Roundabout Details

US 550 / US 160 WB Ramps / US 160 EB Exit Ramp / Wilson Gulch Dr.

Type
Roundabout
Status
Existing
Functional Class
Freeway Ramps (Grade-Separated)
Lane Type
Multilane (3+ Lane)
Control Type
All-Way Yield
Previous Control Type
None (new)
Other Control Type
None
Approaches
5
Driveways
0
Diameter (ICD)
64.01 m
City
Durango
County
La Plata Co.
State
CO
Country
United States
Latitude
37.22978
Longitude
-107.83943
Year Completed
2014
Notes
Year Completed estimated (2011-2014). North leg added 2014-2017. US 550 added in 2024, although that uses the same leg as US 160 EB. https://www.durangoherald.com/articles/u-s-highway-550-connection-finally-opens-in-durango/
Back to List