29740 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Durango, CO
La Plata Co.
United States
US 550 / US 160 WB Ramps / US 160 EB Exit Ramp / Wilson Gulch Dr.
(37.22978, -107.83943)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
64.0080
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
2014 Year Completed estimated (2011-2014). North leg added 2014-2017. US 550 added in 2024, although that uses the same leg as US 160 EB. https://www.durangoherald.com/articles/u-s-highway-550-connection-finally-opens-in-durango/
Durango, CO
La Plata Co.
United States
US 550 / US 160 EB Entrance Ramp
(37.22666, -107.83949)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2024 https://www.facebook.com/coloradodot/videos/grandview-interchange-us-550-us-160-durango-on-monday-715-many-motorists-travele/853241030015092/
Penrose, CO
Fremont Co.
United States
SR 115 / US 50 EB Ramps
(38.41802, -105.04263)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://krdo.com/news/top-stories/2024/07/02/traffic-roundabout-now-open-at-interchange-of-us-50-highway-115-in-fremont-county/
Mörrum, Blekinge County
Karlshamns kommun
Sweden
Pukaviksvägen / E22 NB Rapms
(56.16762, 14.67657)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.1000
Freeway Ramps (Grade-Separated)
Single-Lane
2015 Raindrop shaped.
Mörrum, Blekinge County
Karlshamns kommun
Sweden
Pukaviksvägen / E22 SB Ramps
(56.16834, 14.67366)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.1000
Freeway Ramps (Grade-Separated)
Single-Lane
2016 Raindrop shaped.
Växjö, Kronoberg County
Växjö
Sweden
Rte 30 / Rte 25-Rte 27 WB Ramps
(56.89816, 14.72903)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2021 Was a T-intersection. Year Completed estimated (2021-2022).
Finnveden, Jönköping County
Värnamo
Sweden
Malmövägen / Rte 27 WB Ramps
(57.16874, 14.06233)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
32.0040
Freeway Ramps (Grade-Separated)
Single-Lane
2013 Year Completed estimated (2012-2014).
Värnamo, Jönköping County
Värnamo
Sweden
Rte 27 / E4-Rte 84 SB Ramps
(57.16575, 14.06992)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
60.9600
Freeway Ramps (Grade-Separated)
Single-Lane
2008 Completed before 2009.
Transjö, Kronoberg County
Alvesta kommun
Sweden
Värnamovägen / Rte25-Rte 27 WB Ramps
(56.91585, 14.50128)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped.
Alvesta, Kronoberg County
Alvesta kommun
Sweden
Värnamovägen / Rte 25-Rte 27 EB Ramps
(56.91407, 14.50210)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped.
Green Oak Township, MI
Livingston Co.
United States
Silver Lake Rd. / US 23 NB Ramps / Fieldcrest Dr.
(42.46717, -83.75473)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 Combined a previous all-way stop and two-way stop into one roundabout. https://www.facebook.com/GreenOakPolice/videos/as-a-follow-up-to-our-previous-post-about-using-the-fieldcrest-roundabout-check-/988342009671510/
Wentzville, MO
St. Charles Co.
United States
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd.
(38.80935, -90.87713)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Year Completed estimated (2023-2024).
Northfield, MN
Rice Co.
United States
Lonsdale Blvd. W (SR 19 / CR 46) / I-35 NB Ramps / Anoka Ave. / Hazelwood Ave.
(44.47181, -93.29085)
Roundabout
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Combines a 4-way intersection with a freeway interchange ramp terminal intersection. https://www.ricecountymn.gov/CivicAlerts.aspx?AID=969
San Juan, San Juan
Oriente Barrio
Puerto Rico
Calle A (Marginal Rd.) / Hwy 17 EB Entrance Ramp
(18.40897, -66.02947)
Roundabout
Existing
All-Way Yield
None
2 Approaches
0 Driveways
44.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2014 Concentric striped circulatory roadway.
Ironton, OH
Lawrence Co.
United States
SR 93 (Park Ave.) / US 52 EB Ramps
(38.53856, -82.67758)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419
Ironton, OH
Lawrence Co.
United States
SR 93 (Park Dr.) / US 52 WB Ramps
(38.53950, -82.67593)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419
Lincoln, NE
Lancaster Co.
United States
S 82nd St. / SR 2 WB Ramps
(40.69395, -96.60874)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
60.9600
Freeway Ramps (Grade-Separated)
Single-Lane
2022
Lincoln, NE
Lancaster Co.
United States
S 84nd St. / SR 2 EB Ramps
(40.69054, -96.61087)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
60.9600
Freeway Ramps (Grade-Separated)
Single-Lane
2022
Tumwater, WA
Thurston Co.
