29465 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Ridge, NY
Suffolk Co.
United States
Princeton Ave. / York Ln.
(40.86451, -72.89717)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
62.4840
Other (At-Grade)
Multilane (2 Lane, unspecified)
2019 Year Completed estimated (2019-2020).
Patchogue, NY
Suffolk Co.
United States
Holbrook Rd. / Lake St.
(40.76695, -73.01946)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2020 Replaces triangle-shaped intersection with stop and yield control. https://www.suffolkcountynews.net/stories/lake-street-west-avenue-traffic-circle-to-open,86421
Bay Shore, NY
Suffolk Co.
United States
Robert Moses State Parkway / Robert Moses Causeway
(40.62361, -73.26164)
Rotary
Existing
Unknown
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, unspecified)
Great River, NY
Suffolk Co.
United States
Heckscher State Pkwy. / Heckscher State Pkwy.
(40.71337, -73.16494)
Rotary
Existing
Other
Unknown
3 Approaches
0 Driveways
198.1200
Other (At-Grade)
Multilane (2 Lane, unspecified)
Stop control on circulatory roadway.
Eastport, NY
Suffolk Co.
United States
Hamptons Court Dr W / Hamptons Court Dr. E
(40.84068, -72.73421)
Other
Existing
Unknown
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
No splitter islands.
Smithtown, NY
Suffolk Co.
United States
Redan Dr. / Raynors Way
(40.82879, -73.21520)
Other
Unknown
Unknown
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Unknown
Shirley, NY
Suffolk Co.
United States
Fire Island Beach Rd. / William Floyd Pkwy.
(40.73340, -72.86561)
Rotary
Existing
Uncontrolled
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, unspecified)
Quogue, NY
Suffolk Co.
United States
Post Ln. / Niamogue Ln.
(40.81284, -72.59672)
Other
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
44.1960
Other (At-Grade)
Single-Lane
Circle with roundabout features.
Westhampton Beach, NY
Suffolk Co.
United States
Main St. / Mill Rd. / Library Ave.
(40.81013, -72.64144)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2020 Library Ave is one-way exit to the south. Year Completed estimated (2019-2020). https://www.danspapers.com/2018/07/big-plans-for-whbs-main-street/
Westhampton Beach, NY
Suffolk Co.
United States
Potunk Ln. / Main St.
(40.80814, -72.64700)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2019 https://www.danspapers.com/2018/07/big-plans-for-whbs-main-street/
Bristol, TN
Sullivan Co.
United States
Bass Pro Dr. / Pinnacle Pkwy.
(36.59545, -82.25318)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
53.3400
Other (At-Grade)
Multilane (2 Lane, unspecified)
2014 Concentric circulatory roadway striping. No left turn arrows on entry or within roundabout. Year Completed estimated (2012-2015).
Claremont, NH
Sullivan Co.
United States
Main St. / Broad St. / Tremont St. / Sullivan St.
(43.37272, -72.33808)
Other
Existing
Other
Unknown
0 Approaches
0 Driveways
32.1219
Other (At-Grade)
Unknown
ICD estimated from Google Maps linework.
Newport, NH
Sullivan Co.
United States
Rte 10 / Rte 11
(43.36506, -72.17355)
Other
Existing
Unknown
Unknown
0 Approaches
0 Driveways
30.3894
Other (At-Grade)
Unknown
ICD estimated from Google Maps linework.
Liberty, NY
Sullivan Co.
United States
Rte 17 SB Ramps / Rte 52
(41.79303, -74.73518)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.9463
Other (At-Grade)
Single-Lane
2006 ICD estimated from Google Maps linework.
Liberty, NY
Sullivan Co.
United States
Rte 52 / Rte 55
(41.79688, -74.74020)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.2731
Other (At-Grade)
Single-Lane
2006 ICD estimated from Google Maps linework.
Kingsport, TN
Sullivan Co.
United States
Watauga St. / E Ravine Rd. / Gibson Mill Rd.
(36.54887, -82.55197)
Roundabout
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
26.8650
Other (At-Grade)
Single-Lane
2008 ICD estimated from Google Maps linework.
Kingsport, TN
Sullivan Co.
