City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Duluth,
GA Gwinnett Co. United States |
Infinite Energy Center / (parking access) (33.99070, -84.09148) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | |
Kennesaw,
GA Cobb Co. United States |
Stanley Rd. NW / Collins Rd. NW (33.99314, -84.60382) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2017 | No splitter island on north leg. North leg added 2021-2022. |
Johns Creek,
GA Fulton Co. United States |
Barnwell Rd. / Rivermont Pkwy. (34.00025, -84.25754) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Giratoire du Montcel: D3088 / Rue Jean Moulin (45.41269, 4.37259) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
||
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Rue Jean Moulin / D201 SB Ramps (45.41473, 4.37340) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
||
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
D3088 / Rue des Cytises (45.40995, 4.36446) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
||
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Giratoire Saint-Pierre: D3088 / Rue Jean-Pierre Blachier (45.40503, 4.35636) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Single-Lane |
||
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Giratoire Marseille: D3088 / Rue des Combes (45.40350, 4.35046) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Single-Lane |
||
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Giratoire du Marais: D88 / D3088 / Rue Maxime Gorki (45.39920, 4.34445) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 75.0000 |
Other (At-Grade) Single-Lane |
||
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Rue de l'Europe / Rue Jean Monnet (45.39593, 4.33334) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Single-Lane |
||
Weddington,
NC Union Co. United States |
Weddington-Matthews Rd. (SR 1344) / Tilley Morris Rd. (SR 1345) / (school access) (35.05645, -80.73426) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.constructionjournal.com/projects/details/9adae8f3933146738feedddda9e51146.html |
Bowling Green,
MO Pike Co. United States |
US 61 Business / MO 161 / Court St (39.33344, -91.19504) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/roundabout-bowling-green |
Billings,
MT Yellowstone Co. United States |
Five Mile Rd. / Mary St. / (Billings Bypass) (45.84863, -108.42492) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2021 | https://www.yourbigsky.com/local-news-2/billings-bypass-project-roundabout-opening-on-november-24/ |
Cleves,
OH Hamilton Co. United States |
Cooper Ave. / (high school parking) (39.16904, -84.75329) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | Painted splitter island on south leg. |
Westfield,
IN Hamilton Co. United States |
W 171st St. / Eagletown Rd. (40.03649, -86.19331) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Opened March 2023. |
Cambridge,
ON Waterloo Canada |
Blenheim Rd. / Bismark Dr. (43.36041, -80.34133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.cambridgetoday.ca/local-news/citys-newest-roundabout-unique-to-cambridge-west-development-5511610 |
Deptford,
NJ Gloucester Co. United States |
Salina Rd. / S College Dr. (39.77645, -75.12438) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://42freeway.com/roads/salina-road-roundabout-at-rowan-college-completed-traffic-signal-at-delsea-is-coming/ |
Roebling,
NJ Burlington Co. United States |
Cedar Ln. / Railroad Ave. (40.10521, -74.79512) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2017 | Previous control: Triangular intersection with yield signs. https://www.burlingtoncountytimes.com/story/news/2017/08/27/no-more-waiting-road-improvements/17642282007/ |
Cinnaminson,
NJ Burlington Co. United States |
Cinnaminson Ave. / Calhoun St. (39.98910, -75.01095) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Year Completed estimated (2007-2008). |
Cinnaminson,
NJ Burlington Co. United States |
Branch Pike / Burlington Pike (39.99064, -75.00752) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2008 | Inside shopping center. Year Completed estimated (2007-2008). |
Cinnaminson,
NJ Burlington Co. United States |
Riverton Rd. / Branch Pike / Parry Rd. (39.98818, -74.98070) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Harrisburg,
PA Dauphin Co. United States |
Derry St. / Mulberry St. (40.26312, -76.86948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://theburgnews.com/news/project-to-make-harrisburgs-mulder-square-safer-greener-nears-completion |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 WB Exit Ramp (38.87982, -77.26743) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaces full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 EB Exit Ramp (38.87714, -77.26629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaced full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking lot) (38.87667, -77.26993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on east and west legs. South leg stubbed. Year Completed estimated (2012-2014). |
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking garage) (38.87600, -77.27317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on northeast and southwest legs. Southeast leg stubbed. Year Completed estimated (2012-2014). |
Fairfax,
VA Fairfax Co. United States |
Patriot Cir. / Mason Pond Dr. (38.82981, -77.31152) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2008 | |
Moses Lake,
WA Grant Co. United States |
SR 17 / Grape Dr. (47.14957, -119.29411) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://wsdot.wa.gov/construction-planning/search-projects/sr-17-grape-drive-intersection-improvements https://columbiabasinherald.com/news/2022/sep/06/grape-dr-roundabout-nears-completion/ |
Steamboat Springs,
CO Routt Co. United States |
Mount Werner Dr. / Steamboat Blvd. / Bangtail Way (40.45897, -106.81287) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.engagesteamboat.net/roundabout |
Steamboat Springs,
CO Routt Co. United States |
Central Park Dr. / Alpine Plaza / (parking) (40.46194, -106.82118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Entrance to Central Park Plaza shopping center. Year Completed estimated (2015-2018). |
Woodland,
CA Yolo Co. United States |
Road 25A / Parkland Ave. (38.64099, -121.74450) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | |
Woodland,
CA Yolo Co. United States |
Road 25A / Miekle Ave. (38.64078, -121.73624) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Woodland,
CA Yolo Co. United States |
Hunt St. / Heritage Pkwy. (38.64945, -121.74580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Knoxville,
TN Knox Co. United States |
Moss Grove Blvd. / Amberleigh Bluff Way (35.90592, -84.09103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Knoxville,
TN Knox Co. United States |
Montlake Dr. / Lakemoor View Rd. / US 129 SB Exit Ramp (35.92067, -83.95729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Meridian,
ID Ada Co. United States |
S Vanguard Way / S Wayfinder Ave. / (parking) (43.59800, -116.43116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Right-turn-only lane on northeast leg. |
Meridian,
ID Ada Co. United States |
S Wayfinder Ave. / W Cobalt Dr. (43.60115, -116.42905) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Missoula,
MT Missoula Co. United States |
Mullan Rd. / Mary Jane Blvd. (46.88725, -114.05372) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. / Grove Dr. (53.55573, -113.86097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / Copperhaven Dr. / Harvest Ridge Dr. (53.55575, -113.95196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / (unknown) (53.55467, -113.95664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. (Range Road 271) / Fenwyck Blvd. (53.55121, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd (Range Road 271) / (unknown) (53.54856, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / 218th St. NW (53.52741, -113.69339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / Secord Blvd. NW (53.52657, -113.70582) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / (unknown) (53.52650, -113.70143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2019). |
Edmonton,
AB Division 11 Canada |
Glastonbury Blvd. NW / Granville Dr. NW (53.50464, -113.68570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
Terwillegar Blvd. NW / Towne Centre Blvd. (53.44467, -113.57784) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2000-2004). |
Langford,
BC Capital Canada |
Millstream Rd. / Bear Mountain Pkwy. (48.47140, -123.50526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Everett,
WA Snohomish Co. United States |
Riverfront Blvd. / 29th Ave. SE / 44th St. SE (47.95950, -122.19112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2020 | |
Arlington,
WA Snohomish Co. United States |
236th St. NE / 19th Ave. NE (48.20959, -122.20491) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2021 | https://www.236safetyimprovements.org/project-updates |
Whittlesford,
England Cambridgeshire United Kingdom |
A505 / M11 Ramps (52.09854, 0.13804) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Whittlesford,
England Cambridgeshire United Kingdom |
Hunts Road Roundabout: A505 / Hunts Rd. (52.10111, 0.14380) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Beaverton,
OR Washington Co. United States |
SW 92nd Ave. / SW Allen Blvd. (45.47149, -122.77200) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | RRFB at shared-use crossing on south leg serving Fanno Creek Trail. https://www.beavertonoregon.gov/718/CIP-3112---Allen-Blvd92nd-Ave-Shared-Use?contentId=2643d655-60c2-481d-bf75-2f33d242b523 |
Menasha,
WI Winnebago Co. United States |
Racine St. / Main St. (44.20131, -88.44619) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://fox11online.com/news/state/wisconsin-roundabouts-traffic-intersections-lee-rodegerdts-washington-post-analysis-data-study Image of this roundabout is the 2nd picture in the set of 5 at the top of the page. |
Menasha,
WI Winnebago Co. United States |
