City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Watari Town,Watari District,
Miyagi Pref. Japan |
(unknown) (38.04373, 140.86918) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Tomiya,
Miyagi Pref. Japan |
Higashikoyodai 2 chome (38.33664, 140.90346) |
Other Existing |
All-Way Stop None |
6 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Higashimatsushima City,
Miyagi Pref. Japan |
Omagari Shimodai (38.41179, 141.24126) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Natori City,
Miyagi Pref. Japan |
Sogodai (38.20813, 140.80908) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Natori City,
Miyagi Pref. Japan |
Sogodai (38.20477, 140.80778) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Natori City,
Miyagi Pref. Japan |
Sogodai (38.20206, 140.80672) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Natori City,
Miyagi Pref. Japan |
Sogodaihigashi (38.21103, 140.81667) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Kostanjevica na Krasu,
Miren-Kostanjevica Slovenia |
SR 614 (Miren) / (unknown) (45.89908, 13.61504) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Borovlyanskiy sel'skiy sovet,
Minsk Province Minskiy rayon Belarus |
Aviatsionnaya / (Wright Brothers St.) (53.95852, 27.66416) |
Unknown Existing |
Unknown None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Minsk,
Minsk Minsk Belarus |
Stalietava / Zaporozhskaya / Filimonava (53.90697, 27.63042) |
Roundabout Existing |
All-Way Yield Pedestrian Signal (red-yellow-green to drivers) |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Minsk,
Minsk Minsk Belarus |
Maksima Bahdanovica / Arlouskaja / Surganova (53.93130, 27.57690) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Herning,
Middle Jutland Herning Denmark |
Vesterholmvej / Gullestrupvej (56.15784, 8.96920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Århus,
Middle Jutland Århus Denmark |
Ormslevvej / Klokkeskovvej / Byvænget (56.12862, 10.11565) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Århus,
Middle Jutland Århus Denmark |
Ormslevvej / Jarlsmindevej (56.12847, 10.12520) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Brabrand,
Middle Jutland Århus Denmark |
Silkeborgvej / Herningmotorvejen (56.15248, 10.07507) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Horsens,
Middle Jutland Horsens Denmark |
Torstedalle / Thorsvej / Langballe / Kvartetvej (55.84926, 9.81540) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute O1 (Lægårdvej - Enghavevej) / Stationsvej / Lægårdvej (56.36256, 8.62117) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Randers,
Middle Jutland Randers Denmark |
Primærrute 16-Primærrute 21 (Ringvej Syd) / E45 (Nordjyske Motorvej) NB Ramps / Sekundærrute 511 (Tulipvej) / Stånumvej / Merkurvej (56.41388, 10.07852) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Viborg,
Middle Jutland Viborg Denmark |
Primærrute 16-Primærrute 13 (Nordre Ringvej) / Primærrute 13 (Aalborgvej) / Indre Ringvej (56.47475, 9.41660) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Merging right-turn bypass lane on north leg. | |
Viborg,
Middle Jutland Viborg Denmark |
Primærrute 16 (Nordre Ringvej) / Houlkærvej (56.47208, 9.44476) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Sekundærrute 189 (Skivevej) / Primærrute 18 (Holstebromotorvejen) WB Ramps (56.38708, 8.65517) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Sekundærrute 189 (Skivevej) / Primærrute 18 (Holstebromotorvejen) WB Ramps / (parking) (56.38505, 8.65214) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Primærrute 18 (Holstebromotorvejen) WB Ramps (56.36871, 8.72131) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Primærrute 18 (Holstebromotorvejen) EB Ramps (56.36814, 8.71820) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Holstebro,
Middle Jutland Holstebro Denmark |
Primærrute 16 (Viborgvej) / Østre Ringvej / Sletten (56.36332, 8.67574) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Primærrute 46 (Nørreskov Bakke) / Nordre Højmarksvej / Østre Højmarksvej (56.19847, 9.59181) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Nordre Højmarksvej / Sejling Hedevej / Kejlstrupvej (56.19849, 9.55834) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Nordre Højmarksvej / Høje Kejlstrupvej / (parking) (56.19747, 9.54622) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Primærrute 52 (Viborgvej) / Nordre Højmarksvej (56.19552, 9.52550) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Herning,
Middle Jutland Herning Denmark |
Sekundærrute 195 (Dronningens Blvd.) / Primærrute 15 Ramps / Snejbjergvej (56.11757, 8.90629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Ringkøbing,
Middle Jutland Denmark |
Primærrute 15 (Vestre Ringvej - Nordre Ringvej) / Primærrute 16 (Holstebrovej) (56.10564, 8.25936) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Silkeborg,
