City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Regina,
SK Division 6 Canada |
20th Ave. / Rae St. (50.43330, -104.62110) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Regina,
SK Division 6 Canada |
20th Ave. / Robinson St. (50.43331, -104.62395) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Regina,
SK Division 6 Canada |
20th Ave. / Athol St. (50.43332, -104.62826) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Airdrie,
AB Division 6 Canada |
Williamstown Blvd. NW / Reunion Blvd. NW (51.30299, -114.03377) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Calgary,
AB Division 6 Canada |
Redstone St. NE / Redstone Plaza NE (51.17097, -113.96197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Calgary,
AB Division 6 Canada |
Redstone Dr. NE / Redstone St. NE (51.16838, -113.96205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Calgary,
AB Division 6 Canada |
Redstone Dr. NE / Redstone Blvd. NE (51.16838, -113.95107) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2015 | |
Calgary,
AB Division 6 Canada |
Redstone Ave. NE / Redstone Blvd. NE (51.17294, -113.95110) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Calgary,
AB Division 6 Canada |
128th Ave. NE / Cornerstone St. NE (51.16538, -113.94244) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | North leg stubbed. |
Calgary,
AB Division 6 Canada |
128 Ave. NE / Cornerstone Blvd. NE (51.16542, -113.93815) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2017 | North and east legs stubbed. |
Calgary,
AB Division 6 Canada |
Skyview Ranch Blvd. NE / Skyview Ranch Rd. NE / Skyview Ranch Manor NE (51.16287, -113.95109) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Calgary,
AB Division 6 Canada |
Skyview Ranch Dr. NE / 52 St. NE (51.15802, -113.95843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Cityscape Dr. NE / Cityscape Gate NE (51.15240, -113.95842) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2013 | |
Calgary,
AB Division 6 Canada |
Cityscape Blvd. NE / Cityscape Dr. NE (51.14719, -113.96633) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2014 | North and west legs 2014. East leg 2016. South leg 2018. |
Calgary,
AB Division 6 Canada |
104 Ave. NE / 42 St. NE (51.14721, -113.97406) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | |
Calgary,
AB Division 6 Canada |
Savanna Blvd. NE / Savanna St. NE (51.13504, -113.95242) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Single-Lane |
2016 | |
Calgary,
AB Division 6 Canada |
Savanna Blvd. NE / 52 St. NE (51.13495, -113.95843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
46 St. NE / Savanna Blvd. NE (51.13503, -113.96582) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Crowfoot Cir. NW / Crowfoot Parade / (transit center) (51.12465, -114.20779) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Single-Lane |
2008 | Oval shaped. ICD = 53 m x 42 m. Year Completed estimated (2008-2012). |
Calgary,
AB Division 6 Canada |
Nose Hill Dr. NW / Haskayne Dr. NW / Rosemont Blvd. NW (51.10814, -114.26887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
McCall Way NE / Barlow Trl. NE (51.10221, -114.00061) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Year Completed estimated (2008-2011). |
Calgary,
AB Division 6 Canada |
Uxbridge Dr. NW / Ulster Rd. NW (51.06991, -114.12950) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Springborough Blvd. SW / Springborough Gate SW (51.03379, -114.19200) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Calgary,
AB Division 6 Canada |
Lower Springbank Rd. (Township Rd. 241A) / Township Rd. 242 (51.03721, -114.24617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Calgary,
AB Division 6 Canada |
Westhills Way SW / Glenmore Trl. SW (Hwy 8-Hwy 201) WB Ramps (51.00996, -114.17395) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Westhills Way SW / Tsuut'ina Pkwy. / Glenmore Trl. (Hwy 8-Hwy 201) EB Ramps (51.00743, -114.17479) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW NB Ramps (51.00090, -114.16348) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW SB Ramps (51.00130, -114.16953) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
Peacekeepers Way SW / Don Ethell Blvd. SW (51.00475, -114.12697) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Calgary,
AB Division 6 Canada |
