City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Calgary,
AB Division 6 Canada |
Savanna Blvd. NE / 52 St. NE (51.13495, -113.95843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
46 St. NE / Savanna Blvd. NE (51.13503, -113.96582) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Crowfoot Cir. NW / Crowfoot Parade / (transit center) (51.12465, -114.20779) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Single-Lane |
2008 | Oval shaped. ICD = 53 m x 42 m. Year Completed estimated (2008-2012). |
Calgary,
AB Division 6 Canada |
Nose Hill Dr. NW / Haskayne Dr. NW / Rosemont Blvd. NW (51.10814, -114.26887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
McCall Way NE / Barlow Trl. NE (51.10221, -114.00061) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Year Completed estimated (2008-2011). |
Calgary,
AB Division 6 Canada |
Uxbridge Dr. NW / Ulster Rd. NW (51.06991, -114.12950) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Springborough Blvd. SW / Springborough Gate SW (51.03379, -114.19200) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Calgary,
AB Division 6 Canada |
Lower Springbank Rd. (Township Rd. 241A) / Township Rd. 242 (51.03721, -114.24617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Calgary,
AB Division 6 Canada |
Westhills Way SW / Glenmore Trl. SW (Hwy 8-Hwy 201) WB Ramps (51.00996, -114.17395) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Westhills Way SW / Tsuut'ina Pkwy. / Glenmore Trl. (Hwy 8-Hwy 201) EB Ramps (51.00743, -114.17479) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW NB Ramps (51.00090, -114.16348) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW SB Ramps (51.00130, -114.16953) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
Peacekeepers Way SW / Don Ethell Blvd. SW (51.00475, -114.12697) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Calgary,
AB Division 6 Canada |
Quarry Way SE / Quarry Gate SE (50.96118, -114.01967) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Buffalo Run Blvd. / 130 Ave. SW / Tsuut'ina Trl. SB Entrance Ramp (50.93654, -114.14333) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Raindrop shaped. Merging right-turn bypass lane on west leg. Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
130 Ave. SW / Tsuut'ina Trl. NB Exit Ramp (50.93611, -114.13893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2020 | Raindrop shaped. |
Calgary,
AB Division 6 Canada |
Woodpark Blvd. SW / 24 St. SW (50.93578, -114.11793) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
Marine Dr. SE / Mahogany Rd. SE (50.89464, -113.92917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Marine Dr. SE / Masters Ave. SE (50.89226, -113.92533) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Chaparral Valley Square SE / Chaparral Valley Dr. SE (50.88594, -114.01532) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2008-2011). |
Calgary,
AB Division 6 Canada |
Chaparral Valley Dr. SE / Chaparral Valley Gate SE / Chaparral Valley Grove SE (50.88197, -114.01471) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2008). |
Calgary,
AB Division 6 Canada |
194 Ave. SE / Wolf Willow Blvd. SE (50.87758, -114.00378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Cranston Gate SE / Deerfoot Trl. (Hwy 2) SB Ramps (50.86657, -113.96433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 72.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Deerfoot Trl. NB Exit Ramp (50.86526, -113.96014) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 70.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / 212 Ave. SE / Union Ave. / Seton Cir. SE (50.86832, -113.95356) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / Seton Ave. SE (50.87133, -113.95589) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Legacy Village Way SE / Legacy Village Rd. SE (50.85969, -114.02478) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Okotoks,
AB Division 6 Canada |
D'Arcy Blvd. / Sandstone Dr. / Larkspur Bend (50.73559, -113.98112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2021). |
Okotoks,
AB Division 6 Canada |
Mountainview Dr. / Mountainview Gate (50.72974, -113.98983) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Lethbridge,
AB Division 2 Canada |
Metis Trl. W / Temple Blvd. W (49.66881, -112.89288) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Saskatoon,
SK Division 11 Canada |
Feheregyhazi Blvd. / Orban Way (52.17548, -106.55102) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Saskatoon,
SK Division 11 Canada |
Nelson Rd. / (parking) (52.14987, -106.57944) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2005 | No splitter islands on north and south legs. Year Completed estimated (2004-2005). |
Saskatoon,
SK Division 11 Canada |
Nelson Rd. / (parking) (52.14844, -106.58254) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2005 | At entrance to school. No splitter islands on northwest and southeast legs. Year Completed estimated (2004-2005). |
Pocatello,
ID Bannock Co. United States |
Olympus Dr. / Northgate Pkwy. / E Siphon Dr. (42.92794, -112.42884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2018 | Concentric striped circulatory roadway with dotted edge line around entire circumference. No splitter island on east leg. Year Completed estimated (2017-2019). |
Nibley,
UT Cache Co. United States |
W 3200 S / S 1200 W (41.67509, -111.86225) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2020-2022). |
Woodburn,
OR Marion Co. United States |
OR 219 / Butteville Rd. (45.15079, -122.89405) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Yield-controlled right-turn bypass lane on west leg. South leg realigned with roundabout. Serves large warehouse. |