United States
Sullivan St. / Broad St. / Watauga St. / Holston St.
(36.54914, -82.55837)
Other
Existing
All-Way Yield
Unknown
6 Approaches
0 Driveways
30.7027
Other (At-Grade)
Single-Lane
1917 Very early traffic circle. ICD estimated from Google Maps linework.
Kingsport, TN
Sullivan Co.
United States
Netherland Inn Rd. / Industry Dr.
(36.55264, -82.57854)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
31.6607
Other (At-Grade)
Single-Lane
2012 Bypass lanes on north and east quadrants. ICD estimated from Google Maps linework.
Tallmadge, OH
Summit Co.
United States
Tallmadge Circle (North Ave. / Northeast Ave. / East Ave. / Southeast Ave. / South Ave. / Southwest Ave. / West Ave. / Northwest Ave.)
(41.10138, -81.44121)
Rotary
Existing
All-Way Yield
None
8 Approaches
10 Driveways
59.3989
Other (At-Grade)
Single-Lane
1807 1807 is the year it was built, but as a square. Unknown when it took present form. Some history here: https://www.ohio.com/akron/lifestyle/local-history-tallmadge-circle-is-center-of-creation ICD estimated from Google Maps linework.
Green, OH
Summit Co.
United States
E Turkeyfoot Lake Rd. / Pickle Rd.
(40.97410, -81.47402)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
36.9707
Other (At-Grade)
Single-Lane
2018 https://www.whbc.com/city-opens-new-roundabout-has-plans-for-more/ ICD estimated from Google Maps linework.
Breckenridge, CO
Summit Co.
United States
S Park Ave. (CO 9) / Four O'clock Rd.
(39.48043, -106.04811)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
34.1078
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2015-2018). ICD estimated from Google Maps linework.
Akron, OH
Summit Co.
United States
S Old Main St. / W South St. / Bachtel Ave.
(41.06039, -81.52863)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.6185
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2017-2018). ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
W Ute Blvd. / Uintah Way
(40.72449, -111.54245)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.1103
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 Year Completed estimated (2011-2013). ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
Newpark Blvd. / Uintah Way
(40.72177, -111.54224)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
29.8705
Other (At-Grade)
Single-Lane
2013 Year Completed estimated (2013-2015). ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
Homestead Rd. / Kilby Rd. / I-80 EB Off-ramp
(40.75223, -111.57247)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
88.6656
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2019 https://www.deseret.com/utah/2019/11/26/20983915/around-and-around-new-roundabouts-at-i-80-jeremy-ranch-interchange-now-open ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
Rasmussen Rd. / Jeremy Rd. / Jeremy Ranch Rd.
(40.75569, -111.57350)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
25.3317
Other (At-Grade)
Single-Lane
2007 This roundabout was reconfigured as part of the Jeremy Ranch Roundabouts project. Formerly it had a driveway to a park-and-ride lot. Jeremy Ranch Rd is a new approach to this intersection and the eastern approach on Rasmussen Dr was closed. https://www.summitcounty.org/1005/Email-Updates ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
Homestead Rd. / Rasmussen Rd. / I-80 WB Ramps
(40.75488, -111.57172)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
83.2338
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2019 https://www.deseret.com/utah/2019/11/26/20983915/around-and-around-new-roundabouts-at-i-80-jeremy-ranch-interchange-now-open ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
Olympic Pkwy. / N Landmark Dr.
(40.72175, -111.54711)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.9221
Other (At-Grade)
Single-Lane
2009 ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
N Landmark Dr. / W Ute Blvd.
(40.72444, -111.54747)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
35.3000
Other (At-Grade)
Multilane (2 Lane, unspecified)
2009 ICD estimated from Google Maps linework.
Akron, OH
Summit Co.
United States
Edgewood Ave. / Westerly Rd.
(41.07351, -81.53973)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.3135
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2006-2009). ICD estimated from Google Maps linework.
Green, OH
Summit Co.
United States
Corporate Woods Pkwy. / Corporate Woods Cir.
