City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
London,
ON Middlesex Canada |
Coronation Dr. / Lawson Rd. (42.99659, -81.32142) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2006-2009). |
London,
ON Middlesex Canada |
Brunswick Ave. / Coronation Dr. (42.99836, -81.32060) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2006 | |
London,
ON Middlesex Canada |
Callingham Dr. / Meadowlands Way (43.03489, -81.29534) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2010-2013). Splitter islands added 2016-2019. (streetview) 21442 |
Waterloo,
ON Waterloo Canada |
Davenport Rd. / Old Abbey Rd. / (shopping center) (43.49957, -80.52551) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2012 | Right-turn-only leg on north leg. Year Completed estimated (2011-2012). |
Waterloo,
ON Waterloo Canada |
Conestoga Rd. / Kraus Dr. (43.49983, -80.52906) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2009 | Add lane right-turn bypass lane on west leg. |
Waterloo,
ON Waterloo Canada |
Hagey Blvd. / Frank Trompa Dr. (43.47734, -80.54814) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (before 2005). |
Waterloo,
ON Waterloo Canada |
Columbia St. W / Bennington Gate / Chancery Ln. (43.46485, -80.57403) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Year Completed estimated (2016-2018). |
Albuquerque,
NM Bernalillo Co. United States |
Loop Two NW / Learning Rd. NW (Bosque School Rd. NW) / Antequera Rd. NW (35.14393, -106.69165) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2007 | Difference of opinion between Bing and Googlemaps of name of Learning/Bosque School Rd. |
Albuquerque,
NM Bernalillo Co. United States |
Antequera Rd. NW / Mirandela St. NW (35.14597, -106.68837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2007 | |
Wesley Hills,
NY Rockland Co. United States |
Willow Tree Rd. / Forshay Rd. / Wilder Rd. (41.15437, -74.08338) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | |
Carson City,
NV Carson City Co. United States |
Northridge Dr. / Spooner Dr. (39.18150, -119.74896) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 99.9997 |
Other (At-Grade) Single-Lane |
1997 | Painted splitter islands on Northridge approaches. Year Completed estimated (1994-1999). |
Carson City,
NV Carson City Co. United States |
Northridge Dr. / Carriage Crest Dr. (39.18290, -119.75077) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
1997 | Year Completed estimated (1994-1999). |
Carson City,
NV Carson City Co. United States |
Northridge Dr. / Tablerock Dr. (39.18460, -119.75685) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
1999 | Year Completed estimated (1994-1999). |
Prairieville,
LA Ascension Par. United States |
Timberstone Dr. / Devall Rd. / Tigers Eye Stone Ave. (30.29926, -90.89318) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2008 | |
Blackman Township,
MI Jackson Co. United States |
Cooper St. / I-94 WB Ramps (42.27376, -84.40371) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://www.mlive.com/news/jackson/2019/12/take-a-ride-on-new-i-94-cooper-street-bridge-roundabouts-after-9-month-closure.html |
Blackman Township,
MI Jackson Co. United States |
Cooper St. / I-94 EB Ramps (42.27098, -84.40380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://www.mlive.com/news/jackson/2019/12/take-a-ride-on-new-i-94-cooper-street-bridge-roundabouts-after-9-month-closure.html |
Sherbrooke,
QC Sherbrooke Canada |
Boulevard René-Lévesque / Rue Matisse / Rue Luce-Dufresne (45.38324, -71.99812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2018 | |
Sherbrooke,
QC Sherbrooke Canada |
Boulevard René-Lévesque / Rue Sainte Claire / Rue Magnelli (45.38799, -71.99469) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2018 | |
North Mankato,
MN Nicollet Co. United States |
Lookout Dr. / US 14 EB Ramps (44.18021, -94.05378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2016 | Year Completed estimated (2015-2017). |
North Mankato,
MN Nicollet Co. United States |
Lookout Dr. / US 14 WB Ramps (44.18184, -94.05374) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2016 | Year Completed estimated (2015-2017). |
Mankato,
MN Nicollet Co. United States |
Rockford Rd. (CR 41) / Pleasant View Dr. / 520th St. (44.18361, -94.06988) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2015). |
North Mankato,
MN Nicollet Co. United States |
Rockford Rd. (CR 41) / US 14 EB Ramps (44.18520, -94.06893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Raindrop shape. Year Completed estimated (2011-2015). |
North Mankato,
MN Nicollet Co. United States |
Rockford Rd. (CR 41) / W Howard Dr. / US 14 WB Ramps (44.18763, -94.06758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Double-left-turn on west leg. Year Completed estimated (2011-2015). |
Mankato,
MN Blue Earth Co. United States |
CR 12 (586th Ave.) / Hoffman Rd. (44.15578, -93.93909) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2019). |
Mankato,
MN Blue Earth Co. United States |
Hoffman Rd. / Prairie Winds Dr. (44.15592, -93.94483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2019). |
Buffalo,
MN Wright Co. United States |
8th St. NE / 20th St. NE / Calder Ave. NE (45.17995, -93.84729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2016 | http://co.wright.mn.us/CivicAlerts.aspx?AID=559&ARC=1045 |
Oroville,
CA Butte Co. United States |
SR 191 (Clark Rd.) / Durham Pentz Rd. (39.64733, -121.63448) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Painted splitter islands and truck apron; gravel inside the center island. Year Completed estimated (2018-2019). |
Carmel,
IN Hamilton Co. United States |
N Range Line Rd. / Lowes Way (39.99193, -86.12728) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Unknown |
2020 | New roundabout opened for connection to the new Lowes Way extension (will connect to the new overpass to the east over Keystone). https://www.hamiltoncounty.in.gov/881/Lowes-Way-Connection---Phase-2 . https://twitter.com/HamcoIndiana/status/1254047807759097859 |
Lincoln,
NE Lancaster Co. United States |
S 32nd St. / Zermatt Dr. (40.74172, -96.67376) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 28.9560 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1999-2002). |
Lincoln,
NE Lancaster Co. United States |
S 90th St. / Red Sky Ln. (40.81189, -96.59797) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Lincoln,
NE Lancaster Co. United States |
N 66th St. / Fremont St. (40.84863, -96.63043) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | Year Completed estimated (2018-2019). |
Blue Mountains,
ON Grey Canada |
CR 19 / Gord Canning Dr. / Scenic Caves Rd. (44.49650, -80.30181) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Year Completed estimated (2009-2011). |
Thunder Bay,
ON Thunder Bay Canada |
Marina Park Dr. (Sleeping Giant Pkwy.) / Pearl St. (48.43155, -89.21965) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2015). |
Repentigny,
QC L'Assomption Regional County Municipality Canada |
Boulevard Basile-Routhier / Avenue des Rivières (45.78281, -73.43269) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2010 | |
Repentigny,
QC L'Assomption Regional County Municipality Canada |
Boulevard Louis-Phillippe-Picard / Boulevard Iberville (45.78892, -73.40757) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Year Completed estimated (2006-2008). |
Saint-Charles-Borromée,
QC Joliette Regional County Municipality Canada |
Rue de la Petite-Noraie / Boulevard l'Assomption (46.03950, -73.46948) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2014) as three-leg roundabout. Fourth leg added 2016-2019. |
Surrey,
BC Greater Vancouver Canada |
108 Ave. / 156 St. (49.19885, -122.78978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Surrey,
BC Greater Vancouver Canada |
108 Ave. / 158 St. / 157A St. (49.19886, -122.78424) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2006-2007). |
North Vernon,
IN Jennings Co. United States |
US 50 / Walnut St. / CR 400 W (38.98696, -85.68113) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | https://www.facebook.com/NVPDS/photos/west-end-bypass-roundabout-opens-six-months-after-construction-started-the-new-w/2385364561504366/ |
Cassidy,
BC Nanaimo Canada |
Spit Fire Rd. / (unknown) (49.05375, -123.87605) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2010-2011). |
Calgary,
AB Alberta Canada |
24 St. SE / Ogden Rd. SE / 86 Ave. SE / 85 Ave. SE (50.97635, -113.99957) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 68.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2013-2014) with south and east legs completed and two legs stubbed. Other two legs added 2016. |
West Jordan,
UT Salt Lake Co. United States |
W 8600 S / 6000 W (40.59520, -112.03394) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). |
Kaysville,
UT Davis Co. United States |
S Angel St. / Smith Ln. (41.02160, -111.96155) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2007 | |
Birmingham,
AL Jefferson Co. United States |
Cotton Ave. SW / Tuscaloosa Ave. SW / (parking) (33.49569, -86.84738) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2014 | |
Watford City,
ND McKenzie Co. United States |
12th St. SE / 6th Ave. SE (47.79584, -103.26239) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Findlay,
OH Hancock Co. United States |
Lima Ave. / US 68-SR 15 EB On-ramp / I-75 Off-ramp (41.02305, -83.66838) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://socialfindlay.com/lima-ave-roundabout/ |
Findlay,
OH Hancock Co. United States |
Lima Ave. / US 68-SR 15 WB Off-ramp / I-75 On-ramp (41.02393, -83.66688) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://socialfindlay.com/lima-ave-roundabout/ |
Norman,
OK Cleveland Co. United States |
Corporate Centre Dr. / (unknown) (35.25055, -97.47797) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2014-2015). |
Norwood Young America,
MN Carver Co. United States |
CR 33 / CR 34 (44.78632, -93.92955) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.co.carver.mn.us/departments/public-works/projects-studies/highway-33-34-roundabout-project |
Mayer,
MN Carver Co. United States |
STH 25 (Mayer Blvd.) / 7th St. / 62nd St. (44.89120, -93.88554) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Skewed intersection. https://www.hometownsource.com/sun_patriot/mayer-premieres-new-roundabout-on-hwy-25/article_fdc7a910-4598-58ad-a60c-967e9892573b.html |
Prior Lake,
MN Scott Co. United States |
CR 12 / Fish Point Rd. (44.70864, -93.41052) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2014 | |
Credit River Township,
MN Scott Co. United States |
Texas Ave. / 190th St. E (44.67421, -93.37938) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2017 | |
Pine Island,
MN Goodhue Co. United States |
CR 11 / E Frontage Rd. / US 52 WB Ramps (44.20482, -92.63406) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Year Completed estimated (2014 - streetview). |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Sargent Rd. (39.92707, -86.00638) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Open June 8, 2020. https://twitter.com/DriveFishers/status/1270045736265297922 |
Hagerstown,
MD Washington Co. United States |
Robinwood Dr. / Academic Blvd. / Youngstoun Dr. (39.62804, -77.66541) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | https://www.heraldmailmedia.com/news/local/robinwood-drive-to-reopen-next-month-but-roundabout-questioned/article_95edc272-8319-5f1a-a05d-cfb62ada2f8f.html |
Spring Branch East,
TX Harris Co. United States |
Hillendahl Blvd. / Westwood Dr. (29.79893, -95.49322) |
Roundabout Removed |
All-Way Yield None |
3 Approaches 0 Driveways 7.0101 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2010 | Built as a mini roundabout in 1998 as part of a larger neighborhood street reconstruction project. It had a mountable center island 6 ft. in diameter and 3" high made from recycled rubber; long gone. Conversion to TWSC estimated from aerial photos. |
Houston,
TX Harris Co. United States |
Westwood Dr. / Huge Oaks St. (29.79887, -95.49113) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-Lane |
1998 | Implemented as part of a larger neighborhood street reconstruction project that incorporated systematic traffic calming elements. |
Houston,
TX Harris Co. United States |
Westwood Dr. / Pine Chase Dr. (29.79887, -95.48897) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-Lane |
1998 | Implemented as part of a larger neighborhood street reconstruction project that incorporated systematic traffic calming elements. |
Houston,
TX Harris Co. United States |
Helios Way / (future street) (29.78332, -95.63666) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2009 | Designed as part of a larger corporate campus master plan for BP. Its design includes a right hand bus apron for pick up and drop off of employees and visitors by shuttle buses, tour buses, and school buses. The leg to the west is intended to serve a future mixed use development. While the ICD may seem larger than it needs to be from a functionality standpoint, the size was intended to accommodate landscape architecture and placemaking elements. |
Cumberland,
RI Providence Co. United States |
Diamond Hill Rd. (Rte 114) / I-295 NB Ramps (41.94962, -71.40285) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2019 | https://www.ri.gov/press/view/36693 |
Cumberland,
RI Providence Co. United States |
Diamond Hill Rd. (Rte 114) / I-295 SB Ramps (41.95149, -71.40241) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2019 | https://www.ri.gov/press/view/36693 |
Gainesville,
FL Alachua Co. United States |
SW 88th St. / SW 76th Ave. (29.58365, -82.43651) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2007 | |
Irmo,
SC Richland Co. United States |
Coogler Rd. / Kennerly Rd. / Steeple Ridge Rd. (34.13011, -81.17782) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2016 | https://twitter.com/RichlandPenny/status/793909450352492544 |
Xenia,
OH Greene Co. United States |
US 42 / E Church St. (39.68780, -83.92357) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 25.9997 |
Other (At-Grade) Single-Lane |
2020 | Truck apron is 15 ft wide. https://www.xeniagazette.com/top-stories/49169/smooth-going-so-far-for-roundabout |
Ingersoll,
ON Oxford Canada |
Plank Line (Hwy 19) / Hwy 401 EB Ramps (43.02638, -80.85271) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Merging right-turn bypass lanes on southwest and southeast legs. |
Ingersoll,
ON Oxford Canada |
Plank Line (Hwy 19) / Harris St. (Hwy 119) / Hwy 401 WB Ramps (43.02839, -80.85549) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Merging right-turn bypass lanes on northwest and northeast legs. |
Wake Forest,
NC Wake Co. United States |
Linslade Way / Cornwell Dr. (35.92725, -78.51090) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.2438 |
Other (At-Grade) Single-Lane |
2007 | ICD = 90 ft. ICD estimated from Google Maps linework. |
South Snyderville Basin,
UT Summit Co. United States |
Canyons Resort Dr. / Frostwood Dr. (40.68753, -111.54847) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2014 | Right-turn add-lane bypass lane on southeast leg. Year Completed estimated (2013-2015). |
Medford,
MA Middlesex Co. United States |
Winthrop St. / High St. / Rural Ave. (42.42129, -71.11800) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2019 | Painted splitter islands. Right-turn-only lanes on southwest and south legs. Converted from traffic circle in 2018-2019. |
Menominee Falls,
WI Waukesha Co. United States |
Megal Ct. / (unknown) (43.18504, -88.10064) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Fourth leg stubbed. Year Completed estimated (2015-2016). |
Nicollet,
MN Nicollet Co. United States |
461st Ave. / US 14 WB Ramps (44.26645, -94.19045) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Year Completed estimated (2016-2018). |
Nicollet,
MN Nicollet Co. United States |
461st Ave. / US 14 EB Ramps (44.26470, -94.19047) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Teardrop shape. Year Completed estimated (2016-2018). |
New Ulm,
MN Brown Co. United States |
US 14 / Front St. Connector (44.32395, -94.45755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2020). Replaced ramps of PARCLO AB interchange. https://www.isginc.com/portfolio/us-highway-14-roundabout |
Saint-Anselme,
QC Bellechasse Regional County Municipality Canada |
Chemin Saint-Jacques / Chemin Sainte-Anne (46.62899, -70.98278) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
West Jordan,
UT Salt Lake Co. United States |
W 7800 S / New Sycamore Dr. (40.60940, -112.05842) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Yield-controlled right-turn bypass lane on east leg. Fourth leg stubbed. Year Completed estimated (2018-2019). |
Lethbridge,
AB Alberta Canada |
Metis Trl. / Country Meadows Blvd. W (49.69571, -112.90888) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | |
Orchidlands Estates,
HI Hawaii Co. United States |
Keaau-Pahoa Rd. / Ainaloa Blvd. (19.54338, -154.97495) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.1084 |
Other (At-Grade) Single-Lane |
2020 | R/W being hard to acquire, this project is being rushed within existing R/W as an urgent safety measure. https://histategis.maps.arcgis.com/apps/MapSeries/index.html?appid=39e4d804242740a89d3fd0bc76d8d7de |
El Paso,
TX El Paso Co. United States |
Sun Bowl Dr. / Glory Rd. (31.77537, -106.50895) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | |
Fort Worth,
TX Tarrant Co. United States |
Brewer Blvd. / McPherson Blvd. (32.60744, -97.42027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3870 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | |
Carmel,
IN Hamilton Co. United States |
E 96th St. / Haverstick Rd. (39.92692, -86.11748) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | http://carmellink.com/project.php?title=96th%20Street%20and%20Haverstick%20Road%20Roundabout http://carmellink.com/images/projects/96th-St-and-Keystone-Pkwy-Exhibit.2017.01.jpg Scheduled for completion by July 4 2020. |
Bend,
OR Deschutes Co. United States |
SE 15th St. / SE Golden Gate Pl. (44.02068, -121.28483) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | |
Ferguson,
PA Centre Co. United States |
Havershire Blvd. / Prestwick Blvd. (40.78873, -77.89571) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2015). |
Boardman,
OR Morrow Co. United States |
Internet Pkwy. / (unknown) (45.85677, -119.63020) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 83.8200 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2015). |
Bemidji,
MN Beltrami Co. United States |
Irvine Ave NW / US 71 NB Ramps (47.54234, -94.88501) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://www.dot.state.mn.us/d2/projects/2019/hwy71-bemidji/index.html |
Bentonville,
AR Benton Co. United States |
NE J St. / Museum Way / John Deshields Blvd. (36.37822, -94.19655) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2019 | https://www.dot.state.mn.us/d2/projects/2019/hwy71-bemidji/index.html |
Kenora,
ON Kenora Canada |
Park St. / 1st St. S / Fifth Ave. S (49.76642, -94.48513) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.facebook.com/CityofKenora/posts/kenoras-second-roundabout-is-open-give-it-a-try-go-from-second-street-to-park-st/2308348529214570/ |
Marquette,
MI Marquette Co. United States |
US 41 / CR HQ (46.54939, -87.46102) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | Year Completed estimated (2019-2020). |
(unincorporated),
TX Montgomery Co. United States |
Woodforest Pkwy. / Woodforest Blvd. / Spyglass Park Ln. (30.27643, -95.55388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Wood Buffalo,
AB Alberta Canada |
Snowbird Way / (air cargo access) (56.64996, -111.23847) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2013 | Entry to Fort McMurray International Airport. Year Completed estimated (2011-2014). |
Wood Buffalo,
AB Alberta Canada |
Range Road 85 (Saline Creek Pkwy.) / Snowbird Way (56.65106, -111.25513) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2013 | Right-turn-only lane on south leg. Year Completed estimated (2011-2014). |
Lutz,
FL Hillsborough Co. United States |
Sunlake Blvd. / County Line Rd. W / Misty Willow Way (28.16666, -82.50122) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2007 | |
Lutz,
FL Pasco Co. United States |
Long Lake Ranch Blvd. / Nature View Dr. (28.18110, -82.50268) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2014 | |
Lutz,
FL Pasco Co. United States |
Long Lake Ranch Blvd. / Fox Grape Loop / Daggerwing Blvd. (28.18080, -82.49978) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2014 | |
Odessa,
FL Pasco Co. United States |
S Branch Blvd. / Secret Meadows Dr. / Storybrook Preserve Dr. (28.19402, -82.55107) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | |
Grand Terrace,
CA San Bernardino Co. United States |
Barton Rd. / I-215 SB Ramps (34.03398, -117.32604) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2019 | |
Shenandoah,
TX Montgomery Co. United States |
David Memorial Dr. / Shenandoah Park Dr. (30.19171, -95.44727) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | Right-turn-only markings in both lanes on all entries. |
Lehi,
UT Utah Co. United States |
Gray Hawk Dr. / Homestead Dr. (40.45275, -111.89259) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2005-2006). |
Lehi,
UT Utah Co. United States |
E 3200 N / Center St. (40.42800, -111.84974) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2007 | Roundabout modified in 2016-2017 to reduce width of truck apron and increase circulatory roadway width. 21442 |
Saratoga Springs,
UT Utah Co. United States |
N 3600 W / W Waterbury Dr (40.41506, -111.90693) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (3+ Lane) |
2017 | Through arrows on entry (no left turn arrows). Northbound has two entry through lanes going into a LT, LT-TH, TH section of circulatory roadway. Year Completed estimated (2016-2017). |
Saratoga Springs,
UT Utah Co. United States |
N 3600 W / Drexler Dr. / W 2450 N (40.41725, -111.90695) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | Through arrows on entry - no left turn arrows shown. Year Completed estimated (2016-2017). |