City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Calgary,
AB Division 6 Canada |
Sarcee Trl. SW / Na'a Dr. SW / Trans-Canada Hwy EB Ramps (51.07800, -114.18891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | |
Calgary,
AB Division 6 Canada |
West Valley Rd. SW / 101 St. SW / 1 Ave. SW / Trans-Canada Hwy EB On-Ramp (51.08514, -114.23423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
Valley Ridge Blvd. NW / Trans Canada Hwy EB Ramps (51.08743, -114.24755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | |
Richmond,
VA Richmond City United States |
W Laburnum Ave. / I-195 SB Ramps (37.58383, -77.47494) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Freeway Ramps (Grade-Separated) Single-lane w/ Traversable Central Island |
2020 | Central island made of pre-cast concrete. https://precast.org/2021/08/first-of-its-kind/ |
Waterford,
VA Loudoun Co. United States |
Charles Town Pike / E Colonial Hwy. / Dry Mill Pkwy. / SR 7 EB Ramps (39.14003, -77.61273) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2015 | Combines two stop-controlled intersections. Year Completed estimated (2014-2016). |
East Greenbush,
NY Rensselaer Co. United States |
US 4 (Troy Rd.) / I-90-Rte 9 WB Ramps (42.62923, -73.70059) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | |
Lake St Louis,
MO St. Charles Co. United States |
Lake Saint Louis Blvd. / Veteran's Memorial Pkwy. / I-70 EB Ramps (38.80322, -90.77073) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 67.0560 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | |
Mount Orab,
OH Brown Co. United States |
N High St. / SR 32 EB Ramps (39.04104, -83.92064) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Raindrop shaped. |
Girard,
PA Erie Co. United States |
SR 18 (Meadville Rd.) / I-90 WB Ramps (41.96319, -80.34086) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.goerie.com/story/news/local/2022/07/15/bridge-and-roundabouts-open-i-90-route-18-girard-platea-interchange-erie-county-pa/65373375007/ |
Girard,
PA Erie Co. United States |
SR 18 (Meadville Rd.) / I-90 EB Ramps (41.96210, -80.34068) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.goerie.com/story/news/local/2022/07/15/bridge-and-roundabouts-open-i-90-route-18-girard-platea-interchange-erie-county-pa/65373375007/ |
Beaver Falls,
PA Beaver Co. United States |
College Ave. / 31st St. / Moss Alley (40.77170, -80.32230) |
Other Existing |
All-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Parking along circulatory roadway. | |
Indianapolis,
IN Marion Co. United States |
W County Line Rd. / N Bluff Rd. / I-69 (SR 37) NB Ramps (39.63481, -86.20389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). |
Delta,
BC Greater Vancouver Canada |
Nordel Way / Highway 91 Connector EB Ramps / Frontage Rd. (49.14617, -122.94689) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Merging right-turn bypass lane on east leg; add-lane right-turn bypass lane on south leg. |
Bargersville,
IN Johnson Co. United States |
SR 144 / I-69 SB Ramps (39.56591, -86.24760) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | Interchange replaced at-grade signalized intersection. |
Bargersville,
IN Johnson Co. United States |
SR 144 / CR 144 / I-69 NB Ramps (39.56557, -86.24616) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | Interchange replaced at-grade signalized intersection. |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. WB Ramps (49.97435, -98.35997) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://portageonline.com/articles/see-aerial-view-of-west-end-roundabout-now-open https://www.portageonline.com/articles/final-plan-for-west-end-overpass-complete |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. EB Ramps (49.97330, -98.36839) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Unknown |
https://www.portageonline.com/articles/update-on-west-end-overpass-replacement-construction | |
Cranberry Township,
PA Butler Co. United States |
MSA Dr. / I-79 NB Off-Ramp (40.68440, -80.09193) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 WB Ramps (40.69162, -96.62914) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9973 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Whittlesford,
England Cambridgeshire United Kingdom |
A505 / M11 Ramps (52.09854, 0.13804) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Lincoln,
NE Lancaster Co. United States |
S 68th St. / NE 2 EB Ramps (40.68931, -96.62932) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.9976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. |
Trego,
WI Washburn Co. United States |
US 63 / US 53 SB Ramps / CR E (45.89603, -91.82981) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://mobile.twitter.com/WisDOTnorthwest/status/1587519853581271043?cxt=HHwWhoC8qaq5gIgsAAAA |
Trego,
WI Washburn Co. United States |