(40.96101, -81.46780)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6838
Other (At-Grade)
Single-Lane
2019 ICD estimated from Google Maps linework.
Green, OH
Summit Co.
United States
E Turkeyfoot Lake Rd. / Myersville Rd.
(40.97616, -81.42369)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.0679
Other (At-Grade)
Single-Lane
2019 ICD estimated from Google Maps linework.
Twinsburg, OH
Summit Co.
United States
Liberty Rd. / Glenwood Dr.
(41.34166, -81.41895)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
25.1071
Other (At-Grade)
Single-Lane
2009 ICD estimated from Google Maps linework.
Fairlawn, OH
Summit Co.
United States
Ridgewood Rd. / Jacoby Rd.
(41.11011, -81.61945)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
26.0960
Other (At-Grade)
Single-Lane
2010 ICD estimated from Google Maps linework.
Tallmadge, OH
Summit Co.
United States
Howe Rd. / Northeast Ave. / N Munroe Rd.
(41.11800, -81.41503)
Roundabout
Existing
Unknown
Unknown
6 Approaches
0 Driveways
52.1858
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 Functional Class: Arterial ICD estimated from Google Maps linework.
Breckenridge, CO
Summit Co.
United States
Main St. / N. Park Ave.
(39.49046, -106.04560)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
32.2595
Other (At-Grade)
Multilane (2 Lane, unspecified)
2006 ICD estimated from Google Maps linework.
Twinsburg, OH
Summit Co.
United States
Darien Ln. / (unknown)
(41.32028, -81.42608)
Traffic Calming Circle
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2007 Functional Class: Local
Green, OH
Summit Co.
United States
Massillon Rd. (SR 241) / Steese Rd.
(40.94755, -81.46524)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.5169
Other (At-Grade)
Multilane (2 Lane, unspecified)
2009 Opened August 2009. ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
Powderwood Dr. / Factory Outlet Parking
(40.72733, -111.55255)
Other
Existing
All-Way Yield
None
3 Approaches
0 Driveways
24.4374
Other (At-Grade)
Single-Lane
2000 Pedestrian access to central island. ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
Kilby Rd. / Factory Outlet Parking
(40.73040, -111.55040)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
34.3918
Other (At-Grade)
Multilane (2 Lane, unspecified)
2000 ICD estimated from Google Maps linework.
Frisco, CO
Summit Co.
United States
SH 9 / I-70 WB Ramps
(39.59339, -106.09700)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
34.0524
Freeway Ramps (Grade-Separated)
Single-Lane
2000 Highway ref. pt. 70-202.35. ICD estimated from Google Maps linework.
Copley Township, OH
Summit Co.
United States
Ridgewood Rd. / Hametown Rd.
(41.11395, -81.66791)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
25.1947
Other (At-Grade)
Single-Lane
2006 Opened August 21, 2006. ICD estimated from Google Maps linework.
Park City, UT
Summit Co.
United States
Rte 224 (Deer Valley Drive) / Heber Avenue / Marsac Avenue
(40.64572, -111.49500)
Roundabout
Existing
Unknown
Unknown
4 Approaches
0 Driveways
46.2161
Other (At-Grade)
Multilane (2 Lane, unspecified)
2000 See: www.Roundaboutsusa.com Information as reported in Salt Lake Tribune article: http://www.sltrib.com/2000/Sep/09142000/utah/22072.htm Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework.
Breckenridge, CO
Summit Co.
United States
CO-9 / Stan Miller Dr. / Fairview Blvd.
(39.52585, -106.04534)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.5341
Other (At-Grade)
Multilane (2 Lane, unspecified)
2015 ICD estimated from Google Maps linework.
Twinsburg, OH
Summit Co.
United States
Glenwood Dr. / Darrow Rd. (OH Hwy 91)
(41.34087, -81.43990)
Roundabout
Existing
All-Way Yield
Pedestrian Hybrid Beacon (PHB, HAWK)
4 Approaches
0 Driveways
36.7644
Other (At-Grade)
Single-Lane
2016 Right-turn-only lanes on north and south legs. ICD estimated from Google Maps linework.
Green, OH
Summit Co.
