City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Oxford,
MS Lafayette Co. United States |
SR 30 / SR 7 SB Ramps (34.38488, -89.49810) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Raindrop shaped. Series of three roundabouts. |
(unincorporated),
PA Westmoreland Co. United States |
Waltz Mill Rd. / I-70 EB Ramps (40.21090, -79.66617) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2023). |
Claremont,
MN Dodge Co. United States |
CR 3 (130th Ave.) / US 14 EB Ramps (44.03664, -92.98574) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html. |
Claremont,
MN Dodge Co. United States |
CR 3 (130th Ave.) / US 14 WB Ramps (44.03834, -92.98577) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html. |
West Linn,
OR Clackamas Co. United States |
OR 43 (Willamette Dr.) / I-205 NB Ramps (45.36158, -122.60954) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.westlinntidings.com/news/new-i-205-roundabout-opens-at-highway-43-in-west-linn/article_27714680-46ce-11ee-a8d4-db795c337eb4.html (image at https://www.flickr.com/photos/oregondot/ ) |
Greenwood,
IN Johnson Co. United States |
W Smith Valley Rd. / I-69 NB Ramps (39.60476, -86.21867) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2023 | https://uploads.knightlab.com/storymapjs/a054ad9d809a2e94199b7216d217fa6d/i-69-finish-line-construction-overview-johnson-county-v-0-4/index.html |
Greenwood,
IN Johnson Co. United States |
W Smith Valley Rd. / I-69 SB Ramps (39.60480, -86.22082) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2023 | https://uploads.knightlab.com/storymapjs/a054ad9d809a2e94199b7216d217fa6d/i-69-finish-line-construction-overview-johnson-county-v-0-4/index.html |
Wasioja Township,
MN Dodge Co. United States |
STH 56 / US 14 EB Ramps (44.03323, -92.91556) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. https://www.dot.state.mn.us/d6/projects/hwy14/index.html |
Wasioja Township,
MN Dodge Co. United States |
STH 56 / US 14 WB Ramps (44.03463, -92.91491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. https://www.dot.state.mn.us/d6/projects/hwy14/index.html |
Blackeberg,
Halland County Falkenbergs kommun Sweden |
Rte 154 / E6-E20 SB Ramps (56.93033, 12.51433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 150.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Yielding right-turn bypass lane on northeast leg. |
Vinbergs kyrkby,
Halland County Falkenbergs kommun Sweden |
Rte 154 / E6-E20 NB Ramps (56.93274, 12.51676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Year Completed estimated (2014-2015). |
Allen,
TX Collin Co. United States |
Allen Dr. / US 75-TX 36 (North Central Expressway) SB Frontage Rd. (33.11254, -96.67377) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Right-turn-only lane on west leg. |
Allen,
TX Collin Co. United States |
Allen Dr. / US 75-TX 36 (North Central Expressway) NB Frontage Rd. (33.11162, -96.67259) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2023 | Right-turn-only lane on east leg. No left turn arrows marked on entry. |
Arlington,
FL Duval Co. United States |
SR 109 (University Blvd. N) / Colcord Ave. / Alt US 90-SR 115 EB Exit Ramp (30.32669, -81.60476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2014 | Replaced loop ramp in one quadrant of full cloverleaf interchange. |
Halmstad,
Halland County Halmstads kommun Sweden |
Rte 26 (Nissastigen) / E6-E20 NB Ramps (56.71150, 12.89011) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Year Completed estimated (2009-2012). Add-lane right-turn bypass lane on south leg; yielding right-turn bypass lane on west leg. |
Halmstad,
Halland County Halmstads kommun Sweden |
Växjövägen / E6 SB Ramps (56.67370, 12.89606) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2015 | Concentric striped circulatory roadway. |
Halmstad,
Halland County Halmstads kommun Sweden |
