City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Detroit Lakes,
MN Becker Co. United States |
US 59 / CR 22 (46.76216, -95.87928) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2017 | https://www.kare11.com/article/traffic/major-road-projects-highlight-mndot-construction-season/488383654 |
Delano,
MN Wright Co. United States |
CSAH 30 / Tiger Dr. (45.05002, -93.77685) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Entrance to Delano Schools campus. https://www.delano.k12.mn.us/district/communication/in-the-news/blog-post/roundabout-construction-begins-july-6 |
Delano,
MN Wright Co. United States |
CR 30 SE / Davidson Ave. (45.03593, -93.81248) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
Dayton,
MN Hennepin Co. United States |
129th Ave. N / Pineview Ln. N (45.18821, -93.44235) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Dayton,
MN Hennepin Co. United States |
Brockton Ln. N / Territorial Rd. (45.16258, -93.52163) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2020 | |
Crosslake,
MN Crow Wing Co. United States |
CSAH 3 / CSAH 11 (46.61705, -94.13182) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | https://www.facebook.com/photo/?fbid=747532257374234&set=a.506101878183941 |
Crosby,
MN Crow Wing Co. United States |
STH 6-STH 210 / CSAH 31 / CSAH 135 (46.48524, -93.93665) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2023 | Elliptical shaped. ICD = 170 ft x 130 ft. https://www.dot.state.mn.us/news/2023/08/18-d3-detourlifted.html. Picture here: https://www.dot.state.mn.us/d3/projects/local/images/h6-210crosbyproject.png. |
Credit River Township,
MN Scott Co. United States |
Texas Ave. / 190th St. E (44.67421, -93.37938) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2017 | |
Courtland,
MN Nicollet Co. United States |
CSAH 12 (4th St.) / US 14 EB Ramps (44.27180, -94.34138) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. https://www.mprnews.org/story/2023/11/21/southwestern-minnesota-celebrates-completion-of-highway-14-expansion-project (picture about halfway down the page) |
Courtland,
MN Nicollet Co. United States |
CSAH 12 (4th St. - 541st Ave.) / US 14 WB Ramps / 466th St. (44.27411, -94.34144) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.nujournal.com/news/local-news/2023/09/16/new-courtland-csah-12-highway-14-intersection-opens/ |
Cottage Grove,
MN Washington Co. United States |
Innovation Rd. / US 10-US 61 WB Ramps / E Point Douglas Rd. S (44.80640, -92.91166) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 52.5367 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Hinton Ave. S / 70th St. S (44.84809, -92.94916) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1039 |
Other (At-Grade) Single-Lane |
2019 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
65th St. S / Goodview Ave. S (44.85509, -92.97948) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0928 |
Other (At-Grade) Single-Lane |
2018 | North approach is currently a stub for future development as of 2019. Constructed in conjunction with adjacent middle school. ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Hadley Ave. S / 95th St. S (44.81180, -92.96479) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0442 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave S / 70th St S (44.84808, -92.92186) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1039 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave. / US 10-US 61 EB Ramps / W Point Douglas Rd. (44.81452, -92.93504) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.6128 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave. / US 10-US 61 WB Ramps (44.81586, -92.93379) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2780 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
CSAH 19-CSAH 19A (Keats Ave. S) / CSAH 22 (70th St. S) (44.84796, -92.90354) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1040 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Columbus,
MN Anoka Co. United States |
Lake Dr. NE / (unknown) (45.25047, -93.02965) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.8368 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). ICD estimated from Google Maps linework. |
Columbia Heights,
MN Anoka Co. United States |
39th Ave. NE / Jefferson St. NE (45.03828, -93.25522) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.7581 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Cologne,
MN Carver Co. United States |