United States
Greensburg Rd. / Lauby Rd.
(40.92918, -81.43810)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.3865
Other (At-Grade)
Single-Lane
2015 Opened August 2015. ICD estimated from Google Maps linework.
Akron, OH
Summit Co.
United States
Riverview Rd. (SR 9) / Smith Rd.
(41.14098, -81.56433)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
26.0838
Other (At-Grade)
Single-Lane
2012 Railroad crossing on west leg. ICD estimated from Google Maps linework.
Twinsburg, OH
Summit Co.
United States
Darrow Rd. (SR 91) / Meadowood Blvd. / Ethans Dr.
(41.34696, -81.44008)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Multilane (2 Lane, unspecified)
2020 http://www.dot.state.oh.us/districts/D04/Documents/2019%20construction%20book%20ver%203.pdf (page 9)
Summit Park, UT
Summit Co.
United States
Gorgoza Pines Rd. / (parking)
(40.75044, -111.57153)
Other
Existing
All-Way Yield
None
4 Approaches
0 Driveways
35.0520
Other (At-Grade)
Single-Lane
2003 No splitter islands. Year Completed estimated (2002-2004).
South Snyderville Basin, UT
Summit Co.
United States
Canyons Resort Dr. / Frostwood Dr.
(40.68753, -111.54847)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2014 Right-turn add-lane bypass lane on southeast leg. Year Completed estimated (2013-2015).
Dillon, CO
Summit Co.
United States
Dillon Dam Rd. / La Bonte St.
(39.62759, -106.05380)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2010 Year Completed estimated (2008-2011).
Green, OH
Summit Co.
United States
Massillon Rd. / Raber Rd. / (parking)
(40.96647, -81.46515)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, unspecified)
2020 https://www.cityofgreen.org/413/Massillon-Road-North
West Akron, OH
Summit Co.
United States
Mull Ave. / S Hawkins Ave.
(41.09970, -81.56933)
Other
Existing
Unknown
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
To be converted to roundabout as part of roadwork on Mull Ave.
Downtown Akron, OH
Summit Co.
United States
S Main St. / W Mill St. / E Mill St.
(41.08258, -81.51787)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2021
Ellet, OH
Summit Co.
United States
SR 241 (Triplett Blvd.) / Massillon Rd. / (airport parking)
(41.04309, -81.46298)
Other
Existing
All-Way Yield
None
3 Approaches
4 Driveways
0.0000
Other (At-Grade)
Single-Lane
Year Completed unknown. Traffic circle with roundabout features.
Akron, OH
Summit Co.
United States
SR 241 (Seiberling St. - Innovation Way) / Seiberling St. / Eagle St. / Eagle Way
(41.05604, -81.47194)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
60.9600
Other (At-Grade)
Single-Lane
2011
Fairlawn, OH
Summit Co.
United States
S Cleveland Massillon Rd. / Rothrock Rd.
(41.12151, -81.63784)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021 Rothrock Rd roundabout opened Aug 3, 2021. The entire project is here. Design and handout documents are at the bottom: https://www.fairlawn.us/CMProject Pictures were taken during construction. https://www.fairlawn.us/CivicAlerts.aspx?AID=803 Aerial https://www.fairlawn.us/CivicAlerts.aspx?AID=797
Green, OH
Summit Co.
United States
Massillon Rd. / Boettler Rd. / Franks Pkwy.
(40.95914, -81.46541)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2023 https://www.crainscleveland.com/politics-policy/northeast-ohio-communities-embrace-roundabout
Green, OH
Summit Co.
United States
Massillon Rd. / Thorn Dr. / Corporate Woods Cir.
(40.96083, -81.46530)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
44.1960
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2023 https://www.cityofgreen.org/CivicAlerts.aspx?AID=383&ARC=713
Frisco, CO
Summit Co.
United States
Copper Rd / Beeler Pl. / Copper Cir.
(39.50153, -106.15826)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2003 Year Completed estimated (1999-2005).
Pinebrook, UT
Summit Co.
