City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Bray Park,
QLD Moreton Bay Australia |
Francis Rd. / Ellis St. / Sparkes Rd. (-27.28699, 152.97702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Brayton,
IA Cass Co. United States |
710th St. / 350th St. (41.50440, -94.83505) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Cottonwood tree in center of intersection. On Audubon County-Cass County Line. https://www.roadsideamerica.com/tip/8830 | |
Breaux Bridge,
LA St. Martin Par. United States |
Grand Pointe Ave. (LA 347) / Doyle Melancon Rd. (30.28636, -91.87545) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2019 | Circle moved to save an old oak tree. https://www.klfy.com/local/dotd-changes-roundabout-design-for-200-year-old-tree/ |
Breckenridge,
CO Summit Co. United States |
N Park Ave. / Watson Ave. (39.48470, -106.04887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.townofbreckenridge.com/live/watson-roundabout |
Breckenridge,
CO Summit Co. United States |
Main St. / N. Park Ave. (39.49046, -106.04560) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.2595 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | ICD estimated from Google Maps linework. |
Breckenridge,
CO Summit Co. United States |
CO-9 / Stan Miller Dr. / Fairview Blvd. (39.52585, -106.04534) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.5341 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Breckenridge,
CO Summit Co. United States |
S Park Ave. (CO 9) / Four O'clock Rd. (39.48043, -106.04811) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.1078 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2015-2018). ICD estimated from Google Maps linework. |
Břeclav,
South Moravia Břeclav Czechia |
Rte 425 / Sady 28. října 9 / Silingrova / (train station entrance) (48.75347, 16.89100) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Břeclav,
South Moravia Břeclav Czechia |
Stromořadní / Slovacka (48.75616, 16.89323) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Břeclav,
South Moravia Břeclav Czechia |
Rte 55 / Rte 425 / Lidická (48.77982, 16.90342) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bredbury,
England Greater Manchester United Kingdom |
A560 (Crookilley Way) / M60 Ramps (53.42420, -2.12365) |
Rotary Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Bredbury,
England Greater Manchester United Kingdom |
A560 (Crookilley Way) / A6017 (Ashton Rd.) / M60 Ramp / Oldmoor Rd. (53.42626, -2.12194) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Breinigsville,
PA Lehigh Co. United States |
US 222 (Hamilton Blvd. - Kutztown Rd.) / Schantz Rd. / Farmington Rd. (40.54440, -75.67207) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Oval shaped. ICD = 190 ft x 180 ft. |
Bremerton,
WA Kitsap Co. United States |
Washington Ave. / Manette Bridge (47.56922, -122.62369) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=tD7NviOOFDE |
Bremerton,
WA Kitsap Co. United States |
Wheaton Way / Harkins St. / Manette Bridge (47.57079, -122.61700) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 23.3679 |
Other (At-Grade) Single-Lane |
2011 | Previous intersection was four-way with south leg. ICD estimated from Google Maps linework. |
Bremerton,
WA Kitsap Co. United States |
Cross SKIA Connector / Harry Earl Rd. (47.50340, -122.75060) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.2730 |
Other (At-Grade) Single-Lane |
2010 | September 2010. ICD estimated from Google Maps linework. |
Breña,
Lima Province of Lima Peru |
Parque General Pedro Silva (-12.06179, -77.04826) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Unknown |
||
Breña,
Lima Province of Lima Peru |
Plaza de la Bandera (-12.06746, -77.06112) |
Other Existing |
Unknown Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Unknown |
||
Brendale,
QLD Moreton Bay Australia |
French Ave. / Griffin Crescent / Bailey Ct. (-27.31271, 152.98053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Brentsville,
VA Prince William Co. United States |
Twin Leaf Dr. / Spring Iris Dr. (38.72948, -77.55567) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2020). |
Brentwood,
TN Williamson Co. United States |
Holly Tree Gap Rd. / Murray Ln. (36.01571, -86.84598) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2024 | https://www.instagram.com/cityofbrentwoodtn/p/C-GqsY-MLk0/?img_index=3 |
Brentwood,
TN Williamson Co. United States |
Longmoore Ln. / Elgin Way / Charity Dr. (35.93784, -86.74764) |
Other Existing |
Unknown Unknown |
4 Approaches 10 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Brentwood,
TN Williamson Co. United States |
Green Hill Blvd. / Bathwick Dr. (36.01170, -86.75138) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2017 | One-stage pedestrian crossings. Original circle built 2013-2014. Converted from circle to roundabout by adding splitter islands. Year Completed estimated (2016-2018). |
Brentwood,
TN Williamson Co. United States |
Crockett Rd. / Green Hill Blvd. / Raintree Pkwy. (35.97879, -86.75281) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.0618 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Brentwood,
TN Williamson Co. United States |