Syracuse,
UT Davis Co. United States |
W Parkview Dr. / S 2000 W (41.06461, -112.06470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Salt Lake City,
UT Salt Lake Co. United States |
Parleys Canyon Blvd. / S 2000 E / Country Club Cir. (40.71923, -111.83359) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | No splitter island on north leg; pedestrian ramp can lead directly into circulatory roadway. Year Completed estimated (2020-2021). |
West Valley City,
UT Salt Lake Co. United States |
Antelope Rd. / Hawker Ln. (40.70728, -112.05997) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1997-2002). |
West Valley City,
UT Salt Lake Co. United States |
Collie Dr. / Dalmatian St. / Labrador Cir. (40.70477, -112.05642) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2004 | |
Draper,
UT Salt Lake Co. United States |
E 12200 S / S 450 E (40.52807, -111.87785) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2014). |
Varberg,
Halland County Varbergs kommun Sweden |
Föreningsgatan / Engelbrektsgatan (57.10653, 12.27300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2010 | Constructed before 2010. |
Varberg,
Halland County Varbergs kommun Sweden |
Engelbrektsgatan / Östra vägen (57.10708, 12.26924) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2010 | Constructed before 2010. |
Varberg,
Halland County Varbergs kommun Sweden |
Österängsvägen / (unknown) (57.10107, 12.27494) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Bypass lanes on all legs. The previous design was one-way yield for the intersection. |
Lehi,
UT Utah Co. United States |
N 3600 W / W 2700 N (40.42051, -111.90717) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2020 | Through-only and through-right arrows on all approaches, including on stem of T-intersection. |
Covington,
LA St. Tammany Par. United States |
Ochsner Blvd. / S Ochsner Blvd. (30.45565, -90.15060) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). South leg added 2019-2022. |
Covington,
LA St. Tammany Par. United States |
River Chase Dr. / Continental Dr. (30.43874, -90.12867) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2014). Southwest leg stubbed. |
Snellville,
GA Gwinnett Co. United States |
Wisteria Dr. / Clower St. (33.85952, -84.01452) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | |
West Dundee,
IL Kane Co. United States |
Millbrook Dr. / (unknown) / (parking) (42.14551, -88.34157) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2015). |
Malta,
NY Saratoga Co. United States |
Stonebreak Rd. / Luther Forest Blvd. (42.96551, -73.75795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Add-lane right-turn bypass lane on southeast leg. Year Completed estimated (2011-2013). Southeast leg added 2015-2018. |
Troy,
NY Rensselaer Co. United States |
US 4 (N Greenbush Rd.) / Williams Rd. (Rte 136) / Glenmore Rd. (42.69219, -73.68692) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lanes on north and east legs. Year Completed estimated (2021-2022). |
Cohoes,
NY Albany Co. United States |
Preston Dr. / Stacey Ct. (42.77582, -73.74557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2015). |
Jenks,
OK Tulsa Co. United States |
S 1st St. / (parking) (36.01555, -95.96640) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | At-grade rail crossing approximately 270 ft on northwest leg. Year Completed estimated (2016-2017). |
Jenks,
OK Tulsa Co. United States |
S Aquarium Dr. / S 7th St. / Aquarium Dr. / E 101st St. (36.01776, -95.96138) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2017 | TWSC intersection relocated to east. Year Completed estimated (2016-2017). |
Tulsa,
OK Tulsa Co. United States |
W 5th St. / S Main St. (36.15147, -95.99006) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Whitestown,
IN Boone Co. United States |
S Main St. / Albert S White Dr. / E 400 S (39.98263, -86.34596) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | https://www.youtube.com/watch?v=34EKqFKijoI |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Old Hollow Rd. (NC 66) (36.19481, -80.25493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.19637, -80.25492) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Opened in 2021 temporarily as single lane. Converted to 2x1 in 2022. https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.19956, -80.25396) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.18421, -80.22286) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.18202, -80.22303) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Signed as NC 74 in 2023; will change to to I-74 when beltway completed in 2026. https://malmeroads.net/i7374nc/i74seg4.html |
Brownsburg,
IN Hendricks Co. United States |
S Green St. / Airport Rd. (39.82142, -86.40107) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://twitter.com/BrownsburgIN/status/1552378297249677312 |
Avon,
IN Hendricks Co. United States |
E CR 100 S / (unknown) (39.74854, -86.36651) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Only two legs finished as of June 2022, but it looks like north and south legs will be added. |
Avon,
IN Hendricks Co. United States |
E CR 100 S / CR 900 E (39.74857, -86.36160) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | |
Avon,
IN Hendricks Co. United States |
E CR 100 S / Allpoints Ct. (39.74893, -86.34938) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Laddonia,
MO Audrain Co. United States |
US 54 / MO 19 / CR J (39.28073, -91.64373) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/node/27038 |