CR 53 / Village Pkwy. (44.76309, -93.78109) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7681 |
Other (At-Grade) Single-Lane |
2008 | Right-turn bypass lane on north leg. ICD estimated from Google Maps linework. |
Cologne,
MN Carver Co. United States |
Village Pkwy. / Village Market Dr. (44.76307, -93.78307) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.7681 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Cologne,
MN Carver Co. United States |
STH 5 / Orchard Rd. (44.82925, -93.82348) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2017 | Rural. Year Completed estimated (2017-2018). |
Cold Spring,
MN Stearns Co. United States |
Red River Ave. N / N 5th Ave. E (45.46041, -94.42907) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.7229 |
Other (At-Grade) Single-Lane |
2016 | https://www.sctimes.com/story/news/local/rocori/2016/05/20/cold-spring-break-ground-citys-1st-roundabout/84643718/ ICD estimated from Google Maps linework. |
Cloquet,
MN Carlton Co. United States |
STH 33 / I-35 Ramps / Frontage Rd. (46.69239, -92.45712) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.4067 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Claremont,
MN Dodge Co. United States |
CR 3 (130th Ave.) / US 14 EB Ramps (44.03664, -92.98574) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html. |
Claremont,
MN Dodge Co. United States |
CR 3 (130th Ave.) / US 14 WB Ramps (44.03834, -92.98577) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html. |
Circle Pines,
MN Anoka Co. United States |
Town Center Pkwy. / Village Dr. (45.17908, -93.11011) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.1493 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Chisholm,
MN St. Louis Co. United States |
STH 73 / Iron World Rd. (47.48252, -92.89623) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0430 |
Other (At-Grade) Single-Lane |
2017 | https://www.duluthnewstribune.com/news/4344903-new-chisholm-roundabout-open. ICD estimated from Google Maps linework. |
Chisago City,
MN Chisago Co. United States |
Lofton Ave. / Chisago Blvd. (45.34679, -92.87900) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.chisagocountymn.gov/DocumentCenter/View/17057/Postcard-Notification-CSAH-2324-Round-A-Bout?bidId= |
Chaska,
MN Carver Co. United States |
STH 41 (N Chestnut St.) / Peavey Rd. (44.84105, -93.59896) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | https://www.swnewsmedia.com/chaska_herald/news/local/news_briefs/the-highway-41-and-peavey-road-roundabout-is-complete/article_f6380990-8fb7-11ee-badc-03f570cc07d0.html |
Chaska,
MN Carver Co. United States |
Lyman Blvd. / Peavey Rd. (44.84901, -93.59468) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.swnewsmedia.com/chaska_herald/news/local/highway-41-to-reopen-this-weekend-with-new-roundabout-at-lyman-boulevard/article_c9bc706b-49d8-5a8c-8286-e7b9d6127258.html |
Chaska,
MN Carver Co. United States |
STH 41 (N Chestnut St.-Hazeltine Blvd.) / Lyman Blvd. (44.84905, -93.59701) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.swnewsmedia.com/chaska_herald/news/local/highway-41-to-reopen-this-weekend-with-new-roundabout-at-lyman-boulevard/article_c9bc706b-49d8-5a8c-8286-e7b9d6127258.html |
Chaska,
MN Carver Co. United States |
Lyman Blvd. / Norex Dr. (44.84894, -93.58895) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2020 | https://www.swnewsmedia.com/chaska_herald/news/local/highway-41-to-reopen-this-weekend-with-new-roundabout-at-lyman-boulevard/article_c9bc706b-49d8-5a8c-8286-e7b9d6127258.html |
Chaska,
MN Carver Co. United States |
Big Woods Blvd. / US 212 WB Off-Ramp (44.79113, -93.63390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2020 | Add-lane right-turn bypass lane on south leg. Year Completed estimated (2019-2020). |
Chaska,
MN Carver Co. United States |
Big Woods Blvd. / US 212 EB On-Ramp (44.79095, -93.63046) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2020). |
Chaska,
MN Carver Co. United States |
Big Woods Blvd. / Savanna Way (44.79102, -93.62533) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2020 | South leg stubbed. Year Completed estimated (2019-2020). |
Chaska,
MN Carver Co. United States |
Hundertmark Rd. / Clover Ridge Dr. (44.81856, -93.63370) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.3460 |
Other (At-Grade) Single-Lane |
2002 | Year completed estimated (1993-2003). ICD estimated from Google Maps linework. |
Chaska,
