|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
Woodburn,
OR Marion Co. United States |
OR 219 / Butteville Rd. (45.15079, -122.89405) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Yield-controlled right-turn bypass lane on west leg. South leg realigned with roundabout. Serves large warehouse. |
|
Syracuse,
UT Davis Co. United States |
W Parkview Dr. / S 2000 W (41.06461, -112.06470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
|
Salt Lake City,
UT Salt Lake Co. United States |
Parleys Canyon Blvd. / S 2000 E / Country Club Cir. (40.71923, -111.83359) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | No splitter island on north leg; pedestrian ramp can lead directly into circulatory roadway. Year Completed estimated (2020-2021). |
|
West Valley City,
UT Salt Lake Co. United States |
Antelope Rd. / Hawker Ln. (40.70728, -112.05997) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1997-2002). |
|
West Valley City,
UT Salt Lake Co. United States |
Collie Dr. / Dalmatian St. / Labrador Cir. (40.70477, -112.05642) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2004 | |
|
Draper,
UT Salt Lake Co. United States |
E 12200 S / S 450 E (40.52807, -111.87785) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2014). |
|
Varberg,
Halland County Varbergs kommun Sweden |
Föreningsgatan / Engelbrektsgatan (57.10653, 12.27300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2010 | Constructed before 2010. |
|
Varberg,
Halland County Varbergs kommun Sweden |
Engelbrektsgatan / Östra vägen (57.10708, 12.26924) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2010 | Constructed before 2010. |
|
Varberg,
Halland County Varbergs kommun Sweden |
Österängsvägen / (unknown) (57.10107, 12.27494) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Bypass lanes on all legs. The previous design was one-way yield for the intersection. |
|
Lehi,
UT Utah Co. United States |
N 3600 W / W 2700 N (40.42051, -111.90717) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2020 | Through-only and through-right arrows on all approaches, including on stem of T-intersection. |
|
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. / Grove Dr. (53.55573, -113.86097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
|
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / Copperhaven Dr. / Harvest Ridge Dr. (53.55575, -113.95196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2020). |
|
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / (unknown) (53.55467, -113.95664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2016-2020). |
|
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. (Range Road 271) / Fenwyck Blvd. (53.55121, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
|
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd (Range Road 271) / (unknown) (53.54856, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
|
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / 218th St. NW (53.52741, -113.69339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2020). |
|
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / Secord Blvd. NW (53.52657, -113.70582) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2020). |
|
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / (unknown) (53.52650, -113.70143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2019). |
|
Edmonton,
AB Division 11 Canada |
Glastonbury Blvd. NW / Granville Dr. NW (53.50464, -113.68570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2020). |
|
Edmonton,
AB Division 11 Canada |
Terwillegar Blvd. NW / Towne Centre Blvd. (53.44467, -113.57784) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2000-2004). |
|
Langford,
BC Capital Canada |
Millstream Rd. / Bear Mountain Pkwy. (48.47140, -123.50526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
|
Everett,
WA Snohomish Co. United States |
Riverfront Blvd. / 29th Ave. SE / 44th St. SE (47.95950, -122.19112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2020 | |
|
Arlington,
WA Snohomish Co. United States |
236th St. NE / 19th Ave. NE (48.20959, -122.20491) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2021 | https://www.236safetyimprovements.org/project-updates |
|
St.-Étienne,
Auvergne-Rhône-Alpes Loire France |
Place Paul-Louis Courier (45.40953, 4.38702) |
Other Existing |
Unknown Unknown |
7 Approaches 0 Driveways |
Other (At-Grade) Unknown |
Trams through central island. | |
|
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Giratoire du Montcel: D3088 / Rue Jean Moulin (45.41269, 4.37259) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
||
|
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Rue Jean Moulin / D201 SB Ramps (45.41473, 4.37340) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
||
|
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
D3088 / Rue des Cytises (45.40995, 4.36446) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
||
|
