City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Kasson,
MN Dodge Co. United States |
STH 57 (Mantorville Rd.) / CSAH 34 (E Veterans Memorial Hwy.) (44.02837, -92.74819) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.kimt.com/news/new-roundabouts-open-to-drivers-in-kasson/article_af81a8d4-3d2e-11ee-9d69-0bdec4451a2a.html |
Kasson,
MN Dodge Co. United States |
STH 57 (Mantorville Ave.) / Main St. (44.02953, -92.74820) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Railroad crossing approximately 50 feet south of roundabout. Removes the last traffic signal in Dodge County. https://www.kimt.com/news/new-roundabouts-open-to-drivers-in-kasson/article_af81a8d4-3d2e-11ee-9d69-0bdec4451a2a.html. |
Fremont,
NE Dodge Co. United States |
US 77 (Fremont Southeast Beltway) / S Downing St. (41.40772, -96.47361) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Inglewood,
NE Dodge Co. United States |
US 77 / S Broad St. / S Main St. (41.40986, -96.49868) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Left-through-right and right-turn-only lanes on northwest leg. Year Completed estimated (2023-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 NB Ramps / Old Highway 8 (41.40473, -96.44391) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 SB Ramps (41.40474, -96.44633) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024). |
Theresa,
WI Dodge Co. United States |
STH 67-STH 175 / STH 28 / CR TW (43.53623, -88.44702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2022 | External truck aprons on north, east, and south legs. |
Rubicon,
WI Dodge Co. United States |
STH 60 / CTH P (43.32538, -88.45889) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.5730 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Watertown,
WI Dodge Co. United States |
BUS 26 (N Church St.) / STH 16 WB Ramps / Provimi Rd. (43.21918, -88.73837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.5177 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Dodge Co. United States |
BUS 26 (N Church St.) / STH 16 EB Ramps (43.21605, -88.73625) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.2976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Fremont,
NE Dodge Co. United States |
Diers Pkwy. / Johnson Rd. / E 16th St. / (parking) (41.44422, -96.45389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1999-2003). |
Mayville,
WI Dodge Co. United States |
STH 33 / CR P (43.43082, -88.45031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.washingtoncountyinsider.com/dodge-county-highway-p-and-wi-33-roundabout-nears-completion-by-ron-naab/ |
Rhodes,
Southern Aegean Dodecanese Greece |
Rte 95 / (unknown) (36.17301, 28.07534) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Rhodes,
Southern Aegean Dodecanese Greece |
Rte 95 / EO Malona (36.18314, 28.08398) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Lhindos,
Southern Aegean Dodecanese Greece |
Rte 95 / Pros Gennadio (36.11255, 28.05797) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Derventa,
Serb Republic Doboj Bosnia and Herzegovina |
Kninska / Svetog Save (44.98848, 17.90185) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bosanski Šamac,
Serb Republic Doboj Bosnia and Herzegovina |
E73-M17 / R464 / Njegoševa (45.05436, 18.47614) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Doboj,
Serb Republic Doboj Bosnia and Herzegovina |
E73 / M4 (44.73576, 18.09682) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Dnipro,
Dnipropetrovsk Dnipro Raion Ukraine |
Zaporizke shose / prospekt Yuriia Haharina (48.42477, 35.02403) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Divnogorsk,
Krasnoyarsk Divnogorsk Russia |
M54 (Studencheskiy pereulok) / Komsomol'skaya ulitsa (55.96267, 92.39139) |
Other Existing |
Other Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Circulating traffic yields to entering traffic. | |
Portage la Prairie,
MB Division 9 Canada |
Royal Rd. S / Crescent Rd. (49.96855, -98.29062) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2021 | Right-turn bypass lanes on southwest and southeast legs. https://www.youtube.com/watch?v=7CzYNrFk0uY. |
Portage la Prairie,
MB Division 9 Canada |
