City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
London,
England Greater London United Kingdom |
Prologis Park / Nine Acre Close (51.50223, -0.44740) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Hayes,
England Greater London United Kingdom |
A437 (Dawley Rd.) / Bourne Ave. (51.50250, -0.43051) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Clewer Village,
England Windsor And Maidenhead United Kingdom |
A308 (Maidenhead Rd.) / A332 (Royal Windsor Way) Ramps (51.48356, -0.62366) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Windsor Castle,
England Windsor And Maidenhead United Kingdom |
Charles St. / Arthur Rd. / Goswell Rd. (51.48234, -0.61213) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Clewer Green,
England Windsor And Maidenhead United Kingdom |
A308 (Osborne Rd.) / Alma Rd. (51.47645, -0.61702) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Spital,
England Windsor And Maidenhead United Kingdom |
B3022 (St Leonard's Rd.) / Bolton Rd. (51.47136, -0.61687) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
||
Dedworth,
England Windsor And Maidenhead United Kingdom |
B3022 (Winkfield Rd.) / Legoland Windsor (51.46308, -0.64514) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Russell,
ON Prescott and Russell Canada |
St-Guillaume Rd. / Burton Rd. / St Pierre Rd. (45.33172, -75.34597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.russell.ca/en/news/construction-roundabout-vars-417.aspx |
Russell,
ON Prescott and Russell Canada |
Notre Dame St. / St Guillaume Rd. / (parking) (45.26964, -75.31120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2013). |
Hampton,
GA Henry Co. United States |
Floyd Rd. / King Rd. / Grafton St. (33.37580, -84.27815) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | https://mhfnews.org/2023/04/12/east-king-roundabout-is-nearly-complete-in-hampton/ |
Stockbridge,
GA Henry Co. United States |
GA 138 / Moseley Dr. (33.56930, -84.16559) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | Initially constructed as a mini-roundabout in 2016; upgraded to a full roundabout in 2022. https://mhfnews.org/2022/06/16/gdot-crews-to-enlarge-moseley-drive-roundabout/ |
De Soto,
KS Johnson Co. United States |
W 103rd St. / Astra Pkwy. (38.94208, -95.00725) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2023 | https://www.kcur.org/podcast/up-to-date/2024-03-05/heres-how-de-soto-kansas-is-getting-ready-for-massive-panasonic-plants-2025-opening |
Greenville,
NC Pitt Co. United States |
W 5th St. / 14th Ave. / Tyson St. (35.61294, -77.38683) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2024 | https://www.reflector.com/news/local/new-traffic-circle-welcomes-fifth-street-motorists/article_00a1eca6-f341-11ee-9098-bf9358b17966.html |
Trinidad,
CO Las Animas Co. United States |
County Road 69.1 / I-25 SB Ramps (37.13386, -104.52197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.codot.gov/projects/archived-project-sites/i25-exit11-trinidad-intersection |
Trinidad,
CO Las Animas Co. United States |
Santa Fe Trail / I-25 NB Ramps (37.13383, -104.52080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.codot.gov/projects/archived-project-sites/i25-exit11-trinidad-intersection |
Pueblo,
CO Pueblo Co. United States |
Frontage Rd. / Drew Dix Pkwy. / I-25 SB Exit Ramp (38.34309, -104.62080) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.codot.gov/projects/drewdixdillon |
(unincorporated),
TX Fort Bend Co. United States |
Mason Rd. / Beechnut St. (29.68438, -95.73837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8637 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2024 | |
Cippenham,
England Slough United Kingdom |
Lower Cippenham Ln. / Spring Ln. (51.51471, -0.63438) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Blaine,
GA Pickens Co. United States |
GA 136 / GA 136 Connector (34.51086, -84.55772) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Replaced triangular set of intersections. |
Double Oak,
TX Denton Co. United States |
Waketon Rd. / Chinn Chapel Rd. (33.06268, -97.08807) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | On border between Flower Mound and Double Oak https://www.doubleoak.texas.gov/public-works/news/waketon-road-detour-09302022 |
Tulcea,
Tulcea Romania |