MN Carver Co. United States |
Clover Ridge Dr. / Clover Preserve Dr. / Walden Dr. (44.81900, -93.63693) |
Roundabout Existing |
Unknown None |
4 Approaches 0 Driveways 28.8042 |
Other (At-Grade) Single-Lane |
2002 | Year completed estimated (1993-2002). ICD estimated from Google Maps linework. |
Chaska,
MN Carver Co. United States |
Bavaria Rd. / Pioneer Trl. (44.83083, -93.61781) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.1863 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | At-grade rail crossing between two roundabouts. ICD estimated from Google Maps linework. |
Chaska,
MN Carver Co. United States |
Bavaria Rd. / Pioneer Trl. / Ashley Dr. (44.82900, -93.61632) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.6462 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | At-grade rail crossing between two roundabouts. ICD estimated from Google Maps linework. |
Chanhassen,
MN Carver Co. United States |
Bluff Creek Blvd. / Bluff Creek Dr. (44.83069, -93.56711) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2684 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Chanhassen,
MN Carver Co. United States |
Flying Cloud Dr. / STH 101 (44.81211, -93.53889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.9207 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Replaced triangle intersection. ICD estimated from Google Maps linework. |
Chanhassen,
MN Carver Co. United States |
Flying Cloud Dr. / Bluff Creek Dr. (44.81190, -93.54749) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2806 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Year Completed estimated (2015-2016). ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
W River Rd. / E Hayden Lake Rd. (45.18068, -93.38559) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2014 | |
Champlin,
MN Hennepin Co. United States |
CSAH 14 (Douglas Dr.) / 117th Ave. (45.16629, -93.36066) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3667 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
109th Ave. / Elm Creek Pkwy. (45.15210, -93.40291) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0064 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
117th Ave. / Business Park Blvd. (45.16656, -93.38891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5244 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
Business Park Blvd. / Emery Pkwy. (45.16798, -93.38905) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.3656 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Champlin,
MN Hennepin Co. United States |
109th Ave. / Goose Lake Rd. / Zachary Ln. (45.15226, -93.42163) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.3217 |
Other (At-Grade) Single-Lane |
2006 | Posted speed on mainline approach 45 mph. Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Center City,
MN Chisago Co. United States |
US 8 (Lake Blvd.) / Pleasant Valley Rd. (45.38276, -92.79510) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2020). |
Cedar Lake Township,
MN Scott Co. United States |
SH 13 (Langford Ave.) / CR 2 (260th St.) (44.57259, -93.50546) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.9429 |
Other (At-Grade) Single-Lane |
2005 | Rural location, intersection of two 55-mph facilities. Previous 2-way stop had 2 fatal crashes and 50 injury crashes in 5 years. Opened to traffic in September 2005. During 12 months after opening, 1 reported crash involving single motorcycle running off road. Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Cedar Lake Township,
MN Scott Co. United States |
TH 19 / CSAH 23 / CSAH 86 (44.54387, -93.44223) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0071 |
Other (At-Grade) Single-Lane |
2010 | Right-turn bypass lane in southwest quadrant. Realigned four 2-way stop intersections into single roundabout. ICD estimated from Google Maps linework. |
Cannon Falls,
MN Goodhue Co. United States |
County 24 Blvd. / 65th Ave. / 4th St. S (44.48234, -92.90306) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0141 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Cannon Falls,
MN Goodhue Co. United States |
County 24 Blvd. / US 52 NB Ramps (44.48193, -92.90622) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2750 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Raindrop shape. Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Cannon Falls,
MN Goodhue Co. United States |
