City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Indianapolis,
IN Marion Co. United States |
W County Line Rd. / N Bluff Rd. / I-69 (SR 37) NB Ramps (39.63481, -86.20389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). |
Innisfil,
ON Simcoe Canada |
6th Line / Webster Blvd. (44.28848, -79.55307) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2020). |
North Leeds,
WI Columbia Co. United States |
US 51 / STH 22 / STH 60 (43.33205, -89.32536) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.channel3000.com/roundabout-at-us-51-state-highways-22-and-60-in-columbia-county-to-open-thursday/pic/4787689/ |
Westfield,
IN Hamilton Co. United States |
E 191st St. / Chad Hittle Dr. (40.06468, -86.13217) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.westfield.in.gov/egov/apps/document/center.egov?view=item;id=3499#:~:text=191st%20Street%20and%20Chad%20Hittle%20Drive%20Roundabout https://mobile.twitter.com/TravelWestfield/status/1580319271162290176 |
Delta,
BC Greater Vancouver Canada |
Nordel Way / Highway 91 Connector EB Ramps / Frontage Rd. (49.14617, -122.94689) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Merging right-turn bypass lane on east leg; add-lane right-turn bypass lane on south leg. |
Monroe,
NC Union Co. United States |
Unionville Indian Trail Rd. W / Sardis Church Rd. (35.07154, -80.62123) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Yield-controlled right-turn bypass lanes on northwest and northeast legs. Driveway is exit from school parking lot; https://www.youtube.com/watch?v=r2sUo7XnTOU |
Concord,
NH Merrimack Co. United States |
US 4 (Old Boyce Rd.) / Whitney Rd. / Hoit Rd. (43.28906, -71.58169) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.concordmonitor.com/A-Canterbury-homeowner-enjoys-the-storm-before-the-calm-47736538 |
Morristown,
NJ Morris Co. United States |
Morris St. / Spring St. (40.79761, -74.47800) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://nj1015.com/hows-the-new-circle-in-morristown-nj-youd-be-surprised/ |
Lincoln,
CA Placer Co. United States |
E Joiner Pkwy. / Fieldstone Dr. (38.84770, -121.28659) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on northwest leg. https://www.lincolnca.gov/en/our-government/east-joiner-parkway-widening-project.aspx |
Big Bear Lake,
CA San Bernardino Co. United States |
Moonridge Rd. / Elm St. (34.24075, -116.87464) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.youtube.com/watch?v=wfZy_7SYJvg (starts at 1:10) |
Big Bear Lake,
CA San Bernardino Co. United States |
Moonridge Rd. / Rathbun Dr. / Club View Dr. (34.23967, -116.86952) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Peanut shaped. https://www.youtube.com/watch?v=wfZy_7SYJvg (starts at 2:10) |
Holly Springs,
GA Cherokee Co. United States |
Hickory Rd. / Betty Barrett Way (34.17294, -84.49807) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | North leg stubbed. |
Arlington,
WA Snohomish Co. United States |
SR 531 (172nd St. NE) / 43rd Ave. NE (48.15231, -122.17230) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.arlingtonwa.gov/758/43rd-Ave-SR-531-172nd-St-Roundabout |
Rolla,
MO Phelps Co. United States |
US 63 (N Bishop Ave.) / University Dr. (37.95373, -91.77712) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Entrance to Missouri S&T campus. http://moverollatdd.com/university-drive-realignment/ |
Orange Township,
OH Delaware Co. United States |
E Powell Rd. / Lyra Dr. / Mesloh Dr. (40.15631, -82.97132) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.delgazette.com/news/98988/roundabout-completed-in-orange |
Windsor,
CO Larimer Co. United States |
CR 5 / Westgate Dr. / E CR 32 E (40.48667, -104.98201) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Windsor,
CO Larimer Co. United States |
CR 5 / Oakmont St. / Oakmont Ln. (40.48214, -104.98213) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Salem,
NH Rockingham Co. United States |
Tuscan Blvd. / S Village Dr. (42.76904, -71.22519) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | In a mixed-use development called Tuscan Village. |
Salem,
NH Rockingham Co. United States |
Tuscan Blvd. / (unknown) (42.77007, -71.22693) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | In a mixed-use development called Tuscan Village. |
Meridian,
ID Ada Co. United States |
E Lake Hazel Rd. / S Locust Grove Rd. (43.54644, -116.37449) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2021-2022). |
Noblesville,
IN Hamilton Co. United States |
SR 32 (Westfield Rd.) / SR 38 (Sheridan Rd.) / (Riverview Health Center entrance) (40.04704, -86.02480) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.cityofnoblesville.org/topic/subtopic.php?topicid=540&structureid=1 |
Noblesville,
IN Hamilton Co. United States |
SR 32 (Westfield Rd.) / River Rd. (40.04704, -86.02793) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
https://www.cityofnoblesville.org/topic/subtopic.php?topicid=540&structureid=1 | |
Sioux Falls,
SD Minnehaha Co. United States |
N Granite Ln. / N Granite Ct. (43.60869, -96.76803) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2015 | |
Independence,
MN Hennepin Co. United States |