United States
Kilby Rd. / (parking)
(40.74010, -111.56068)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
28.9560
Other (At-Grade)
Single-Lane
2018 Serves Ecker Hill International Middle School.
Pinebrook, UT
Summit Co.
United States
Kilby Rd. / (parking)
(40.73918, -111.56018)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
28.9560
Other (At-Grade)
Single-Lane
2018 Serves Ecker Hill International Middle School. East leg added with roundaobut.
Breckenridge, CO
Summit Co.
United States
N Park Ave. / Watson Ave.
(39.48470, -106.04887)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 https://www.townofbreckenridge.com/live/watson-roundabout
Green, OH
Summit Co.
United States
Arlington Rd. / Greensburg Rd.
(40.94937, -81.49420)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
41.1480
Other (At-Grade)
Single-Lane
2022 Yield-controlled right-turn bypass lane on north leg. https://www.youtube.com/watch?v=n5GeAwyMV7k
Park City, UT
Summit Co.
United States
Frostwood Blvd. / Cooper Ln.
(40.68972, -111.55018)
Other
Existing
All-Way Yield
None
3 Approaches
2 Driveways
0.0000
Other (At-Grade)
Single-Lane
Built before 2007, rebuilt between 2007 and 2016 to add truck apron and splitter islands.
Park City, UT
Summit Co.
United States
Canyons Resort Dr. / W High Mountain Rd.
(40.68398, -111.55347)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
27.4320
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2019-2020).
Park City, UT
Summit Co.
United States
Silver Creek Dr. / Pace Frontage Rd. / Old Hwy 40
(40.71974, -111.48507)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Multilane (2 Lane, unspecified)
2014 Year Completed estimated (2013-2015).
Akron, OH
Summit Co.
United States
OH 91 (Canton Rd.) / East Market St.
(41.05544, -81.43963)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021 Opened 10/15/2021. A quarter of the circle has 2 lanes. Pictures are here: https://twitter.com/AkronOhioMayor/status/1449057995766239232.
Green, OH
Summit Co.
United States
SR 619 (E Turkeyfoot Lake Rd.) / Massillon Rd.
(40.97377, -81.46463)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, unspecified)
2021
Green, OH
Summit Co.
United States
Massillon Rd. / Stein Rd.
(40.97001, -81.46515)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2021
Green, OH
Summit Co.
United States
Troon Dr. / Muirfield Dr.
(40.96066, -81.45029)
Other
Existing
Uncontrolled
Unknown
3 Approaches
3 Driveways
0.0000
Other (At-Grade)
Single-Lane
Elliptical shaped.
Frisco, CO
Summit Co.
United States
S Summit Blvd. / 8th Ave.
(39.57496, -106.09161)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
0.0000
Other (At-Grade)
Unknown
2021 Under construction September 2021.
Frisco, CO
Summit Co.
United States
S Summit Blvd. / Peak One Blvd. / Water Dance Dr.
(39.57343, -106.08514)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, unspecified)
2021 Year Completed estimated (2019-2021).
Hendersonville, TN
Sumner Co.
United States
Gadwall Circle
(36.36126, -86.60330)
Other
Existing
Unknown
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
Pedestrian access to central island. No splitter islands.
Hendersonville, TN
Sumner Co.
United States
Gadwall Cir. / Harlequin Blvd.
(36.36208, -86.60325)
Other
Existing
Unknown
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
No splitter islands.
Hendersonville, TN
Sumner Co.
United States
Drakes Creek Rd. / Azalea Cir. / Old Drakes Creek Rd.
(36.35976, -86.59578)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
41.1480
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2018-2019).
Mulvane, KS
Sumner Co.
United States
E 119th St. connector / (casino access) / I-35 NB Ramps (Kansas Turnpike)
(37.47198, -97.32102)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
70.1040
Freeway Ramps (Grade-Separated)
Single-Lane
2011 Open December 2011.
Mulvane, KS
Sumner Co.
United States
E 119th St. connector / (casino access) / I-35 SB Ramps (Kansas Turnpike)
(37.47137, -97.32445)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
70.1040
Freeway Ramps (Grade-Separated)
Single-Lane
2011 Open December 2011.
Wellington, KS
Sumner Co.