Royal Rd. S / Mayfair Farms Rd. (49.96672, -98.29230) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.youtube.com/watch?v=7CzYNrFk0uY. |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. WB Ramps (49.97435, -98.35997) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://portageonline.com/articles/see-aerial-view-of-west-end-roundabout-now-open https://www.portageonline.com/articles/final-plan-for-west-end-overpass-complete |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. EB Ramps (49.97330, -98.36839) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Unknown |
https://www.portageonline.com/articles/update-on-west-end-overpass-replacement-construction | |
Yorkton,
SK Division 9 Canada |
Darlington St. E / Mayhew Ave. (51.21647, -102.43958) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2020 | https://www.yorktonthisweek.com/news/local-news/top-10-stories-of-2020-7-roundabout-finally-finished-1.24256135 |
Red Deer,
AB Division 8 Canada |
54 Ave. / 55th St. (52.27375, -113.81759) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 2 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2013). |
Red Deer,
AB Division 8 Canada |
Signet Close / Seneca Dr. (52.23689, -113.82224) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Red Deer County,
AB Division 8 Canada |
AB Hwy 2A / Airport Dr. / Township Road 372 (52.17205, -113.86197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://www.reddeeradvocate.com/news/red-deer-county-roundabouts-completed/ |
Red Deer County,
AB Division 8 Canada |
Laura Ave/Liberty Ave (52.21374, -113.82382) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Sylvan Lake,
AB Division 8 Canada |
Hwy 11 (David Thompson Hwy.) / 50 St. / Hwy 781 (52.28232, -114.09704) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Painted spiral in circulatory roadway. Previous control was stop control on south leg and yield control on north leg. Year Completed estimated (2022-2023). |
Sylvan Lake,
AB Division 8 Canada |
Hwy 11 (David Thompson Hwy.) / 60 St. / Range Road 15 (52.28193, -114.12092) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Painted spirals in circulatory roadway. Year Completed estimated (2022-2023). |
Sylvan Lake,
AB Division 8 Canada |
Crestview Blvd. / (unknown) (52.29241, -114.09186) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.0000 |
Other (At-Grade) Single-Lane |
2022 | No splitter islands. |
Bentley,
AB Division 8 Canada |
Hwy 12 / Hwy 20 (52.46439, -114.07495) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Single-Lane |
2022 | https://centralalbertaonline.com/articles/roundabout-construction-begins-on-highway-12-and-highway-20 |
Red Deer County,
AB Division 8 Canada |
MacKenzie Rd. / Lexa Ave, / Hwy 2 SB Ramps (52.20126, -113.81739) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/ |
Red Deer County,
AB Division 8 Canada |
McKenzie Rd. / Gasoline Alley E / Hwy 2 NB Off-Ramp (52.20130, -113.81247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/ |
Sylvan Lake,
AB Division 8 Canada |
Crestview Blvd. / Cameron Close (52.29481, -114.09185) |
Other Existing |
Unknown None |
3 Approaches 0 Driveways 24.0000 |
Other (At-Grade) Single-Lane |
2014 | No splitter islands. |
Sylvan Lake,
AB Division 8 Canada |
Springfield Blvd. / (unknown) (52.29534, -114.12423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Sylvan Lake,
AB Division 8 Canada |
Hwy 20 / Erickson Rd. (52.31537, -114.07144) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.sylvanlakenews.com/news/sylvan-lake-council-reallocates-over-1-million-for-intersection-upgrades/ |
Brandon,
MB Division 7 Canada |
Braecrest Dr. / Lori Rd. / Orchard Dr. (49.87222, -99.93316) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2006-2011). |
Regina,
SK Division 6 Canada |
Research Dr. (50.41278, -104.59053) |
Other Existing |
Unknown Unknown |
2 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Parking along circulatory roadway. | |
Regina,
SK Division 6 Canada |
(unknown) (50.41660, -104.64649) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Regina,
SK Division 6 Canada |
20th Ave. / Rae St. (50.43330, -104.62110) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Regina,
SK Division 6 Canada |
20th Ave. / Robinson St. (50.43331, -104.62395) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Regina,
SK Division 6 Canada |
20th Ave. / Athol St. (50.43332, -104.62826) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Cochrane,
AB Division 6 Canada |