US 12 / (connector to CR 92) (45.02786, -93.72138) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Previously, CR 92 intersected US 12 at two at-grade, stop-controlled locations. Now one of those is an overpass with a side road connecting to this roundabout, which is in between the two previous intersections. The other previous intersection has been removed and the county road realigned to meet the overpass. https://www.hennepin.us/county-road-92-safety |
Independence,
MI Oakland Co. United States |
S Baldwin Rd, / Clarkston Rd. / W Clarkston Rd. (42.76543, -83.31409) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Elliptical shaped. Opened August 2024. https://www.rcocweb.org/675/Baldwin-RoadClarkston-Road-Roundabout-Op |
Redding,
CA Shasta Co. United States |
S Bonnyview Rd. / Bechelli Ln. (40.53910, -122.35470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Serves as a primary intersection for a Costco store. https://krcrtv.com/news/local/south-bonnyview-and-bechelli-lane-roadabout-update |
Guaynabo,
PR Frailes United States |
Avenida los Filtros / Calle de Varona / Calle Chevrolet (18.37257, -66.13019) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | |
Welkom,
Free State Lejweleputswa South Africa |
Buiten St. / Reinet St. / (shopping centre entrance) (-27.97778, 26.73645) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Nkoane St. / A Phakathi Dr. (-27.96295, 26.80997) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 65.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Liberty Township,
OH Butler Co. United States |
Veterans Blvd. / Bell Blvd. (39.37220, -84.35684) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 54.8637 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | New road, Veterans Blvd, constructed for new development. |
Liberty Township,
OH Butler Co. United States |
Veterans Blvd. / Reagan Way (39.37030, -84.35617) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 54.8637 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | New roundabout on new alignment, Veterans Blvd, constructed for new commercial development (Costco). |
Farmington Hills,
MI Oakland Co. United States |
Orchard Lake Rd. / (shopping center entrances) (42.52448, -83.35994) |
Roundabout Existing |
All-Way Yield Pedestrian Hybrid Beacon (PHB, HAWK) |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Guaynabo,
PR Frailes United States |
Carretera Acueducto (PR 833) / Calle Príncipe de Asturias (Avenida los Filtros) (18.37477, -66.13139) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | |
Guaynabo,
PR Santa Rosa United States |
Calle Príncipe de Asturias (Las Cumbres Avenida) / Rey Arturo (18.36337, -66.12522) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | |
Charlottetown,
PE Queens Canada |
St Peters Rd. / Belvedere Ave. / Falconwood Dr. / Brackley Point Rd. (46.25888, -63.11950) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://twitter.com/ChtownPE/status/1601305941785264128?cxt=HHwWgICqzaPR_bgsAAAA https://www.saltwire.com/atlantic-canada/news/major-charlottetown-roundabout-project-to-begin-in-july-100733988/ |
Plateau,
WA King Co. United States |
Auburn Way / (school entrance) / (parking) (47.28822, -122.18165) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Entrance to Chinook elementary school. |
Whittlesford,
England Cambridgeshire United Kingdom |
Hunts Road Roundabout: A505 / Hunts Rd. (52.10111, 0.14380) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Menasha,
WI Winnebago Co. United States |
Racine St. / Main St. (44.20131, -88.44619) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://fox11online.com/news/state/wisconsin-roundabouts-traffic-intersections-lee-rodegerdts-washington-post-analysis-data-study Image of this roundabout is the 2nd picture in the set of 5 at the top of the page. |
(unincorporated),
WI Dane Co. United States |
US 14 / STH 92 / Biglow Rd. (42.85434, -89.34080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.channel3000.com/u-s-highway-14-to-close-between-oregon-brooklyn-starting-next-week/ |
West Lake Stevens,
WA Snohomish Co. United States |
SR 9 / S Lake Stevens Rd. (47.97461, -122.10273) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.tiktok.com/@j_will_entrepreneur/video/7151997176799939883?is_from_webapp=v1&item_id=7151997176799939883 |
Varberg,
Halland County Varberg Sweden |
Rte 153 (Värnamovägen) / Österleden (57.12319, 12.28811) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Built as a roundabout with four single lane approaches at or before 2008. Widened and has since 2018 three approaches with double entry lanes. Two of those approaches have separate islands between the approach lanes. |
Buena Vista,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 SB Ramps (43.41453, -83.89324) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on north leg. Replaced cloverleaf interchange. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Saginaw,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 NB Ramps (43.41447, -83.88874) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Replaced cloverleaf interchange. Merging right-turn bypass lane on east leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 96th St. (39.26747, -94.55716) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | East leg stubbed. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Platte Co. United States |