Middle Jutland Silkeborg Denmark |
Sekundærrute 195 (Skærskovhedevej) / Herningmotorvejen / Funder Dalgårdsvej (56.14664, 9.45466) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Århus,
Middle Jutland Århus Denmark |
Christian X's Vej / Jyllands Allé / (parking) (56.12205, 10.17032) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Grenå,
Middle Jutland Denmark |
Østerbrogade / N.P. Josiassens Vej (56.41399, 10.88659) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
||
Grenå,
Middle Jutland Denmark |
Kannikegade / Østerbrogade / Rosengade / Stationsvej (56.41342, 10.87920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Orion,
MI Oakland Co. United States |
Baldwin Rd. / (parking) (42.72527, -83.30757) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | West leg is for athletic club; east leg is for a small strip mall. A fountain is featured in the circle. |
Orion,
MI Oakland Co. United States |
Baldwin Rd. / Maybee Rd. (42.72884, -83.30775) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Yield-controlled right-turn bypass lane on east leg. West leg enters into a residential subdivision local road. |
Orion,
MI Oakland Co. United States |
Baldwin Rd. / Waldon Rd. (42.73619, -83.30805) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | |
Orion,
MI Oakland Co. United States |
E Flint St. / Orion Rd. / Miller Rd. (42.78398, -83.23184) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | |
Independence,
MI Oakland Co. United States |
Sashabaw Rd. / Oak Hill Rd. (42.79422, -83.37240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | West leg is unpaved away from roundabout. |
Swartz Creek,
MI Genesee Co. United States |
Grand Blanc Rd. / Morrish Rd. (42.91289, -83.83040) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://swartzcreekview.mihomepaper.com/articles/traffic-circle-construction-underway-bridge-work-set-to-begin/ |
Columbus,
MI St. Clair Co. United States |
Gratiot Ave. / Palms Rd. (42.85156, -82.63709) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.thetimesherald.com/story/news/2021/09/29/roundabout-palms-gratiot-open-traffic-week-columbus-twp/5913286001/ |
Traverse City,
MI Grand Traverse Co. United States |
M-37 / Vance Rd. (44.65747, -85.65622) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Traverse City,
MI Grand Traverse Co. United States |
Parsons Rd. / Airport Access Rd. (44.75181, -85.58162) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Swartz Creek,
MI Genesee Co. United States |
Grand Blanc Rd. / Linden Rd. (42.91411, -83.77008) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Traverse City,
MI Grand Traverse Co. United States |
Hammond Rd. E / Four Mile Rd. N (44.71542, -85.53638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2021 | https://www.record-eagle.com/news/local_news/winding-down-hammond-4-mile-roundabout-opens/article_8b0055ae-0ffa-11ec-99ed-8be394157c49.html |
Rochester,
MI Oakland Co. United States |
E Avon Rd. / Dequindre Rd. (42.67168, -83.09685) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Bridge to the east and roundabout at Avon and Dequindre is under construction November 2021. http://www.rcocweb.org/606/Avon-Road-Dequindre-to-23-Mile-Road The one driveway is a utility drive. Note: Popular Cider mill is to the east as well with another roundabout planed for 2022 at Dequindre and 23 Mile Rd. |
Shelby Township,
MI Macomb Co. United States |
E Avon Rd. / 23 Mile Rd. (42.67368, -83.09389) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Roundabout constructed after completion of bridge and roundabout to the west is completed. |
China,
MI St. Clair Co. United States |
Fred W Moore Hwy. / Wadhams Rd. (42.81537, -82.55479) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2019-2022). |
Novi,
MI Oakland Co. United States |
Gateway Rd. / Woodstone Ln. (42.52271, -83.49676) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Wixom,
MI Oakland Co. United States |
W Chambers St. / Johanna Ware W (42.52579, -83.53382) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Belmont,
MI Kent Co. United States |
Seven Mile Rd. NE / Brewer Ave. NE (43.07137, -85.57053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2006-2009). |
Portage,
MI Kalamazoo Co. United States |
Zylman Ave. / Coxs Dr. (42.19367, -85.55061) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | Replaced offset T-intersections. Year Completed estimated (2018-2020). |
Auburn Hills,
MI Oakland Co. United States |
Pioneer Dr. / Meadow Brook Rd. (42.66857, -83.21853) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2018 | Previous T-intersection shifted to east. |
Auburn Hills,
MI Oakland Co. United States |
N Squirrel Rd. / Squirrel Ct. (42.63475, -83.22058) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Yield-controlled right-turn bypass lane on north leg. |