Crockett Rd. / Arrowhead Dr. (35.97701, -86.76277) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.0624 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Brentwood,
TN Williamson Co. United States |
Wilson Pike Cir. / Town Center Way (36.03482, -86.78563) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 22.2135 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Brest,
Brest Brest Belarus |
vul. Jankі Kupaly / Ulitsa Grodnenskaya (52.11510, 23.77892) |
Unknown Existing |
Unknown None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Brevard,
NC Transylvania Co. United States |
US 64-US 276 (Asheville Hwy.) / Rustling Woods Dr. (35.26900, -82.71022) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2021-2023). |
Brevard,
NC Transylvania Co. United States |
Ecusta Rd. / Rustling Woods Dr. (35.26814, -82.70583) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 78.9847 |
Other (At-Grade) Single-Lane |
2019 | ICD estimated from Google Maps linework. |
Brewerytown,
PA Philadelphia Co. United States |
Waterworks Dr. (39.96762, -75.18357) |
Other Existing |
Unknown Unknown |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
Pedestrian access to central island. | |
Briatico,
Calabria Vibo Valentia Italy |
SP6 / SP80 (38.71758, 16.04923) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bridal Falls,
BC Fraser Valley Regional District Canada |
Hwy 9 / Yale Road East (49.18523, -121.76500) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2004 | Completed October 29, 2004. |
Bridge of Don,
Scotland Aberdeen City United Kingdom |
A92 (The Parkway - Ellon Rd.) / A956 (Ellon Rd.) / Parway East (57.18722, -2.08912) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bridge of Don,
Scotland Aberdeen City United Kingdom |
A92 (Ellon Rd.) / B999 / Berryhill Crescent (57.20204, -2.08992) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bridge of Don,
Scotland Aberdeen City United Kingdom |
Parkway East / Exploration Dr. / Exhibition Ave. / Claymore Dr. (57.18692, -2.08590) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bridge of Don,
Scotland Aberdeen City United Kingdom |
A92 (The Parkway) / B997 (Scotstown Rd.) (57.18902, -2.10533) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bridgeport,
NY Onondaga Co. United States |
Rte 31 / Minoa Rd. (Rte 298) (43.15437, -75.97328) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 20.0394 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Bridgeport,
CT Fairfield Co. United States |
Soundview Dr. / Monument Dr. (41.16021, -73.18696) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Bridgetown,
England Warks United Kingdom |
A422 (Banbury Rd.) / A3400 (Shipston Rd.) (52.19035, -1.69853) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bridgeville,
PA Washington Co. United States |
Morganza Rd. / Morgan Rd. / Baker Rd. (40.31090, -80.14808) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | |
Bridgeville,
DE Sussex Co. United States |
Heritage Shores Cir. / White Pelican Ct. / Will's Island Dr. (38.71647, -75.60235) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Bridgeville,
DE Sussex Co. United States |
Heritage Shores Cir. / Champions Dr. (38.72458, -75.60463) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Bridgeville,
DE Sussex Co. United States |
Heritage Shore Dr. / (future roads) (38.71236, -75.59344) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Bridgeville,
DE Sussex Co. United States |
Heritage Shore Dr. (38.71171, -75.59194) |
Other Existing |
Unknown Unknown |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Bridgewater,
SA Adelaide Hills Australia |
B34 (Mount Barker Rd.) / M1 (Southeastern Fwy.) Ramps (-35.01890, 138.78757) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Bridgewater,
TAS Brighton Australia |
NH 1 (Midland Hwy.) / B32 (E Derwent Hwy.) (-42.73289, 147.23715) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bridgewater,
TAS Brighton Australia |
NH 1 (Midland Hwy.) / B10 (Boyer Rd.) / Gunn St. (-42.73811, 147.22759) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Bridgewater,
TAS Brighton Australia |
B32 (E Derwent Hwy.) / C326 (Cove Hill Rd.) / Chalmers Link (-42.73438, 147.24078) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bridgewater,
TAS Brighton Australia |
C195 (Brighton Rd.) / Glenstone Rd. (-42.71269, 147.24350) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bridgtown,
England Staffs United Kingdom |
A5 (Watling St. - Walsall Rd.) / A460 (Lodge Ln. - Eastern Way) / A34 (Walsall Rd.) (52.67278, -2.02327) |
Signalized Roundabout/Circle Existing |
Signal None |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
||
Bridlewood,
IN St. Joseph Co. United States |
Bridlewood Cir. / Broken Wood Dr. (41.75165, -86.13323) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2001 | Flush concrete splitter islands. No truck apron. Year Completed estimated (1999-2003). |
Bridlington,
England East Riding of Yorkshire United Kingdom |
A165 (Bessingby Rd.) / Bessingby Way (54.08350, -0.20864) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
||
Bridlington,
England East Riding of Yorkshire United Kingdom |
A165 / B1423 (Scarborough Rd.) / Market Pl. (54.09528, -0.20997) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bridlington,