US 63 / US 53 NB Ramps / Service Loop (45.89745, -91.82604) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://mobile.twitter.com/WisDOTnorthwest/status/1587519853581271043?cxt=HHwWhoC8qaq5gIgsAAAA |
Chernogorsk,
Khakassia Chernogorsk Russia |
prospekt Kosmonavtov / M54 (avtodoroga Yenisey) EB Ramps (53.84000, 91.34129) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Marengo,
IL McHenry Co. United States |
SR 23 / I-90 WB Ramps (42.17930, -88.61798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp. |
Marengo,
IL McHenry Co. United States |
SR 23 / I-90 EB Ramps (42.17539, -88.61798) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp. |
Bayonne,
NJ Hudson Co. United States |
Avenue E / I-78 Ramps (40.68260, -74.09906) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2018 | Roundabout centered under I-78 freeway ramps. Year Completed estimated (2017-2018). |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 NB Ramps (57.12949, 12.31446) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2009 and before July 2016 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches. |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 SB Ramps (57.12786, 12.31052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2012 and before 2018 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches |
Williamsburg,
KY Whitley Co. United States |
US 25W / I-75 NB Ramps (36.79226, -84.16820) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Williamsburg,
KY Whitley Co. United States |
US 25W / I-75 SB Ramps (36.79318, -84.17100) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Buena Vista,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 SB Ramps (43.41453, -83.89324) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on north leg. Replaced cloverleaf interchange. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Saginaw,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 NB Ramps (43.41447, -83.88874) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Replaced cloverleaf interchange. Merging right-turn bypass lane on east leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Orlando,
FL Orange Co. United States |
(connector to Cargo Rd.) / Jeff Fuqua Blvd. Ramps (28.44101, -81.30795) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 42.9765 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | At Orlando International Airport. |
Grandview,
MO Jackson Co. United States |
US 71 NB Frontage Road / I-49-US 71 NB Ramps (38.86704, -94.52594) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
US 71 SB Frontage Rd. / I-49-US 71 SB Ramps (38.87725, -94.52680) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. NE / I-80 WB Ramps (41.67198, -91.44380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was entrance ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. SE / I-80 EB Ramps (41.67099, -91.44629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was exit ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Voglans,
Auvergne-Rhône-Alpes Savoie France |
D1504 / D1201 Ramps (45.61639, 5.88404) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 96.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / Raider Rd. / US 67 SB Ramps (37.91037, -90.53216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Elliptical shaped. ICD = 155 ft x 145 ft. Year Completed estimated (2007-2009). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / US 67 NB Ramps (37.91294, -90.53029) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Avila Beach,
CA San Luis Obispo Co. United States |
Avila Beach Dr. / Palisades Rd. / US 101 SB Ramps (35.17977, -120.70042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening in fall of 2024. | |
Santa Barbara,
CA Santa Barbara Co. United States |
Olive Mill Rd. / Coast Village Rd. / N Jameson Ln. / US 101 Ramps (34.42156, -119.63993) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 46.3296 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
Montecito,
CA Santa Barbara Co. United States |
San Ysidro Rd. / N Jameson Ln. / US 101 NB Ramps (34.42287, -119.63152) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 53.6445 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | This is an unique kidney shaped single-lane roundabout (approx. varying ICD 176' x 116'). Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 EB Ramps (36.76908, -121.73823) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.7573 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. Future 3rd leg is planned to connect to BlackieRd. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 WB Ramps (36.77058, -121.73771) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 SB Ramps / Theatre Dr. (35.56644, -120.70261) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.8909 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Knoxville,
