29465 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Kasson, MN
Dodge Co.
United States
STH 57 (Mantorville Rd.) / CSAH 34 (E Veterans Memorial Hwy.)
(44.02837, -92.74819)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 https://www.kimt.com/news/new-roundabouts-open-to-drivers-in-kasson/article_af81a8d4-3d2e-11ee-9d69-0bdec4451a2a.html
Kasson, MN
Dodge Co.
United States
STH 57 (Mantorville Ave.) / Main St.
(44.02953, -92.74820)
Roundabout
Existing
All-Way Yield
At-grade Rail Crossing Signals/Gates (controlling approach only)
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-lane w/ Traversable Central Island
2023 Railroad crossing approximately 50 feet south of roundabout. Removes the last traffic signal in Dodge County. https://www.kimt.com/news/new-roundabouts-open-to-drivers-in-kasson/article_af81a8d4-3d2e-11ee-9d69-0bdec4451a2a.html.
Fremont, NE
Dodge Co.
United States
US 77 (Fremont Southeast Beltway) / S Downing St.
(41.40772, -96.47361)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
67.0560
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022
Inglewood, NE
Dodge Co.
United States
US 77 / S Broad St. / S Main St.
(41.40986, -96.49868)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
67.0560
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Left-through-right and right-turn-only lanes on northwest leg. Year Completed estimated (2023-2024).
Fremont, NE
Dodge Co.
United States
US 77 / US 275 NB Ramps / Old Highway 8
(41.40473, -96.44391)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.2920
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).
Fremont, NE
Dodge Co.
United States
US 77 / US 275 SB Ramps
(41.40474, -96.44633)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
48.7680
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024).
Theresa, WI
Dodge Co.
United States
STH 67-STH 175 / STH 28 / CR TW
(43.53623, -88.44702)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
51.8160
Other (At-Grade)
Single-Lane
2022 External truck aprons on north, east, and south legs.
Rubicon, WI
Dodge Co.
United States
STH 60 / CTH P
(43.32538, -88.45889)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
42.5730
Other (At-Grade)
Single-Lane
2014 ICD estimated from Google Maps linework.
Watertown, WI
Dodge Co.
United States
BUS 26 (N Church St.) / STH 16 WB Ramps / Provimi Rd.
(43.21918, -88.73837)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
43.5177
Freeway Ramps (Grade-Separated)
Single-Lane
2011 ICD estimated from Google Maps linework.
Watertown, WI
Dodge Co.
United States
BUS 26 (N Church St.) / STH 16 EB Ramps
(43.21605, -88.73625)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.2976
Freeway Ramps (Grade-Separated)
Single-Lane
2011 ICD estimated from Google Maps linework.
Fremont, NE
Dodge Co.
United States
Diers Pkwy. / Johnson Rd. / E 16th St. / (parking)
(41.44422, -96.45389)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Single-Lane
2001 Year Completed estimated (1999-2003).
Mayville, WI
Dodge Co.
United States
STH 33 / CR P
(43.43082, -88.45031)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2019 https://www.washingtoncountyinsider.com/dodge-county-highway-p-and-wi-33-roundabout-nears-completion-by-ron-naab/
Rhodes, Southern Aegean
Dodecanese
Greece
Rte 95 / (unknown)
(36.17301, 28.07534)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Rhodes, Southern Aegean
Dodecanese
Greece
Rte 95 / EO Malona
(36.18314, 28.08398)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Lhindos, Southern Aegean
Dodecanese
Greece
Rte 95 / Pros Gennadio
(36.11255, 28.05797)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Derventa, Serb Republic
Doboj
Bosnia and Herzegovina
Kninska / Svetog Save
(44.98848, 17.90185)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Bosanski Šamac, Serb Republic
Doboj
Bosnia and Herzegovina
E73-M17 / R464 / Njegoševa
(45.05436, 18.47614)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Doboj, Serb Republic
Doboj
Bosnia and Herzegovina
E73 / M4
(44.73576, 18.09682)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Dnipro, Dnipropetrovsk
Dnipro Raion
Ukraine
Zaporizke shose / prospekt Yuriia Haharina
(48.42477, 35.02403)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, unspecified)
Divnogorsk, Krasnoyarsk
Divnogorsk
Russia
M54 (Studencheskiy pereulok) / Komsomol'skaya ulitsa
(55.96267, 92.39139)
Other
Existing
Other
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
Circulating traffic yields to entering traffic.