Fort Worth,
TX Tarrant Co. United States |
Ventana Pkwy. / Jerry Dunn Pkwy. (32.66820, -97.50849) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Panama City Beach,
FL Bay Co. United States |
Front Beach Rd. / S Arnold Rd. (30.22327, -85.89081) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Triangular section of roads converted to roundabout with two of the former triangle sides to be converted to large-radius right-turn bypass lanes. https://www.pcbfl.gov/Home/Components/News/News/4818/ https://www.newsherald.com/story/news/local/2023/01/20/panama-city-beach-opens-a-new-lane-on-front-beach-road-roundabout/69820095007/ |
Stockton,
CA San Joaquin Co. United States |
E Miner Ave. / N San Joaquin St. (37.95611, -121.28804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Bicycle lanes leading into roundabout with bicycle sharrows on outer edge of circulatory roadway beyond each entry. https://twitter.com/stocktonupdates/status/1407046118156947458 |
Santa Clara,
CA Santa Clara Co. United States |
(shopping center entrance) / (parking) (37.35667, -121.93755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.svvoice.com/coleman-costco-installing-roundabout/ |
Ramara,
ON Simcoe Canada |
Hwy 12 / CR 169 / Concession Road 6 (44.57153, -79.18908) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Truckee,
CA Nevada Co. United States |
Cold Creek Cir. / Summer Camp Way (39.32143, -120.22793) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Moses Lake,
WA Grant Co. United States |
SR 17 / Grape Dr. (47.14957, -119.29411) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://wsdot.wa.gov/construction-planning/search-projects/sr-17-grape-drive-intersection-improvements https://columbiabasinherald.com/news/2022/sep/06/grape-dr-roundabout-nears-completion/ |
Steamboat Springs,
CO Routt Co. United States |
Mount Werner Dr. / Steamboat Blvd. / Bangtail Way (40.45897, -106.81287) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.engagesteamboat.net/roundabout |
Steamboat Springs,
CO Routt Co. United States |
Central Park Dr. / Alpine Plaza / (parking) (40.46194, -106.82118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Entrance to Central Park Plaza shopping center. Year Completed estimated (2015-2018). |
Woodland,
CA Yolo Co. United States |
Road 25A / Parkland Ave. (38.64099, -121.74450) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | |
Woodland,
CA Yolo Co. United States |
Road 25A / Miekle Ave. (38.64078, -121.73624) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Woodland,
CA Yolo Co. United States |
Hunt St. / Heritage Pkwy. (38.64945, -121.74580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Knoxville,
TN Knox Co. United States |
Moss Grove Blvd. / Amberleigh Bluff Way (35.90592, -84.09103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Knoxville,
TN Knox Co. United States |
Montlake Dr. / Lakemoor View Rd. / US 129 SB Exit Ramp (35.92067, -83.95729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Meridian,
ID Ada Co. United States |
S Vanguard Way / S Wayfinder Ave. / (parking) (43.59800, -116.43116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Right-turn-only lane on northeast leg. |
Meridian,
ID Ada Co. United States |
S Wayfinder Ave. / W Cobalt Dr. (43.60115, -116.42905) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. / Grove Dr. (53.55573, -113.86097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / Copperhaven Dr. / Harvest Ridge Dr. (53.55575, -113.95196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / (unknown) (53.55467, -113.95664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. (Range Road 271) / Fenwyck Blvd. (53.55121, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd (Range Road 271) / (unknown) (53.54856, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / 218th St. NW (53.52741, -113.69339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / Secord Blvd. NW (53.52657, -113.70582) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / (unknown) (53.52650, -113.70143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2019). |
Edmonton,
AB Division 11 Canada |
Glastonbury Blvd. NW / Granville Dr. NW (53.50464, -113.68570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
Terwillegar Blvd. NW / Towne Centre Blvd. (53.44467, -113.57784) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2000-2004). |
Langford,
BC Capital Canada |
Millstream Rd. / Bear Mountain Pkwy. (48.47140, -123.50526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Everett,
WA Snohomish Co. United States |
Riverfront Blvd. / 29th Ave. SE / 44th St. SE (47.95950, -122.19112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2020 | |
Arlington,
WA Snohomish Co. United States |
236th St. NE / 19th Ave. NE (48.20959, -122.20491) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2021 | https://www.236safetyimprovements.org/project-updates |
St.-Étienne,
Auvergne-Rhône-Alpes Loire France |
Place Paul-Louis Courier (45.40953, 4.38702) |
Other Existing |
Unknown Unknown |
7 Approaches 0 Driveways |
Other (At-Grade) Unknown |
Trams through central island. | |
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Giratoire du Montcel: D3088 / Rue Jean Moulin (45.41269, 4.37259) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
||
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Rue Jean Moulin / D201 SB Ramps (45.41473, 4.37340) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
||
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
D3088 / Rue des Cytises (45.40995, 4.36446) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |