City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Cabocan,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (unknown) (16.61556, -22.91791) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Honselersdijk,
South Holland Westland Netherlands |
N213 / Bosweg / Boswoning (52.00587, 4.21178) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Turbo-roundabout. | |
Le Boulou,
Occitanie Pyrénées-Orientales France |
D115 / A9-E15 Ramps / El place (42.52147, 2.81713) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
D115 / D900 (42.52064, 2.80619) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Le Boulou,
Occitanie Pyrénées-Orientales France |
Rond-Point de l'Ordre National du Mérite: D115 / D618 / Boulevard du Maréchal Foch / Zone de l'Autoport / Route de Céret (42.52102, 2.82225) |
Roundabout Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
D900 / (unknown) (42.52540, 2.80615) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Seclin,
Hauts-de-France Nord France |
Rond-Point de l'Épinette: M549 (Route d'Avelin) / M925 / Avenue de l'Épinette (50.54807, 3.04859) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Lakewood Ranch,
FL Sarasota Co. United States |
Deer Dr. / Pine Warbler Pl. (27.36678, -82.41850) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2018 | South leg has no lane use designations but has only one receiving circulating lane. Year Completed estimated (2017-2018). |
Parker,
CO Douglas Co. United States |
Lincoln Meadows Pkwy. / S Twenty Mile Rd. (39.53380, -104.77565) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2004 | Year Completed estimated (2003-2004). |
Calgary,
AB Division 6 Canada |
104 Ave. NE / 42 St. NE (51.14721, -113.97406) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | |
Cedar Falls,
IA Black Hawk Co. United States |
Greenhill Rd. / Cedar Heights Dr. (42.49805, -92.41128) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | Year Completed estimated (2021-2022). |
Pine Bluff,
AR Jefferson Co. United States |
US 63-US 79-SR 15 (Market St.) / Saracen Resort Dr. (34.21292, -91.96112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0560 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2020 | Double left turn on north and south legs. |
Texarkana,
TX Bowie Co. United States |
Gibson Ln. / University Ave. (33.45836, -94.11277) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | https://www.texarkanagazette.com/news/2022/aug/12/gibson-lane-extension-completed-after-delays/?redirect=/news/2022/aug/12/gibson-lane-extension-completed-after-delays/ |
Liberty Township,
OH Butler Co. United States |
SR 129 / Cox Rd. / Veterans Blvd. (39.37289, -84.36015) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 62.4840 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | New roundabout partially opened in November 2022. Full operation is scheduled in mid-December 2022. SR 129 highway was extended to Cox Road (local road) and new alignment (Veterans Blvd) was constructed to help alleviate traffic congestion and safety issues involving Liberty Way interchange with I-75. |
Matjhabeng,
Free State Lejweleputswa South Africa |
M4 / R730 (-27.94903, 26.79691) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 90.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
R730 / Craib Ave. (-27.93720, 26.78769) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 92.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Tempest Rd. / Jan Hofmeyr Rd. (-27.97304, 26.73351) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Tempest Rd. / Volks Rd. (-27.97033, 26.73479) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 70.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Tempest Rd. / Constantia Rd. (-27.96443, 26.73962) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 70.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Tempest Rd. / Ararrat Rd. / King St. (-27.96515, 26.75022) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 90.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Constantia Rd. / Arrarat Rd. / Strand St. / Fischer St. (-27.96940, 26.74816) |
Roundabout Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways 90.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
M1 (Koppie Alleen Rd.) / Constantia Rd. / Nourse St. / Honeyball St. (-27.97482, 26.76292) |
Roundabout Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways 120.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Constantia Rd. / Power Rd. (-27.97531, 26.77441) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 80.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
R73 (Jan Hofmeyr Rd.) / Power Rd. (-27.98121, 26.77359) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 70.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Long Rd. / Tempest Rd. (-27.98296, 26.72778) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 100.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Elliptical shaped. ICD = 100 m x 70 m | |
Matjhabeng,
Free State Lejweleputswa South Africa |
Long Rd. / Meulen St. (-27.98423, 26.73138) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 86.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Welkom,
Free State Lejweleputswa South Africa |
Long Rd. / Toronto Rd. (-27.98583, 26.73561) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 85.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Welkom,
