City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Barksdale,
WI Bayfield Co. United States |
STH 13 / US 2 WB Ramps (46.58774, -90.95454) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9645 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
CTH G (Main Ave.) / US 41 NB Ramps (44.45238, -88.08887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | |
De Pere,
WI Brown Co. United States |
CTH G (Main St.) / US 41 SB Ramps (44.45374, -88.09212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.5943 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
Stonewall Dr. / Living Word Ln. / Eagle Dr. (43.32521, -88.14996) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 21.7210 |
Other (At-Grade) Single-Lane |
2008 | Functional Class: Local ICD estimated from Google Maps linework. |
West Bend,
WI Washington Co. United States |
Veterans Ave. / Water St. / S Island Ave. (43.42306, -88.18069) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 32.0952 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 EB Ramps (43.06063, -88.44229) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9046 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 WB Ramps (43.06174, -88.44228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1203 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / CTH DR (Delafield Rd.) (43.05922, -88.44241) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.6506 |
Other (At-Grade) Single-Lane |
2011 | Opened August 11, 2011. ICD estimated from Google Maps linework. |
Waupaca,
WI Waupaca Co. United States |
STH 22 / STH 54 (Royalton St.) (44.35154, -89.03481) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.7229 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Right turn bypass lane. Opened September 2008. ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 NB Ramps (42.76902, -88.92310) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 SB Ramps (42.76911, -88.92484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock Co. United States |
STH 59 / CTH M (42.76886, -88.91364) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.5632 |
Other (At-Grade) Single-Lane |
2009 | Opened October 2009. ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 NB Ramps (44.94889, -92.69390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5014 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 SB Ramps (44.94890, -92.69675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0372 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / CTH X / Gateway Blvd. (42.53840, -88.94769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.7205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 NB Ramps (42.53960, -88.94841) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.6798 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 SB Ramps (42.54142, -88.94933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0787 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / Timothy Ln. (43.55597, -89.77811) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 39.8145 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6788 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5437 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Platteville,
WI Grant Co. United States |
Chestnut St. / Markee Ave. (42.72607, -90.48517) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.6039 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Appleton,
WI Calumet Co. United States |
CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.2316 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Morrisville,
NC Wake Co. United States |
Shiloh Glenn Dr. / Lower Shiloh Way (35.86587, -78.84024) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 31.9398 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Apex,
NC Wake Co. United States |
Homeplace Dr. / Blue Thorn Dr. (35.66598, -78.75475) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 35.9014 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Cary,
NC Wake Co. United States |
Carpenter Upchurch Rd. / Green Hope High School entrance (35.80318, -78.86969) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.4946 |
Other (At-Grade) Single-Lane |
2014 | Only one circulating lane is provided. South leg has two lanes (TH and RT); east leg has two lanes (LT and RT). ICD estimated from Google Maps linework. |
Shallotte,
NC Brunswick Co. United States |
Bricklanding Rd. / Hale Swamp Rd. (33.94207, -78.41089) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.5042 |
Other (At-Grade) Single-Lane |
2015 | Right-turn bypass lane in SE quadrant. ICD estimated from Google Maps linework. |
Castle Hayne,
NC New Hanover Co. United States |
US 117 / NC 133-NC 132 (34.34860, -77.90085) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 50.2891 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Rocky Mount,
NC Nash Co. United States |
Eastern Ave. / Nash Community College entrance (35.97127, -77.89972) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.8639 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Durham,
NC Durham Co. United States |
Danziger Dr. / Witherspoon Blvd. (35.94866, -78.98963) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 30.9395 |
Other (At-Grade) Single-Lane |
2004 | ICD estimated from Google Maps linework. |
Smithfield,
NC Johnston Co. United States |
Industrial Park Dr. / Outlet Center Dr. (35.50568, -78.32335) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 26.2508 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 NB Ramps (39.97797, -86.15668) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
W Main St. / US 31 SB Ramps (39.97787, -86.15802) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Raindrop shaped. |
Carmel,
IN Hamilton Co. United States |
Old Meridian St. / US 31 SB Ramps (39.98504, -86.14209) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | |
Carmel,