Line Creek Pkwy. / Tiffany Springs Rd. (39.25957, -94.61010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Kansas City,
MO Clay Co. United States |
N Booth Ave. / NE Shoal Creek Valley Dr. / Commercial Dr. (39.24626, -94.47674) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Yield-controlled right-turn bypass lane on west leg. Year Completed estimated (2020-20210. |
San Juan Bautista,
CA San Benito Co. United States |
SR 156 (San Juan Hollister Rd.) / Bixby Rd. (36.84096, -121.49042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 68.2749 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
ICD 224 ft x 211 ft. Anticipated opening year in 2025. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
Moses Lake,
WA Grant Co. United States |
SR 17 / Grape Dr. (47.14957, -119.29411) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://wsdot.wa.gov/construction-planning/search-projects/sr-17-grape-drive-intersection-improvements https://columbiabasinherald.com/news/2022/sep/06/grape-dr-roundabout-nears-completion/ |
Steamboat Springs,
CO Routt Co. United States |
Mount Werner Dr. / Steamboat Blvd. / Bangtail Way (40.45897, -106.81287) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.engagesteamboat.net/roundabout |
Meridian,
ID Ada Co. United States |
S Vanguard Way / S Wayfinder Ave. / (parking) (43.59800, -116.43116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Right-turn-only lane on northeast leg. |
Missoula,
MT Missoula Co. United States |
Mullan Rd. / Mary Jane Blvd. (46.88725, -114.05372) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. / Grove Dr. (53.55573, -113.86097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / 218th St. NW (53.52741, -113.69339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / (unknown) (53.52650, -113.70143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2019). |
Langford,
BC Capital Canada |
Millstream Rd. / Bear Mountain Pkwy. (48.47140, -123.50526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Weddington,
NC Union Co. United States |
Weddington-Matthews Rd. (SR 1344) / Tilley Morris Rd. (SR 1345) / (school access) (35.05645, -80.73426) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.constructionjournal.com/projects/details/9adae8f3933146738feedddda9e51146.html |
Cinnaminson,
NJ Burlington Co. United States |
Cinnaminson Ave. / Calhoun St. (39.98910, -75.01095) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Year Completed estimated (2007-2008). |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 WB Exit Ramp (38.87982, -77.26743) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaces full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 EB Exit Ramp (38.87714, -77.26629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaced full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Troy,
NY Rensselaer Co. United States |
US 4 (N Greenbush Rd.) / Williams Rd. (Rte 136) / Glenmore Rd. (42.69219, -73.68692) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lanes on north and east legs. Year Completed estimated (2021-2022). |
Jenks,
OK Tulsa Co. United States |
S 1st St. / (parking) (36.01555, -95.96640) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | At-grade rail crossing approximately 270 ft on northwest leg. Year Completed estimated (2016-2017). |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Old Hollow Rd. (NC 66) (36.19481, -80.25493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) EB Ramps (36.19637, -80.25492) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | Opened in 2021 temporarily as single lane. Converted to 2x1 in 2022. https://malmeroads.net/i7374nc/i74seg4.html |
Winston-Salem,
NC Forsyth Co. United States |
Germanton Rd. (NC 8) / Winston-Salem Northern Beltway (NC 74) WB Ramps (36.19956, -80.25396) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | https://malmeroads.net/i7374nc/i74seg4.html |
Brownsburg,
IN Hendricks Co. United States |
S Green St. / Airport Rd. (39.82142, -86.40107) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://twitter.com/BrownsburgIN/status/1552378297249677312 |
Avon,
IN Hendricks Co. United States |
E CR 100 S / (unknown) (39.74854, -86.36651) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Only two legs finished as of June 2022, but it looks like north and south legs will be added. |
Avon,
IN Hendricks Co. United States |
E CR 100 S / Allpoints Ct. (39.74893, -86.34938) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Fort Wayne,
IN Allen Co. United States |
Union Chapel Rd. / Parkview Plaza (41.20002, -85.10064) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.fwbusiness.com/fwbusiness/article_f4f95c16-cf7f-5063-b7fa-31833acc622f.html |
Vétraz-Monthoux,
Auvergne-Rhône-Alpes Haute-Savoie France |
D1206 / Chemin des Trois Noyers / Chemin de la Loex (46.17940, 6.24488) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Reduced from 2x2 to 2x1 in 2016-2018. | |
Annemasse,
Auvergne-Rhône-Alpes Haute-Savoie France |
D1206 (Route de Thonon) / Rue des Esserts (46.19665, 6.26440) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Ville-la-Grand,
Auvergne-Rhône-Alpes Haute-Savoie France |
D1206 (Route de Thonon) / D150 (Rue des Voirons) (46.20048, 6.27516) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