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Giratoire Saint-Pierre: D3088 / Rue Jean-Pierre Blachier (45.40503, 4.35636) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Single-Lane |
||
|
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Giratoire Marseille: D3088 / Rue des Combes (45.40350, 4.35046) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Single-Lane |
||
|
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Giratoire du Marais: D88 / D3088 / Rue Maxime Gorki (45.39920, 4.34445) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 75.0000 |
Other (At-Grade) Single-Lane |
||
|
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Rue de l'Europe / Rue Jean Monnet (45.39593, 4.33334) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Single-Lane |
||
|
Weddington,
NC Union Co. United States |
Weddington-Matthews Rd. (SR 1344) / Tilley Morris Rd. (SR 1345) / (school access) (35.05645, -80.73426) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.constructionjournal.com/projects/details/9adae8f3933146738feedddda9e51146.html |
|
Bowling Green,
MO Pike Co. United States |
US 61 Business / MO 161 / Court St (39.33344, -91.19504) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/roundabout-bowling-green |
|
Billings,
MT Yellowstone Co. United States |
Five Mile Rd. / Mary St. / (Billings Bypass) (45.84863, -108.42492) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2021 | https://www.yourbigsky.com/local-news-2/billings-bypass-project-roundabout-opening-on-november-24/ |
|
Cleves,
OH Hamilton Co. United States |
Cooper Ave. / (high school parking) (39.16904, -84.75329) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | Painted splitter island on south leg. |
|
Westfield,
IN Hamilton Co. United States |
W 171st St. / Eagletown Rd. (40.03649, -86.19331) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Opened March 2023. |
|
Cambridge,
ON Waterloo Canada |
Blenheim Rd. / Bismark Dr. (43.36041, -80.34133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.cambridgetoday.ca/local-news/citys-newest-roundabout-unique-to-cambridge-west-development-5511610 |
|
Deptford,
NJ Gloucester Co. United States |
Salina Rd. / S College Dr. (39.77645, -75.12438) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://42freeway.com/roads/salina-road-roundabout-at-rowan-college-completed-traffic-signal-at-delsea-is-coming/ |
|
Roebling,
NJ Burlington Co. United States |
Cedar Ln. / Railroad Ave. (40.10521, -74.79512) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2017 | Previous control: Triangular intersection with yield signs. https://www.burlingtoncountytimes.com/story/news/2017/08/27/no-more-waiting-road-improvements/17642282007/ |
|
Cinnaminson,
NJ Burlington Co. United States |
Cinnaminson Ave. / Calhoun St. (39.98910, -75.01095) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Year Completed estimated (2007-2008). |
|
Cinnaminson,
NJ Burlington Co. United States |
Branch Pike / Burlington Pike (39.99064, -75.00752) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2008 | Inside shopping center. Year Completed estimated (2007-2008). |
|
Cinnaminson,
NJ Burlington Co. United States |
Riverton Rd. / Branch Pike / Parry Rd. (39.98818, -74.98070) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
|
Harrisburg,
PA Dauphin Co. United States |
Derry St. / Mulberry St. (40.26312, -76.86948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://theburgnews.com/news/project-to-make-harrisburgs-mulder-square-safer-greener-nears-completion |
|
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 WB Exit Ramp (38.87982, -77.26743) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaces full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
|
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 EB Exit Ramp (38.87714, -77.26629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaced full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
|
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking lot) (38.87667, -77.26993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on east and west legs. South leg stubbed. Year Completed estimated (2012-2014). |
|
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking garage) (38.87600, -77.27317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on northeast and southwest legs. Southeast leg stubbed. Year Completed estimated (2012-2014). |
|
Fairfax,
VA Fairfax Co. United States |
Patriot Cir. / Mason Pond Dr. (38.82981, -77.31152) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2008 | |
|
Brayton,
IA Cass Co. United States |
710th St. / 350th St. (41.50440, -94.83505) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Cottonwood tree in center of intersection. On Audubon County-Cass County Line. https://www.roadsideamerica.com/tip/8830 | |
|
Cedar Rapids,
IA Linn Co. United States |
16th Ave. SE / 5th St. SE (41.97092, -91.65498) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2019). |