TN Knox Co. United States |
Montlake Dr. / Lakemoor View Rd. / US 129 SB Exit Ramp (35.92067, -83.95729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Rue Jean Moulin / D201 SB Ramps (45.41473, 4.37340) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 WB Exit Ramp (38.87982, -77.26743) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaces full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 EB Exit Ramp (38.87714, -77.26629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaced full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Le Boulou,
Occitanie Pyrénées-Orientales France |
D115 / A9-E15 Ramps / El place (42.52147, 2.81713) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.19637, -80.25492) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Opened in 2021 temporarily as single lane. Converted to 2x1 in 2022. https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.19956, -80.25396) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.18421, -80.22286) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Baux Mountain Rd. / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.18202, -80.22303) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Signed as NC 74 in 2023; will change to to I-74 when beltway completed in 2026. https://malmeroads.net/i7374nc/i74seg4.html |
Annemasse,
Auvergne-Rhône-Alpes Haute-Savoie France |
D907 (Route de Taninges) / D1206 (Route de Thonon) Ramps / Rue du 18 Aout 1944 / Route de Livron (46.19144, 6.25080) |
Roundabout Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Lille,
Hauts-de-France Nord France |
Rue Jean Perrin / N356 NB Ramps (50.62074, 3.08434) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Lille,
Hauts-de-France Nord France |
M750 / Boulevard de la Moselle / A25-E42 Ramps (50.62317, 3.02852) |
Rotary Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Idaho Falls,
ID Bonneville Co. United States |
W 65th S / S 45th W / I-15 NB Ramps (43.43835, -112.12018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Idaho Falls,
ID Bonneville Co. United States |
W 65th W / Saint John Rd. / I-15 SB Ramps (43.43962, -112.12198) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Foley,
AL Baldwin Co. United States |
S OWA Blvd. / Midtown Village Blvd. / (unknown) (30.37156, -87.65917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | Unsigned and unmarked left-turn-only trap lane on east leg. 2022 or earlier (SV) |
Calgary,
AB Division 6 Canada |
Westhills Way SW / Glenmore Trl. SW (Hwy 8-Hwy 201) WB Ramps (51.00996, -114.17395) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Westhills Way SW / Tsuut'ina Pkwy. / Glenmore Trl. (Hwy 8-Hwy 201) EB Ramps (51.00743, -114.17479) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW NB Ramps (51.00090, -114.16348) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW SB Ramps (51.00130, -114.16953) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Buffalo Run Blvd. / 130 Ave. SW / Tsuut'ina Trl. SB Entrance Ramp (50.93654, -114.14333) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Raindrop shaped. Merging right-turn bypass lane on west leg. Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
130 Ave. SW / Tsuut'ina Trl. NB Exit Ramp (50.93611, -114.13893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2020 | Raindrop shaped. |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Cranston Gate SE / Deerfoot Trl. (Hwy 2) SB Ramps (50.86657, -113.96433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 72.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Deerfoot Trl. NB Exit Ramp (50.86526, -113.96014) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 70.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Colorado Springs,
CO El Paso Co. United States |
Bradley Rd. / SR 83 (S Academy Blvd.) NB Ramps / Cody Dr. (38.77019, -104.75705) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Bloomingdale,
GA Chatham Co. United States |
Bloomingdale Rd. / Little Neck Rd. / I-16 EB Ramps (32.09873, -81.32315) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lane on west leg (freeway exit ramp) that is aimed at circulatory roadway. Yield-controlled right-turn bypass lane on south leg onto freeway entrance ramp. |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / I-94 EB Ramps (42.26564, -84.61940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Parma,
MI Jackson Co. United States |
W Michigan Ave. / Norton Rd. / I-94 WB Ramps (42.26653, -84.62125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Combined two intersections. https://jtv.tv/i-94-michigan-avenue-parma-interchange-to-reopen-tuesday/ |
Rice Lake,
WI Barron Co. United States |
