City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Lethbridge,
AB Alberta Canada |
Mildred Dobbs Blvd. / Jesse Robinson Close N (49.73043, -112.82899) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Lethbridge,
AB Alberta Canada |
Mildred Dobbs Blvd. / Lettice Perry Rd. N (49.72947, -112.82776) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Anchorage,
AK Anchorage United States |
Huffman Rd. / Huffman Park Dr. / Brandon St. (61.10862, -149.85617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.3143 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Anchorage,
AK Anchorage United States |
Huffman Rd. / Seward Hwy SB Ramps (61.10854, -149.85175) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0848 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Anchorage,
AK Anchorage United States |
Huffman Rd. / Seward Hwy NB Ramps-Brayton Dr. (61.10858, -149.84928) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.2781 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Paradise,
NL Newfoundland and Labrador Canada |
Karwood Dr. / Kenmont Rd. (47.52622, -52.84978) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.5819 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Huntington,
NY Suffolk Co. United States |
New York Ave. / Grist Mill Ln. / CR 35 (40.88407, -73.41909) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 31.6034 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Middle Island,
NY Suffolk Co. United States |
Miller Place Yaphank Rd. / Whiskey Rd. (40.90476, -72.95687) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.4256 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Riverhead,
NY Suffolk Co. United States |
Quogue Riverhead Rd. / Old Riverhead Rd. (40.87822, -72.63782) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.7335 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Salem,
CT New London Co. United States |
Rte 85 (Hartford Rd.-New London Rd.) / Rte 82 (E Haddam Rd.-Norwich Rd.) (41.47662, -72.26473) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.1084 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Lethbridge,
AB Alberta Canada |
Mauretania Rd. / (unknown) (49.67145, -112.90948) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Merging right-turn bypass lane on west leg. |
Lethbridge,
AB Alberta Canada |
Keystone Terr. / Coalbanks Gate / Silkstone Rd. W (49.66938, -112.90330) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2012 | Merging right-turn bypass lane on north leg. |
Lethbridge,
AB Alberta Canada |
Coalbanks Link / Silkstone Rd. (49.67028, -112.89758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Sugar Land,
TX Fort Bend Co. United States |
Imperial Blvd. / Stadium Dr. (29.62548, -95.64404) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8637 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Primary access to a minor league baseball stadium. |
Plainfield,
IN Hendricks Co. United States |
S County Road 800 E / E County Road 200 N (39.79270, -86.38114) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.3779 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Year completed estimated (2010-2012). ICD estimated from Google Maps linework. |
Brockport,
NY Monroe Co. United States |
Rte 19 (Main St.-Lake Rd.) / West St. / East St. (43.22019, -77.93696) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.7763 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Elmira,
NY Chemung Co. United States |
Maple Ave. / Caldwell Ave. (42.08399, -76.79589) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 8.8639 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Year completed estimated (2011-2013). ICD estimated from Google Maps linework. |
Elmira,
NY Chemung Co. United States |
Maple Ave. / Horner St. (42.08282, -76.79445) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 17.7281 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Year completed estimated (2011-2013). ICD estimated from Google Maps linework. |
Horseheads,
NY Chemung Co. United States |
Rte 13 / E. Franklin St. (42.16756, -76.80553) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.7531 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Horseheads,
NY Chemung Co. United States |
Rte 13 / Old Ithaca Rd. / Breesport Rd. (42.18851, -76.79076) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 29.2025 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
East Greenbush,
NY Rensselaer Co. United States |
US 4 (Troy Rd) / Red Mill Rd. / Luther Rd. (42.61947, -73.70200) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.1856 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Gloversville,
NY Fulton Co. United States |
S Kingsboro Ave. / Hales Mills Rd. (43.03311, -74.34221) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.5392 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Schenectady,
NY Schenectady Co. United States |
Rte 29 / Glenridge Rd. (42.86709, -73.90634) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.7653 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Temecula,
CA Riverside Co. United States |
Rancho California Rd. / Anza Rd. (33.53401, -117.05592) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.8217 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Baltimore,
MD Baltimore City Co. United States |
Guilford Ave. / 22nd St. (39.31441, -76.61263) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 6.4682 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | ICD estimated from Google Maps linework. |
Baltimore,
MD Baltimore City Co. United States |
Guilford Ave. / E 24th St. (39.31650, -76.61276) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 9.2400 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | ICD estimated from Google Maps linework. |
Baltimore,
MD Baltimore City Co. United States |
Guilford Ave. / E 32nd St. (39.32703, -76.61345) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | |
Greenville,
NC Pitt Co. United States |
E Fire Tower Rd. / Portertown Rd. / Robins Ln. (35.57142, -77.32778) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.9724 |
Other (At-Grade) Single-Lane |
2012 | Right-turn bypass lane in NW quadrant. ICD estimated from Google Maps linework. |
Bedford,
NH Hillsborough Co. United States |
Donald St. / Market Basket center entrance (42.96921, -71.50647) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 27.9653 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Bedford,