IN Hamilton Co. United States |
Old Meridian St. / US 31 NB Ramps (39.98429, -86.14154) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | |
Carmel,
IN Hamilton Co. United States |
Old Meridian St. / W Smokey Row Rd. (39.98359, -86.14087) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | ICD estimated from Google Maps linework. |
Indianapolis,
IN Marion Co. United States |
Crawfordsville Rd. / W Main St. (39.78814, -86.24068) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 79.2480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2015 | Right-turn-only lane on south leg. |
Juneau,
AK Juneau United States |
Glacier Hwy. / Mendenhall Loop Rd. (Back Loop) (58.38637, -134.64432) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0674 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Brunswick,
MD Frederick Co. United States |
MD 17 / Volunteer Drive (39.33261, -77.63365) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.9516 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Brunswick,
MD Frederick Co. United States |
Potomac View Parkway / Volunteer Drive (39.33145, -77.63483) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.1808 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Eagle,
CO Eagle Co. United States |
Eby Creek Rd. / I-70 EB Ramps (39.65961, -106.82719) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 37.6976 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Right-turn bypass lane in southeast quadrant. Estimated year completed; built sometime between 2011 and 2015. ICD estimated from Google Maps linework. |
Merrimack,
NH Hillsborough Co. United States |
Spartan Way / Digital Dr. (42.82118, -71.50855) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.4288 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | On campus of Fidelity Investments. ICD estimated from Google Maps linework. |
Merrimack,
NH Hillsborough Co. United States |
Spartan Way / Spartan Ln. (42.81991, -71.51026) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.1818 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2006 | On campus of Fidelity Investments. ICD estimated from Google Maps linework. |
Goffstown,
NH Hillsborough Co. United States |
NH 114 (S. Mast St.) / Wallace Rd. (43.01441, -71.58619) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 24.4516 |
Other (At-Grade) Single-Lane |
2010 | External truck apron in SE quadrant. ICD estimated from Google Maps linework. |
Goffstown,
NH Hillsborough Co. United States |
Center St. / Henry Bridge Rd. (43.02136, -71.54726) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 29.6879 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Westfield,
IN Hamilton Co. United States |
E 161st St. / US 31 NB Ramps (40.02195, -86.13092) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2013 | Raindrop shaped. Series of 3 roundabouts. |
Westfield,
IN Hamilton Co. United States |
E 161st St. / US 31 SB Ramps (40.02183, -86.13259) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2013 | Raindrop shaped. Series of 3 roundabouts. |
Notre Dame,
IN St. Joseph Co. United States |
Douglas Rd. / Moreau Dr. (41.70933, -86.23394) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Year Completed estimated (2011-2015). |
South Bend,
IN St. Joseph Co. United States |
Douglas Rd. / Juniper Rd. (41.71270, -86.23662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2013 | Year Completed estimated (2011-2015). |
Lexington,
KY Fayette Co. United States |
Iron Works Pkwy. / War Admiral Blvd. / Jenney Ln. (38.14812, -84.52026) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.3265 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Waterbury,
VT Washington Co. United States |
US 2 / VT 100 (44.34144, -72.75923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.1459 |
Other (At-Grade) Single-Lane |
2014 | Completion year estimated. ICD estimated from Google Maps linework. |
Peterborough,
NH Hillsborough Co. United States |
NH 101 / Shaw's Plaza entrance (42.87519, -71.96153) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 28.0080 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Durham,
NH Strafford Co. United States |
Main St. / North Dr. (43.14065, -70.94124) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 30.5016 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Concord,
NH Merrimack Co. United States |
US 3 (Village St.) / Washington St. (43.28008, -71.59997) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 25.2150 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Boscawen,
NH Merrimack Co. United States |
US 4 (King St.) / Tremont St. (43.29130, -71.59523) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2011 | Merging right-turn bypass lane on south leg. |
Bedford,
NH Hillsborough Co. United States |
Donald St. / Market Basket center entrance (42.96921, -71.50647) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 27.9653 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Bedford,
NH Hillsborough Co. United States |
Meetinghouse Rd. / Gault Rd. (42.94741, -71.49442) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 35.8432 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Laconia,
NH Belknap Co. United States |
US 3 / NH 11B (43.60333, -71.45460) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 35.4589 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Old Hopland,
CA Mendocino Co. United States |
SR 175 / Old River Rd. (38.97746, -123.09910) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 35.2816 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Outagamie Co. United States |
CTH A / CTH JJ (44.31701, -88.44591) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.1627 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Chippewa Falls,
WI Chippewa Co. United States |