Hwy 1A / Hwy 22 (51.20118, -114.48486) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Temporary roundabout. https://cochranenow.com/articles/temporary-roundabout-to-support-1a22-traffic-during-construction |
High River,
AB Division 6 Canada |
20 St. NE / Hampton Hill Dr. / 2 Ave. NE (50.58505, -113.83614) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://highriver.ca/community/town-services/engineering-design-major-projects/hamptons-bypass-project |
High River,
AB Division 6 Canada |
2 Ave. SE / Hamptons Blvd. / Sunshine Trl. (50.58111, -113.84114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://highriveronline.com/articles/high-rivers-hamptons-south-roundabout-set-to-open-sunday |
Airdrie,
AB Division 6 Canada |
Williamstown Blvd. NW / Reunion Blvd. NW (51.30299, -114.03377) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Calgary,
AB Division 6 Canada |
Redstone St. NE / Redstone Plaza NE (51.17097, -113.96197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Calgary,
AB Division 6 Canada |
Redstone Dr. NE / Redstone St. NE (51.16838, -113.96205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Calgary,
AB Division 6 Canada |
Redstone Dr. NE / Redstone Blvd. NE (51.16838, -113.95107) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2015 | |
Calgary,
AB Division 6 Canada |
Redstone Ave. NE / Redstone Blvd. NE (51.17294, -113.95110) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Calgary,
AB Division 6 Canada |
128th Ave. NE / Cornerstone St. NE (51.16538, -113.94244) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | North leg stubbed. |
Calgary,
AB Division 6 Canada |
128 Ave. NE / Cornerstone Blvd. NE (51.16542, -113.93815) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2017 | North and east legs stubbed. |
Calgary,
AB Division 6 Canada |
Skyview Ranch Blvd. NE / Skyview Ranch Rd. NE / Skyview Ranch Manor NE (51.16287, -113.95109) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Calgary,
AB Division 6 Canada |
Skyview Ranch Dr. NE / 52 St. NE (51.15802, -113.95843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Cityscape Dr. NE / Cityscape Gate NE (51.15240, -113.95842) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2013 | |
Calgary,
AB Division 6 Canada |
Cityscape Blvd. NE / Cityscape Dr. NE (51.14719, -113.96633) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2014 | North and west legs 2014. East leg 2016. South leg 2018. |
Calgary,
AB Division 6 Canada |
104 Ave. NE / 42 St. NE (51.14721, -113.97406) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | |
Calgary,
AB Division 6 Canada |
Savanna Blvd. NE / Savanna St. NE (51.13504, -113.95242) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Single-Lane |
2016 | |
Calgary,
AB Division 6 Canada |
Savanna Blvd. NE / 52 St. NE (51.13495, -113.95843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
46 St. NE / Savanna Blvd. NE (51.13503, -113.96582) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Crowfoot Cir. NW / Crowfoot Parade / (transit center) (51.12465, -114.20779) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Single-Lane |
2008 | Oval shaped. ICD = 53 m x 42 m. Year Completed estimated (2008-2012). |
Calgary,
AB Division 6 Canada |
Nose Hill Dr. NW / Haskayne Dr. NW / Rosemont Blvd. NW (51.10814, -114.26887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
McCall Way NE / Barlow Trl. NE (51.10221, -114.00061) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Year Completed estimated (2008-2011). |
Calgary,
AB Division 6 Canada |
Uxbridge Dr. NW / Ulster Rd. NW (51.06991, -114.12950) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Springborough Blvd. SW / Springborough Gate SW (51.03379, -114.19200) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Calgary,
AB Division 6 Canada |
Lower Springbank Rd. (Township Rd. 241A) / Township Rd. 242 (51.03721, -114.24617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Calgary,
AB Division 6 Canada |
Westhills Way SW / Glenmore Trl. SW (Hwy 8-Hwy 201) WB Ramps (51.00996, -114.17395) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Westhills Way SW / Tsuut'ina Pkwy. / Glenmore Trl. (Hwy 8-Hwy 201) EB Ramps (51.00743, -114.17479) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW NB Ramps (51.00090, -114.16348) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW SB Ramps (51.00130, -114.16953) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