County 24 Blvd. / US 52 SB Ramps (44.48221, -92.90877) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7888 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Raindrop shape. Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Cannon Falls,
MN Goodhue Co. United States |
County 24 Blvd. / 63rd Ave. (44.48285, -92.91156) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7179 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2012-2015). ICD estimated from Google Maps linework. |
Cambridge,
MN Isanti Co. United States |
STH 95 / STH 47 (45.58695, -93.38894) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.hometownsource.com/county_news_review/free/highway-95-west-of-cambridge-is-now-open/article_2f9f27ac-376f-11ec-8e8a-830df18e853a.html |
Byron,
MN Olmsted Co. United States |
7th St. NE / 10th Ave. NE (44.03618, -92.62845) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.facebook.com/WeAreByron/posts/the-roundabout-is-officially-complete-at-the-intersection-of-10th-ave-7-street-n/3517592178291647/ |
Byron,
MN Olmsted Co. United States |
10th Ave. NE / Frontage Rd. (44.03014, -92.62851) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0650 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Burnsville,
MN Dakota Co. United States |
Portland Ave. / E. Nicollet Blvd. (44.75141, -93.26827) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.9270 |
Other (At-Grade) Single-Lane |
2005 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Burnsville,
MN Dakota Co. United States |
Burnhaven Dr. / 150th St. W / Crystal Lake Rd. W (44.73183, -93.28778) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.8777 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Burnsville,
MN Dakota Co. United States |
Portland Ave. / (high school access) (44.78388, -93.26816) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.3648 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Burnsville,
MN Dakota Co. United States |
Cliff Rd. W / I-35W SB Ramps (44.78229, -93.29009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://patch.com/minnesota/burnsville/construction-begins-i-35w-southbound-ramp-improvement-project |
Buffalo,
MN Wright Co. United States |
35th St. NE / Braddock Ave. (45.20177, -93.87000) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Intersection moved 250-300 feet to the west. |
Buffalo,
MN Wright Co. United States |
8th St. NE / 20th St. NE / Calder Ave. NE (45.17995, -93.84729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2016 | http://co.wright.mn.us/CivicAlerts.aspx?AID=559&ARC=1045 |
Buffalo,
MN Wright Co. United States |
10th St. NE / Calder Ave. NE (45.16556, -93.84756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Buffalo,
MN Wright Co. United States |
CSAH 35 (20th St. NE) / Dague Ave. NE (45.17986, -93.82706) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://ci.buffalo.mn.us/CivicAlerts.aspx?AID=131&ARC=322 |
Buffalo,
MN Wright Co. United States |
STH 25 (Lake Blvd. S) / Settlers Pkwy. (45.16208, -93.86793) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.5799 |
Other (At-Grade) Single-Lane |
2015 | https://northwrightcounty.today/2015/04/highway-25-reconstruction-creates-havoc-in-buffalo/ ICD estimated from Google Maps linework. |
Buffalo,
MN Wright Co. United States |
35th St. NW / CR 12 N (45.20144, -93.88987) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.4433 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2012-2016). ICD estimated from Google Maps linework. |
Buffalo,
MN Wright Co. United States |
Central Ave. (STH 25) / 8th St. NW / 8th St. NE (45.17989, -93.87621) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.6745 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | https://www.ci.buffalo.mn.us/events/th25-ribbon-cutting-ceremony/ ICD estimated from Google Maps linework. |
Buffalo,
MN Wright Co. United States |
Caitlin St. / Commerce Cir. (45.19446, -93.87541) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.9327 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |
Buffalo,
MN Wright Co. United States |
Pulaski Rd. / 16th St. NE (45.19438, -93.84424) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2002 | Crosswalk on east leg passes within circulatory roadway. |
Brooklyn Park,
MN Hennepin Co. United States |
Seltzer Pkwy. / Neddersen Pkwy. / Founders Pkwy. (45.11604, -93.36655) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.4547 |
Other (At-Grade) Single-Lane |
1995 | Will be a 4th leg in future (Tessman Pkwy.). Functional Class: Collector ICD estimated from Google Maps linework. |