Quarry Way SE / Quarry Gate SE (50.96118, -114.01967) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Buffalo Run Blvd. / 130 Ave. SW / Tsuut'ina Trl. SB Entrance Ramp (50.93654, -114.14333) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Raindrop shaped. Merging right-turn bypass lane on west leg. Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
130 Ave. SW / Tsuut'ina Trl. NB Exit Ramp (50.93611, -114.13893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2020 | Raindrop shaped. |
Calgary,
AB Division 6 Canada |
Woodpark Blvd. SW / 24 St. SW (50.93578, -114.11793) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
Marine Dr. SE / Mahogany Rd. SE (50.89464, -113.92917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Marine Dr. SE / Masters Ave. SE (50.89226, -113.92533) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Chaparral Valley Square SE / Chaparral Valley Dr. SE (50.88594, -114.01532) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2008-2011). |
Calgary,
AB Division 6 Canada |
Chaparral Valley Dr. SE / Chaparral Valley Gate SE / Chaparral Valley Grove SE (50.88197, -114.01471) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2008). |
Calgary,
AB Division 6 Canada |
194 Ave. SE / Wolf Willow Blvd. SE (50.87758, -114.00378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Cranston Gate SE / Deerfoot Trl. (Hwy 2) SB Ramps (50.86657, -113.96433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 72.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Deerfoot Trl. NB Exit Ramp (50.86526, -113.96014) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 70.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / 212 Ave. SE / Union Ave. / Seton Cir. SE (50.86832, -113.95356) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / Seton Ave. SE (50.87133, -113.95589) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Legacy Village Way SE / Legacy Village Rd. SE (50.85969, -114.02478) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Okotoks,
AB Division 6 Canada |
D'Arcy Blvd. / Sandstone Dr. / Larkspur Bend (50.73559, -113.98112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2021). |
Okotoks,
AB Division 6 Canada |
Mountainview Dr. / Mountainview Gate (50.72974, -113.98983) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Olds,
AB Division 6 Canada |
Hwy 2A / 68 St. (51.77414, -114.09612) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2022 | East leg stubbed. Year Completed estimated (2021-2022). |
Balzac,
AB Division 6 Canada |
Hwy 566 / Range Rd. 11 (15 St. NE) (51.21263, -114.02476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://discoverairdrie.com/articles/balzac-traffic-circle-inches-closer-to-completion |
Calgary,
AB Division 6 Canada |
Sarcee Trl. SW / Na'a Dr. SW / Trans-Canada Hwy EB Ramps (51.07800, -114.18891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | |
Calgary,
AB Division 6 Canada |
Na'a Dr. SW / Na'a Plaza SW (51.07872, -114.19234) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | |
Calgary,
AB Division 6 Canada |
34 Ave. NW / Sarcee Trl. NW (51.08368, -114.18893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
West Valley Rd. SW / 101 St. SW / 1 Ave. SW / Trans-Canada Hwy EB On-Ramp (51.08514, -114.23423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
Valley Ridge Blvd. NW / Trans Canada Hwy EB Ramps (51.08743, -114.24755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | |
Cochrane,
AB Division 6 Canada |
Hwy 1A / Hwy 22 (51.20118, -114.48486) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Temporary roundabout. https://cochranenow.com/articles/temporary-roundabout-to-support-1a22-traffic-during-construction |
High River,
AB Division 6 Canada |
20 St. NE / Hampton Hill Dr. / 2 Ave. NE (50.58505, -113.83614) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://highriver.ca/community/town-services/engineering-design-major-projects/hamptons-bypass-project |
High River,
AB Division 6 Canada |
2 Ave. SE / Hamptons Blvd. / Sunshine Trl. (50.58111, -113.84114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://highriveronline.com/articles/high-rivers-hamptons-south-roundabout-set-to-open-sunday |
Brandon,
MB Division 7 Canada |
Braecrest Dr. / Lori Rd. / Orchard Dr. (49.87222, -99.93316) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2006-2011). |
Red Deer,
AB Division 8 Canada |
54 Ave. / 55th St. (52.27375, -113.81759) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 2 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2013). |
Bentley,
AB Division 8 Canada |
