Roundabout Details

Titan Rd. / Eagle River St.

Type
Roundabout
Status
Existing
Functional Class
Other (At-Grade)
Lane Type
Single-Lane
Control Type
All-Way Yield
Previous Control Type
None (new)
Other Control Type
Unknown
Approaches
3
Driveways
0
Diameter (ICD)
51.60 m
City
(unincorporated)
County
Douglas Co.
State
CO
Country
United States
Latitude
39.50721
Longitude
-105.03658
Year Completed
2017
Notes
Roundabout has been constructed, but is not being fully utilized yet until the Sterling Ranch development is complete. ICD estimated from Google Maps linework.
Back to List