NH Hillsborough Co. United States |
Meetinghouse Rd. / Gault Rd. (42.94741, -71.49442) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 35.8432 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Laconia,
NH Belknap Co. United States |
US 3 / NH 11B (43.60333, -71.45460) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 35.4589 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Keene,
NH Cheshire Co. United States |
NH 12A (Maple Ave.) / Court St. / Old Walpole Rd. (42.96305, -72.30895) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 29.7161 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Westfield,
IN Hamilton Co. United States |
E 151st St. / Cool Creek Park Rd. (40.00753, -86.12267) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2012 | Painted spirals next to central island. |
Carmel,
IN Hamilton Co. United States |
W. 106th St. / Ditch Rd. (39.94146, -86.18407) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 29.3022 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
W. 106th St. / Shelborne Rd. (39.94108, -86.22241) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.1221 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave. (44.03258, -88.57882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2012 | Roundabout relocated to west of previous intersection. Series of 4 roundabouts. Opened June 18, 2012. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St. (44.03244, -88.58758) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.9435 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / CTH M (42.94950, -89.37981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9613 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Kaukauna,
WI Outagamie Co. United States |
STH 55 (Crooks Ave.) / CTE CE (E College Ave.) (44.25803, -88.27377) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9138 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Kihei,
HI Maui Co. United States |
Piikea Ave. / Liloa Dr. (20.75081, -156.44990) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5056 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / CTH TT (Graham St.-80th Ave.) (44.97808, -92.55799) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.5353 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 2012. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 130th St. (44.99273, -92.53744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.8527 |
Other (At-Grade) Single-Lane |
2012 | Opened July 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / US 12 / 120th St. (44.99254, -92.55791) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0760 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 2012. Yield-controlled right-turn bypass lane. ICD estimated from Google Maps linework. |
New Richmond,
WI Saint Croix Co. United States |
STH 65 / CTH G (45.07907, -92.53756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.9508 |
Other (At-Grade) Single-Lane |
2012 | Opened September 2012. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / Klondike Dr. (44.59813, -90.18018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.6235 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. Free-flow right-turn bypass lane with acceleration lane. ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / Heritage Dr. (44.62685, -90.18053) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.6000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Marshfield,
WI Wood Co. United States |
STH 13 / US 10 / CTH BB (44.62490, -90.18009) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.3017 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Free-flow right-turn bypass lane into added lane. ICD estimated from Google Maps linework. |
Sherwood,
WI Calumet Co. United States |
STH 114-STH 55 / Stommel Rd. (44.19113, -88.28387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5360 |
Other (At-Grade) Single-Lane |
2012 | Opened September 24, 2012. ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) (43.38493, -87.92303) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Saukville,
WI Ozaukee Co. United States |
STH 33 (E Green Bay Ave.) / Northwood Rd. (43.38498, -87.92057) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1913 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Port Washington,
WI Ozaukee Co. United States |
STH 33 (W Grand Ave.) / CTH LL (43.38688, -87.90026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.6619 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened September 21, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Tallahassee,
FL Leon Co. United States |
Miccosukee Rd. / Fleischmann Rd. (30.47602, -84.21957) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.8503 |
Other (At-Grade) Single-Lane |
2012 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / Gillingham Rd. / Bergstrom Rd. (44.15643, -88.48816) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.5587 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 SB Ramps (44.15623, -88.48662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1274 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 NB Ramps (44.15602, -88.48505) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.4139 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / W Bell St. / Harrison St. (44.15568, -88.48331) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1298 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Barksdale,
WI Bayfield Co. United States |
STH 13 / US 2 WB Ramps (46.58774, -90.95454) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9645 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Suamico,
WI Brown Co. United States |
School Ln. (CTH B) / Velp Ave. (CTH HS) (44.63452, -88.05177) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7946 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
CTH G (Main Ave.) / US 41 NB Ramps (44.45238, -88.08887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | |
De Pere,
WI Brown Co. United States |
CTH G (Main St.) / US 41 SB Ramps (44.45374, -88.09212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.5943 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Lacy Rd. / Cheryl Pkwy. (43.00643, -89.39114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.9225 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