Växjövägen / E6 NB Ramps (56.67432, 12.90147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2009 | Merging right-turn bypass lane on west leg. Concentric striped circulatory roadway. |
Halmstad,
Halland County Halmstads kommun Sweden |
Laholmsvägen / E6 SB Ramps / Gjutaregatan (56.65500, 12.90306) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2020 | Previously a T intersection. Changed to 4 leg roundabout in 2020. Concentric striped circulatory roadway. |
Halmstad,
Halland County Halmstads kommun Sweden |
Reparatörgatan / E6 SB Ramps (56.64597, 12.90109) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Halmstad,
Halland County Halmstads kommun Sweden |
Villmansstrandsvägen / E6 NB Ramps (56.64404, 12.90476) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Slagtofta,
Skåne County Hörby kommun Sweden |
Kristianstadsvägen / E22 Ramps (55.86490, 13.69484) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | |
Vellinge,
Skåne County Vellinge kommun Sweden |
Norra leden / Vellinge Allé / E6-E22 Ramps (55.47730, 13.01928) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Ulvaryd,
Kronoberg County Markaryds kommun Sweden |
Rte 117 / Handelsvägen / E4 NB Ramps (56.44572, 13.60102) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
Completed on or before 2009. | |
Markaryd,
Kronoberg County Markaryds kommun Sweden |
Hässleholmsvägen / Rte 117 / E4 SB Ramps / (unknown) (56.44826, 13.59916) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Single-Lane |
Completed on or before 2009. | |
Sonnarp,
Skåne County Örkelljunga kommun Sweden |
/Rte 24 / E4 Ramps (56.28422, 13.34145) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 106.6800 |
Freeway Ramps (Grade-Separated) Single-Lane |
Elliptical shaped. Completed on or before 2009. | |
Kennewick,
WA Benton Co. United States |
Ridgeline Dr. / US 395 NB Ramps / S Zintel Way (46.17192, -119.19115) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.nbcrightnow.com/news/us-395-and-ridgeline-drive-interchange-near-southridge-now-open/article_f08f07aa-e2e2-11ed-a02e-ab286dbac1ad.html |
Sundsvall,
Västernorrland County Sundsvall Municipality Sweden |
Cpl Birsta N: Timmervägen / E4 SB Ramps (62.44850, 17.33855) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | Year Completed estimated (2012-2017). |
Sundsvall,
Västernorrland County Sundsvall Municipality Sweden |
Ortviksvägen / E4 Ramps / Arbetarsvängen (62.39681, 17.33741) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 91.4400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | |
Sundsvall,
Västernorrland County Sundsvall Municipality Sweden |
E14 / E4 Ramps (62.38152, 17.35326) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 91.4400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | |
Vaple,
Västernorrland County Sundsvall Municipality Sweden |
Kemivägen / E4 SB Ramps (62.33946, 17.35021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Raindrop shaped. Year Completed estimated (2010-2017). |
Stockvik,
Västernorrland County Sundsvall Municipality Sweden |
Kemivägen / E4 NB Ramps (62.33902, 17.35173) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Raindrop shaped. Year Completed estimated (2010-2017). |
Västbo,
Västernorrland County Sundsvall Municipality Sweden |
Cpl Nolby: Tunavägen / E4 SB Ramps (62.29391, 17.34802) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | |
Skarmyra,
Gävleborg County Hudiksvalls kommun Sweden |
Rte 84 / E4 SB Ramps (61.71420, 17.04736) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
Raindrop shaped. Completed in 2009 or earlier. | |
Skarmyra,
Gävleborg County Hudiksvalls kommun Sweden |
Rte 84 / E4 NB Ramps (61.71437, 17.05036) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
Raindrop shaped. Completed in 2009 or earlier. | |
Björkmo,
Gävleborg County Hudiksvalls kommun Sweden |
Forsavägen / E4 SB Ramps (61.65449, 17.01670) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Raindrop shaped. |