|
Le Boulou,
Occitanie Pyrénées-Orientales France |
D115 / A9-E15 Ramps / El place (42.52147, 2.81713) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
|
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
D115 / D900 (42.52064, 2.80619) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
|
Le Boulou,
Occitanie Pyrénées-Orientales France |
Rond-Point de l'Ordre National du Mérite: D115 / D618 / Boulevard du Maréchal Foch / Zone de l'Autoport / Route de Céret (42.52102, 2.82225) |
Roundabout Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
|
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
D900 / (unknown) (42.52540, 2.80615) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
|
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
Rond-Point de Saint-Sébastien: D115 / D13 / Rue Résidences du Soleil (42.51471, 2.78701) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
D13 / Rue de la Poste / Rue de l'Ancienne Poste (42.51149, 2.79007) |
Other Existing |
Other Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Middletown,
DE New Castle Co. United States |
Brick Mill Rd. / Dove Run Centre Dr. (39.45413, -75.68672) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | |
|
Baton Rouge,
LA East Baton Rouge Par. United States |
The Grove Blvd. / (parking) (30.38708, -91.07573) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2018 | |
|
Cabocan,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (unknown) (16.60403, -22.91096) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
|
Covington,
LA St. Tammany Par. United States |
Ochsner Blvd. / S Ochsner Blvd. (30.45565, -90.15060) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). South leg added 2019-2022. |
|
Covington,
LA St. Tammany Par. United States |
River Chase Dr. / Continental Dr. (30.43874, -90.12867) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2014). Southwest leg stubbed. |
|
Snellville,
GA Gwinnett Co. United States |
Wisteria Dr. / Clower St. (33.85952, -84.01452) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | |
|
West Dundee,
IL Kane Co. United States |
Millbrook Dr. / (unknown) / (parking) (42.14551, -88.34157) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2015). |
|
Malta,
NY Saratoga Co. United States |
Stonebreak Rd. / Luther Forest Blvd. (42.96551, -73.75795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Add-lane right-turn bypass lane on southeast leg. Year Completed estimated (2011-2013). Southeast leg added 2015-2018. |
|
Troy,
NY Rensselaer Co. United States |
US 4 (N Greenbush Rd.) / Williams Rd. (Rte 136) / Glenmore Rd. (42.69219, -73.68692) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lanes on north and east legs. Year Completed estimated (2021-2022). |
|
Cohoes,
NY Albany Co. United States |
Preston Dr. / Stacey Ct. (42.77582, -73.74557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2015). |
|
Jenks,
OK Tulsa Co. United States |
S 1st St. / (parking) (36.01555, -95.96640) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | At-grade rail crossing approximately 270 ft on northwest leg. Year Completed estimated (2016-2017). |
|
Jenks,
OK Tulsa Co. United States |
S Aquarium Dr. / S 7th St. / Aquarium Dr. / E 101st St. (36.01776, -95.96138) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2017 | TWSC intersection relocated to east. Year Completed estimated (2016-2017). |
|
Tulsa,
OK Tulsa Co. United States |
W 5th St. / S Main St. (36.15147, -95.99006) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Whitestown,
IN Boone Co. United States |
S Main St. / Albert S White Dr. / E 400 S (39.98263, -86.34596) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | https://www.youtube.com/watch?v=34EKqFKijoI |
|
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Old Hollow Rd. (NC 66) (36.19481, -80.25493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
|
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.19637, -80.25492) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Opened in 2021 temporarily as single lane. Converted to 2x1 in 2022. https://malmeroads.net/i7374nc/i74seg4.html |
|
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.19956, -80.25396) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
|
Winston-Salem,
NC Forsyth Co. United States |
Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.18421, -80.22286) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
|
Winston-Salem,
NC Forsyth Co. United States |
Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.18202, -80.22303) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Signed as NC 74 in 2023; will change to to I-74 when beltway completed in 2026. https://malmeroads.net/i7374nc/i74seg4.html |
|
Brownsburg,
IN Hendricks Co. United States |
S Green St. / Airport Rd. (39.82142, -86.40107) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://twitter.com/BrownsburgIN/status/1552378297249677312 |
