28735 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Missoula, MT
Missoula Co.
United States
Southgate Mall Access Rd. / Mary Ave.
(46.84412, -114.02685)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
24.3840
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2016-2019).
Missoula, MT
Missoula Co.
United States
Mary Ave. / Southgate Mall Access Rd.
(46.84420, -114.03158)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2016-2019).
Kuching, Sarawak
Bahagian Kuching
Malaysia
Lorong Bunga Kenanga: Jala Tun Abdul Rahman / Jalan Bako / (unknown)
(1.57992, 110.35132)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Multilane (3+ Lane)
Concentric striped circulatory roadway.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Bulatan D P Abang Haji Abdillah
(1.57168, 110.35128)
Rotary
Existing
All-Way Yield
Unknown
6 Approaches
0 Driveways
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Datuk Marican Salleh / Jalan Demak / (unknown)
(1.56605, 110.35639)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
150.0000
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
(unknown) / Jalan Stadium
(1.58857, 110.35680)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
(unknown) / Julan Stadium
(1.58872, 110.35351)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Concentric striped circulatory roadway.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Bulatan Datuk Temenggong Abang Kipali Bin Abang Akip
(1.56887, 110.32092)
Rotary
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
200.0000
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
Oval shaped. ICD = 200 m x 180 m.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Matang / Jalan Matang Baru / (unknown)
(1.57234, 110.30408)
Rotary
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
145.0000
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
(unknown) / Lorong 2
(1.55926, 110.29878)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
90.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Datuk Temenggong Tan Meng Chong / Lorong Pisang Barat
(1.54136, 110.31343)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
90.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Stapok
(1.52862, 110.32288)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
20.0000
Other (At-Grade)
Single-Lane
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Lapangan Terbang
(1.50399, 110.34811)
Other
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
Vehicular access to central island.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Sherip Masahor / Jalan Taman Hui Sing
(1.51238, 110.34372)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
110.0000
Other (At-Grade)
Multilane (3+ Lane)
Concentric striped circulatory roadway.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Datuk Tawi Sli
(1.52093, 110.33663)
Rotary
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
200.0000
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
Oval shaped. ICD = 200 m x 160 m.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Tun Razak / Jalan Wan Alwi / Jalan Ridgeway
(1.53037, 110.35927)
Rotary
Existing
All-Way Yield
Unknown
6 Approaches
0 Driveways
230.0000
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Wan Alwi / Jalan Setia Raja
(1.52098, 110.38141)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
130.0000
Other (At-Grade)
Multilane (3+ Lane)
Oval shaped. ICD = 130 m x 105 m.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Stutong / Jalan Tabuan Laru
(1.50515, 110.37383)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
110.0000
Other (At-Grade)
Multilane (3+ Lane)
Kota Samarahan, Sarawak
Bahagian Samarahan
Malaysia
Jalan Datuk Muhammad Musa / Lebuhraya Kuching-Samarahan
(1.45870, 110.41921)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
1 Driveways
210.0000
Other (At-Grade)
Multilane (3+ Lane)
Kota Samarahan, Sarawak
Bahagian Samarahan
Malaysia
Lebuhraya Kuching-Samarahan / (unknown)
(1.47543, 110.41598)
Rotary
Existing
All-Way Yield
Unknown
3 Approaches
2 Driveways
240.0000
Other (At-Grade)
Multilane (3+ Lane)
Kota Samarahan, Sarawak
Bahagian Samarahan
Malaysia
Lebuhraya Kuching-Samarahan / (unknown)
(1.48899, 110.40638)
Rotary
Existing
All-Way Yield
Unknown
3 Approaches
1 Driveways
240.0000
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Kilang / Jalan Jentera / Jalan Daya
(1.57086, 110.38610)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
130.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Kemajuan /Jalan Keruing / Jalan Tekad
(1.56589, 110.39047)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
165.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Belian / Jalan Mersawa
(1.55877, 110.38910)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
120.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Oval shaped. ICD = 120 m x 105 m.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Demak Laut / (unknown)
(1.59627, 110.40727)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
95.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Concentric striped circulatory roadway.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Rte 1002 / (unknown)
(1.59920, 110.43140)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
110.0000
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Bako
(1.59957, 110.44135)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
200.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Demak Maju / (unknown)
(1.59923, 110.44736)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
130.0000
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Sultan Tengah / (unknown)
(1.62387, 110.34799)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
245.0000
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Lorong Cahya Mata / (unknown)
(1.64234, 110.33686)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
1 Driveways
Other (At-Grade)
Single-Lane
Kuching, Sarawak
Bahagian Kuching
Malaysia
(unknown)
(1.64450, 110.33504)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Kuching, Sarawak
Bahagian Kuching
Malaysia
(unknown)
(1.64720, 110.33526)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Timnath, CO
Larimer Co.