Björkmo,
Gävleborg County Hudiksvalls kommun Sweden |
Forsavägen / E4 NB Ramps (61.65422, 17.01869) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Raindrop shaped. |
Rossla,
Gävleborg County Hudiksvalls kommun Sweden |
(unknown) / E4 SB Ramps (61.60826, 17.00904) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | |
Rossla,
Gävleborg County Hudiksvalls kommun Sweden |
(unknown) / E4 NB Ramps (61.60874, 17.01314) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | |
Ina,
Gävleborg County Söderhamns kommun Sweden |
Rte 50 / E4 SB Ramps (61.29717, 17.02226) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
Raindrop shaped. Completed in 2009 or earlier. | |
Ina,
Gävleborg County Söderhamns kommun Sweden |
Rte 50 / E4 NB Ramps / Södra Tvärleden / Söderhamnsporten (61.29733, 17.02650) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Single-Lane |
Completed in 2009 or earlier. | |
Mauston,
WI Juneau Co. United States |
STH 82 (Gateway Ave.) / I-90-I-94 EB Ramps (43.79649, -90.05800) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.mauston.com/vertical/Sites/%7BF7711255-419A-434B-BDA9-D1E7B277079F%7D/uploads/221216_I-90-94_and_WIS_82_Winter_Shutdown.pdf |
Mauston,
WI Juneau Co. United States |
STH 82 (Gateway Ave.) / I-90-I-94 WB Ramps (43.79635, -90.05521) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. https://www.mauston.com/vertical/Sites/%7BF7711255-419A-434B-BDA9-D1E7B277079F%7D/uploads/221216_I-90-94_and_WIS_82_Winter_Shutdown.pdf |
Sheffield Cross,
Co Laois Ireland |
N77 / M7 (Portlaoise Bypass) Ramps / L26965 (53.01330, -7.30334) |
Rotary Existing |
Unknown Unknown |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Boardman,
NC Columbus Co. United States |
Old Boardman Rd. / US 74 EB Ramps (34.43447, -78.95052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | New interchange replaces single at-grade, stop-controlled intersection. https://www.nrcolumbus.com/news/new-boardman-interchange-open-to-traffic-ncdot-says/article_feaec6c2-4c23-11ee-a358-437c17d778ff.html. |
Boardman,
NC Columbus Co. United States |
Old Boardman Rd. / US 74 WB Ramps (34.43547, -78.94924) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | New interchange replaces single at-grade, stop-controlled intersection. https://www.nrcolumbus.com/news/new-boardman-interchange-open-to-traffic-ncdot-says/article_feaec6c2-4c23-11ee-a358-437c17d778ff.html. |
New Florence,
MO Montgomery Co. United States |
MO 19 / Tree Farm Rd. / I-70 EB Ramps (38.89821, -91.45624) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.modot.org/node/35298 |
New Florence,
MO Montgomery Co. United States |
MO 19 / Booneslick Rd. / I-70 WB Ramps (38.90090, -91.45707) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.modot.org/node/35298 Combined freeway interchange with at-grade intersection. Previously, the interchange was stop controlled and the intersection had traffic lights. |
McFarland,
WI Dane Co. United States |
CR AB / US 12-US 18 WB Ramps (43.04036, -89.24278) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2023 | Interchange replaced single stop-controlled intersection. |
McFarland,
WI Dane Co. United States |
CR AB / US 12-US 18 EB Ramps (43.03910, -89.24354) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2023 | Interchange replaced single stop-controlled intersection. |
Wentzville,
MO St. Charles Co. United States |
Prospect Rd. / I-64 EB Exit Ramp (38.79596, -90.82043) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Interchange replaced single at-grade intersection. Year Completed estimated (2008-2009). |
Wentzville,
MO St. Charles Co. United States |
Prospect Rd. / Corporate Pkwy. / I-64 WB Exit Ramp (38.79597, -90.81810) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Interchange replaced single at-grade intersection. Year Completed estimated (2008-2009). |
O'Fallon,
MO St. Charles Co. United States |
