Still Well Pkwy. / Jasper Dr.
- Type
- Roundabout
- Status
- Existing
- Functional Class
- Other (At-Grade)
- Lane Type
- Single-Lane
- Control Type
- All-Way Yield
- Previous Control Type
- None (new)
- Other Control Type
- None
- Approaches
- 3
- Driveways
- 0
- Diameter (ICD)
- 36.58 m
- City
- Prescott Valley
- County
- Yavapai Co.
- State
- AZ
- Country
- United States
- Latitude
- 34.61134
- Longitude
- -112.36722
- Year Completed
- 2020
- Notes