Roundabout Details

Steptoe Dr. / SR 240 EB Ramps / Columbia Park Trl.

Type
Roundabout
Status
Existing
Functional Class
Freeway Ramps (Grade-Separated)
Lane Type
Multilane (2 Lane, unspecified)
Control Type
All-Way Yield
Previous Control Type
One/Two-Way Stop
Other Control Type
Metering Signal
Approaches
5
Driveways
0
Diameter (ICD)
49.56 m
City
Richland
County
Benton Co.
State
WA
Country
United States
Latitude
46.23893
Longitude
-119.24546
Year Completed
2007
Notes
5th leg is on-ramp to SR 240. Opened November 2007. Lane configuration reduced in 2016. Modified in 2018 to add metering signal. According to local news (link below) they started metering the traffic on the westbound Columbia Park Trail approach in 2018. It only turns on when traffic coming off the freeway gets backed up. https://97rockonline.com/tri-cities-roundabout-gets-new-metered-traffic-light-wait-what/ 21442
Back to List