DN22-E87 (Danube Delta) / Strada Mihail Kogălniceanu / Strada Buna Vestire / Strada Progresului (45.17621, 28.80142) |
Roundabout Existing |
All-Way Yield Other |
5 Approaches 0 Driveways |
Unknown Multilane (2 Lane, 2x2 max) |
||
Maidenhead,
England Windsor And Maidenhead United Kingdom |
Braywick Roundabout: A308 / A308 (M) / A330 / Braywick Rd. (51.50423, -0.71170) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Fishery,
England Windsor And Maidenhead United Kingdom |
A308 (Braywick Rd.) / Stafferton Way / Rushington Ave. (51.51711, -0.72021) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Maidenhead,
England Windsor And Maidenhead United Kingdom |
A4 / A308 (51.52276, -0.72468) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Maidenhead,
England Windsor And Maidenhead United Kingdom |
A4 / B4447 (51.52457, -0.72022) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Maidenhead,
England Windsor And Maidenhead United Kingdom |
A4 / Forlease Rd. (51.52442, -0.71510) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Maidenhead,
England Windsor And Maidenhead United Kingdom |
A4 / A4094 (Ray Mead Rd.) (51.52395, -0.70372) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Maidenhead,
England Bucks United Kingdom |
A4 (Bath Rd.) / Jubilee Ln. (51.52411, -0.69923) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Burnham,
England Bucks United Kingdom |
A4 (Bath Rd.) / B3026 (Lake End Rd.) / Lent Rise Rd. (51.52124, -0.66740) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Cippenham,
England Slough United Kingdom |
A4 (Bath Rd.) / M4 (Hunterscombe Spur) / Goldsworthy Way (51.52017, -0.65469) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Riley,
KS Riley Co. United States |
Huebner Rd. / Williston Point Rd. (39.09658, -96.74795) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2007 | Painted splitter islands. Merging through bypass lane on southwest leg. Year Completed estimated (2006-2008). |
Sherwood Park,
AB Division 11 Canada |
Jim Common Dr. / Charlton Rd. / Brower Dr. (53.54474, -113.28639) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Sherwood Park,
AB Division 11 Canada |
Range Road 233 / Fountain Creek Way (53.49805, -113.32036) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2023 | East leg added with construction of roundabout. |
Roseville,
CA Placer Co. United States |
Washington Blvd. / All America City Blvd. / Lincoln St. (38.75716, -121.28871) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Lincoln St. has been converted to one-way in the vicinity of the roundabout, going away from the roundabout, with a separate right-in/right-out connection to Washington Blvd. https://www.roseville.ca.us/government/departments/public_works/roadways_traffic/current_projects/roundabout_washington_allamericacity_lincoln |
Post Falls,
ID Kootenai Co. United States |
W Prairie Ave. / Spokane St. (47.74500, -116.94847) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.postfalls.gov/city_info/Project%20Updates/PrairieSpokane1121.pdf |
Penticton,
BC Okanagan-Similkameen Canada |
S Main St. / Galt Ave. / Pineview Rd. (49.46931, -119.58105) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2023 | Oval shaped. https://www.penticton.ca/city-services/roadwork-construction/point-intersection-construction |
Westhampton Beach,
NY Suffolk Co. United States |
Main St. / Mill Rd. / Library Ave. (40.81013, -72.64144) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2020 | Library Ave is one-way exit to the south. Year Completed estimated (2019-2020). https://www.danspapers.com/2018/07/big-plans-for-whbs-main-street/ |
Westhampton Beach,
NY Suffolk Co. United States |
Potunk Ln. / Main St. (40.80814, -72.64700) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2019 | https://www.danspapers.com/2018/07/big-plans-for-whbs-main-street/ |
Town of Empire,
WI Fond Du Lac Co. United States |
CR UU / STH 23 WB Ramps (43.78427, -88.36128) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://projects.511wi.gov/wis23resurface/full-project-overview/ |
Town of Empire,
WI Fond Du Lac Co. United States |
CR UU / STH 23 EB Ramps (43.78296, -88.36133) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://projects.511wi.gov/wis23resurface/full-project-overview/ |
Fond du Lac,
WI Fond Du Lac Co. United States |