STH 48 (W Knapp St.) / US 53 NB Ramps (45.50926, -91.76067) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right-turn bypass lane on east leg. https://www.apg-wi.com/rice_lake_chronotype/free/traffic-changes-around-us-53-wis-48-interchange-in-rice-lake-coming-in-october/article_4e8de952-0334-11eb-a7de-678b8ff263bc.html |
Rice Lake,
WI Barron Co. United States |
STH 48 (21st Ave - Knapp St.) / US 53 SB Ramps (45.50932, -91.76298) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Yield-controlled right-turn bypass lane on west leg. https://www.apg-wi.com/rice_lake_chronotype/free/traffic-changes-around-us-53-wis-48-interchange-in-rice-lake-coming-in-october/article_4e8de952-0334-11eb-a7de-678b8ff263bc.html |
Platten,
Rhineland-Palatinate Bernkastel-Wittlich Germany |
K56 / B50-E42 Ramps (49.95063, 6.92518) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
||
Basingstoke,
England Hants United Kingdom |
A339 / M3 Ramps (51.25793, -1.06507) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Kuching,
Sarawak Bahagian Kuching Malaysia |
Bulatan Datuk Temenggong Abang Kipali Bin Abang Akip (1.56887, 110.32092) |
Rotary Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 200.0000 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Oval shaped. ICD = 200 m x 180 m. | |
Kuching,
Sarawak Bahagian Kuching Malaysia |
Jalan Lapangan Terbang (1.50399, 110.34811) |
Other Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Vehicular access to central island. | |
Kuching,
Sarawak Bahagian Kuching Malaysia |
Jalan Datuk Tawi Sli (1.52093, 110.33663) |
Rotary Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 200.0000 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Oval shaped. ICD = 200 m x 160 m. | |
Kuching,
Sarawak Bahagian Kuching Malaysia |
Jalan Tun Razak / Jalan Wan Alwi / Jalan Ridgeway (1.53037, 110.35927) |
Rotary Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways 230.0000 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Berthoud,
CO Weld Co. United States |
CO 56 / I-25 SB Ramps (40.30636, -104.98169) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | https://www.codot.gov/news/2021/november-2021/co56-i25-reopens-early |
Berthoud,
CO Weld Co. United States |
CO 56 / I-25 NB Ramps (40.30632, -104.97848) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2021 | https://www.codot.gov/news/2021/november-2021/co56-i25-reopens-early |
Port Coquitlam,
BC Greater Vancouver Canada |
Fremont St. / Fremont Dr. / Hwy 7B (Loogheed Hwy.) Exit Ramp (49.24939, -122.73402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Raindrop shaped. Year Completed estimated (2008-2011). |
Anoka,
MN Anoka Co. United States |
Green Haven Rd. / Jacob Ln. / US 10-US 169 WB Ramps (45.20655, -93.40067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Anoka,
MN Anoka Co. United States |
W Main St. / US 10-US 169 EB Ramps / Church St. (45.20504, -93.40072) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2022-2023). |
Hobart,
WI Brown Co. United States |
CR VV (Marley St.) / STH 29 EB Ramps (44.57594, -88.17273) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Howard,
WI Brown Co. United States |
CR VV (Marley St.) / STH 29 WB Ramps (44.57753, -88.17131) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Burnsville,
MN Dakota Co. United States |
Cliff Rd. W / I-35W SB Ramps (44.78229, -93.29009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://patch.com/minnesota/burnsville/construction-begins-i-35w-southbound-ramp-improvement-project |
(unincorporated),
NC Robeson Co. United States |
Leeper Rd. / I-295 SB Ramps (34.92075, -78.97889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Robeson Co. United States |
Leeper Rd. / I-295 NB Ramps (34.92281, -78.97772) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Cumberland Co. United States |
Old Plank Rd. / I-295 SB Ramps (34.94793, -78.99697) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lanes on north and west legs. https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
(unincorporated),
NC Cumberland Co. United States |
Old Plank Rd. / I-295 NB Ramps (34.94791, -78.99430) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Yield-controlled right-turn bypass lanes on south and east legs. https://abc11.com/nc-fayetteville-outer-loop-i295-new-sections-open/12478490/ |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 EB Ramps (42.27461, -84.38325) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Jackson,
MI Jackson Co. United States |
N Elm Ave. / I-94-US 127 WB Entrance Ramp (42.27627, -84.38357) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.michigan.gov/mdot/projects-studies/i-route-construction/i94-road-and-bridge-rebuilding-project-jackson-county |
Ruffs Dale,
PA Westmoreland Co. United States |
SR 3014 (Hunker Rd.) / I-70 WB Ramps (40.21336, -79.66387) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Year Completed estimated (2020-2021). |