Free State Lejweleputswa South Africa |
M4 (State Way) / Arrarat Rd. (-27.98200, 26.74216) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Welkom,
Free State Lejweleputswa South Africa |
M4 (State Way) / Buiten St. / Box St. (-27.97955, 26.73565) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 70.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
M4 (State Way) / Tempest Rd. (-27.97822, 26.73207) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 86.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
M1 (Koppie Alleen Rd.) / M4 (State Way) (-27.98715, 26.75585) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 87.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Koppie Alleen Rd. / Long Rd. (-27.99266, 26.74879) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 90.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
State Way / 3rd St. (-27.99058, 26.75894) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Toronto Rd. / Lategan Rd. / Badenhorst St. (-27.99112, 26.73164) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 90.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Tempest Rd. / Lategan Rd. / Othello Rd. (-27.98639, 26.72604) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 84.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Macbeth Rd. / Othello Rd. (-27.98684, 26.71199) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 85.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
M1 (Koppie Alleen Rd.) / Jan Hofmeyr Rd. / Volks Rd. (-27.98289, 26.76217) |
Roundabout Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways 115.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Matjhabeng,
Free State Lejweleputswa South Africa |
Arrarat Rd. / Jan Hofmeyr Rd. (-27.97720, 26.74448) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 90.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Bayonne,
NJ Hudson Co. United States |
Avenue E / I-78 Ramps (40.68260, -74.09906) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2018 | Roundabout centered under I-78 freeway ramps. Year Completed estimated (2017-2018). |
Greenwood,
IN Johnson Co. United States |
Valley Ln. / Centerbrook Trace (Victory Dr.) / (parking) (39.57616, -86.19095) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2018 | Concentric striped circulatory roadway in all quadrants with only one two-lane entry (west leg) and two-lane exit (north leg). |
Lakewood Ranch,
FL Manatee Co. United States |
Crossland Trl. / Silver Falls Run (27.43461, -82.41965) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2018 | |
Lakewood Ranch,
FL Manatee Co. United States |
Crossland Trl. / New Haven Blvd. (27.43743, -82.41733) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 58.5216 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | |
Toa Alta,
PR Contorno United States |
PR 165 / PR 165R / Calle 1 (18.39162, -66.25352) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | Northeast and southeast legs approaches have painted splitter islands. Year Completed estimated (2004-2006). |
West Chicago,
IL DuPage Co. United States |
Technology Blvd. / Discovery Dr. / Innovation Dr. (north) (41.87817, -88.25418) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Year Completed estimated (2005-2006). |
West Chicago,
IL DuPage Co. United States |
Technology Blvd. / Discovery Dr. / Innovation Dr. (south) (41.87416, -88.25731) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Year Completed estimated (2005-2006). |
Buckeye,
AZ Maricopa Co. United States |
W Westpark Loop / W Lower Buckeye Rd. (33.42018, -112.60342) |
Rotary Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2005 | Concentric striped circulatory roadway. Lane change required for driver making movement from left lane of northeast entry to the southeast exit. |
Rushden,
England Northants United Kingdom |
A6 / A5028 (John Clark Way) (52.30021, -0.58320) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Concentric striped circulatory roadway. | |
Saint Lucie West,
FL St. Lucie Co. United States |
NW Courtyard Cir. / (unknown) (27.31244, -80.40819) |
Other Existing |
All-Way Stop Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Saint Lucie West,
FL St. Lucie Co. United States |
NW Courtyard Cir. / (parking) (27.31400, -80.41023) |
Other Existing |
All-Way Stop Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Pedestrian access to central island. | |
Whangarei,
Northland Whangarei District New Zealand |
SH 1-SH 15 / Loop Rd. (-35.78059, 174.30783) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Salem,
NH Rockingham Co. United States |
Tuscan Blvd. / Artisan Dr. (42.77110, -71.22775) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2020 | In a mixed-use development called Tuscan Village. |
Fredericton,
NB York Canada |
Rte 105 (Ring Rd.) / Brookside Dr. (45.99016, -66.65182) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | https://www.youtube.com/watch?v=ZmnmNNx1cpA |
Cambridge,
ON Waterloo Canada |
Dundas St. / Beverly St. (43.36588, -80.30592) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | https://www.therecord.com/local-cambridge/news/2022/09/10/what-s-going-on-here-beverly-and-dundas-streets-in-cambridge.html |
Carmel,
IN Hamilton Co. United States |
E 116th St. / S Rangeline Rd. / Westfield Blvd. (39.95661, -86.12675) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Opened August 22, 2022. http://carmellink.com/project.php?title=116th%20Street%20and%20Range%20Line%20Road%20Roundabout |
Laurel,
MS Jones Co. United States |
Sawmill Rd. / Sixth Ave. / Central Ave. (31.69357, -89.13285) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Central Ave is one-way exiting roundabout. http://laurelmainstreet.com/tag/roundabout/ |
Winona,
MN Winona Co. United States |
US 14-US 61 / STH 43 (44.02956, -91.62216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | https://www.youtube.com/watch?v=xA9c17OwsGk |
Baton Rouge,
LA East Baton Rouge Par. United States |
Stumberg Ln. / Womans Way (30.38264, -91.03593) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2012 | Year Completed estimated (2011-2013). |
Celina,
TX Collin Co. United States |
Choate Pkwy. / Kinship Pkwy. (33.29258, -96.76976) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | Interim scenario - ultimate lane configuration striped out on initial build. |
Prosper,
TX Collin Co. United States |
Richland Blvd. / S Coleman St. (33.22432, -96.80275) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2020 | |
Vestal,
NY Broome Co. United States |
Glenn G Bartle Dr. / West Dr. (42.09200, -75.96836) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Concentric striped circulatory roadway. | |
Fort Worth,
TX Tarrant Co. United States |
Keller Haslet Rd. / (connector to Alliance Gateway Fwy. WB Frontage Road) / (parking) (32.97209, -97.28930) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | |
Richmond,
TX Fort Bend Co. United States |
Texas Heritage Pkwy. / (unknown) (29.68788, -95.87474) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | |
Katy,
TX Waller Co. United States |
Pederson Rd. / (unknown) (29.77246, -95.88083) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | |
Capitol Heights,
MD Prince George's Co. United States |
Hampton Park Blvd. (38.87175, -76.85022) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2007 | Yield signs but no entrance line or yield lines. |
Clinton Township,
MI Macomb Co. United States |
Partridge Creek Blvd. / Scoter Ln. / Montage (42.62068, -82.94597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Opened with unstriped circulatory roadway. Marked with two circulating lanes throughout even though side streets are single-lane entries. Combination of concentric and exit striping added 2019-2020. |
Clinton Township,
MI Macomb Co. United States |
Partridge Creek Blvd. / Hawk Ln. / Montage (42.62063, -82.94027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Opened with unstriped circulatory roadway. North leg added 2015-2016. Marked with two circulating lanes throughout even though side streets are single-lane entries. Combination of concentric and exit striping added 2019-2020. |
Banja Luka,
Serb Republic Banja Luka Bosnia and Herzegovina |
Knjaza Miloša / Ivana Gorana Kovacica (44.78744, 17.20575) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Banja Luka,
Serb Republic Banja Luka Bosnia and Herzegovina |
E661 / Ivana Gorana Kovacica / Marije Dimic (44.79064, 17.19908) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Banja Luka,
Serb Republic Banja Luka Bosnia and Herzegovina |
Bulevar Srpske Vojske / Olimpijskih pobjednika (44.77883, 17.20638) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Banja Luka,
Serb Republic Banja Luka Bosnia and Herzegovina |
Bulevar vojvode Petra Bojovića / Bulevar vojvode Stepe Stepanovića (44.76639, 17.20923) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Westfield,
IN Hamilton Co. United States |
E 161st St. / Westfield Blvd. / S Union St. (40.02203, -86.12753) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | Opened August 1, 2022. |
Chillicothe,
IL Peoria Co. United States |
N Old Galena Rd. / N State St. (40.83312, -89.56268) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | Merging right-turn bypass lane on north leg. Year Completed estimated (2013-2016). |
Hemel Hempstead,
England Herts United Kingdom |
A4146 (Leighton Buzzard Rd.) / Queensway / Warners End Rd. (51.75713, -0.47560) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Left-turn-only lanes on all legs. | |
Falun,
Dalarna County Falu kommun Sweden |
Gruvrondellen: E16 / Gruvgatan (60.60195, 15.62015) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 65.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Completed before 2010. |
Falun,
Dalarna County Falu kommun Sweden |
Gruvgatan / Hyttgatan (60.60352, 15.62607) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Completed before 2006. |
Falun,
Dalarna County Falu kommun Sweden |
Gruvgatan / Engelbrektsgatan (60.60416, 15.62822) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2010 | Constructed before 2010. |
Brodheadsville,
PA Monroe Co. United States |
US 209 / SR 115 / Rodenbach Ln. (40.92314, -75.39917) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | |
Hemel Hempstead,
England Herts United Kingdom |
A414 (Saint Albans Rd.) / Jarman Way (51.74980, -0.45562) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Through bypass lane on west leg. | |
Cambridge,
ON Wellington Canada |
Hespeler Rd. / Kossuth Rd. / CR 124 / (unknown) (43.47206, -80.30539) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2019 | Year Completed estimated (2018-2019). |
McKinney,
TX Collin Co. United States |
Wilmeth Rd. / Lake Forest Dr. (33.23242, -96.67934) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2025 | |
McKinney,
TX Collin Co. United States |
Wilmeth Rd. / Hardin Blvd. (33.23223, -96.65209) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2025 | |
Brant,
ON Brant Canada |
Rest Acres Rd. / Hutchings Rd. (43.16711, -80.37922) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Right-turn-only lane and three-lane pedestrian crossing on south leg. |
Johnstown,
CO Weld Co. United States |
SH 60 / Gateway Cir. (40.33527, -104.98559) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 59.4360 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Primary access to large travel and fuel center. Year Completed estimated (2023-2024). |
Falun,
Dalarna County Falu kommun Sweden |
Korsnäsvägen / Kungsgårdsvägen (60.59940, 15.66827) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2006 | Completed before 2006. |
Atlanta,
GA DeKalb Co. United States |
Maynard Terrace SE / McPherson Ave. / I-20 EB Exit Ramp (33.74396, -84.33482) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2025 | |
Hurricane,
UT Washington Co. United States |
S Sand Hollow Rd. / Gateway Blvd. (37.16339, -113.37305) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 82.2960 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2025 | Add-lane right-turn bypass lane on north leg. Merging right-turn bypass lane on west leg. |
Memphis,
TN Shelby Co. United States |
US 70 (W Eh Crump Blvd.) / Riverside Dr / I-55 Ramps / W Alston Ave. (35.12483, -90.06723) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
5 Approaches 0 Driveways 73.1520 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2025 | Replaced three-quadrant cloverleaf interchange. At-grade rail crossing 430 ft to the east. https://www.youtube.com/watch?v=7DjkNBuVjlo |
Tumalo,
OR Deschutes Co. United States |
US 20 / O.B. Riley Rd. / Cook Ave. (44.14548, -121.33124) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | https://www.youtube.com/watch?v=d52_QDGjjIE |
Bossier City,
LA Bossier Par. United States |
Walter O. Bigby Carriageway / Hamilton Rd. (32.52940, -93.72630) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.shreveporttimes.com/story/news/local/2024/10/01/walter-o-bigby-carriageway-opens-in-bossier-city/75455416007/ |
Bossier City,
LA Bossier Par. United States |
Walter O. Bigby Carriageway / Shed Rd. (32.53213, -93.72376) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.shreveporttimes.com/story/news/local/2024/10/01/walter-o-bigby-carriageway-opens-in-bossier-city/75455416007/ |
Smiths Grove,
KY Warren Co. United States |
KY 101 (Smiths Grove-Scottsville Rd.) / (parking) (37.03988, -86.21051) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Right-turn bypass lane on north leg. Double left turn on west leg. https://www.wnky.com/kytc-announces-smiths-grove-road-projects-near-buc-ees/ |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Allisonville Rd. (39.92704, -86.06626) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Replaced intersection that used "Michigan Lefts" on the border between Fishers in Hamilton County and Indianapolis in Marion County. Fully open in late October 2024. https://fishersin.gov/next-chapter/allisonville-road-corridor-revitalization/96th-st-allisonville-rd-roundabout/ |
San Juan,
San Juan Oriente Barrio Puerto Rico |
Calle A (Marginal Rd.) / Hwy 17 EB Entrance Ramp (18.40897, -66.02947) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 44.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2014 | Concentric striped circulatory roadway. |
Hilliard,
OH Franklin Co. United States |
Scioto Darby Rd. / Cosgray Rd. (40.03280, -83.17834) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://x.com/HilliardGov/status/1844542579636830394 |
Warrington,
England United Kingdom |
Whittle Avenue Roundabout: A5281 (Whittle Ave. / Burtonwood Rd.) / Whittle Ave. / Westbrook Way / Fortress Blvd. (53.40726, -2.64444) |
Rotary Existing |
All-Way Yield None |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
St Thomas,
ON Elgin Canada |
Hwy 30 (Highbury Ave.) / Ron McNeil Line (42.81099, -81.15033) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.youtube.com/watch?v=hiwMT6hxZi0 |
Florence,
AZ Pinal Co. United States |
SR 287 / SR 79 Business (Main St.) (33.01978, -111.38809) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Replaced channelized at-grade interchange. https://azdot.gov/projects/southcentral-district-projects/state-route-28779b-roundabout-florence |
Lebanon,
IN Boone Co. United States |
W 300 N / Witt Rd. (40.08342, -86.49589) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Gateway to Lilly Medicine Foundry campus. |
St Thomas,
ON Elgin Canada |
Hwy 3 (St. Thomas Expressway / Heritage Hwy.) / Centennial Ave. (42.78906, -81.14742) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.youtube.com/watch?v=sH0wZd962xw |
Wigan,
England United Kingdom |
A49 (Warrington Rd.) / B5238 (Poolstock Ln.) (53.52299, -2.65304) |
Roundabout Removed |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2016 | Year Removed estimated (2015-2016). Replaced with signalized intersection. |