United States
6th Ave. SW / I-5 NB Ramps
(46.99904, -122.91042)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
36.5760
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 Yield-controlled right-turn bypass lane with low entry angle on north leg. Left-turn-only lane on south leg. https://www.facebook.com/cityoftumwater/videos/roundabouts/851059580420485/
Henderson, KY
Henderson Co.
United States
KY 54-KY 351 (2nd St.) / US 41 SB Ramps
(37.83090, -87.56729)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Raindrop shaped. https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon.
Newport, MI
Monroe Co.
United States
Swan Creek Rd. / I-75 NB Ramps
(42.00419, -83.31263)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/.
Newport, MI
Monroe Co.
United States
Swan Creek Rd. / Newport Rd. / I-75 SB Ramps
(42.00705, -83.31515)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Yield-controlled right-turn bypass lane on southwest leg. Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/.
New Iberia, LA
Iberia Par.
United States
LA 88 (Coteau Rd.) / US 90 WB Ramps
(30.05086, -91.92829)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.2440
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2023 Left-turn-only lane on west leg; merging right-turn bypass lane on east leg; right-turn-only lane on south leg. https://www.katc.com/news/construction-of-roundabouts-continues-in-iberia-parish
New Iberia, LA
Iberia Par.
United States
LA 88 (Coteau Rd.) / US 90 EB Ramps
(30.05083, -91.92975)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.2440
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2023 Left-turn-only lane on east leg; merging right-turn bypass lane on west leg; right-turn-only lane on north leg. https://www.katc.com/news/construction-of-roundabouts-continues-in-iberia-parish
Oak Level Township, NC
Nash Co.
United States
Sunset Ave. / I-95 SB Ramps / Freight Rd.
(35.96924, -77.88406)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html.
Oak Level Township, NC
Nash Co.
United States
Sunset Ave. / I-95 NB Ramps
(35.96838, -77.88020)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html.
New Castle, DE
New Castle Co.
United States
Airport Rd. / I-95 NB Exit Ramp
(39.69593, -75.61570)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://www.facebook.com/FirstStateUpdate1/photos/-i-95-offramp-to-airport-road-has-re-opened-after-new-roundabout-installed-/1135316878598748/?_rdr
Oak Level Township, NC
Nash Co.
United States
N Old Carriage Rd. / US 64 EB Ramps
(35.98033, -77.89689)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html
Oak Level Township, NC
Nash Co.
United States
N Old Carriage Rd. / US 64 WB Ramps
(35.98205, -77.89806)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html
Findlay, OH
Hancock Co.
United States
US 68 / SR 15 EB Ramps / CR 80
(40.98862, -83.65067)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 New exit ramp from SR 15 coming in from the east. Former exit ramp from SR 15 (from the west) is now connected to County Road 80. https://wfin.com/local-news/opening-of-new-findlay-roundabout-pushed-back-a-few-days/ .
Lincoln, NE
Lancaster Co.
United States
Jamaica Ave. / SR 2 WB Ramps
(40.69198, -96.67250)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
57.9120
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped.
LIncoln, NE
Lancaster Co.
United States
Jamaica Ave. / SR 2 EB Ramps
(40.69029, -96.67110)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
57.9120
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped.
Syracuse, NY
Onondaga Co.
United States
E Brighton Ave. / E Glen Ave. / I-481 WB Exit Ramp / I-81 NB Entrance Ramp
(43.00895, -76.13260)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2024 https://dailyorange.com/2024/09/new-york-transportation-completes-syracuse-roundabout/
Green Oak Township, MI
Livingston Co.
United States
Whitmore Lake Rd. / Silver Lake Rd. / US 23 SB Ramps
(42.46683, -83.75719)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
1 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024
Lodi, WI
Columbia Co.
United States
STH 60 / I-90 WB Ramps
(43.33575, -89.45242)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174.
Lodi, WI
Columbia Co.
United States
STH 60 / I-90 EB Ramps
(43.33478, -89.45497)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174
Napa, CA
Napa Co.
United States
Soscol Ferry Rd. / SR 221 / SR 12 EB Ramps
(38.24117, -122.26975)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.2440
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction
Napa, CA
Napa Co.
United States
SR 221 (Napa Vallejo Hwy.) / SR 12 WB Entrance Ramp
(38.24207, -122.26930)
Roundabout
Existing
All-Way Yield
None
2 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction
New Ulm, MN
Nicollet Co.
United States
CSAH 37 / US 14 WB Ramps
(44.30186, -94.42165)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).
New Ulm, MN
Nicollet Co.
United States
CSAH 37 / US 14 EB Ramps
(44.30098, -94.42365)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).