CR K / STH 23 WB Ramps (43.78438, -88.38654) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://projects.511wi.gov/wis23resurface/full-project-overview/ |
Fond du Lac,
WI Fond Du Lac Co. United States |
CR K / STH 23 WB Ramps / Mary Hill Park Dr. (43.78288, -88.38671) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://projects.511wi.gov/wis23resurface/full-project-overview/ |
Moultrie,
GA Colquitt Co. United States |
5th Ave. SE / 1st St. SE (31.17483, -83.78763) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | https://www.walb.com/2023/08/28/moultrie-adds-new-roundabout-help-reduce-injuries/ |
Cochrane,
AB Division 6 Canada |
Hwy 1A / Hwy 22 (51.20118, -114.48486) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Temporary roundabout. https://cochranenow.com/articles/temporary-roundabout-to-support-1a22-traffic-during-construction |
High River,
AB Division 6 Canada |
20 St. NE / Hampton Hill Dr. / 2 Ave. NE (50.58505, -113.83614) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://highriver.ca/community/town-services/engineering-design-major-projects/hamptons-bypass-project |
High River,
AB Division 6 Canada |
2 Ave. SE / Hamptons Blvd. / Sunshine Trl. (50.58111, -113.84114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://highriveronline.com/articles/high-rivers-hamptons-south-roundabout-set-to-open-sunday |
Sandy Springs,
GA Fulton Co. United States |
Northside Dr. / Riverview Rd. / Old Powers Ferry Rd. (33.90162, -84.42744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2023 | Elliptical shaped. ICD = 140 ft x 135 ft. https://www.youtube.com/watch?v=CjVSHQUyLiE |
Lodi,
CA San Joaquin Co. United States |
Cherokee Ln. / SR 99 SB Exit Ramp / (connector to E Turner Rd.) (38.14475, -121.26156) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. https://www.youtube.com/watch?v=K4bMgmfZOPg |
Mocksville,
NC Davie Co. United States |
Wilkesboro St. / Yadkinville Rd. / Mumford Dr. / Meroney St. (35.90201, -80.57252) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://mocksvillenc.org/2023/07/17/wilkesboro-street-roundabout-opening-delayed/ |
Lanesburgh Township,
MN Le Sueur Co. United States |
STH 13 / CR 28 (44.48613, -93.58544) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://www.keyc.com/2023/08/31/highway-13le-sueur-county-road-28-construction-updates/ |
Montreal,
QC Montreal Canada |
Avenue Pierre-de Coubertin / Avenue Desjardins (45.55450, -73.55120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Cleveland,
OH Cuyahoga Co. United States |
Franklin Blvd. / W 38th St. (41.48616, -81.71387) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://thelandcle.org/stories/how-residents-fought-for-and-won-a-slower-franklin-boulevard/ |
Cleveland,
OH Cuyahoga Co. United States |
W 45th St. / Franklin Blvd. (41.48517, -81.71771) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Oval shaped. ICD = 65 ft x 60 ft. https://thelandcle.org/stories/how-residents-fought-for-and-won-a-slower-franklin-boulevard/ |
Cleveland,
OH Cuyahoga Co. United States |
Franklin Blvd. / W 48th St. (41.48455, -81.72006) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://thelandcle.org/stories/how-residents-fought-for-and-won-a-slower-franklin-boulevard/ |
Cleveland,
OH Cuyahoga Co. United States |
Franklin Blvd. / W 50th St. (41.48423, -81.72128) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Oval shaped. ICD = 60 ft x 55 ft. https://thelandcle.org/stories/how-residents-fought-for-and-won-a-slower-franklin-boulevard/ |
Cleveland,
OH Cuyahoga Co. United States |
Franklin Blvd. / W 54th St. (41.48359, -81.72372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Oval shaped. ICD = 65 ft x 50 ft. https://thelandcle.org/stories/how-residents-fought-for-and-won-a-slower-franklin-boulevard/ |
Cleveland,
OH Cuyahoga Co. United States |
Franklin Blvd. / W 58th St. (41.48290, -81.72638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Oval shaped. ICD = 65 ft x 50 ft. https://thelandcle.org/stories/how-residents-fought-for-and-won-a-slower-franklin-boulevard/ |
Cleveland,
OH Cuyahoga Co. United States |
Franklin Blvd. / W 74th St. (41.48048, -81.73575) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
2022 | Oval shaped. ICD = 70 ft x 50 ft. https://thelandcle.org/stories/how-residents-fought-for-and-won-a-slower-franklin-boulevard/ |
(unincorporated),
TN Meigs Co. United States |
Hwy 68 / Hwy 58 (35.61721, -84.70638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Sacramento,
CA Sacramento Co. United States |
Crossfield Dr. / Lindbergh Dr. / Airport Blvd. SB Ramps (38.67892, -121.59240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Serves Sacramento International Airport. https://sacramento.aero/scas/about/news-and-events/upcoming-smf-construction-plan-ahead-for-improved-travel-experience |
Sacramento,
CA Sacramento Co. United States |
Crossfield Dr. / Meister Way / Airport Blvd. NB Ramps (38.67890, -121.58937) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Serves Sacramento International Airport. https://sacramento.aero/scas/about/news-and-events/upcoming-smf-construction-plan-ahead-for-improved-travel-experience |
Revelstoke,
BC Columbia-Shuswap Canada |
Nichol Rd. / Nels Nelson Crescent / (unknown) (50.97572, -118.17129) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2021 | https://revelstokemountaineer.com/brief-construction-to-begin-on-new-roundabout-near-revelstoke-mountain-resort/ |
Lake Stevens,
WA Snohomish Co. United States |
N Davies Rd. / Vernon Rd. / Frontage Rd. (48.00477, -122.10589) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Originally opened July 2012. Shifted to east 2022-2023 as part of construction of SR 9/Vernon Rd roundabout. |
Caledonia,
PE Queens Canada |
PE 315 (Wood Islands Rd.) / PE 24 (Murray Harbour Rd.) (46.06054, -62.71099) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.peicanada.com/eastern_graphic/truckers-stress-disconnect-with-roundabouts/article_a22bf178-5d51-11ea-842b-d74254b428db.html |
Edmond,
OK Oklahoma Co. United States |
Covell Rd (NW 206th St.) / N MacArthur Blvd. (35.68210, -97.62074) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | https://www.instagram.com/p/CuE7HRJt6vy/?img_index=1 |
Elk River,
MN Sherburne Co. United States |
Twin Lakes Rd. NW / Tyler St. / Twin Lakes Pkwy. (45.31576, -93.54120) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Elk River,
MN Sherburne Co. United States |
Twin Lakes Rd. NW / Line Ave. / 185th Ave. NW (45.30775, -93.54880) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2021-2023). |
Forest Grove,
OR Washington Co. United States |
OR 47 / Martin Rd. (45.52663, -123.08434) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3877 |
Other (At-Grade) Single-Lane |
2024 | https://www.washingtoncountyor.gov/lut/projects/martin-road-highway-47 |
Grandview,
WA Yakima Co. United States |
E Wine Country Rd. / McCreadie Rd. / (parking) (46.25373, -119.88036) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | https://www.nbcrightnow.com/news/grandviews-first-roundabout-opening-a-month-early/article_c06b15d0-589b-11ee-86dd-032c5866d948.html |
Kuna,
ID Ada Co. United States |
Hickory Valley Rd. / Courage Ave. (43.49807, -116.32973) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | |
Gaffney,
SC Cherokee Co. United States |
Shelby Hwy. / I-85 NB Ramps (35.10925, -81.60193) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | |
Gaffney,
SC Cherokee Co. United States |
Shelby Hwy. / I-85 SB Ramps (35.11093, -81.60201) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | |
Pacolet,
SC Spartanburg Co. United States |
SR 150 (Sunny Acres Rd. / Limestone St.) / Montgomery Ave. (34.92060, -81.74250) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | https://www.facebook.com/TownofPacolet/photos/a.358466380967526/2030875397059941/?type=3 |
Elizabethtown,
KY Hardin Co. United States |
SR 251 (N Miles St.) / W Poplar St. (37.69707, -85.86198) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | |
Strathcona County,
AB Division 11 Canada |
Crestview Terrace / (unknown) (53.58814, -113.26600) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Strathcona County,
AB Division 11 Canada |
Crestview Terrace / Hearthstone Blvd. (53.59009, -113.26137) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2023 | |
Strathcona County,
AB Division 11 Canada |
Highway Ave. / Crestview Terrace (53.59105, -113.25078) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 29.0000 |
Other (At-Grade) Single-Lane |
2023 | |
Strathcona County,
AB Division 11 Canada |