Lacy Rd. / Haight Farm Rd. (43.00164, -89.39327) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.6727 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
River Falls,
WI Pierce Co. United States |
Cascade Ave. / 6th St. (44.85409, -92.61926) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.2533 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
River Falls,
WI Pierce Co. United States |
Cascade Ave. / 2nd St. (44.85418, -92.62532) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4799 |
Other (At-Grade) Single-Lane |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Evans,
GA Columbia Co. United States |
Ronald Reagan Dr. / (unknown) (33.54462, -82.12749) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.8855 |
Other (At-Grade) Single-Lane |
2012 | Oval shape. Functional Class: Local ICD estimated from Google Maps linework. |
Tavares,
FL Lake Co. United States |
Main St. / Sinclair Ave. (28.80227, -81.73129) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.3041 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Fermanagh Township,
PA Juniata Co. United States |
SR 35 / SR 3002 (40.56470, -77.39610) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.9211 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Middle Smithfield Township,
PA Monroe Co. United States |
US 209 / SR 1019 (41.03390, -75.12340) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.4508 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Bensalem,
PA Bucks Co. United States |
Trevose Rd. / Somerton Rd. (40.13440, -74.99160) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 26.4801 |
Other (At-Grade) Single-Lane |
2012 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Warrensburg,
MO Johnson Co. United States |
SR 13 / Old SR 13 / NW 435 Rd. (38.82513, -93.74133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9401 |
Other (At-Grade) Single-Lane |
2012 | Functional Class: Arterial ICD estimated from Google Maps linework. |
Fort Bragg,
CA Mendocino Co. United States |
Hwy 1 / Simpson Ln. (39.41239, -123.80830) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.5958 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
Clay Terrace Blvd. / Circle Dr. / Range Line Rd. / US 31 SB Off-Ramp (39.99264, -86.12840) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | |
Truckee,
CA Nevada Co. United States |
Hwy 89 / Prosser Dam Rd. / Alder Dr. (39.34531, -120.17300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.2574 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Acworth,
GA Cobb Co. United States |
County Line Rd. / Burnt Hickory Rd. (33.99833, -84.72916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.6557 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Marietta,
GA Cobb Co. United States |
Fairground St. / Allgood Rd. / Chicopee Dr. (33.96695, -84.53750) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.7632 |
Other (At-Grade) Single-Lane |
2012 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
(unincorporated),
MI Oakland Co. United States |
N Pontiac Trl. / M-5 / Martin Pkwy. (42.55450, -83.44852) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 76.2000 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Substantial screen fence was installed on south and east legs to slow down approach vehicles. |
Duluth,
GA Gwinnett Co. United States |
Lawrenceville St. / Irvindale Rd. (34.00639, -84.15111) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.5531 |
Other (At-Grade) Single-Lane |
2012 | Oval shape. ICD estimated from Google Maps linework. |
(unincorporated),
GA Gwinnett Co. United States |
Rabbit Hill Rd. / Rabbit Hill Park entrance (33.99940, -83.92819) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.7144 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Chico,
CA Butte Co. United States |
First St. / Salem St. (39.72980, -121.84300) |
Other Existing |
All-Way Yield None |
2 Approaches 1 Driveways 18.3704 |
Other (At-Grade) Single-Lane |
2012 | Hybrid mini-roundabout / "drop off circle" at major bike/ped entrance into Chico State University. Completed 2012. ICD estimated from Google Maps linework. |
Meridian,
ID Ada Co. United States |
Records Ave. / Elden Gray St. (43.62166, -116.34700) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.5835 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Owatonna,
MN Steele Co. United States |
CSAH 7 / TH 14 EB Ramps (44.05747, -93.27671) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Owatonna,
MN Steele Co. United States |
CSAH 7 / TH 14 WB Ramps (44.05998, -93.27671) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1964 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Mason St. (STH 32-STH 54) / S. Taylor St. (44.52414, -88.07916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4266 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Amelia Island,
FL Nassau Co. United States |
Beach Walker Rd. / Beachwood Rd. (30.55425, -81.44608) |
Roundabout Removed |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2012 | Roundabout completed before 1999, removed 2011-2013. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 SB Ramps (44.52418, -88.08284) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9811 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
W. Mason St. (STH 32-STH 54) / US 41 NB Ramps (44.52415, -88.08103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.4266 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Series of 3 roundabouts. Opened August 31, 2012. ICD estimated from Google Maps linework. |
Redmond,
OR Deschutes Co. United States |
Canal Blvd. / Canal Dr. / 27th St. / Wells Rd. (44.24421, -121.19900) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.7901 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Albany,
NY Albany Co. United States |
Fuller Rd. (CR 156) / I-90 WB Ramps (42.69511, -73.82928) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.6231 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Year Completed estimated (2011-2013). Functional Class: Arterial ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
US 141 / Atkinson Dr. (44.53348, -88.02827) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4601 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened October 17, 2012. ICD estimated from Google Maps linework. |
Springfield,
IL Sangamon Co. United States |
Capitol Ave. / 12th St. (39.79816, -89.63947) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2012 |