England East Riding of Yorkshire United Kingdom |
Sewerby Rd. / Sewerby Heads / Fortyfoot (54.09649, -0.18796) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bridport,
TAS Dorset Australia |
Main St. / Bentley St. (-41.00166, 147.39284) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Brielle,
South Holland Gemeente Brielle Netherlands |
N218 (Groene Kruisweg) / P. van de Wallendam (51.89914, 4.16136) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Brielle,
South Holland Gemeente Brielle Netherlands |
N218 (Groene Kruisweg - Schrijversdijk) / G.J. van den Boogerdweg (51.89920, 4.16004) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Through bypass lane on east leg. | |
Brielle,
South Holland Gemeente Brielle Netherlands |
Hossenbosdijk / Veckdijk / De Nolle (51.89027, 4.17911) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Brienz,
Berne Interlaken-Oberhasli Switzerland |
Hauptstrasse / Schwanderstrasse / Strandbadweg (46.75321, 8.04581) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Brier,
WA Snohomish Co. United States |
Locust Way / Logan Rd. / Larch Way (47.80828, -122.25425) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://snohomishcountywa.gov/3811/Larch-Way-and-Locust-Way---Bothell-2024 |
Brigantine,
NJ Atlantic Co. United States |
Brigantine Blvd. / Bayshore Ave. / 34th St. S / (unknown) / (parking lot) (39.39482, -74.38953) |
Other Existing |
Other None |
7 Approaches 0 Driveways 28.6120 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
All entries except Brigantine Blvd controled by stop signs. ICD estimated from Google Maps linework. | |
Brighouse,
England Calderdale United Kingdom |
A643 (Ludenscheid Link - Huddersfield Rd.) / A641 (Bradford Rd.) / (parking) (53.70343, -1.77795) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Brighton,
CO Adams Co. United States |
Cherry Blossom Dr. / Willow Oak St. / N Golden Eagle Pkwy. (39.99599, -104.74341) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | |
Brighton,
CO Adams Co. United States |
Longs Peak St. / N Golden Eagle Pkwy. (39.99224, -104.74163) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | South leg stubbed. Year Completed estimated (2018-2019). |
Brighton,
CO Adams Co. United States |
Cisne Cir. / Goldfinch St. (39.98653, -104.74396) |
Other Existing |
Unknown Unknown |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Brighton,
CO Adams Co. United States |
Killdeer St. / Pelican Ave. (39.98524, -104.74270) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Brighton,
CO Adams Co. United States |
Park Place Dr. / Donna St. (39.97846, -104.79810) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Brighton,
NY Monroe Co. United States |
E Henrietta Rd. / (unklnown) (43.09657, -77.60624) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2014 | Merging right-turn bypass lane on south leg. |
Brighton,
CO Adams Co. United States |
Longs Peak St. / N 46th Ave. (39.99462, -104.75972) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2021 | |
Brighton,
CO Adams Co. United States |
Longs Peak St. / Silo Ct. (39.99463, -104.75777) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Brighton,
CO Adams Co. United States |
Longs Peak St. / Baler Ct. (39.99464, -104.75476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Brighton,
CO Adams Co. United States |
Longs Peak St. / Bowie Dr. / N 46th Ave. (39.99239, -104.75969) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2021 | 2022 or earlier (SV) |
Brighton,
CO Adams Co. United States |
156th Ave. / 157th Ave. / Syracuse Way (39.97989, -104.89921) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Brighton,
CO Adams Co. United States |
Southgate Blvd. / Gateway St. (39.91320, -104.83390) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2018 | Year Completed estimated (2018-2019). |
Brighton,
MA Suffolk Co. United States |
Beacon St / Soldiers Field Parkway / Parsons St / US 20 (42.35821, -71.16022) |
Rotary Existing |
Other None |
5 Approaches 0 Driveways 147.3851 |
Other (At-Grade) Multilane (3+ Lane) |
Lane redesign in approx. 2013 Pavement markings redone in approx. 2010. Control Type: mix of Signal, stop and yield signs. All approaches have their own treatment. ICD estimated from Google Maps linework. | |
Brighton,
CO Adams Co. United States |
W. Bridge St. / US 85 NB Ramps (39.98683, -104.82320) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 43.0090 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | Part of double-dumbbell interchange with two roundabouts and one storage lane into railroad crossing. ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
W. Bridge St. / US 85 SB Ramps (39.98682, -104.82450) |
Roundabout Existing |
Unknown Unknown |
5 Approaches 0 Driveways 43.9241 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | Part of double-dumbbell interchange with two roundabouts and one storage lane into railroad crossing. ICD estimated from Google Maps linework. |
Brighton,
MI Livingston Co. United States |
Main St. / S 3rd St. (42.52942, -83.78761) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.1233 |
Other (At-Grade) Single-Lane |
2000 | ICD estimated from Google Maps linework. |
Brighton,