Hwy 12 / Hwy 20 (52.46439, -114.07495) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Single-Lane |
2022 | https://centralalbertaonline.com/articles/roundabout-construction-begins-on-highway-12-and-highway-20 |
Red Deer County,
AB Division 8 Canada |
Hwy 20 / Memorial Trl. / Township Road 384 (52.29009, -114.07341) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 39.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Completed in October 2024. RRFB is located on the north leg only. Currently, Memorial Trail is only one lane in each direction, but can be upgraded to two lanes in the future. |
Red Deer,
AB Division 8 Canada |
Signet Close / Seneca Dr. (52.23689, -113.82224) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Red Deer County,
AB Division 8 Canada |
AB Hwy 2A / Airport Dr. / Township Road 372 (52.17205, -113.86197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://www.reddeeradvocate.com/news/red-deer-county-roundabouts-completed/ |
Red Deer County,
AB Division 8 Canada |
Laura Ave/Liberty Ave (52.21374, -113.82382) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Sylvan Lake,
AB Division 8 Canada |
Crestview Blvd. / (unknown) (52.29241, -114.09186) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.0000 |
Other (At-Grade) Single-Lane |
2022 | No splitter islands. |
Sylvan Lake,
AB Division 8 Canada |
Hwy 11 (David Thompson Hwy.) / 50 St. / Hwy 781 (52.28232, -114.09704) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Painted spiral in circulatory roadway. Previous control was stop control on south leg and yield control on north leg. Year Completed estimated (2022-2023). |
Sylvan Lake,
AB Division 8 Canada |
Hwy 11 (David Thompson Hwy.) / 60 St. / Range Road 15 (52.28193, -114.12092) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Painted spirals in circulatory roadway. Year Completed estimated (2022-2023). |
Red Deer County,
AB Division 8 Canada |
MacKenzie Rd. / Lexa Ave, / Hwy 2 SB Ramps (52.20126, -113.81739) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/ |
Red Deer County,
AB Division 8 Canada |
McKenzie Rd. / Gasoline Alley E / Hwy 2 NB Off-Ramp (52.20130, -113.81247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/ |
Sylvan Lake,
AB Division 8 Canada |
Hwy 20 / Erickson Rd. (52.31537, -114.07144) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.sylvanlakenews.com/news/sylvan-lake-council-reallocates-over-1-million-for-intersection-upgrades/ |
Sylvan Lake,
AB Division 8 Canada |
Crestview Blvd. / Cameron Close (52.29481, -114.09185) |
Other Existing |
Unknown None |
3 Approaches 0 Driveways 24.0000 |
Other (At-Grade) Single-Lane |
2014 | No splitter islands. |
Sylvan Lake,
AB Division 8 Canada |
Springfield Blvd. / (unknown) (52.29534, -114.12423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Portage la Prairie,
MB Division 9 Canada |
Royal Rd. S / Crescent Rd. (49.96855, -98.29062) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2021 | Right-turn bypass lanes on southwest and southeast legs. https://www.youtube.com/watch?v=7CzYNrFk0uY. |
Portage la Prairie,
MB Division 9 Canada |
Royal Rd. S / Mayfair Farms Rd. (49.96672, -98.29230) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.youtube.com/watch?v=7CzYNrFk0uY. |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. WB Ramps (49.97435, -98.35997) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://portageonline.com/articles/see-aerial-view-of-west-end-roundabout-now-open https://www.portageonline.com/articles/final-plan-for-west-end-overpass-complete |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. EB Ramps (49.97330, -98.36839) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Unknown |
https://www.portageonline.com/articles/update-on-west-end-overpass-replacement-construction | |
Yorkton,
SK Division 9 Canada |
Darlington St. E / Mayhew Ave. (51.21647, -102.43958) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2020 | https://www.yorktonthisweek.com/news/local-news/top-10-stories-of-2020-7-roundabout-finally-finished-1.24256135 |
Divnogorsk,
Krasnoyarsk Divnogorsk Russia |
M54 (Studencheskiy pereulok) / Komsomol'skaya ulitsa (55.96267, 92.39139) |
Other Existing |
Other Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Circulating traffic yields to entering traffic. | |
Dnipro,
Dnipropetrovsk Dnipro Raion Ukraine |
Zaporizke shose / prospekt Yuriia Haharina (48.42477, 35.02403) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Doboj,
