29820 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
New Castle, DE
New Castle Co.
United States
Airport Rd. / I-95 NB Exit Ramp
(39.69593, -75.61570)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://www.facebook.com/FirstStateUpdate1/photos/-i-95-offramp-to-airport-road-has-re-opened-after-new-roundabout-installed-/1135316878598748/?_rdr
Oak Level Township, NC
Nash Co.
United States
N Old Carriage Rd. / US 64 EB Ramps
(35.98033, -77.89689)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html
Oak Level Township, NC
Nash Co.
United States
N Old Carriage Rd. / US 64 WB Ramps
(35.98205, -77.89806)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
51.8160
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html
Findlay, OH
Hancock Co.
United States
US 68 / SR 15 EB Ramps / CR 80
(40.98862, -83.65067)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 New exit ramp from SR 15 coming in from the east. Former exit ramp from SR 15 (from the west) is now connected to County Road 80. https://wfin.com/local-news/opening-of-new-findlay-roundabout-pushed-back-a-few-days/ .
Lincoln, NE
Lancaster Co.
United States
Jamaica Ave. / SR 2 WB Ramps
(40.69198, -96.67250)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
57.9120
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped.
LIncoln, NE
Lancaster Co.
United States
Jamaica Ave. / SR 2 EB Ramps
(40.69029, -96.67110)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
57.9120
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped.
Syracuse, NY
Onondaga Co.
United States
E Brighton Ave. / E Glen Ave. / I-481 WB Exit Ramp / I-81 NB Entrance Ramp
(43.00895, -76.13260)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2024 https://dailyorange.com/2024/09/new-york-transportation-completes-syracuse-roundabout/
Green Oak Township, MI
Livingston Co.
United States
Whitmore Lake Rd. / Silver Lake Rd. / US 23 SB Ramps
(42.46683, -83.75719)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
1 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024
Lodi, WI
Columbia Co.
United States
STH 60 / I-90 WB Ramps
(43.33575, -89.45242)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174.
Lodi, WI
Columbia Co.
United States
STH 60 / I-90 EB Ramps
(43.33478, -89.45497)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Placed PARCLO B interchange ramps with diamond ramps. https://x.com/WisconsinDOT/status/1811030212756357174
Valdosta, GA
Lowndes Co.
United States
SR 31 (Madison Hwy.) / I-75 NB Ramps
(30.75206, -83.27321)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2025 https://valdostatoday.com/news-2/local/2025/02/lowndes-i75-exit-11-traffic-to-begin-using-roundabouts/
Valdosta, GA
Lowndes Co.
United States
SR 31 (Madison Hwy.) / I-75 SB Ramps
(30.75023, -83.27416)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2025 https://valdostatoday.com/news-2/local/2025/02/lowndes-i75-exit-11-traffic-to-begin-using-roundabouts/
Lake Park, GA
Lowndes Co.
United States
Lake Park Bellville Rd. / I-75 NB Ramps
(30.64409, -83.18847)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2022 https://wfxl.com/news/local/traffic-pattern-change-expected-in-lowndes-county-on-i-75-exit-2
Lake Park, GA
Lowndes Co.
United States
Lake Park Bellville Rd. / I-75 SB Ramps
(30.64297, -83.18993)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2022 https://wfxl.com/news/local/traffic-pattern-change-expected-in-lowndes-county-on-i-75-exit-2
Evergreen, CO
Clear Creek Co.
United States
US 40 / Homestead Rd. / I-70 WB Entrance Ramp
(39.72195, -105.40944)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Through bypass lane on east leg. Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects.
(unincorporated), CO
Jefferson Co.
United States
US 40 / CR 65 / I-70 WB Exit Ramp
(39.71621, -105.39166)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects.
Napa, CA
Napa Co.
United States
Soscol Ferry Rd. / SR 221 / SR 12 EB Ramps
(38.24117, -122.26975)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.2440
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction
Napa, CA
Napa Co.
United States
SR 221 (Napa Vallejo Hwy.) / SR 12 WB Entrance Ramp
(38.24207, -122.26930)
Roundabout
Existing
All-Way Yield
None
2 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/soscol-junction
New Ulm, MN
Nicollet Co.
United States
CSAH 37 / US 14 WB Ramps
(44.30186, -94.42165)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).
New Ulm, MN
Nicollet Co.
United States
CSAH 37 / US 14 EB Ramps
(44.30098, -94.42365)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
44.1960
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).