v=3-AotYkeJqk |
Tuckahoe,
VA Henrico Co. United States |
Henrico Ave. / Glendale Dr. / Knowland Cir. / University Blvd. (37.59204, -77.56166) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Temporary installation. https://www.nbc12.com/video/2022/08/15/first-community-roundabout-henrico-complete/ |
McDonough,
GA Henry Co. United States |
GA 20 (Conyers Rd.) / Turner Church Rd. (33.46634, -84.12195) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.henryherald.com/news/roundabout-at-state-route-20-turner-church-road-completed/article_d24937ec-134f-11ed-9d97-df5b21ece3e9.html |
Napoleon,
OH Henry Co. United States |
SR 108 / US 6-US 24 WB Ramps (41.40926, -84.13197) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.northwestsignal.net/news/image_e08cef2c-9084-52ef-9bc1-bfd8ab955679.html |
Hampton,
GA Henry Co. United States |
Floyd Rd. / King Rd. / Grafton St. (33.37580, -84.27815) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | https://mhfnews.org/2023/04/12/east-king-roundabout-is-nearly-complete-in-hampton/ |
Stockbridge,
GA Henry Co. United States |
GA 138 / Moseley Dr. (33.56930, -84.16559) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | Initially constructed as a mini-roundabout in 2016; upgraded to a full roundabout in 2022. https://mhfnews.org/2022/06/16/gdot-crews-to-enlarge-moseley-drive-roundabout/ |
McDonough,
GA Henry Co. United States |
Willow Ln. / Bridges Rd. (33.44394, -84.18782) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Painted splitter islands. https://www.facebook.com/HenryCountyBOC/posts/the-willow-bridges-roundabout-is-expected-to-be-opened-to-traffic-by-5-pm-on-wed/833216152173087/ |
McDonough,
GA Henry Co. United States |
Mount Carmel Rd. / Mill Rd. (33.44787, -84.21413) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | |
McDonough,
GA Henry Co. United States |
Mount Carmel Rd. / Chambers Rd. (33.44669, -84.23067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2018). |
Locust Grove,
GA Henry Co. United States |
N Unity Grove Rd. / Colvin Dr. (33.36757, -84.08138) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2008 | Y-shaped roundabout with high-radius right-turn movements. Replaced triangular intersection with unknown control. Year Completed estimated (2008-2009). |
McDonough,
GA Henry Co. United States |
S Bethany Rd. / Old Jackson Rd. (33.41972, -84.09065) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
McDonough,
GA Henry Co. United States |
GA 81 / Snapping Shoals Rd. / Jackson Lake Rd. (33.46282, -83.96860) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.9199 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2017 | On high-speed roadway (55 mph, 2-lane highway) with an 85 ft ICD. Painted splitter islands, no external curbs but external truck aprons on three corners. ICD estimated from Google Maps linework. |
Stockbridge,
GA Henry Co. United States |
GA 138 / Hemphill Rd. (33.55716, -84.17061) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.7874 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). ICD estimated from Google Maps linework. |
Stockbridge,
GA Henry Co. United States |
SR 155 / Fairview Rd. (33.61089, -84.16482) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.7916 |
Other (At-Grade) Single-Lane |
2011 | Georgia DOT Project ID 332980 ICD estimated from Google Maps linework. |
Locust Grove,
GA Henry Co. United States |
Jubilee Blvd. / Celebration Ct. (33.34806, -84.09556) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.9373 |
Other (At-Grade) Single-Lane |
2005 | Painted splitter islands. ICD estimated from Google Maps linework. |
Locust Grove,
GA Henry Co. United States |
Jubilee Blvd. / Victory Ln. (33.35083, -84.09556) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.9412 |
Other (At-Grade) Single-Lane |
2005 | Painted splitter islands. ICD estimated from Google Maps linework. |
Napoleon,
OH Henry Co. United States |
SR 110 / Industrial Dr. (41.40239, -84.10034) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://nbc24.com/newsletter-daily/roundabout-opens-on-state-route-110-in-napoleon |
Napoleon,
OH Henry Co. United States |
SR 424 (E Riverview Ave.) / Industrial Dr. (41.40593, -84.10515) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.crescent-news.com/news/local_news/second-napoleon-traffic-roundabout-opens/article_a0a29aab-464d-5d54-aa2d-b73a72ca2c49.html |
McDonough,
GA Henry Co. United States |
Jonesboro Rd. / Doris St. (33.44801, -84.15701) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | https://movinghenryforward.org/2020/03/04/gdot-one-way-pair-to-be-complete-by-the-end-of-summer-2020/ |
McDonough,
GA Henry Co. United States |
Lake Dow Rd. / Rodgers Rd. / Rosser Rd. (33.44197, -84.10629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2017 | |
Jonesboro,
GA Henry Co. United States |