United States
Club Dr. / Innovate Pl.
(40.52134, -104.95463)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
53.3400
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2008 Year Completed estimated (2006-2010).
Timnath, CO
Larimer Co.
United States
Signal Tree Dr. / Timinath Trail Rd.
(40.52143, -104.97703)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2015 Year Completed estimated (2014-2015).
Timnath, CO
Larimer Co.
United States
Signal Tree Dr. / Stone Fly Dr.
(40.51928, -104.97637)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2019 South leg stubbed. Year Completed estimated (2017-2019).
Windsor, CO
Weld Co.
United States
CO 257 / Pointe Plaza Dr.
(40.47823, -104.88905)
Roundabout
Existing
All-Way Yield
At-grade Rail Crossing Signals/Gates (controlling approach only)
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2019 At-grade rail crossing located 370 feet to south. Year Completed estimated (2018-2019).
Windsor, CO
Larimer Co.
United States
Crystal Downs Dr. / Vernazza Way
(40.45625, -104.97811)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2016-2017).
Berthoud, CO
Weld Co.
United States
CO 56 / I-25 SB Ramps
(40.30636, -104.98169)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2021 https://www.codot.gov/news/2021/november-2021/co56-i25-reopens-early
Berthoud, CO
Weld Co.
United States
CO 56 / I-25 NB Ramps
(40.30632, -104.97848)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2021 https://www.codot.gov/news/2021/november-2021/co56-i25-reopens-early
Middleton, ID
Canyon Co.
United States
Middleton Rd. / E Sawtooth Lake Dr.
(43.69887, -116.61324)
Roundabout
Unknown
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 Scheduled for completion August 2023.
Middleton, ID
Canyon Co.
United States
N Middleton Rd. / E Main St. (Cornell St.)
(43.70651, -116.61307)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
21.3360
Other (At-Grade)
Single-lane w/ Traversable Central Island
2021
Ranson, WV
Jefferson Co.
United States
N Fairfax Blvd. / E 13th Ave.
(39.30680, -77.85569)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
54.8640
Other (At-Grade)
Single-Lane
2019 Peanut shaped. ICD = 180 ft on each end; 530 ft long. Year Completed estimated (2017-2020). This condition is locally known as the "Peanut" and constructed within the historic plat of the city where an oval park was visioned. The peanut shape will support additional approaches as further development occurs. https://www.cityofransonwv.net/149/Fairfax-Boulevard https://www.cityofransonwv.net/DocumentCenter/View/1219/Fairfax-Blvd-Extension---Engineering-Peanut?bidId=
Norman, OK
Cleveland Co.
United States
Corporate Centre Dr.
(35.25673, -97.48459)
Roundabout
Existing
All-Way Yield
None
2 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2015 Year Completed estimated (2014-2015).
Rio, FL
Martin Co.
United States
SR 707 (NE Dixie Hwy.) / NE Martin Ave.
(27.21959, -80.23709)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2010 Roundabout constructed by the Martin County CRA in coordination with the Rio 707 streetscape project.
Jensen Beach, FL
Martin Co.
United States
SR 707 (NE Dixie Hwy.) / NE Palmer St. / NE Langford Ln.
(27.22321, -80.22038)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
35.0520
Other (At-Grade)
Single-Lane
2018 Replaced triangular intersection.
Jensen Beach, FL
Martin Co.
United States
NE Savannah Rd. / NE Pinelake Village Blvd. / NE Collins Cir.
(27.23035, -80.23639)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2008 Oval shaped. ICD = 110 ft x 95 ft. Crosswalks adjacent to circulatory roadway. Year Completed estimated (2007-2008).
Stuart, FL
Martin Co.
United States
NW Green River Pkwy. / NE Baker Rd.
(27.22209, -80.25291)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2010 Year Completed estimated (2009-2010). North leg realigned from west; south leg added.
Indiantown, FL
Martin Co.
United States
SW Seminole Dr. / SW Osceola St.
(27.01828, -80.46004)
Other
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
No splitter islands on northwest, northeast, and southeast legs.
Middleton, ID
Canyon Co.
United States
W Highlands Pkwy. / 9th St.
(43.71596, -116.64096)
Other
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 No splitter island on side street.
Middleton, ID
Canyon Co.
United States
W Highlands Pkwy. / Stallion Springs Way
(43.71894, -116.63822)
Other
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
32.0037
Other (At-Grade)
Single-Lane
2008 No splitter islands on side street. Year Completed estimated (2007-2009).
Longmont, CO
Boulder Co.
United States
Sundance Dr. / Galapagos Pl.
(40.20011, -105.06468)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2016-2017).
Longmont, CO
Boulder Co.
United States
Sundance Dr. / Tyrrhenian Dr.
(40.20202, -105.06468)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2016-2017).
Longmont, CO
Boulder Co.
United States
Sundance Dr. / Tyrrhenian Cir.
(40.19784, -105.06451)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2016-2017).
Longmont, CO
Boulder Co.
United States
Sundance Dr. / Twilight Dr.
(40.19529, -105.06175)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 Initial construction without splitter islands 1999-2002. Splitter islands added 2016-2017.
Longmont, CO
Boulder Co.
United States
S Martin St. / Bountiful Ave.
(40.14740, -105.08831)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2017
Frederick, CO
Weld Co.
United States
Colorado Blvd. / 5th St.
(40.09868, -104.94236)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
54.8640
Other (At-Grade)
Single-Lane
2016 Striped out inside circulating lane and inside entry lanes on north and south legs, with evidence of vehicle paths traveling over striped circulatory roadway area. Year Completed estimated (2015-2017).
Frederick, CO
Weld Co.
United States
Aggregate Blvd. / Wyndham Hill Pkwy.
(40.09242, -104.99890)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Single-Lane
2006 Right-turn-only lanes on north and south legs. Striped out portions of circulatory roadway.
Erie, CO
Boulder Co.
United States
Jasper Rd. / Lombard St.
(40.05485, -105.06504)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2021 Year Completed estimated (2020-2021).
Broomfield, CO
Broomfield Co.
United States
W 169th Ave. / Palisade Pkwy.
(40.00437, -104.99443)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2014
Lafayette, CO
Boulder Co.
United States
Roser Dr. / Crater Lake Ln. / Murphy Creek Dr.
(39.99879, -105.13387)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.5760
Other (At-Grade)
Single-Lane
2009 Year Completed estimated (2008-2010).
Louisville, CO
Boulder Co.
United States
Roser Dr. / W Hecla Dr. / Paschal Dr.
(39.99411, -105.13074)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2011
Louisville, CO
Boulder Co.
United States
E Hecla Dr. / Snowberry Ln.
(39.99167, -105.12415)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2007-2008).
Louisville, CO
Boulder Co.
United States
E Hecla Dr. / Golden Eagle Way / Rose Ct.
(39.99337, -105.12375)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2007-2008).
Thornton, CO
Adams Co.
United States
E 162nd Ave. / Grant St. / (parking)
(39.98980, -104.98308)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Single-Lane
2007
Thornton, CO
Adams Co.
United States
E 163rd Ave. / Elizabeth St.
(39.99121, -104.95523)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2017-2018).
Brighton, CO
Adams Co.
United States
Longs Peak St. / N 46th Ave.
(39.99462, -104.75972)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2021
Brighton, CO
Adams Co.
United States
Longs Peak St. / Silo Ct.
(39.99463, -104.75777)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2022).
Brighton, CO
Adams Co.
United States
Longs Peak St. / Baler Ct.
(39.99464, -104.75476)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2022).
Brighton, CO
Adams Co.
United States
Longs Peak St. / Bowie Dr. / N 46th Ave.
(39.99239, -104.75969)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2021 2022 or earlier (SV)
Brighton, CO
Adams Co.
United States
156th Ave. / 157th Ave. / Syracuse Way
(39.97989, -104.89921)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2018-2019).
Thornton, CO
Adams Co.
United States
Grant St. / E 146th Ave. / (parking)
(39.96090, -104.98184)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2018 Year Completed estimated (2018-2019).
Thornton, CO
Adams Co.
United States
Grant St. / E 143rd Pl.
(39.95485, -104.98191)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2013 Opened with north and west legs 2013. South and east legs added 2015.
Thornton, CO
Adams Co.
United States
Grant St. / E 141 Pl.
(39.95214, -104.98286)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2016 West leg added 2022-2023.
Thornton, CO
Adams Co.
United States
Lincoln St. / E 141st Pl. / (parking)
(39.95280, -104.98624)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2013
Thornton, CO
Adams Co.
United States
Grant St. / E 140th Ave. / (parking)
(39.94932, -104.98311)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
62.4840
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2018 Year Completed estimated (2018-2019).
Thornton, CO
Adams Co.
United States
Grant St. / (parking)
(39.94597, -104.98307)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2018 Year Completed estimated (2018-2019).
Broomfield, CO
Broomfield Co.
United States
W 138th Ave. / Kalamath St. / Maddox Ct.
(39.94514, -105.00113)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
30.4800
Other (At-Grade)
Single-Lane
2008
Broomfield, CO
Broomfield Co.