MI Livingston Co. United States |
Lee Rd. / US 23 NB Ramps / Fieldcrest Dr. (42.50486, -83.75652) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.5461 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | ICD estimated from Google Maps linework. |
Brighton,
MI Livingston Co. United States |
Lee Rd. / US 23 SB Ramps (42.50605, -83.75954) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.8600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | Linked with Lee Rd/Whitmore Lake Rd roundabout. Previously controlled by one-way stop control ICD estimated from Google Maps linework. |
Brighton,
MI Livingston Co. United States |
Lee Rd. / Whitmore Lake Rd. (42.50627, -83.76012) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.2622 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | Linked with US 23 SB Ramps/Lee Rd. roundabout. Functional Class: Arterial ICD estimated from Google Maps linework. |
Brighton,
MI Livingston Co. United States |
Village Place Blvd. / Green Oak Dr. / Fieldcrest Dr. (42.50573, -83.75296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | |
Brighton,
MI Livingston Co. United States |
Village Place Blvd. / Green Oak Ave. (42.50698, -83.75462) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | ICD estimated from Google Earth. |
Brighton,
CO Adams Co. United States |
Golden Eagle Pkwy. / Heron St. (39.97720, -104.74991) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 89.6910 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-1999). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Goshawk St. / Goshawk Ct. / Heron Ln. (39.97633, -104.74956) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.5745 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-1999). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Golden Eagle Pkwy. / Tanager St. (39.97858, -104.74845) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 84.1980 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-1999). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Golden Eagle Pkwy. / Crane St. / Southern St. (39.97963, -104.74733) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 96.0941 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-1999). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Nighthawk Pkwy. / Crane St. (39.98134, -104.74878) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 65.8914 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-1999). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Nighthawk Pkwy. / Heron St. (39.98132, -104.75076) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 96.0917 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-1999). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Pelican St. / (unknown) (39.97597, -104.74867) |
Traffic Calming Circle Existing |
Unknown Unknown |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Earth. |
Brighton,
CO Adams Co. United States |
Goshawk St. / Tanager St. (39.97816, -104.74840) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7104 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-1999). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Goshawk St. / Crane St. (39.97920, -104.74729) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.7101 |
Other (At-Grade) Single-Lane |
1998 | Year Completed estimated (1993-1999). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Prairie Falcon Pkwy. / Killdeer St. (39.98546, -104.74473) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 108.8973 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (1999-2002). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Royal Pine St. / Bristle Cone St. (39.99139, -104.74762) |
Roundabout Existing |
Unknown None |
4 Approaches 0 Driveways 73.2019 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2004). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Royal Pine St. / Longs Peak St. (39.99458, -104.74971) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.0446 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2004). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Midland St. / N 46th Ave. (39.99625, -104.75962) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 131.7535 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2004). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Midland St. / N 45th Ave. (39.99675, -104.76143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 71.3663 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2004). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
N 45th Ave. / Oxbow Dr. (39.99866, -104.76214) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 115.2808 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2004). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
N 42nd Ave. / Clover Ln. (39.99227, -104.76718) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 119.8666 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2004). ICD estimated from Google Maps linework. |
Brighton,
CO Adams Co. United States |
Bromley Ln. / Medical Center Dr. (39.97238, -104.75449) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.2723 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2008-2010). ICD estimated from Google Maps linework. |