Jodeco Rd. / Blackhall Rd. / Longwood Dr. (33.50911, -84.27798) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://movinghenryforward.org/2018/07/03/jodeco-blackhall-closure-for-final-construction/ |
McDonough,
GA Henry Co. United States |
GA 20 (Conyers Rd.) / E Lake Rd. (33.50149, -84.07857) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Stockbridge,
GA Henry Co. United States |
Monarch Lake Way / Pathwood Ln. (33.51855, -84.26603) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Stockbridge,
GA Henry Co. United States |
Monarch Village Way / Manderly Dr. (33.52425, -84.26656) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Stockbridge,
GA Henry Co. United States |
Monarch Village Way / Vista Creek Dr. (33.51967, -84.26598) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
(unincorporated),
FL Hernando Co. United States |
US 98 (Ponce de Leon Blvd.) / Citrus Way (28.65101, -82.44695) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://www.facebook.com/Citruscountylive/photos/a.472614453496154/1305047673586157/?type=3&theater |
Spring Hill,
FL Hernando Co. United States |
Wexford Blvd. / Farnsworth Blvd. (28.43895, -82.53054) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 73.1520 |
Other (At-Grade) Single-Lane |
2005 | |
Spring Hill,
FL Hernando Co. United States |
Linden Dr. / Florian Way (28.44208, -82.50387) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Painted splitter islands. No crossings even though pedestrian facilities in all quadrants. | |
Spring Hill,
FL Hernando Co. United States |
Linden Dr. / Bend St. (28.44397, -82.50302) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Painted splitter islands. No crossings even though pedestrian facilities in all quadrants. | |
Spring Hill,
FL Hernando Co. United States |
Linden Dr. / Jessica Dr. (28.44530, -82.50341) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Painted splitter islands. No crossings even though pedestrian facilities in all quadrants. | |
Spring Hill,
FL Hernando Co. United States |
Pablo Blvd. / Degas Ln. (28.46391, -82.48829) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
Building in central island. | |
Spring Hill,
FL Hernando Co. United States |
Wexford Blvd. / Billingham Blvd. (28.44547, -82.53505) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 73.1520 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1995-1998). |
Herne,
North Rhine-Westphalia Herne Germany |
Magdeburger Straße / aRoute der Industriekultur / Hordeler Straße (51.50743, 7.18368) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling circulatory roadway only) |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Tram lines making turn through central island. | |
Herne,
North Rhine-Westphalia Herne Germany |
K11 (Königstraße - Holstenhauser Straße) / Dorneburger Straße / Bielefelder Straße (51.52219, 7.18042) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Herne,
North Rhine-Westphalia Herne Germany |
Bielefelder Straße / Kastanienallee (51.52274, 7.18096) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Herning,
Middle Jutland Herning Denmark |
Vesterholmvej / Gullestrupvej (56.15784, 8.96920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Herning,
Middle Jutland Herning Denmark |
Sekundærrute 195 (Dronningens Blvd.) / Primærrute 15 Ramps / Snejbjergvej (56.11757, 8.90629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Hemel Hempstead,
England Herts United Kingdom |
Plough Roundabout: A414 / Lawn Ln. / Two Waters Rd. / Station Rd. / Leighton Buzzard Rd. / Selden Hill (51.74628, -0.47329) |
Roundabout Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Ring junction (3+ mini-roundabouts in ring) |
Ring junction of six mini-roundabouts. | |
Čapljina,
Federation of Bosnia and Herzegovina Herzegovina-Neretva Canton Bosnia and Herzegovina |
M6 (Mate Bobana -Tasovčići) / Augusta Šenoe / (parking) (43.10987, 17.69906) |
Roundabout Existing |
Unknown None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Entrance to rail station. | |
Čapljina,
Federation of Bosnia and Herzegovina Herzegovina-Neretva Canton Bosnia and Herzegovina |
Ante Starčevića / Braće Radić / Metkovačka (43.10962, 17.70131) |
Roundabout Existing |
Unknown None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Čapljina,
Federation of Bosnia and Herzegovina Herzegovina-Neretva Canton Bosnia and Herzegovina |
Ante Starčevića / Gojka Šuška (43.10933, 17.70390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Mostar,
Federation of Bosnia and Herzegovina Herzegovina-Neretva Canton Bosnia and Herzegovina |
Zalik / Kralja Tomislava (43.35789, 17.81290) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Bypass lanes on all legs. | |
Heesbeen,
North Brabant Heusden Netherlands |
Heesbeenseweg / Grotestraat (51.73049, 5.12113) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 22.1916 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
McAllen,
TX Hidalgo Co. United States |
Valencia Market Pl. / Warbler Ave. (26.27065, -98.22098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2011 | |
McAllen,
TX Hidalgo Co. United States |
Lark Blvd. (26.26139, -98.23389) |
Other Existing |
All-Way Yield None |
2 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2011 | Pedestrian access through central island. Painted splitter islands. |
McAllen,
TX Hidalgo Co. United States |
Auburn Ave. / N Main St. (26.27509, -98.22352) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | |
McAllen,
TX Hidalgo Co. United States |
Capistrano Dr. / San Nicholas St. (26.23926, -98.27941) |
Other Existing |
All-Way Stop None |
4 Approaches 1 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
1995 | Parking along circulatory roadway. |
Mission,
TX Hidalgo Co. United States |
Santa Engracia / Plantation Grove Blvd. / (parking) (26.16439, -98.28937) |
Other Existing |
All-Way Stop Unknown |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Mission,
TX Hidalgo Co. United States |
Los Indios Pkwy. / Santa Engratia (26.16944, -98.28858) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
Right-turn bypass lanes on all legs. | |
McAllen,
TX Hidalgo Co. United States |
Houston Ave. / Convention Center Blvd. (26.19941, -98.25947) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Tain,
Scotland Highland United Kingdom |
Meikle Ferry Roundabout [A9 (Moray Firth) / A836] (57.83092, -4.10612) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Newton of Petty,
Scotland Highland United Kingdom |
Airport Roundabout [A96 (Highland) / Croy Rd. / (Inverness Airport entrance)] (57.53056, -4.04831) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Fort William,
Scotland Highland United Kingdom |
A82 / A830 (56.83469, -5.07561) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Lochyside,
Scotland Highland United Kingdom |
Blar Mhor Roundabout [A830 / Blar Mhor Industrial Estate / (unknown)] (56.84028, -5.08440) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Inverness,
Scotland Highland United Kingdom |
Tomnahurich Roundabout [A82 (Glenurquhart Rd.) / A8082] (57.46508, -4.24236) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Portree,
Scotland Highland United Kingdom |
A87 (Dunvegan Rd.) / Woodpark Rd. / Matheson Pl. (57.41704, -6.20977) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Portree,
Scotland Highland United Kingdom |
Woodpark Rd. / Road of the Hay (57.41921, -6.20432) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Portree,
Scotland Highland United Kingdom |
Rathad Na H-Airigh / Ceãrn Rõmasdail (57.42095, -6.19955) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Nairn,
Scotland Highland United Kingdom |
A96 (King St. - Saint Ninian Rd.) / Marine Rd. / King St. (57.58670, -3.86827) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
||
Inverness,
Scotland Highland United Kingdom |
Millburn Roundabout [B865 (Millburn Rd.) / Harbour Rd. / Old Perth Rd.] (57.48241, -4.20076) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Inverness,
Scotland Highland United Kingdom |
A8082 (Sir Walter Scott Dr.) / B8082 (Culloden Rd.) / B9006 (Old Perth Rd.) / Sir Walter Scott Dr. / (shopping centre entrance) (57.47174, -4.19006) |
Roundabout Existing |
All-Way Yield None |
6 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Maryburgh,
Scotland Highland United Kingdom |
A835 / A862 (Station Rd.) (57.57925, -4.43786) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Tore,
Scotland Highland United Kingdom |
Tore Roundabout [A9 / A835 / A832] (57.54055, -4.33611) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Inverness,
Scotland Highland United Kingdom |
A9 / A82 (Longman Rd.) / Stadium Rd. (57.49173, -4.21505) |
Signalized Roundabout/Circle Existing |
Signal None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Inverness,
Scotland Highland United Kingdom |
Harbour Road Roundabout [A82 (Longman Rd.) / Harbour Rd.] (57.48577, -4.22072) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Inverness,
Scotland Highland United Kingdom |
Shore Street Roundabout [A82 (Longman Rd. - Loch Ness) / B865 (Chapel St.) / Waterloo Pl. / Shore St.] (57.48266, -4.23060) |
Roundabout Existing |
All-Way Yield Pedestrian Signal (red-yellow-green to drivers) |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Sebring,
FL Highlands Co. United States |
Sebring Pkwy. / Panther Pkwy. (27.51862, -81.45949) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | https://facers.net/wp-content/uploads/2020/01/FACERS-4th-quarter-invoice-2019.pdf |
Avon Park,
FL Highlands Co. United States |
Memorial Dr. / W College Dr. (27.56722, -81.49424) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.3494 |
Other (At-Grade) Single-Lane |
2019 | https://www.yoursun.com/sebring/news/getting-around-about-it-memorial-roundabout-opens/article_2634dea6-b935-11e9-b646-77c0c498609f.html ICD estimated from Google Maps linework. |