||
Nampa,
ID Canyon Co. United States |
Ustick Rd. / Santa Ana Ave. (43.63404, -116.60317) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Near two schools. |
Sarasota,
FL Sarasota Co. United States |
Coburn Rd. / (unknown) (27.33715, -82.43697) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Yield-controlled right-turn bypass lane on north leg. Right-turn-only lane on east leg. |
Cedar Falls,
IA Black Hawk Co. United States |
W Ridgeway Ave. / Goldfinch Dr. (42.46945, -92.44998) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2018-2020). |
Stonecrest,
GA DeKalb Co. United States |
GA 212 (Browns Mill Rd.) / Salem Rd. (33.67657, -84.18566) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Smyrna,
GA Cobb Co. United States |
Belmont Blvd. / Belmont Pl. SE (33.89147, -84.52132) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Lane changes required for through movements or left turns to circulate or exit. |
Duluth,
GA Gwinnett Co. United States |
Infinite Energy Center / (parking access) (33.99070, -84.09148) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | |
Alpharetta,
GA Fulton Co. United States |
Lakeview Pkwy. / Lake St. / (parking) (34.05755, -84.29142) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Dublin,
OH Franklin Co. United States |
Shier Rings Rd. / (parking) / (parking) (40.09514, -83.16281) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Dublin,
OH Franklin Co. United States |
Shier Rings Rd. / University Blvd. (40.09553, -83.16594) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://dublinohiousa.gov/construction-updates/university-boulevard-phase-2-construction/ |
Dublin,
OH Franklin Co. United States |
University Blvd. / (unknown) (40.09681, -83.16949) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | University Blvd was re-aligned to this location. https://dublinohiousa.gov/construction-updates/university-boulevard-phase-2-construction/ |
St Cloud,
MN Stearns Co. United States |
33rd St S. / Oak Grove Rd. (CR 136) (45.51515, -94.19881) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2020-2021). |
Gulfport,
MS Harrison Co. United States |
20th Ave. / Jones Park Dr. (30.36646, -89.08605) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
Pedestrian access to central island. | |
Foley,
AL Baldwin Co. United States |
S OWA Blvd. / Midtown Village Blvd. / (unknown) (30.37156, -87.65917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | Unsigned and unmarked left-turn-only trap lane on east leg. 2022 or earlier (SV) |
Calgary,
AB Division 6 Canada |
128th Ave. NE / Cornerstone St. NE (51.16538, -113.94244) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | North leg stubbed. |
Calgary,
AB Division 6 Canada |
Nose Hill Dr. NW / Haskayne Dr. NW / Rosemont Blvd. NW (51.10814, -114.26887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
McCall Way NE / Barlow Trl. NE (51.10221, -114.00061) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Year Completed estimated (2008-2011). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Buffalo Run Blvd. / 130 Ave. SW / Tsuut'ina Trl. SB Entrance Ramp (50.93654, -114.14333) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Raindrop shaped. Merging right-turn bypass lane on west leg. Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
194 Ave. SE / Wolf Willow Blvd. SE (50.87758, -114.00378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / 212 Ave. SE / Union Ave. / Seton Cir. SE (50.86832, -113.95356) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / Seton Ave. SE (50.87133, -113.95589) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Lethbridge,
AB Division 2 Canada |
Metis Trl. W / Temple Blvd. W (49.66881, -112.89288) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Woodburn,
OR Marion Co. United States |
OR 219 / Butteville Rd. (45.15079, -122.89405) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Yield-controlled right-turn bypass lane on west leg. South leg realigned with roundabout. Serves large warehouse. |
American Fork,
UT Utah Co. United States |
N 4850 W / 620 S (40.36393, -111.77437) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Interim configuration with north, south, and west legs only. Right-turn-only lane on west leg and striped out receiving lane in circulatory roadway. Two circulating lanes on north leg in interim configuration. Year Completed estimated (2021-2022). |
Colorado Springs,
CO El Paso Co. United States |
Peak Innovation Pkwy. / Integration Loop (38.77922, -104.71029) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Yield-controlled right-turn bypass lanes on north and south legs. Add-lane right-turn bypass lanes on east and west legs. Year Completed estimated (2020-2021). |
Meridian,
ID Ada Co. United States |
S Eagle Rd. / E Zaldia Dr. / E Zaldia St. (43.56661, -116.35440) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
Berthoud,
CO Weld Co. United States |
CO 56 / I-25 SB Ramps (40.30636, -104.98169) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2021 | https://www.codot.gov/news/2021/november-2021/co56-i25-reopens-early |
Thornton,
CO Adams Co. United States |
Grant St. / E 141 Pl. (39.95214, -104.98286) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | West leg added 2022-2023. |