STH 124 / STH 29 (44.92093, -91.38065) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.9694 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Right-turn bypass lanes on all three legs. ICD estimated from Google Maps linework. |
Inver Grove Heights,
MN Dakota Co. United States |
STH 3 / Amana Trl. (44.83743, -93.08530) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.8048 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Maplewood,
MN Ramsey Co. United States |
Sheren Ave. E / Castle Ave. E / Van Dyke St. (45.00990, -93.02256) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.3974 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Lakeville,
MN Dakota Co. United States |
Kenrick Ave. / 175th St. W (44.69593, -93.28402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 26.3186 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Apple Valley,
MN Dakota Co. United States |
153rd St. W / Founders Ln. (44.72710, -93.20991) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.3353 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Fourth leg has exit only. ICD estimated from Google Maps linework. |
Apple Valley,
MN Dakota Co. United States |
Cobblestone Lake Pkwy / Elm Creek Ln. (44.71880, -93.16748) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7353 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |
Sartell,
MN Stearns Co. United States |
CTH 120 / (unknown 1) (45.59050, -94.18830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6242 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Sartell,
MN Stearns Co. United States |
CTH 120 / (unknown 2) (45.58825, -94.19276) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.7753 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Buffalo,
MN Wright Co. United States |
Pulaski Rd. / 16th St. NE (45.19438, -93.84424) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2002 | Crosswalk on east leg passes within circulatory roadway. |
Fairbanks,
AK Fairbanks North Star United States |
Bentley Trust Rd. / Illinois St (64.85444, -147.70893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0170 |
Other (At-Grade) Single-Lane |
2014 | Bypass lane on south leg. Completion year of 2014 estimated. ICD estimated from Google Maps linework. |
Fairbanks,
AK Fairbanks North Star United States |
Helmericks Ave. / Merhar Ave. (64.85627, -147.70576) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 75.6114 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. SB Ramps (39.97844, -86.11319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. NB Ramps (39.97843, -86.11238) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Chico,
CA Butte Co. United States |
E 1st St. / E 2nd St. / Camelia Way (39.73168, -121.83847) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2013 | Designed in tandem with conversion of First and Second Streets to a one-way couplet. Completed 2013. |
Las Vegas (Summerlin),
NV Clark Co. United States |
W. Flamingo Rd. / Granite Ridge Dr. (36.11960, -115.33500) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 61.7449 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2001 | Fatal crash October 28, 2010. 11861-05. ICD estimated from Google Maps linework. |
(unincorporated),
MI Oakland Co. United States |
Martin Pkwy. / PGA Dr. (42.56583, -83.44967) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.9812 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | ICD estimated from Google Maps linework. |
Carlsbad,
CA San Diego Co. United States |
State St. / Carlsbad Blvd. (33.16578, -117.35450) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.9933 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Meridian,
ID Ada Co. United States |
Records Ave. / Elden Gray St. (43.62166, -116.34700) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.5835 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Meridian,
ID Ada Co. United States |
Kleiner Memorial Pkwy. / Kleiner Park Loop (43.62315, -116.34710) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.5827 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Osage Beach,
MO Camden Co. United States |
Burton Duenke Ln. / KK Dr. (38.11672, -92.69313) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.6461 |
Other (At-Grade) Single-Lane |
2011 | Right turn bypass lane. ICD estimated from Google Maps linework. |
Edwards,
CO Eagle Co. United States |
Beard Creek Rd. / Berry Creek Rd. (39.65095, -106.58730) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.5871 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Moody Air Force Base,
GA Lowndes Co. United States |
Stone Rd. / Davidson Rd. (30.96278, -83.21584) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.9414 |
Other (At-Grade) Single-Lane |
2007 | Painted splitter islands. Right turn bypass lane due to skew angle. ICD estimated from Google Maps linework. |
Duluth,
GA Gwinnett Co. United States |
Lawrenceville St. / Irvindale Rd. (34.00639, -84.15111) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.5531 |
Other (At-Grade) Single-Lane |
2012 | Oval shape. ICD estimated from Google Maps linework. |
(unincorporated),
GA Fulton Co. United States |
Boat Rock Rd. / Westchase Ln. (33.72417, -84.57777) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 20.8603 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Hollymead,
VA United States |
Town Center Dr. / Grand Forks Blvd. (38.12770, -78.44547) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.9431 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Wilsonville,
OR Clackamas Co. United States |
SW Grahams Ferry Rd. / SW Barber St. (45.31273, -122.80170) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 26.0368 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Boise,
ID Ada Co. United States |
Crescent Rim Dr. / Eastover Terr. (43.60307, -116.21526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 61.4047 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | ICD estimated from Google Maps linework. |