Portage la Prairie, MB
Division 9
Canada
Royal Rd. S / Crescent Rd.
(49.96855, -98.29062)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2021 Right-turn bypass lanes on southwest and southeast legs. https://www.youtube.com/watch?v=7CzYNrFk0uY.
Portage la Prairie, MB
Division 9
Canada
Royal Rd. S / Mayfair Farms Rd.
(49.96672, -98.29230)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2021 https://www.youtube.com/watch?v=7CzYNrFk0uY.
Portage la Prairie, MB
Division 9
Canada
Hwy 1A / Trans Canada Hwy. WB Ramps
(49.97435, -98.35997)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Single-Lane
2022 https://portageonline.com/articles/see-aerial-view-of-west-end-roundabout-now-open https://www.portageonline.com/articles/final-plan-for-west-end-overpass-complete
Portage la Prairie, MB
Division 9
Canada
Hwy 1A / Trans Canada Hwy. EB Ramps
(49.97330, -98.36839)
Roundabout
Unknown
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Unknown
https://www.portageonline.com/articles/update-on-west-end-overpass-replacement-construction
Yorkton, SK
Division 9
Canada
Darlington St. E / Mayhew Ave.
(51.21647, -102.43958)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2020 https://www.yorktonthisweek.com/news/local-news/top-10-stories-of-2020-7-roundabout-finally-finished-1.24256135
Red Deer, AB
Division 8
Canada
54 Ave. / 55th St.
(52.27375, -113.81759)
Roundabout
Existing
All-Way Yield
None
2 Approaches
2 Driveways
37.0000
Other (At-Grade)
Single-Lane
2013 Year Completed estimated (2012-2013).
Red Deer, AB
Division 8
Canada
Signet Close / Seneca Dr.
(52.23689, -113.82224)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2016-2017).
Red Deer County, AB
Division 8
Canada
AB Hwy 2A / Airport Dr. / Township Road 372
(52.17205, -113.86197)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021 https://www.reddeeradvocate.com/news/red-deer-county-roundabouts-completed/
Red Deer County, AB
Division 8
Canada
Laura Ave/Liberty Ave
(52.21374, -113.82382)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.0000
Other (At-Grade)
Single-Lane
2017
Sylvan Lake, AB
Division 8
Canada
Hwy 11 (David Thompson Hwy.) / 50 St. / Hwy 781
(52.28232, -114.09704)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Painted spiral in circulatory roadway. Previous control was stop control on south leg and yield control on north leg. Year Completed estimated (2022-2023).
Sylvan Lake, AB
Division 8
Canada
Hwy 11 (David Thompson Hwy.) / 60 St. / Range Road 15
(52.28193, -114.12092)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Painted spirals in circulatory roadway. Year Completed estimated (2022-2023).
Sylvan Lake, AB
Division 8
Canada
Crestview Blvd. / (unknown)
(52.29241, -114.09186)
Other
Existing
All-Way Yield
None
3 Approaches
0 Driveways
24.0000
Other (At-Grade)
Single-Lane
2022 No splitter islands.
Bentley, AB
Division 8
Canada
Hwy 12 / Hwy 20
(52.46439, -114.07495)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
55.0000
Other (At-Grade)
Single-Lane
2022 https://centralalbertaonline.com/articles/roundabout-construction-begins-on-highway-12-and-highway-20
Red Deer County, AB
Division 8
Canada
MacKenzie Rd. / Lexa Ave, / Hwy 2 SB Ramps
(52.20126, -113.81739)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2021 https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/
Red Deer County, AB
Division 8
Canada
McKenzie Rd. / Gasoline Alley E / Hwy 2 NB Off-Ramp
(52.20130, -113.81247)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2021 https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/
Sylvan Lake, AB
Division 8
Canada
Crestview Blvd. / Cameron Close
(52.29481, -114.09185)
Other
Existing
Unknown
None
3 Approaches
0 Driveways
24.0000
Other (At-Grade)
Single-Lane
2014 No splitter islands.
Sylvan Lake, AB
Division 8
Canada
Springfield Blvd. / (unknown)
(52.29534, -114.12423)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2017
Sylvan Lake, AB
Division 8
Canada
Hwy 20 / Erickson Rd.
(52.31537, -114.07144)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
47.0000
Other (At-Grade)
Single-Lane
2019 https://www.sylvanlakenews.com/news/sylvan-lake-council-reallocates-over-1-million-for-intersection-upgrades/
Brandon, MB
Division 7
Canada
Braecrest Dr. / Lori Rd. / Orchard Dr.
(49.87222, -99.93316)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2009 Year Completed estimated (2006-2011).
Regina, SK
Division 6
Canada
Research Dr.
(50.41278, -104.59053)
Other
Existing
Unknown
Unknown
2 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Parking along circulatory roadway.
Regina, SK
Division 6
Canada
(unknown)
(50.41660, -104.64649)
Other
Existing
Uncontrolled
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Regina, SK
Division 6
Canada
20th Ave. / Rae St.
(50.43330, -104.62110)
Traffic Calming Circle
Existing
Uncontrolled
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Regina, SK
Division 6
Canada
20th Ave. / Robinson St.
(50.43331, -104.62395)
Traffic Calming Circle
Existing
Uncontrolled
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Regina, SK
Division 6
Canada
20th Ave. / Athol St.
(50.43332, -104.62826)
Traffic Calming Circle
Existing
Uncontrolled
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Cochrane, AB
Division 6
Canada
Hwy 1A / Hwy 22
(51.20118, -114.48486)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Temporary roundabout. https://cochranenow.com/articles/temporary-roundabout-to-support-1a22-traffic-during-construction
High River, AB
Division 6
Canada
20 St. NE / Hampton Hill Dr. / 2 Ave. NE
(50.58505, -113.83614)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 https://highriver.ca/community/town-services/engineering-design-major-projects/hamptons-bypass-project
High River, AB
Division 6
Canada
2 Ave. SE / Hamptons Blvd. / Sunshine Trl.
(50.58111, -113.84114)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 https://highriveronline.com/articles/high-rivers-hamptons-south-roundabout-set-to-open-sunday
Airdrie, AB
Division 6
Canada
Williamstown Blvd. NW / Reunion Blvd. NW
(51.30299, -114.03377)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.0000
Other (At-Grade)
Single-Lane
2012
Calgary, AB
Division 6
Canada
Redstone St. NE / Redstone Plaza NE
(51.17097, -113.96197)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2011
Calgary, AB
Division 6
Canada
Redstone Dr. NE / Redstone St. NE
(51.16838, -113.96205)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2012
Calgary, AB
Division 6
Canada
Redstone Dr. NE / Redstone Blvd. NE
(51.16838, -113.95107)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.0000
Other (At-Grade)
Single-Lane
2015
Calgary, AB
Division 6
Canada
Redstone Ave. NE / Redstone Blvd. NE
(51.17294, -113.95110)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2018
Calgary, AB
Division 6
Canada
128th Ave. NE / Cornerstone St. NE
(51.16538, -113.94244)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
55.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2016 North leg stubbed.
Calgary, AB
Division 6
Canada
128 Ave. NE / Cornerstone Blvd. NE
(51.16542, -113.93815)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
55.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2017 North and east legs stubbed.
Calgary, AB
Division 6
Canada
Skyview Ranch Blvd. NE / Skyview Ranch Rd. NE / Skyview Ranch Manor NE
(51.16287, -113.95109)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2011
Calgary, AB
Division 6
Canada
Skyview Ranch Dr. NE / 52 St. NE
(51.15802, -113.95843)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2017
Calgary, AB
Division 6
Canada
Cityscape Dr. NE / Cityscape Gate NE
(51.15240, -113.95842)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Other (At-Grade)
Single-Lane
2013
Calgary, AB
Division 6
Canada
Cityscape Blvd. NE / Cityscape Dr. NE
(51.14719, -113.96633)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.0000
Other (At-Grade)
Single-Lane
2014 North and west legs 2014. East leg 2016. South leg 2018.
Calgary, AB
Division 6
Canada
104 Ave. NE / 42 St. NE
(51.14721, -113.97406)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
55.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2015
Calgary, AB
Division 6
Canada
Savanna Blvd. NE / Savanna St. NE
(51.13504, -113.95242)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
47.0000
Other (At-Grade)
Single-Lane
2016
Calgary, AB
Division 6
Canada
Savanna Blvd. NE / 52 St. NE
(51.13495, -113.95843)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
46.0000
Other (At-Grade)
Single-Lane
2017
Calgary, AB
Division 6
Canada
46 St. NE / Savanna Blvd. NE
(51.13503, -113.96582)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
46.0000
Other (At-Grade)
Single-Lane
2017
Calgary, AB
Division 6
Canada
Crowfoot Cir. NW / Crowfoot Parade / (transit center)
(51.12465, -114.20779)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
53.0000
Other (At-Grade)
Single-Lane
2008 Oval shaped. ICD = 53 m x 42 m. Year Completed estimated (2008-2012).
Calgary, AB
Division 6
Canada
Nose Hill Dr. NW / Haskayne Dr. NW / Rosemont Blvd. NW
(51.10814, -114.26887)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
48.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021 Year Completed estimated (2020-2021).
Calgary, AB
Division 6
Canada
McCall Way NE / Barlow Trl. NE
(51.10221, -114.00061)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
53.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2010 Year Completed estimated (2008-2011).
Calgary, AB
Division 6
Canada
Uxbridge Dr. NW / Ulster Rd. NW
(51.06991, -114.12950)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
37.0000
Other (At-Grade)
Single-Lane
2017
Calgary, AB
Division 6
Canada
Springborough Blvd. SW / Springborough Gate SW
(51.03379, -114.19200)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.0000
Other (At-Grade)
Single-Lane
2004 Year Completed estimated (2002-2005).
Calgary, AB
Division 6
Canada
Lower Springbank Rd. (Township Rd. 241A) / Township Rd. 242
(51.03721, -114.24617)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
46.0000
Other (At-Grade)
Single-Lane
2021
Calgary, AB
Division 6
Canada
Westhills Way SW / Glenmore Trl. SW (Hwy 8-Hwy 201) WB Ramps
(51.00996, -114.17395)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2020 Year Completed estimated (2020-2021).
Tsuu T'ina Nation 145, AB
Division 6
Canada
Westhills Way SW / Tsuut'ina Pkwy. / Glenmore Trl. (Hwy 8-Hwy 201) EB Ramps
(51.00743, -114.17479)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2020
Tsuu T'ina Nation 145, AB
Division 6
Canada
Tsuut'ina Pkwy / Tsuut'ina Trl. SW NB Ramps
(51.00090, -114.16348)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2020 Year Completed estimated (2020-2021).
Tsuu T'ina Nation 145, AB
Division 6
Canada
Tsuut'ina Pkwy / Tsuut'ina Trl. SW SB Ramps
(51.00130, -114.16953)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
55.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2021 Year Completed estimated (2020-2021).
Calgary, AB
Division 6
Canada
Peacekeepers Way SW / Don Ethell Blvd. SW
(51.00475, -114.12697)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.0000
Other (At-Grade)
Single-Lane
2004 Year Completed estimated (2002-2005).
Calgary, AB
Division 6
Canada
Quarry Way SE / Quarry Gate SE
(50.96118, -114.01967)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.0000
Other (At-Grade)
Single-Lane
2011
Tsuu T'ina Nation 145, AB
Division 6
Canada
Buffalo Run Blvd. / 130 Ave. SW / Tsuut'ina Trl. SB Entrance Ramp
(50.93654, -114.14333)
Roundabout
Existing
All-Way Yield
None
2 Approaches
0 Driveways
50.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2020 Raindrop shaped. Merging right-turn bypass lane on west leg. Year Completed estimated (2019-2020).
Calgary, AB
Division 6
Canada
130 Ave. SW / Tsuut'ina Trl. NB Exit Ramp
(50.93611, -114.13893)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2020 Raindrop shaped.
Calgary, AB
Division 6
Canada
Woodpark Blvd. SW / 24 St. SW
(50.93578, -114.11793)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2019 Year Completed estimated (2019-2020).
Calgary, AB
Division 6
Canada
Marine Dr. SE / Mahogany Rd. SE
(50.89464, -113.92917)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
43.0000
Other (At-Grade)
Single-Lane
2019 Year Completed estimated (2017-2020).
Calgary, AB
Division 6
Canada
Marine Dr. SE / Masters Ave. SE
(50.89226, -113.92533)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Other (At-Grade)
Single-Lane
2019 Year Completed estimated (2017-2020).
Calgary, AB
Division 6
Canada
Chaparral Valley Square SE / Chaparral Valley Dr. SE
(50.88594, -114.01532)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
36.0000
Other (At-Grade)
Single-Lane
2010 Year Completed estimated (2008-2011).
Calgary, AB
Division 6
Canada
Chaparral Valley Dr. SE / Chaparral Valley Gate SE / Chaparral Valley Grove SE
(50.88197, -114.01471)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.0000
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2007-2008).