Serb Republic Doboj Bosnia and Herzegovina |
E73 / M4 (44.73576, 18.09682) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Bosanski Šamac,
Serb Republic Doboj Bosnia and Herzegovina |
E73-M17 / R464 / Njegoševa (45.05436, 18.47614) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Derventa,
Serb Republic Doboj Bosnia and Herzegovina |
Kninska / Svetog Save (44.98848, 17.90185) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Lhindos,
Southern Aegean Dodecanese Greece |
Rte 95 / Pros Gennadio (36.11255, 28.05797) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Rhodes,
Southern Aegean Dodecanese Greece |
Rte 95 / (unknown) (36.17301, 28.07534) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Rhodes,
Southern Aegean Dodecanese Greece |
Rte 95 / EO Malona (36.18314, 28.08398) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Fremont,
NE Dodge Co. United States |
Diers Pkwy. / Johnson Rd. / E 16th St. / (parking) (41.44422, -96.45389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2001 | Year Completed estimated (1999-2003). |
Mayville,
WI Dodge Co. United States |
STH 33 / CR P (43.43082, -88.45031) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.washingtoncountyinsider.com/dodge-county-highway-p-and-wi-33-roundabout-nears-completion-by-ron-naab/ |
Rubicon,
WI Dodge Co. United States |
STH 60 / CTH P (43.32538, -88.45889) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.5730 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Watertown,
WI Dodge Co. United States |
BUS 26 (N Church St.) / STH 16 WB Ramps / Provimi Rd. (43.21918, -88.73837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.5177 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Dodge Co. United States |
BUS 26 (N Church St.) / STH 16 EB Ramps (43.21605, -88.73625) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.2976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Kasson,
MN Dodge Co. United States |
STH 57 (N Mantorville Ave.) / 16th St. NE (44.04384, -92.74833) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.kttc.com/2023/08/11/kasson-highway-57-renovation-close-completion/ |
Kasson,
MN Dodge Co. United States |
STH 57 (Mantorville Rd.) / CSAH 34 (E Veterans Memorial Hwy.) (44.02837, -92.74819) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.kimt.com/news/new-roundabouts-open-to-drivers-in-kasson/article_af81a8d4-3d2e-11ee-9d69-0bdec4451a2a.html |
Kasson,
MN Dodge Co. United States |
STH 57 (Mantorville Ave.) / Main St. (44.02953, -92.74820) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Railroad crossing approximately 50 feet south of roundabout. Removes the last traffic signal in Dodge County. https://www.kimt.com/news/new-roundabouts-open-to-drivers-in-kasson/article_af81a8d4-3d2e-11ee-9d69-0bdec4451a2a.html. |
Wasioja Township,
MN Dodge Co. United States |
STH 56 / US 14 EB Ramps (44.03323, -92.91556) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. https://www.dot.state.mn.us/d6/projects/hwy14/index.html |
Wasioja Township,
MN Dodge Co. United States |
STH 56 / US 14 WB Ramps (44.03463, -92.91491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. https://www.dot.state.mn.us/d6/projects/hwy14/index.html |
Claremont,
MN Dodge Co. United States |
CR 3 (130th Ave.) / US 14 EB Ramps (44.03664, -92.98574) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html. |
Claremont,
MN Dodge Co. United States |
CR 3 (130th Ave.) / US 14 WB Ramps (44.03834, -92.98577) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html. |
Fremont,
NE Dodge Co. United States |
US 77 (Fremont Southeast Beltway) / S Downing St. (41.40772, -96.47361) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Inglewood,
NE Dodge Co. United States |
US 77 / S Broad St. / S Main St. (41.40986, -96.49868) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Left-through-right and right-turn-only lanes on northwest leg. Year Completed estimated (2023-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 NB Ramps / Old Highway 8 (41.40473, -96.44391) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Fremont,
NE Dodge Co. United States |
US 77 / US 275 SB Ramps (41.40474, -96.44633) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024). |
Theresa,
WI Dodge Co. United States |
STH 67-STH 175 / STH 28 / CR TW (43.53623, -88.44702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2022 | External truck aprons on north, east, and south legs. |