City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Orion,
MI Oakland Co. United States |
Baldwin Rd. / (parking) (42.72527, -83.30757) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | West leg is for athletic club; east leg is for a small strip mall. A fountain is featured in the circle. |
Orion,
MI Oakland Co. United States |
Baldwin Rd. / Maybee Rd. (42.72884, -83.30775) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Yield-controlled right-turn bypass lane on east leg. West leg enters into a residential subdivision local road. |
Orion,
MI Oakland Co. United States |
Baldwin Rd. / Waldon Rd. (42.73619, -83.30805) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | |
Orion,
MI Oakland Co. United States |
E Flint St. / Orion Rd. / Miller Rd. (42.78398, -83.23184) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | |
Independence,
MI Oakland Co. United States |
Sashabaw Rd. / Oak Hill Rd. (42.79422, -83.37240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | West leg is unpaved away from roundabout. |
Swartz Creek,
MI Genesee Co. United States |
Grand Blanc Rd. / Linden Rd. (42.91411, -83.77008) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Traverse City,
MI Grand Traverse Co. United States |
Hammond Rd. E / Four Mile Rd. N (44.71542, -85.53638) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2021 | https://www.record-eagle.com/news/local_news/winding-down-hammond-4-mile-roundabout-opens/article_8b0055ae-0ffa-11ec-99ed-8be394157c49.html |
Rochester,
MI Oakland Co. United States |
E Avon Rd. / Dequindre Rd. (42.67168, -83.09685) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Bridge to the east and roundabout at Avon and Dequindre is under construction November 2021. http://www.rcocweb.org/606/Avon-Road-Dequindre-to-23-Mile-Road The one driveway is a utility drive. Note: Popular Cider mill is to the east as well with another roundabout planed for 2022 at Dequindre and 23 Mile Rd. |
Shelby Township,
MI Macomb Co. United States |
E Avon Rd. / 23 Mile Rd. (42.67368, -83.09389) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Roundabout constructed after completion of bridge and roundabout to the west is completed. |
Columbus,
MI St. Clair Co. United States |
Gratiot Ave. / Palms Rd. (42.85156, -82.63709) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.thetimesherald.com/story/news/2021/09/29/roundabout-palms-gratiot-open-traffic-week-columbus-twp/5913286001/ |
Traverse City,
MI Grand Traverse Co. United States |
Parsons Rd. / Airport Access Rd. (44.75181, -85.58162) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Traverse City,
MI Grand Traverse Co. United States |
M-37 / Vance Rd. (44.65747, -85.65622) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Grand Blanc,
MI Genesee Co. United States |
E Grand Blanc Rd. / Embury Rd. (42.91693, -83.64652) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.abc12.com/news/grand-blanc-road-reopens-following-roundabout-construction-project/article_39b8087a-3083-5a44-b841-c1872cfd8918.html. |
Monroe,
MI Monroe Co. United States |
Laplaisance Rd. / I-75 NB On-Ramp (41.87651, -83.39471) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | https://www.monroenews.com/story/news/traffic/2021/12/03/new-bridge-roundabouts-laplaisance-rd-open/8836648002/ Plan is to move NB offramp to the roundabout at some tuture time. |
Monroe,
MI Monroe Co. United States |
Laplaisance Rd. / I-75 SB Ramps (41.87817, -83.39577) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | https://www.monroenews.com/story/news/traffic/2021/12/03/new-bridge-roundabouts-laplaisance-rd-open/8836648002/ |
Sister Lakes,
MI Washtenaw Co. United States |
N Bay Dr. / Timmins Dr. / Chapleau Dr. (42.26417, -83.79140) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on three legs. | |
Lansing,
MI Ingham Co. United States |
Forest Rd. / Collins Rd. (42.70389, -84.49795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | |
Waterford,
MI Oakland Co. United States |
Skippter Dr. / (parking) (42.65920, -83.38892) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. Within shopping mall property. | |
Belmont,
MI Kent Co. United States |
Seven Mile Rd. NE / Brewer Ave. NE (43.07137, -85.57053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2006-2009). |
Portage,
MI Kalamazoo Co. United States |
Zylman Ave. / Coxs Dr. (42.19367, -85.55061) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | Replaced offset T-intersections. Year Completed estimated (2018-2020). |
Auburn Hills,
MI Oakland Co. United States |
N Squirrel Rd. / Squirrel Ct. (42.63475, -83.22058) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Yield-controlled right-turn bypass lane on north leg. |
Clinton Township,
MI Macomb Co. United States |
Partridge Creek Blvd. / Scoter Ln. / Montage (42.62068, -82.94597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Opened with unstriped circulatory roadway. Marked with two circulating lanes throughout even though side streets are single-lane entries. Combination of concentric and exit striping added 2019-2020. |
Clinton Township,
MI Macomb Co. United States |
Partridge Creek Blvd. / Hawk Ln. / Montage (42.62063, -82.94027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Opened with unstriped circulatory roadway. North leg added 2015-2016. Marked with two circulating lanes throughout even though side streets are single-lane entries. Combination of concentric and exit striping added 2019-2020. |
Southfield,
MI Oakland Co. United States |
Franklin Rd. / W Eleven Mile Rd. (42.48636, -83.29104) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2018). |
Northville,
MI Wayne Co. United States |
Yellowstone Dr. / Johnson Creek Dr. (42.40412, -83.52414) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2005 | |
Northville,
MI Wayne Co. United States |
Carriage Way / Glacier Rd. (42.40220, -83.53576) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Northville,
MI Wayne Co. United States |
Johnson Creek Dr. / (park entrance) (42.39610, -83.51860) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Auburn Hills,
MI Oakland Co. United States |
Pioneer Dr. / Meadow Brook Rd. (42.66857, -83.21853) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2018 | Previous T-intersection shifted to east. |
China,
MI St. Clair Co. United States |
Fred W Moore Hwy. / Wadhams Rd. (42.81537, -82.55479) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2019-2022). |
Novi,
MI Oakland Co. United States |
Gateway Rd. / Woodstone Ln. (42.52271, -83.49676) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Wixom,
MI Oakland Co. United States |
W Chambers St. / Johanna Ware W (42.52579, -83.53382) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 EB Ramps (42.27461, -84.38325) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 WB Entrance Ramp (42.27627, -84.38357) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / Seymour Rd. / Rosehill Rd. (42.27724, -84.38398) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Manistee,
MI Manistee Co. United States |
1st St. / Beach Rd. (44.24639, -86.34069) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.0728 |
Other (At-Grade) Single-Lane |
2014 | |
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. N / Cass Rd. (44.69811, -85.61832) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2022 | Railroad crossing on east leg 65 ft from circulatory roadway; controlled by yield sign. https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
Macomb,
MI Macomb Co. United States |
25 Mile Rd. / Romeo Plank Rd. / Garfield Rd. (42.70077, -82.95901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Year Completed estimated (2021-2022). |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / I-94 EB Ramps (42.26564, -84.61940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / Norton Rd. / I-94 WB Ramps (42.26653, -84.62125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Combined two intersections. https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Manistee Township,
MI Manistee Co. United States |
US 31 / M-22 (44.28494, -86.24281) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://upnorthlive.com/news/local/roundabout-opens-in-manistee-township |
Green Oak Township,
MI Livingston Co. United States |
Winans Lake Rd. / Rickett Rd. (42.46413, -83.76620) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.whmi.com/news/article/roundabout-rickett-winans |
Scio Township ,
MI Washtenaw Co. United States |
W Liberty Rd. / Zeeb Rd. (42.26934, -83.83817) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.mlive.com/news/ann-arbor/2022/09/new-roundabout-near-ann-arbor-opens-after-weeks-of-construction.html |
Salem Township,
MI Washtenaw Co. United States |
N Territorial Rd. E / Pontiac Trl. (42.36546, -83.65682) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.wcroads.org/wcrc-project/pontiac-tr-n-territorial-rd-roundabout/ |
Northville,
MI Washtenaw Co. United States |
Eight Mile Rd. / Currie Rd. (42.43382, -83.59039) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.rcocweb.org/529/Currie-Road-COMPLETE |
Independence,
MI Oakland Co. United States |
Knob Hill Circle (42.73975, -83.37107) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
||
Independence,
MI Oakland Co. United States |
3400 W Clarkston Rd (42.76543, -83.31409) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
There used to be a drop-down for a project that is in design. This will be constructed in 2024. | |
Farmington Hills,
MI Oakland Co. United States |
Orchard Lake Rd. / (shopping center entrances) (42.52448, -83.35994) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Southfield,
MI Oakland Co. United States |
Coral Bells Dr. / Windflower Dr. / Violet Dr. (42.51039, -83.22182) |
Other Unknown |
Unknown None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
South Lyon,
MI Oakland Co. United States |
Nine Mile Rd. / Currie Rd. (42.44831, -83.59180) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Opened November 21, 2022. |
Ann Arbor,
MI Washtenaw Co. United States |
E Ann St / Observatory St. / (hospital access) (42.28240, -83.73114) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 3 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Novi,
MI Oakland Co. United States |
W 9 Mile Rd. / Taft Rd. (42.45158, -83.49410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.candgnews.com/news/novi-council-approves-lighting-for-new-roundabout-635 |
Buena Vista,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 SB Ramps (43.41453, -83.89324) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on north leg. Replaced cloverleaf interchange. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Saginaw,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 NB Ramps (43.41447, -83.88874) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Replaced cloverleaf interchange. Merging right-turn bypass lane on east leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. S / Beitner Rd. / River Rd. W (44.67776, -85.62668) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.4048 |
Other (At-Grade) Single-Lane |
2022 | https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Gerald Ave. (42.63809, -83.09578) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Harrison Ave. (42.63763, -83.09821) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Cadillac,
MI Wexford Co. United States |
Plett Rd. / E 13th St. (44.26695, -85.39646) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2012 | https://www.9and10news.com/2012/08/13/city-of-cadillac-gets-new-driving-maneuver-at-intersection/ |
Cadillac,
MI Wexford Co. United States |
E Division St. / Crosby Rd. (44.25260, -85.37770) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://www.cadillacnews.com/news/new-roundabout-at-crosby-division-opened-to-traffic/article_2ed78a18-40c4-11ec-8a2e-bb7590311039.html |
Standish,
MI Arenac Co. United States |
US 23 / M-13 (43.95018, -83.96713) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2022 | Grade separation replaced with roundabout. https://www.upnorthvoice.com/news/2022/03/us-23-at-standish-to-undergo-major-construction-this-summer-2/ |
Lake Eastbrook,
MI Kent Co. United States |
Lake Eastbrook Blvd. SE / Sparks Dr. SE (42.91585, -85.57470) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2022 | |
Creston,
MI Kent Co. United States |
Monroe Ave. NW / Knapp St. NE / Riverside Park Dr. NE (42.99924, -85.67037) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2014 | https://www.mlive.com/news/grand-rapids/2013/06/4_roundabouts_cycle_track_plan.html |
Byron Center,
MI Kent Co. United States |
84th St. SE / Kalamazoo Ave. SE (42.81191, -85.62478) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.mlive.com/news/grand-rapids/2023/08/roundabout-the-first-of-its-kind-in-kent-county-opens-ahead-of-schedule.html |
Bellwood Estates,
MI Oakland Co. United States |
Bell Rd. / Coventry Woods Ln. (42.49306, -83.27073) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.3944 |
Other (At-Grade) Single-Lane |
2017 | Circulating edge line extensions across exits. |
Beverly Hills,
MI Oakland Co. United States |
Greenfield Rd. / Normandy Rd. / Beverly Rd. (42.52471, -83.20409) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Opened August 26, 2023. https://www.rcocweb.org/655/GreenfieldNormandy-Beverly-Roundabout-CO |
White Lake,
MI Oakland Co. United States |
Elizabeth Lake Rd. / Oxbow Lake Rd. (42.64128, -83.48775) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.rcocweb.org/619/Elizabeth-Lake-Road-Roundabouts-White-La |
White Lake,