United States
W 138th Ave. / Quivas St. / Beacon St.
(39.94559, -105.00860)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
32.0040
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2008-2010).
Thornton, CO
Adams Co.
United States
Tamarac St. / E 129th Ave. / Tamarac Way
(39.93026, -104.89660)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2005 Year Completed estimated (2004-2005).
Thornton, CO
Adams Co.
United States
131st Ave. / Oneida St.
(39.93268, -104.90764)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2005 Year Completed estimated (2004-2005).
Thornton, CO
Adams Co.
United States
Holly Cir. / Jasmine St.
(39.92580, -104.91863)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2005 Year Completed estimated (2004-2005).
Henderson, CO
Adams Co.
United States
Henderson Rd. / E 124th Ave. / Park Blvd.
(39.92505, -104.87550)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2022 Merging right-turn bypass lanes on north and east legs. https://adcogov.org/henderson-rd-park-blvd-roundabout-project
Brighton, CO
Adams Co.
United States
Southgate Blvd. / Gateway St.
(39.91320, -104.83390)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2018 Year Completed estimated (2018-2019).
Commerce City, CO
Adams Co.
United States
E 119th Ave. / Oakland St. / (unknown)
(39.91279, -104.84949)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
28.9560
Other (At-Grade)
Single-Lane
2004 Year Completed estimated (2003-2004). East leg added 2008-2010.
Commerce City, CO
Adams Co.
United States
E 121st Ave. / Jasper St.
(39.91627, -104.80425)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
36.5760
Other (At-Grade)
Single-Lane
2003
Arvada, CO
Jefferson Co.
United States
W 94th Ave. / Hallett St.
(39.86650, -105.22434)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2014
West Vancouver, BC
Greater Vancouver
Canada
Cross Creek Rd. / Chartwell Dr.
(49.34530, -123.14714)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2012 Year Completed estimated (2011-2013).
West Vancouver, BC
Greater Vancouver
Canada
Taylor Way / Southborough Dr. / Stevens Dr.
(49.34101, -123.13479)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2005 Yield-controlled right-turn bypass lane on south leg.
Coquitlam, BC
Greater Vancouver
Canada
Soball St. / Gislason Ave.
(49.28930, -122.75026)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
25.0000
Other (At-Grade)
Single-Lane
2011 Year Completed estimated (2009-2011).
Port Coquitlam, BC
Greater Vancouver
Canada
Fremont St. / Fremont Dr. / Hwy 7B (Loogheed Hwy.) Exit Ramp
(49.24939, -122.73402)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2010 Raindrop shaped. Year Completed estimated (2008-2011).
Surrey, BC
Greater Vancouver
Canada
74 Ave. / 194A St.
(49.13733, -122.68371)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.0000
Other (At-Grade)
Single-Lane
2019
Surrey, BC
Greater Vancouver
Canada
194A St. / 73 Ave.
(49.13550, -122.68375)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2014
Delta, BC
Greater Vancouver
Canada
Ferry Rd. / Admiral Way
(49.11201, -123.07804)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
28.0000
Other (At-Grade)
Single-Lane
2005
Delta, BC
Greater Vancouver
Canada
Ferry Rd. / Commodore Dr.
(49.10577, -123.07907)
Traffic Calming Circle
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other (At-Grade)
Single-lane w/ Traversable Central Island
Painted splitter islands.
Chilliwack, BC
Fraser Valley
Canada
Columbia Valley Rd. / Sunnyside Blvd. / (parking)
(49.07529, -121.97639)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.0000
Other (At-Grade)
Single-Lane
2010 Year Completed estimated (2009-2011).
Surrey, BC
Greater Vancouver
Canada
25 Ave. / 166 St.
(49.04745, -122.76265)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2022
Surrey, BC
Greater Vancouver
Canada
3A Ave. / 172 St.
(49.00848, -122.74635)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2012
Gig Harbor, WA
Pierce Co.
United States
Olympus Way / Buckhorn Pl. / Copper Ct.
(47.36278, -122.59679)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
24.3840
Other (At-Grade)
Single-lane w/ Traversable Central Island
2014
Enumclaw, WA
King Co.
United States
Semanski St. / Warner Ave.
(47.19201, -122.00551)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
28.9560
Other (At-Grade)
Single-Lane
2021 Next to Enumclaw High School. https://www.courierherald.com/news/council-awards-bid-for-roundabout-in-front-of-enumclaw-high/
Tumwater, WA
Thurston Co.
United States
93rd Ave. SW / Lathrop Industrial Dr.
(46.95285, -122.94231)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2022 Add-lane right-turn bypass lane on south leg. Year Completed estimated (2021-2022).