Clinton Township,
MI Macomb Co. United States |
Partridge Creek Blvd. / Scoter Ln. / Montage (42.62068, -82.94597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Opened with unstriped circulatory roadway. Marked with two circulating lanes throughout even though side streets are single-lane entries. Combination of concentric and exit striping added 2019-2020. |
Clinton Township,
MI Macomb Co. United States |
Partridge Creek Blvd. / Hawk Ln. / Montage (42.62063, -82.94027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Opened with unstriped circulatory roadway. North leg added 2015-2016. Marked with two circulating lanes throughout even though side streets are single-lane entries. Combination of concentric and exit striping added 2019-2020. |
Southfield,
MI Oakland Co. United States |
Franklin Rd. / W Eleven Mile Rd. (42.48636, -83.29104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2018). |
Northville,
MI Wayne Co. United States |
Yellowstone Dr. / Johnson Creek Dr. (42.40412, -83.52414) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2005 | |
Northville,
MI Wayne Co. United States |
Carriage Way / Glacier Rd. (42.40220, -83.53576) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Northville,
MI Wayne Co. United States |
Johnson Creek Dr. / (park entrance) (42.39610, -83.51860) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Lansing,
MI Ingham Co. United States |
Forest Rd. / Collins Rd. (42.70389, -84.49795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | |
Waterford,
MI Oakland Co. United States |
Skippter Dr. / (parking) (42.65920, -83.38892) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. Within shopping mall property. | |
Sister Lakes,
MI Washtenaw Co. United States |
N Bay Dr. / Timmins Dr. / Chapleau Dr. (42.26417, -83.79140) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on three legs. | |
Grand Blanc,
MI Genesee Co. United States |
E Grand Blanc Rd. / Embury Rd. (42.91693, -83.64652) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.abc12.com/news/grand-blanc-road-reopens-following-roundabout-construction-project/article_39b8087a-3083-5a44-b841-c1872cfd8918.html. |
Monroe,
MI Monroe Co. United States |
Laplaisance Rd. / I-75 NB On-Ramp (41.87651, -83.39471) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | https://www.monroenews.com/story/news/traffic/2021/12/03/new-bridge-roundabouts-laplaisance-rd-open/8836648002/ Plan is to move NB offramp to the roundabout at some tuture time. |
Monroe,
MI Monroe Co. United States |
Laplaisance Rd. / I-75 SB Ramps (41.87817, -83.39577) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | https://www.monroenews.com/story/news/traffic/2021/12/03/new-bridge-roundabouts-laplaisance-rd-open/8836648002/ |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 EB Ramps (42.27461, -84.38325) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 WB Entrance Ramp (42.27627, -84.38357) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / Seymour Rd. / Rosehill Rd. (42.27724, -84.38398) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Macomb,
MI Macomb Co. United States |
25 Mile Rd. / Romeo Plank Rd. / Garfield Rd. (42.70077, -82.95901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Year Completed estimated (2021-2022). |
Manistee,
MI Manistee Co. United States |
1st St. / Beach Rd. (44.24639, -86.34069) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.0728 |
Other (At-Grade) Single-Lane |
2014 | |
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. N / Cass Rd. (44.69811, -85.61832) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | Railroad crossing on east leg 65 ft from circulatory roadway; controlled by yield sign. https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / I-94 EB Ramps (42.26564, -84.61940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / Norton Rd. / I-94 WB Ramps (42.26653, -84.62125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Combined two intersections. https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Independence,
MI Oakland Co. United States |
Knob Hill Circle (42.73975, -83.37107) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
||
Independence,
MI Oakland Co. United States |
3400 W Clarkston Rd (42.76543, -83.31409) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
There used to be a drop-down for a project that is in design. This will be constructed in 2024. | |
Scio Township ,
MI Washtenaw Co. United States |
W Liberty Rd. / Zeeb Rd. (42.26934, -83.83817) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.mlive.com/news/ann-arbor/2022/09/new-roundabout-near-ann-arbor-opens-after-weeks-of-construction.html |
Green Oak Township,
MI Livingston Co. United States |