Connecting Rd. / Alta Mira Ct. / MO 364 WB Ramps (38.76954, -90.74393) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | |
Weldon Spring,
MO St. Charles Co. United States |
Technology Dr. / Meadows Pkwy. / Wolfrum Rd. / I-64 WB Exit Ramp (38.70526, -90.67410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
Oval shaped. ICD = 200 ft x 180 ft. Built initially as 2x2 roundabout in 2005-2006. Concentric circulatory roadway striping. Converted to single lane using by striping out inner circulatory roadway lane and left entry lane on southwest leg 2020-2021. | |
Chesterfield,
MO St. Louis Co. United States |
N Outer 40 Rd. / I-64 WB Exit Ramp (38.67582, -90.65115) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Year Completed estimated (2009-2010). |
Little Falls,
NJ Passaic Co. United States |
Clove Rd. / US 46 EB Ramps / (unknown) (40.87254, -74.19662) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://themontclarion.org/news/commuters-breathe-sigh-of-relief-with-clove-road-bridge-opening/ |
Clifton,
NJ Passaic Co. United States |
Valley Rd. / Great Notch Rd. / US 46-SR 3 WB Exit Ramp (40.87171, -74.18939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.northjersey.com/story/news/transportation/2023/10/31/route-46-and-route-3-construction-in-passaic-county-nearly-done/71330652007/ |
Courtland,
MN Nicollet Co. United States |
CSAH 12 (4th St.) / US 14 EB Ramps (44.27180, -94.34138) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. https://www.mprnews.org/story/2023/11/21/southwestern-minnesota-celebrates-completion-of-highway-14-expansion-project (picture about halfway down the page) |
Courtland,
MN Nicollet Co. United States |
CSAH 12 (4th St. - 541st Ave.) / US 14 WB Ramps / 466th St. (44.27411, -94.34144) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.nujournal.com/news/local-news/2023/09/16/new-courtland-csah-12-highway-14-intersection-opens/ |
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / I-81 SB Ramps / Arden-Nollville Rd. (39.36247, -78.04925) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.journal-news.net/news/local-news/official-phase-one-of-i-81-inwood-bypass-nearly-done/article_87d020ff-2d39-5835-8d9a-c25afa4402ea.html |
Inwood,
WV Berkeley Co. United States |
SR 51 (Gerrardstown Rd.) / I-81 NB Ramps (39.36263, -78.04701) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | https://www.journal-news.net/news/local-news/official-phase-one-of-i-81-inwood-bypass-nearly-done/article_87d020ff-2d39-5835-8d9a-c25afa4402ea.html |
Cox Green,
England Windsor And Maidenhead United Kingdom |
Holyport Interchange: A404 (M) / A308 (M) / M4 Ramps (51.49903, -0.72393) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Chalvey,
England Slough United Kingdom |
Tuns Lane Interchange: A355 (Tuns Ln.) / M4 (Slough-Maidenhead By-Pass) Ramps (51.50311, -0.61641) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Brands Hill,
England Slough United Kingdom |
Langley Roundabout: A4 (London Rd.) / M4 (Slough-Maidenhead By-Pass) Ramps (51.49179, -0.54292) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Cranford,
England Greater London United Kingdom |
A408 / M4 (Heathrow Airport Spur Rd. / M4 (Chiswick to Langley Special Road) Ramps (51.49580, -0.45344) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Clewer Village,
England Windsor And Maidenhead United Kingdom |
A308 (Maidenhead Rd.) / A332 (Royal Windsor Way) Ramps (51.48356, -0.62366) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Trinidad,
CO Las Animas Co. United States |
County Road 69.1 / I-25 SB Ramps (37.13386, -104.52197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.codot.gov/projects/archived-project-sites/i25-exit11-trinidad-intersection |
Trinidad,
CO Las Animas Co. United States |
Santa Fe Trail / I-25 NB Ramps (37.13383, -104.52080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.codot.gov/projects/archived-project-sites/i25-exit11-trinidad-intersection |