Peacekeepers Way SW / Don Ethell Blvd. SW (51.00475, -114.12697) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Calgary,
AB Division 6 Canada |
Quarry Way SE / Quarry Gate SE (50.96118, -114.01967) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Buffalo Run Blvd. / 130 Ave. SW / Tsuut'ina Trl. SB Entrance Ramp (50.93654, -114.14333) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Raindrop shaped. Merging right-turn bypass lane on west leg. Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
130 Ave. SW / Tsuut'ina Trl. NB Exit Ramp (50.93611, -114.13893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2020 | Raindrop shaped. |
Calgary,
AB Division 6 Canada |
Woodpark Blvd. SW / 24 St. SW (50.93578, -114.11793) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
Marine Dr. SE / Mahogany Rd. SE (50.89464, -113.92917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Marine Dr. SE / Masters Ave. SE (50.89226, -113.92533) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Chaparral Valley Square SE / Chaparral Valley Dr. SE (50.88594, -114.01532) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2008-2011). |
Calgary,
AB Division 6 Canada |
Chaparral Valley Dr. SE / Chaparral Valley Gate SE / Chaparral Valley Grove SE (50.88197, -114.01471) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2008). |
Calgary,
AB Division 6 Canada |
194 Ave. SE / Wolf Willow Blvd. SE (50.87758, -114.00378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Cranston Gate SE / Deerfoot Trl. (Hwy 2) SB Ramps (50.86657, -113.96433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 72.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Deerfoot Trl. NB Exit Ramp (50.86526, -113.96014) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 70.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / 212 Ave. SE / Union Ave. / Seton Cir. SE (50.86832, -113.95356) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / Seton Ave. SE (50.87133, -113.95589) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Legacy Village Way SE / Legacy Village Rd. SE (50.85969, -114.02478) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Okotoks,
AB Division 6 Canada |
D'Arcy Blvd. / Sandstone Dr. / Larkspur Bend (50.73559, -113.98112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2021). |
Okotoks,
AB Division 6 Canada |
Mountainview Dr. / Mountainview Gate (50.72974, -113.98983) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Calgary,
AB Division 6 Canada |
Sarcee Trl. SW / Na'a Dr. SW / Trans-Canada Hwy EB Ramps (51.07800, -114.18891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | |
Calgary,
AB Division 6 Canada |
Na'a Dr. SW / Na'a Plaza SW (51.07872, -114.19234) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | |
Calgary,
AB Division 6 Canada |
34 Ave. NW / Sarcee Trl. NW (51.08368, -114.18893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
West Valley Rd. SW / 101 St. SW / 1 Ave. SW / Trans-Canada Hwy EB On-Ramp (51.08514, -114.23423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
Valley Ridge Blvd. NW / Trans Canada Hwy EB Ramps (51.08743, -114.24755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | |
Balzac,
AB Division 6 Canada |
Hwy 566 / Range Rd. 11 (15 St. NE) (51.21263, -114.02476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://discoverairdrie.com/articles/balzac-traffic-circle-inches-closer-to-completion |
Olds,
AB Division 6 Canada |
Hwy 2A / 68 St. (51.77414, -114.09612) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2022 | East leg stubbed. Year Completed estimated (2021-2022). |
Corner Brook,
NL Division 5 Canada |
Confederation Dr. / West Valley Rd. (48.94181, -57.91709) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2021 | http://ntv.ca/corner-brook-opens-first-roundabout/ |
Winkler,
MB Division 3 Canada |
Roblin Blvd. W / 15th St. (49.19050, -97.95600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.pembinavalleyonline.com/local/new-date-set-for-opening-of-15th-street-roundabout-in-winkler |
Lethbridge,
AB Division 2 Canada |
28 Ave. S / 32 St. S / (parking) (49.66524, -112.79767) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | |
Lethbridge,
AB Division 2 Canada |
28 Ave. S / 28 St. S (49.66523, -112.80175) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 |