Roundabout Details

SR 25 / SR 156

Type
Roundabout
Status
Unknown
Functional Class
Other (At-Grade)
Lane Type
Multilane (3+ Lane)
Control Type
All-Way Yield
Previous Control Type
Signal
Other Control Type
None
Approaches
4
Driveways
0
Diameter (ICD)
78.03 m
City
Hollister
County
San Benito Co.
State
CA
Country
United States
Latitude
36.89565
Longitude
-121.42733
Year Completed
0
Notes
Rotor Turbo Roundabout is currently under construction (2022). Anticipated opening year is Summer or Fall of 2023.
Back to List