Calgary, AB
Division 6
Canada
194 Ave. SE / Wolf Willow Blvd. SE
(50.87758, -114.00378)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2019 Year Completed estimated (2017-2020).
Calgary, AB
Division 6
Canada
212 Ave. SE / Cranston Gate SE / Deerfoot Trl. (Hwy 2) SB Ramps
(50.86657, -113.96433)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
72.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2019 Raindrop shaped. Year Completed estimated (2017-2020).
Calgary, AB
Division 6
Canada
212 Ave. SE / Deerfoot Trl. NB Exit Ramp
(50.86526, -113.96014)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
70.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2019 Raindrop shaped. Year Completed estimated (2017-2020).
Calgary, AB
Division 6
Canada
Seton Way SE / 212 Ave. SE / Union Ave. / Seton Cir. SE
(50.86832, -113.95356)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
62.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2019 Year Completed estimated (2017-2020).
Calgary, AB
Division 6
Canada
Seton Way SE / Seton Ave. SE
(50.87133, -113.95589)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
62.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2019 Year Completed estimated (2017-2020).
Calgary, AB
Division 6
Canada
Legacy Village Way SE / Legacy Village Rd. SE
(50.85969, -114.02478)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2015-2016).
Okotoks, AB
Division 6
Canada
D'Arcy Blvd. / Sandstone Dr. / Larkspur Bend
(50.73559, -113.98112)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.0000
Other (At-Grade)
Single-Lane
2019 Year Completed estimated (2017-2021).
Okotoks, AB
Division 6
Canada
Mountainview Dr. / Mountainview Gate
(50.72974, -113.98983)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2012 Year Completed estimated (2011-2012).
Calgary, AB
Division 6
Canada
Sarcee Trl. SW / Na'a Dr. SW / Trans-Canada Hwy EB Ramps
(51.07800, -114.18891)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
55.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2017
Calgary, AB
Division 6
Canada
Na'a Dr. SW / Na'a Plaza SW
(51.07872, -114.19234)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
58.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2020
Calgary, AB
Division 6
Canada
34 Ave. NW / Sarcee Trl. NW
(51.08368, -114.18893)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Other (At-Grade)
Single-Lane
2022
Calgary, AB
Division 6
Canada
West Valley Rd. SW / 101 St. SW / 1 Ave. SW / Trans-Canada Hwy EB On-Ramp
(51.08514, -114.23423)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2022
Calgary, AB
Division 6
Canada
Valley Ridge Blvd. NW / Trans Canada Hwy EB Ramps
(51.08743, -114.24755)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
67.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2022
Balzac, AB
Division 6
Canada
Hwy 566 / Range Rd. 11 (15 St. NE)
(51.21263, -114.02476)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021 https://discoverairdrie.com/articles/balzac-traffic-circle-inches-closer-to-completion
Olds, AB
Division 6
Canada
Hwy 2A / 68 St.
(51.77414, -114.09612)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Single-Lane
2022 East leg stubbed. Year Completed estimated (2021-2022).
Corner Brook, NL
Division 5
Canada
Confederation Dr. / West Valley Rd.
(48.94181, -57.91709)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
35.0000
Other (At-Grade)
Single-Lane
2021 http://ntv.ca/corner-brook-opens-first-roundabout/
Winkler, MB
Division 3
Canada
Roblin Blvd. W / 15th St.
(49.19050, -97.95600)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.0000
Other (At-Grade)
Single-Lane
2021 https://www.pembinavalleyonline.com/local/new-date-set-for-opening-of-15th-street-roundabout-in-winkler
Lethbridge, AB
Division 2
Canada
28 Ave. S / 32 St. S / (parking)
(49.66524, -112.79767)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
1 Driveways
Other (At-Grade)
Single-lane w/ Traversable Central Island
2021
Lethbridge, AB
Division 2
Canada
28 Ave. S / 28 St. S
(49.66523, -112.80175)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-lane w/ Traversable Central Island
2020