Cambrian Blvd. / Castillian Blvd. (53.58204, -113.26655) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2023 | |
Edmonton,
AB Division 11 Canada |
109 St. NW / 60 Ave. NW (53.49739, -113.51195) |
Roundabout Existing |
One-Way/Two-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Spruce Grove,
AB Division 11 Canada |
Calahoo Rd. / Avonlea Way / Longview Dr. (53.56425, -113.91005) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
2006 | Painted splitter islands. |
Edmonton,
AB Division 11 Canada |
66 St. NW / 167 Ave. NW (53.62867, -113.44284) |
Roundabout Unknown |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
To be constructed 2024. | |
Fort Riley,
KS Riley Co. United States |
Apennines Dr. / Estes Rd. (39.11312, -96.81949) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2014-2020). |
Spruce Grove,
AB Division 11 Canada |
Range Road 271 / McLeod Ave. (53.54384, -113.86086) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
Marquis Blvd. NE / 5 St. NE (53.63825, -113.33928) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2023 | Constructed as 2x1 multilane roundabout with temporary curb reducing to single-lane. |
Edmonton,
AB Division 11 Canada |
Allan Dr. SW / Andrews Loop SW / Andrews Way SW (53.43083, -113.59007) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2015 | |
Edmonton,
AB Division 11 Canada |
Allan Way SW / Allan Dr. SW (53.42831, -113.59755) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2013). |
Edmonton,
AB Division 11 Canada |
Glenridding Way SW / Glenridding Gate SW / 11 Ave. SW (53.42344, -113.59660) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2013). |
Edmonton,
AB Division 11 Canada |
Keswick Way SW / Keswick Blvd. SW (53.42239, -113.64220) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Edmonton,
AB Division 11 Canada |
182 St. SW / Kulay Green SW / Kimball Way SW (53.41931, -113.63647) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
182 St. SW / Keswick Way SW (53.41538, -113.63650) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 33.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
182 St. SW / Keswick Dr. SW (53.41258, -113.63649) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
Chappelle Rd. SW / (unknown) (53.39976, -113.57383) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 29.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2010-2012). |
Edmonton,
AB Division 11 Canada |
Chappelle Rd. SW / (parking) (53.39977, -113.56964) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 29.0000 |
Other (At-Grade) Single-Lane |
2014 | |
Edmonton,
AB Division 11 Canada |
(unknown) / 28 Ave. SW (53.41041, -113.55315) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2024). |
Franklin,
IN Johnson Co. United States |
Commerce Dr. / Cumberland Dr. / Simon Rd. (39.50767, -86.08405) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://dailyjournal.net/2023/08/01/sculpture-shaped-planned-by-students-unveiled-at-fchs-roundabout/ |
Canadys,
SC Colleton Co. United States |
US 15 (Jefferies Hwy.) / SR 61 (Augusta Hwy.) (33.05641, -80.61961) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.palmettositeworkservices.com/projects/us-15-sc-61-intersection-improvement/ |
(unincorporated),
SC York Co. United States |
SR 324 (McFarland Rd.) / SR 347 (Gordon Rd.) / Cameron Rd. (34.91962, -81.16901) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2013 | Previously controlled by three-way stop with SC 324 free-flowing. Year Completed estimated (2011-2013). |
Shoreline,
WA King Co. United States |
NE 185th St. / 8th Ave. NE (47.76320, -122.32152) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.shorelineareanews.com/2024/05/185th-roundabout-is-open.html |
Lewes,
DE Sussex Co. United States |
Beaver Dam Rd. / Plantation Rd. / Salt Marsh Rd. (38.74622, -75.17584) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.wrde.com/news/roundabout-near-five-points-in-lewes-delays-opening-to-traffic/article_f4d5a7a8-f5e5-11ee-9c1c-47fda0d30d3e.html. Project map here: https://deldot.gov/public.ejs?command=PublicProjectPortalDocument&iDID=2008254&iProjectObjectID=54771 |
Henderson,
NV Clark Co. United States |
E Galleria Dr. / McCormick Rd. / Cadence Vista Dr. (36.07102, -114.97550) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2023 |