|
Avon,
IN Hendricks Co. United States |
E CR 100 S / (unknown) (39.74854, -86.36651) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Only two legs finished as of June 2022, but it looks like north and south legs will be added. |
|
Avon,
IN Hendricks Co. United States |
E CR 100 S / CR 900 E (39.74857, -86.36160) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2022 | |
|
Avon,
IN Hendricks Co. United States |
E CR 100 S / Allpoints Ct. (39.74893, -86.34938) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
|
Laddonia,
MO Audrain Co. United States |
US 54 / MO 19 / CR J (39.28073, -91.64373) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/node/27038 |
|
Fort Worth,
TX Tarrant Co. United States |
Ventana Pkwy. / Jerry Dunn Pkwy. (32.66820, -97.50849) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
|
Murdeira,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (unknown) (16.67908, -22.93371) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
|
Ribeira Funda,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 (16.70636, -22.93886) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
|
Espargos,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (airport entrance) (16.73751, -22.94333) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
|
Espargos,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / EN3-SL-02 (16.74832, -22.94418) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
|
Ottawa,
ON Ottawa Canada |
Greenbank Rd. / Half Moon Bay Rd. (45.25555, -75.73742) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2023). |
|
Novi,
MI Oakland Co. United States |
W 9 Mile Rd. / Taft Rd. (42.45158, -83.49410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.candgnews.com/news/novi-council-approves-lighting-for-new-roundabout-635 |
|
Lincoln,
NE Lancaster Co. United States |
Augusta Dr. / Glenneagle Ct. (40.76271, -96.60008) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.1373 |
Other (At-Grade) Single-Lane |
2000 | No splitter islands. Northeast leg stubbed. Driveway removed and southeast leg added in 2021. |
|
Bayonne,
NJ Hudson Co. United States |
Avenue E / I-78 Ramps (40.68260, -74.09906) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2018 | Roundabout centered under I-78 freeway ramps. Year Completed estimated (2017-2018). |
|
Newark,
OH Licking Co. United States |
W Main St. / N 4th St. / S 4th St. (40.05725, -82.40430) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://news.yahoo.com/stories-2022-ohio-13-reopens-101620225.html |
|
Newark,
OH Licking Co. United States |
Church St. / N 4th St. (40.05860, -82.40500) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | https://news.yahoo.com/stories-2022-ohio-13-reopens-101620225.html |
|
Point Lookout,
MO Taney Co. United States |
Opportunity Ave. / L W Hyer Dr. (36.61436, -93.23741) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
|
Bowling Green,
OH Wood Co. United States |
Napoleon Rd. / Campbell Hill Rd. (41.36356, -83.62468) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://bgindependentmedia.org/new-roundabout-in-bg-to-reduce-crashes-at-campbell-hill-and-napoleon-roads/ |
|
Richfield Township,
OH Lucas Co. United States |
Brint Rd. / Kilburn Rd. (41.70182, -83.78616) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.13abc.com/2022/08/06/lucas-county-engineers-office-installs-two-new-roundabouts/ |
|
Peoria,
IL Peoria Co. United States |
(parking) (40.66838, -89.68965) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on side street. At Peoria International Airport. | |
|
Peoria,
IL Peoria Co. United States |
(parking) (40.66770, -89.68987) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on side street. At Peoria International Airport. | |
|
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 NB Ramps (57.12949, 12.31446) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2009 and before July 2016 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches. |
|
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 SB Ramps (57.12786, 12.31052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2012 and before 2018 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches |
|
Varberg,
Halland County Varberg Sweden |
Rte 153 (Värnamovägen) / Holmagärdegatan (57.12562, 12.30381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7190 |
Other (At-Grade) Single-Lane |
2021 | Construction of crossroad stared in 2019. Roundabout operational in 2021 with three approaches and possibly in 2020 as well. Fourth approach 'built' but not yet opened to traffic in 2021. |
|
Varberg,
Halland County Varberg Sweden |
Rte 153 (Värnamovägen) / Österleden (57.12319, 12.28811) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Built as a roundabout with four single lane approaches at or before 2008. Widened and has since 2018 three approaches with double entry lanes. Two of those approaches have separate islands between the approach lanes. |