Pueblo,
CO Pueblo Co. United States |
Frontage Rd. / Drew Dix Pkwy. / I-25 SB Exit Ramp (38.34309, -104.62080) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.codot.gov/projects/drewdixdillon |
Berkeley,
CA Alameda Co. United States |
Gilman St. / I-80 EB Ramps / Eastshore Hwy. (37.87826, -122.30681) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Opening 2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/d4-alameda-80-gilman-interchange-improvement-project | |
Berkeley,
CA Alameda Co. United States |
Gilman St. / I-80 WB Ramps / Frontage Rd. (37.87808, -122.30769) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Opening 2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/d4-alameda-80-gilman-interchange-improvement-project | |
Round Rock,
TX Williamson Co. United States |
Chisholm Trail Rd. / (RM 620 (Round Rock Ave.) Ramps / (parking) (30.51070, -97.68924) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling circulatory roadway only) |
5 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Built at new freeway overpass over rail line. Rail line goes through the roundabout. https://www.kxan.com/video/round-rock-drivers-adapt-to-new-roundabout/9518214/ |
Rocky Mount,
NC Nash Co. United States |
NC 43 (Benvenue Rd.) / US 64 EB Ramps / Battle Park Ln. (35.96313, -77.80598) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 73.1520 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/features/local/roundabout-on-benvenue-nears-completion/article_24f4ddfc-9b0d-11ee-b8f7-e7a7fdc66294.html |
Town of Empire,
WI Fond Du Lac Co. United States |
CR UU / STH 23 WB Ramps (43.78427, -88.36128) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://projects.511wi.gov/wis23resurface/full-project-overview/ |
Town of Empire,
WI Fond Du Lac Co. United States |
CR UU / STH 23 EB Ramps (43.78296, -88.36133) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://projects.511wi.gov/wis23resurface/full-project-overview/ |
Fond du Lac,
WI Fond Du Lac Co. United States |
CR K / STH 23 WB Ramps (43.78438, -88.38654) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://projects.511wi.gov/wis23resurface/full-project-overview/ |
Fond du Lac,
WI Fond Du Lac Co. United States |
CR K / STH 23 WB Ramps / Mary Hill Park Dr. (43.78288, -88.38671) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://projects.511wi.gov/wis23resurface/full-project-overview/ |
Lodi,
CA San Joaquin Co. United States |
Cherokee Ln. / SR 99 SB Exit Ramp / (connector to E Turner Rd.) (38.14475, -121.26156) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. https://www.youtube.com/watch?v=K4bMgmfZOPg |
Sacramento,
CA Sacramento Co. United States |
Crossfield Dr. / Lindbergh Dr. / Airport Blvd. SB Ramps (38.67892, -121.59240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Serves Sacramento International Airport. https://sacramento.aero/scas/about/news-and-events/upcoming-smf-construction-plan-ahead-for-improved-travel-experience |
Sacramento,
CA Sacramento Co. United States |
Crossfield Dr. / Meister Way / Airport Blvd. NB Ramps (38.67890, -121.58937) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Serves Sacramento International Airport. https://sacramento.aero/scas/about/news-and-events/upcoming-smf-construction-plan-ahead-for-improved-travel-experience |
Gaffney,
SC Cherokee Co. United States |
Shelby Hwy. / I-85 NB Ramps (35.10925, -81.60193) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | |
Gaffney,
SC Cherokee Co. United States |
Shelby Hwy. / I-85 SB Ramps (35.11093, -81.60201) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | |
Napoleon,
OH Henry Co. United States |
SR 108 / US 6-US 24 WB Ramps (41.40926, -84.13197) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.northwestsignal.net/news/image_e08cef2c-9084-52ef-9bc1-bfd8ab955679.html |
Groningen,