MI Oakland Co. United States |
Elizabeth Lake Rd. / Teggerdine Rd. (42.64243, -83.49436) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.rcocweb.org/619/Elizabeth-Lake-Road-Roundabouts-White-La |
Midland,
MI Midland Co. United States |
N Waldo Rd. / E Monroe Rd. (43.68353, -84.18736) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Opened September 1, 2023. https://www.ourmidland.com/news/article/waldo-monroe-roundabout-open-traffic-sept-1-18308702.php |
Northwest Warren,
MI Macomb Co. United States |
William Durant Blvd. / Charles Chayne Rd. (42.50727, -83.04056) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.4840 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2003 | Inside General Motors plant. |
Northwest Warren,
MI Macomb Co. United States |
Edward Cole Blvd. / Louis Chevrolet Rd. (42.51705, -83.03027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.4840 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2004 | Inside General Motors plant. Year Completed estimated (2003-2005). |
Midland,
MI Midland Co. United States |
E Freeland Rd. / S Sasse Rd. (43.52518, -84.22937) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Rural, high-speed approaches. |
Freeland,
MI Saginaw Co. United States |
W Freeland Rd. / N River Rd. (43.52509, -84.13434) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2020 | https://www.tittabawassee.org/news_detail_T5_R8.php |
Grand Ledge,
MI Eaton Co. United States |
M-43 (E Grand Ledge Hwy.) / (school access road) (42.74365, -84.75917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.fox47news.com/neighborhoods/delta-township-grand-ledge/grand-ledge-public-schools-roundabout-project-on-m-43-is-complete |
Kalamazoo,
MI Kalamazoo Co. United States |
Gull Rd. / G Ave. (42.33324, -85.50268) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://wwmt.com/news/local/roundabout-opens-on-gull-road-in-comstock-township |
Traverse City,
MI Grand Traverse Co. United States |
M-37 / Blair Townhall Rd. (44.64295, -85.65605) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.record-eagle.com/news/missing-the-curve-tractor-trailer-gets-hung-up-in-new-m-37-roundabout/article_0be65b22-e8b0-11eb-9678-3766a742bc20.html. |
Grand Blanc,
MI Genesee Co. United States |
E Cook Rd. / Dort Hwy. (42.90188, -83.65195) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.mlive.com/news/flint/2020/11/dort-highway-extension-roundabouts-now-open-to-traffic.html |
Grand Blanc,
MI Genesee Co. United States |
S Dort Hwy. / I-75 SB Ramps (42.90437, -83.65300) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | https://www.mlive.com/news/flint/2020/11/dort-highway-extension-roundabouts-now-open-to-traffic.html |
Grand Blanc,
MI Genesee Co. United States |
S Dort Hwy. / I-75 NB Ramps (42.90822, -83.64880) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | https://www.mlive.com/news/flint/2020/11/dort-highway-extension-roundabouts-now-open-to-traffic.html |
Brighton,
MI Livingston Co. United States |
Maltby Rd. / (middle school access) (42.50039, -83.78169) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2015). |
Marquette,
MI Marquette Co. United States |
N Lakeshore Blvd. / Wright St. (46.56387, -87.39004) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Both Wright St and Lakeshore Blvd were rerouted. https://www.facebook.com/uppermichiganssource/videos/lakeshore-boulevard-roundabout-oct-7-2020/347038979703362/ |
Munising,
MI Alger Co. United States |
E Munising Ave. / M-28 (46.40970, -86.64977) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.uppermichiganssource.com/2020/11/02/work-on-roundaboutroad-repair-project-in-munising-nearly-done-for-the-year/ |
Ann Arbor,
MI Washtenaw Co. United States |
Textile Rd. / Woodland Dr. (42.19953, -83.76754) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://thesalinepost.com/g/saline-mi/n/15400/washtenaw-county-road-commission-opens-roundabout-intersection-textile-woodland |
Port Huron,
MI St. Clair Co. United States |
Range Rd. / Dove Rd. / I-94 EB Off-Ramp (42.94948, -82.50186) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2020 | https://www.thetimesherald.com/story/news/2020/09/02/range-and-dove-roads-roundabout-set-open-soon/5691922002/ |
Colon,
MI St. Joseph Co. United States |
W Colon Rd. / Farrand Rd. (41.96554, -85.33907) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.patriotledger.com/story/news/politics/county/2020/08/06/roundabout-way-intersection-project-complete/114367056/ |
Ann Arbor,
MI Washtenaw Co. United States |
N Wagner Rd. / Miller Rd. (42.30551, -83.80006) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.9664 |
Other (At-Grade) Single-Lane |
2020 | https://www.wcroads.org/wcrc-project/miller-road-bridge-and-roundabout/ |
Jackson,
MI Jackson Co. United States |
E Morrell St. / Martin Luther King Dr. (Francis St.) (42.24012, -84.40396) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | http://www.cityofjackson.org/CivicAlerts.aspx?AID=629 |
Muskegon,
MI Muskegon Co. United States |
Beach St. / Lakeshore Dr. (43.21957, -86.33019) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.mlive.com/news/muskegon/2020/06/roundabout-at-muskegons-pere-marquette-beach-opens-to-traffic.html |
Marquette,
MI Marquette Co. United States |
US 41 / CR HQ (46.54939, -87.46102) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | Year Completed estimated (2019-2020). |
Raisin,
MI Lenawee Co. United States |
Occidental Hwy. / Sutton Rd. (41.94840, -83.97733) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | Fully traversable central island. Opened June 2020. https://www.lenconnect.com/news/20200618/occidental-sutton-roundabout-open |
Blackman Township,
MI Jackson Co. United States |
Cooper St. / I-94 WB Ramps (42.27376, -84.40371) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://www.mlive.com/news/jackson/2019/12/take-a-ride-on-new-i-94-cooper-street-bridge-roundabouts-after-9-month-closure.html |
Blackman Township,
MI Jackson Co. United States |
Cooper St. / I-94 EB Ramps (42.27098, -84.40380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://www.mlive.com/news/jackson/2019/12/take-a-ride-on-new-i-94-cooper-street-bridge-roundabouts-after-9-month-closure.html |
Marquette Township,
MI Marquette Co. United States |
US 41 / Brickyard Rd. (46.54856, -87.47286) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.9977 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | https://www.radioresultsnetwork.com/2019/11/05/marquette-us-41-roundabouts-opening-on-wednesday/ ICD estimated from Google Maps linework. |
Salem,
MI Washtenaw Co. United States |
Pontiac Trl. / 7 Mile Rd. (42.41368, -83.64647) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2020 | https://www.wcroads.org/wcrc-project/pontiac-trail-and-7-mile-road-roundabout/ |
Grand Blanc Township,
MI Genesee Co. United States |
E Hill Rd. / Belsay Rd. (42.94531, -83.59820) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.1019 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Soo Township,
MI Chippewa Co. United States |
S Mackinac Trl. / Three Mile Rd. / I-75 Business Spur (46.46298, -84.37301) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.1835 |
Other (At-Grade) Single-Lane |
2018 | Combined two intersections: Mackinac Trail/I-75 Bus. Spur (traffic light) and Mackinac Trail/3 MIle Rd (one-way stop) ICD estimated from Google Maps linework. |
Jackson,
MI Jackson Co. United States |
Kibby Rd. / Denton Rd. (42.22748, -84.42911) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.8721 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |
Adrian,
MI Lenawee Co. United States |
Michigan Ave. / S Charles St. / Adrian College Blvd. (41.89566, -84.06310) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 25.7814 |
Other (At-Grade) Single-Lane |
2018 | Adrian College Blvd. is a new street giving access to Adrian College from US 223. ICD estimated from Google Maps linework. |
Grand Rapids,
MI Kent Co. United States |
N Park St. NE / Briggs Blvd. NE / Monroe Ave. NE (43.02218, -85.65964) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 29.6875 |
Other (At-Grade) Single-Lane |
2015 | Previous right-turn bypass lane converted into bike-only right-turn bypass lane feeding a two-way separated bike facility. Year Completed estimated (2013-2016). ICD estimated from Google Maps linework. |
Grand Rapids,
MI Kent Co. United States |
Monroe Ave. NE / Riverside Dr. NE / 3 Mile Rd. NE (43.01350, -85.66388) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 26.1985 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2016). ICD estimated from Google Maps linework. |
Grand Rapids,
MI Kent Co. United States |
Monroe Ave. NE / Guild St. NE (43.00642, -85.66828) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.9612 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2016). ICD estimated from Google Maps linework. |
York Township,
MI Washtenaw Co. United States |
W Bemis Rd. / Moon Rd. (42.17062, -83.73832) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.9936 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 |