Ahnaip St. / Racine St. / Keyes St. / Naymut St. (44.19843, -88.44508) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Previously a 3-way stop. https://www.wearegreenbay.com/news/local-news/supply-chain-issues-halting-construction-progression-in-winnebago-county/ |
Victoria,
BC Capital Canada |
Glen Lake Rd. / Park Dale Dr. / Alouette Dr. (48.44038, -123.52993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (1985-2011). |
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 EB Ramps (40.68931, -96.62932) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Bracebridge,
ON Muskoka Canada |
Taylor Rd. / Cedar Ln. (45.05055, -79.29578) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2009-2012). |
Trego,
WI Washburn Co. United States |
US 63 / US 53 SB Ramps / CR E (45.89603, -91.82981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://mobile.twitter.com/WisDOTnorthwest/status/1587519853581271043?cxt=HHwWhoC8qaq5gIgsAAAA |
Trego,
WI Washburn Co. United States |
US 63 / US 53 NB Ramps / Service Loop (45.89745, -91.82604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://mobile.twitter.com/WisDOTnorthwest/status/1587519853581271043?cxt=HHwWhoC8qaq5gIgsAAAA |
Bedford,
NS Halifax Canada |
Larry Uteck Blvd. / Broad St. / Brookline Dr. (44.70824, -63.70896) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | https://www.cbc.ca/news/canada/nova-scotia/traffic-delays-bedford-larry-uteck-roundabout-1.6183663 |
(unincorporated),
WI Dane Co. United States |
US 14 / STH 92 / Biglow Rd. (42.85434, -89.34080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.channel3000.com/u-s-highway-14-to-close-between-oregon-brooklyn-starting-next-week/ |
De Soto,
KS Johnson Co. United States |
Lexington Ave. / W 91st St. (38.96404, -94.98321) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.desotoks.us/263/Roundabout |
Eau Claire,
WI Eau Claire Co. United States |
N Oxford Ave. / Platt St. (44.81844, -91.50956) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | https://www.leadertelegram.com/news/local/working-on-a-roundabout/article_12847177-9b6d-5af1-b66e-a448bf25543c.html |
Altoona,
WI Eau Claire Co. United States |
Baumbach Way / Hong St. (44.79151, -91.41359) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | |
Sidney,
NE Cheyenne Co. United States |
Outfitter Way / Anna Dr. (41.11520, -102.96810) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2016 | Elliptical shaped. ICD = 115 ft x 105 ft. |
Georgetown,
DE Sussex Co. United States |
Sand Hill Rd. / Clark Dr. (38.70163, -75.36785) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | West leg is entrance to Cheer Community Center. East leg stubbed. https://www.wmdt.com/2022/08/georgetown-east-gateway-project-completed-ensuring-safer-roadways-for-locals/ |
Storrs,
CT Tolland Co. United States |
Hillside Rd. / Alumni Dr. (41.80824, -72.25809) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | On campus of University of Connecticut. |
Port Wentworth,
GA Chatham Co. United States |
Meinhard Rd. / Benton Blvd. (32.18643, -81.22110) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | |
Pooler,
GA Chatham Co. United States |
Park Ave. / Tanger Outlets Blvd. / Benton Grove (32.13210, -81.24824) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | South leg added 2018. |
Wappingers Falls,
NY Dutchess Co. United States |
Rte 376 / New Hackensack Rd. / All Angels Hill Rd. (41.62411, -73.87451) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://dailyvoice.com/new-york/southwestdutchess/news/new-5m-roundabout-hopes-to-smooth-traffic-on-route-376-in-wappinger/852411/ |
Kingsburg,
CA Fresno Co. United States |
S Bethel Ave. / E Conejo Ave. (Sierra St.) (36.51795, -119.57532) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Fire station in southeast quadrant. https://www.cityofkingsburg-ca.gov/DocumentCenter/View/1930/Kingsburg-Roundabout-4-1-22?bidId= |
Sarasota,
FL Sarasota Co. United States |
SR 789 / N Tamiami Trl. (27.33555, -82.54678) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (3+ Lane) |
2022 | https://www.yourobserver.com/news/2022/dec/22/with-gulfstream-roundabout-open-sarasota-adds-another-circle-to-bayfront-string/ |
Berkeley,
CA Alameda Co. United States |
University Ave. / Marina Blvd. (37.86518, -122.31113) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.berkeleyside.org/2022/06/16/berkeley-marina-university-avenue-repaved |
Bradenton,
FL Manatee Co. United States |
Cooper Creek Blvd. / (parking) (27.39155, -82.45453) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://www.yourobserver.com/news/2022/aug/26/cooper-creek-boulevard-roundabout-project-underway-in-sarasota/ |
Encinitas,
CA San Diego Co. United States |
North Coast Highway 101 / El Portal St. (33.05666, -117.29828) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.encinitasca.gov/government/departments/engineering/capital-improvements/north-highway-101-projects |
San Marcos,
CA San Diego Co. United States |