Groningen Groningen Netherlands |
Bedumerweg / N370 Ramps / Smirnoffstraat (53.23734, 6.56591) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
Right-turn-only lane on west leg. | |
Hoogkerk,
Groningen Groningen Netherlands |
Professor Uilkensweg / N355 Ramps (53.23584, 6.51986) |
Signalized Roundabout/Circle Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
Oval shaped. | |
Groningen,
Groningen Groningen Netherlands |
N370 / N7-E22 Ramps (53.20089, 6.55355) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Groningen,
Groningen Groningen Netherlands |
Laan Corpus Den Hoorn / N7-E22 WB Ramps / Jan Evert Scholtenlaan (53.19891, 6.54615) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Groningen,
Groningen Groningen Netherlands |
Laan Corpus Den Hoorn / N7-E22 EB Ramps (53.19819, 6.54671) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
||
Hazelwood,
MO St. Louis Co. United States |
Dunn Rd. / Sieloff Dr. / I-270 WB Entrance Ramp (38.77626, -90.33959) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Left-turn-only lane on east leg. Little deflection westbound. |
Spanish Lake,
MO St. Louis Co. United States |
Dunn Rd. / I-270 WB Ramps (38.77088, -90.22381) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Left-turn-only lane on east leg. Little deflection westbound. |
Warrington,
England Warrington United Kingdom |
Burtonwood Roundabout: Burtonwood Rd. / M62 Ramps / A5282 / A5280 (53.41550, -2.64681) |
Signalized Roundabout/Circle Existing |
Signal Pedestrian Signal (red-yellow-green to drivers) |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Oval shaped. | |
Widnes,
England Halton United Kingdom |
Ditton Roundabout (53.35967, -2.74308) |
Signalized Roundabout/Circle Removed |
Signal Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Widnes,
England Halton United Kingdom |
Widnes Loops Roundabout: A533 (Mersey Gateway) Ramps / A557 (Queensway) / John Collins Way (53.35733, -2.73294) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2017 | Oval shaped. |
Runcorn,
England Halton United Kingdom |
Bridgewater Interchange: A558 (Daresbury Expressway - Bridgewater Expressway) / A533 (Mersey Gateway) Ramps (53.34114, -2.70215) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Dogbone shaped. | |
Halewood,
England Merseyside United Kingdom |
Newstead Farm Interchange: A5300 / A562 Ramps (53.35991, -2.78931) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Oval shaped. | |
Winwick,
England Warrington United Kingdom |
Stump Cross: M62 Ramps / A49 (Winwick Rd.) / Newton Rd. (53.42261, -2.59787) |
Signalized Roundabout/Circle Existing |
Signal None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Winwick,
England Warrington United Kingdom |
Winwick Interchange: M6 Ramps / A49 (Winwick Link Rd.) / A579 (Winwick Ln.) (53.44002, -2.58404) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
Oval shaped. | |
Newton-Le-Willows,
England Merseyside United Kingdom |
Haydock Island: M6 Ramps / A49 (E Lancashire Rd.) / A580 (E Lancashire Rd.) / Lodge Ln. (53.47125, -2.63370) |
Other Existing |
Signal Pedestrian Signal (red-yellow-green to drivers) |
6 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
Hamburger shaped. | |
Lancaster,
England Lancashire United Kingdom |
Shefferlands Roundabout: A683 (Bay Gateway) / M6 Ramps / (connector to Halton Rd.) (54.07689, -2.77417) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Preston,
England Lancashire United Kingdom |
Broughton Roundabout: M55 Ramps / A6 (Garstang Rd.) / James Towers Way (53.80085, -2.71677) |
Signalized Roundabout/Circle Existing |
Signal Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
||
Ribbleton,
England Lancashire United Kingdom |
Samlesbury Interchange: M6 Ramps / A59 (Preston New Rd.) (53.76513, -2.63610) |
Signalized Roundabout/Circle Existing |
Signal None |
5 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |