US 63 / US 53 NB Ramps / Service Loop
- Type
- Roundabout
- Status
- Existing
- Functional Class
- Freeway Ramps (Grade-Separated)
- Lane Type
- Single-Lane
- Control Type
- All-Way Yield
- Previous Control Type
- None (new)
- Other Control Type
- None
- Approaches
- 4
- Driveways
- 0
- Diameter (ICD)
- 0.00 m
- City
- Trego
- County
- Washburn Co.
- State
- WI
- Country
- United States
- Latitude
- 45.89745
- Longitude
- -91.82604
- Year Completed
- 2022
- Notes