Winans Lake Rd. / Rickett Rd. (42.46413, -83.76620) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.whmi.com/news/article/roundabout-rickett-winans |
Salem Township,
MI Washtenaw Co. United States |
N Territorial Rd. E / Pontiac Trl. (42.36546, -83.65682) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.wcroads.org/wcrc-project/pontiac-tr-n-territorial-rd-roundabout/ |
Northville,
MI Washtenaw Co. United States |
Eight Mile Rd. / Currie Rd. (42.43382, -83.59039) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.rcocweb.org/529/Currie-Road-COMPLETE |
Manistee Township,
MI Manistee Co. United States |
US 31 / M-22 (44.28494, -86.24281) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://upnorthlive.com/news/local/roundabout-opens-in-manistee-township |
Novi,
MI Oakland Co. United States |
W 9 Mile Rd. / Taft Rd. (42.45158, -83.49410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.candgnews.com/news/novi-council-approves-lighting-for-new-roundabout-635 |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Harrison Ave. (42.63763, -83.09821) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Gerald Ave. (42.63809, -83.09578) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Buena Vista,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 SB Ramps (43.41453, -83.89324) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on north leg. Replaced cloverleaf interchange. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Saginaw,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 NB Ramps (43.41447, -83.88874) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Replaced cloverleaf interchange. Merging right-turn bypass lane on east leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. S / Beitner Rd. / River Rd. W (44.67776, -85.62668) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.4048 |
Other (At-Grade) Single-Lane |
2022 | https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
Cadillac,
MI Wexford Co. United States |
Plett Rd. / E 13th St. (44.26695, -85.39646) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2012 | https://www.9and10news.com/2012/08/13/city-of-cadillac-gets-new-driving-maneuver-at-intersection/ |
Cadillac,
MI Wexford Co. United States |
E Division St. / Crosby Rd. (44.25260, -85.37770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://www.cadillacnews.com/news/new-roundabout-at-crosby-division-opened-to-traffic/article_2ed78a18-40c4-11ec-8a2e-bb7590311039.html |
Standish,
MI Arenac Co. United States |
US 23 / M-13 (43.95018, -83.96713) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2022 | Grade separation replaced with roundabout. https://www.upnorthvoice.com/news/2022/03/us-23-at-standish-to-undergo-major-construction-this-summer-2/ |
Farmington Hills,
MI Oakland Co. United States |
Orchard Lake Rd. / (shopping center entrances) (42.52448, -83.35994) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Southfield,
MI Oakland Co. United States |
Coral Bells Dr. / Windflower Dr. / Violet Dr. (42.51039, -83.22182) |
Other Unknown |
Unknown None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
South Lyon,
MI Oakland Co. United States |
Nine Mile Rd. / Currie Rd. (42.44831, -83.59180) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Opened November 21, 2022. |
Ann Arbor,
MI Washtenaw Co. United States |
E Ann St / Observatory St. / (hospital access) (42.28240, -83.73114) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 3 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Ypsilanti,
MI Washtenaw Co. United States |
Whittaker Rd. / Bemis Rd. (42.17317, -83.60141) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | https://www.wcroads.org/wcrc-project/bemis-rd-whittaker-rd-roundabout/ |
Jackson,
MI Jackson Co. United States |
Springport Rd. / Rives Junction Rd. (42.28667, -84.46228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/jackson/2023/04/new-roundabout-coming-soon-to-jackson-county-intersection.html |
Boardman,
MI Grand Traverse Co. United States |
Webster St. / Franklin St. (44.76060, -85.61118) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
1999 | https://www.record-eagle.com/archives/two-traffic-circles-going-in-this-fall/article_f3f9d4b6-9a9a-5faa-8100-8de9872bbcad.html |
Boardman,
MI Grand Traverse Co. United States |
Webster St. / Wellington St. (44.76059, -85.61351) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
1999 | https://www.record-eagle.com/archives/two-traffic-circles-going-in-this-fall/article_f3f9d4b6-9a9a-5faa-8100-8de9872bbcad.html |
Harrison Township,
MI Macomb Co. United States |
Sail Rd. / Metro Pkwy. (42.57551, -82.79958) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.5008 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Built as part of parking lot reconfiguration. Painted splitter islands. No speed control on north leg. |