United States
US 160 (E 15th St.-E 16th St.) / N A St
(37.27534, -97.39388)
Roundabout
Existing
Unknown
None
4 Approaches
0 Driveways
116.8953
Other (At-Grade)
Single-Lane
2011 Open November 2011. ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Morse Blvd. / Iron Oak Way / Deskin Ln.
(28.83498, -81.96689)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
144.3820
Other (At-Grade)
Multilane (2 Lane, unspecified)
2015 Year Completed estimated (2013-2016). ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Morse Blvd. / Kristine Way
(28.82655, -81.97238)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
56.5019
Other (At-Grade)
Multilane (2 Lane, unspecified)
2015 Year Completed estimated (2013-2016). ICD estimated from Google Maps linework.
Sumter, SC
Sumter Co.
United States
SR 763 (Wedgefield Rd.) / Pitts Rd.
(33.91004, -80.40886)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2016
The Villages, FL
Sumter Co.
United States
Morse Blvd. / Hillsborough Trl. / Moyer Loop
(28.84764, -81.96526)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
55.4443
Other (At-Grade)
Multilane (2 Lane, unspecified)
2013 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Country Club
(28.85372, -81.99934)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
56.4871
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 Previously controlled by two-way stop ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Hendry Dr.
(28.84761, -82.01067)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
55.4443
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 Previously controlled by one-way stop ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Hillsborough Trl.
(28.84895, -82.00462)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
56.4897
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 Previously controlled by one-way stop ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Old 44A
(28.84546, -82.01556)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
51.2609
Other (At-Grade)
Multilane (2 Lane, unspecified)
2009 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Pinellas Pl.
(28.86062, -81.99858)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
58.5754
Other (At-Grade)
Multilane (2 Lane, unspecified)
2011 Previously controlled by two-way stop ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / (unknown)
(28.84338, -82.01659)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
53.3543
Other (At-Grade)
Multilane (2 Lane, unspecified)
2009 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Morse Blvd. / Pinellas Pl.
(28.86014, -81.96146)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.3917
Other (At-Grade)
Multilane (2 Lane, unspecified)
2011 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Old Mill Run
(28.90720, -81.98250)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
57.5036
Other (At-Grade)
Multilane (2 Lane, unspecified)
2003 Bypass lane for southbound through movement in addition to two entry lanes. ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Morse Blvd. / Mariposa Way / Mission Hills Run
(28.91829, -81.96940)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
57.4974
Other (At-Grade)
Multilane (2 Lane, unspecified)
2003 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Rainey Tr.
(28.91345, -81.99847)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
53.3183
Other (At-Grade)
Multilane (2 Lane, unspecified)
2003 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Lake Miona Dr.
(28.90940, -81.99397)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
55.4114
Other (At-Grade)
Multilane (2 Lane, unspecified)
2003 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Glenview Rd. / El Camino Real
(28.95271, -82.00076)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
71.0641
Other (At-Grade)
Multilane (2 Lane, unspecified)
1998 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Tall Trees Ln.
(28.92198, -82.00272)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
59.5861
Other (At-Grade)
Multilane (2 Lane, unspecified)
2003 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Belvedere Blvd.
(28.91778, -81.99953)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
53.3161
Other (At-Grade)
Multilane (2 Lane, unspecified)
2003 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Morse Blvd. / El Camino Real / Paige Pl.
(28.94803, -81.95540)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
68.9771
Other (At-Grade)
Multilane (2 Lane, unspecified)
1998 ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Stillwater Trl.
(28.90300, -81.98000)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
60.6426
Other (At-Grade)
Multilane (2 Lane, unspecified)
2003 Bypass lane for southbound through movement in addition to two entry lanes. ICD estimated from Google Maps linework.
The Villages, FL
Sumter Co.
United States
Buena Vista Blvd. / Bailey Trl. / Odell Cir.
(28.89440, -81.97949)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
55.4194
Other (At-Grade)
Multilane (2 Lane, unspecified)
2005 ICD estimated from Google Maps linework.