N City Dr. / June Way (33.13429, -117.16177) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2019 | Yield-controlled right-turn bypass lanes on west and south legs. Year Completed estimated (2018-2019). |
San Marcos,
CA San Diego Co. United States |
N City Dr. / Campus Way (33.13473, -117.15999) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | |
La Crosse,
WI La Crosse Co. United States |
US 14-US 61 / STH 35 (43.75183, -91.20088) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://www.news8000.com/construction-wrapping-up-on-roundabout-in-southern-la-crosse-road-fully-opens/ |
Chernogorsk,
Khakassia Chernogorsk Russia |
prospekt Kosmonavtov / M54 (avtodoroga Yenisey) EB Ramps (53.84000, 91.34129) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Altoona,
IA Polk Co. United States |
1st Ave. N / 9th St. NW / NE 54th Ave. (41.65860, -93.46447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://littlevillagemag.com/altoona-1st-avenue-roundabout-woven-lines-sculpture/ |
Carmel,
IN Hamilton Co. United States |
E 106th St. / N College Ave. (39.94178, -86.14595) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://carmellink.com/project.php?title=106th%20Street%20and%20College%20Avenue%20Roundabout%20Construction open to traffic as of 1/1/2023. |
West Lake Stevens,
WA Snohomish Co. United States |
SR 9 / S Lake Stevens Rd. (47.97461, -122.10273) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.tiktok.com/@j_will_entrepreneur/video/7151997176799939883?is_from_webapp=v1&item_id=7151997176799939883 |
(unincorporated),
ID Kootenai Co. United States |
W Prairie Ave. / N Pleasant View Rd. (47.74537, -117.00199) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | At-grade rail crossing approximately 200 ft to south of roundabout controlled by signals and gates. At-grade rail crossing (2 tracks) approximately 320 ft to west of roundabout that is yield controlled. Year Completed estimated (2020-2021). |
Spokane Valley,
WA Spokane Co. United States |
E Sprague Ave. / S Barker Rd. (47.65689, -117.15362) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.spokanevalley.org/spraguebarker |
Burlington,
VT Chittenden Co. United States |
US 7 (Shelburne St.-Willard St.) / Shelbourne St. / Locust St. (44.46348, -73.20781) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.wcax.com/2022/11/17/burlington-city-leaders-celebrate-early-completion-roundabout/ |
Bellevue,
WA King Co. United States |
100th Ave. NE / NE 10th St. / Belfair Ln. (47.61924, -122.20706) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | Year Completed estimated (2019-2020). |
Marengo,
IL McHenry Co. United States |
SR 23 / I-90 WB Ramps (42.17930, -88.61798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp. |
Marengo,
IL McHenry Co. United States |
SR 23 / I-90 EB Ramps (42.17539, -88.61798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp. |
Greenwood,
IN Johnson Co. United States |
Valley Ln. / Centerbrook Trace (Victory Dr.) / (parking) (39.57616, -86.19095) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2018 | Concentric striped circulatory roadway in all quadrants with only one two-lane entry (west leg) and two-lane exit (north leg). |
Greenwood,
IN Johnson Co. United States |
Chancery Blvd. / Coventry Ln. (39.57355, -86.20587) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (1998-2003). |
Ann Arbor,
MI Washtenaw Co. United States |
E Ann St / Observatory St. / (hospital access) (42.28240, -83.73114) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 3 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Bayonne,
NJ Hudson Co. United States |
Avenue E / I-78 Ramps (40.68260, -74.09906) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2018 | Roundabout centered under I-78 freeway ramps. Year Completed estimated (2017-2018). |
Newark,
OH Licking Co. United States |
W Main St. / N 4th St. / S 4th St. (40.05725, -82.40430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://news.yahoo.com/stories-2022-ohio-13-reopens-101620225.html |
Newark,
OH Licking Co. United States |
Church St. / N 4th St. (40.05860, -82.40500) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | https://news.yahoo.com/stories-2022-ohio-13-reopens-101620225.html |
Point Lookout,
MO Taney Co. United States |
Opportunity Ave. / L W Hyer Dr. (36.61436, -93.23741) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Bowling Green,
OH Wood Co. United States |
Napoleon Rd. / Campbell Hill Rd. (41.36356, -83.62468) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://bgindependentmedia.org/new-roundabout-in-bg-to-reduce-crashes-at-campbell-hill-and-napoleon-roads/ |
Richfield Township,
OH Lucas Co. United States |
Brint Rd. / Kilburn Rd. (41.70182, -83.78616) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.13abc.com/2022/08/06/lucas-county-engineers-office-installs-two-new-roundabouts/ |
Orlando,
FL Orange Co. United States |
(connector to Cargo Rd.) / Jeff Fuqua Blvd. Ramps (28.44101, -81.30795) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 42.9765 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | At Orlando International Airport. |