Brooklyn Park,
MN Hennepin Co. United States |
108th Ave. / Regent Ave. / Perry Dr. (45.15072, -93.34499) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0071 |
Other (At-Grade) Single-Lane |
2005 | No splitter islands. Functional Class: Local ICD estimated from Google Maps linework. |
Brainerd,
MN Crow Wing Co. United States |
S 4th St. / E College Dr. (46.34887, -94.20373) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0446 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Brainerd,
MN Crow Wing Co. United States |
W College Dr. / SW 4th St. / Mississippi Pkwy. (46.34735, -94.21218) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.8702 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Brainerd,
MN Crow Wing Co. United States |
W College Dr. / Mississippi Pkwy. (46.34567, -94.22128) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.2759 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | ICD estimated from Google Maps linework. |
Brainerd,
MN Crow Wing Co. United States |
Jackson St. / NW 4th St. / Riverside Dr. (46.36038, -94.21800) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.brainerddispatch.com/news/traffic-and-construction/7065388-NW-4th-roundabout-opens-road-reconstruction-continues |
Blue Earth,
MN Faribault Co. United States |
US 169 / 7th St. / CSAH 16 (43.63770, -94.09087) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5743 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Blue Earth,
MN Faribault Co. United States |
US 169 / CSAH 7 (Leland Pkwy) (43.64480, -94.09164) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.1630 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Blue Earth,
MN Faribault Co. United States |
US 169 / TH 44 (Fairgrounds Rd.) (43.65225, -94.09464) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.3923 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Bloomington,
MN Hennepin Co. United States |
W 78th St. / US 169 Frontage Rd. / (parking lot) (44.86145, -93.39441) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.5554 |
Other (At-Grade) Single-Lane |
2012 | This is one of 6 roundabouts surrounding the interchange of I-494 and US 169. http://www.startribune.com/i-494-hwy-169-interchange-is-up-for-an-award/224898442/ ICD estimated from Google Maps linework. |
Bloomington,
MN Hennepin Co. United States |
W 78th St. / US 169 SB Offramp / I-494 WB Onramp (44.86118, -93.39598) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7090 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | This is one of 6 roundabouts surrounding the interchange of I-494 and US 169. ICD estimated from Google Maps linework. |
Bloomington,
MN Hennepin Co. United States |
Washington Ave. / W 78th St. / Viking Dr. (44.86003, -93.39886) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0960 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | This is one of 6 roundabouts surrounding the interchange of I-494 and US 169. ICD estimated from Google Maps linework. |
Bloomington,
MN Hennepin Co. United States |
W 78th St. / Washington Ave. / Marth Rd. (44.85859, -93.39850) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2504 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | This is one of 6 roundabouts surrounding the interchange of I-494 and US 169. ICD estimated from Google Maps linework. |
Bloomington,
MN Hennepin Co. United States |
Washington Ave. / Ensign Rd. / Marth Rd. / I-494 EB Offramp (44.85775, -93.39652) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.2509 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | This is one of 6 roundabouts surrounding the interchange of I-494 and US 169. ICD estimated from Google Maps linework. |
Bloomington,
MN Hennepin Co. United States |
Marth Rd. / US 169 NB Offramp / I-494 EB Onramp (44.85809, -93.39324) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2507 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | This is one of 6 roundabouts surrounding the interchange of I-494 and US 169. Teardrop shape. ICD estimated from Google Maps linework. |
Blomkest,
MN Kandiyohi Co. United States |
US 71 (1st St. S) / STH 7 (195th Ave. SE) (44.93535, -95.04408) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.8010 |
Other (At-Grade) Single-Lane |
2017 | https://www.kare11.com/article/traffic/major-road-projects-highlight-mndot-construction-season/488383654 ICD estimated from Google Maps linework. |
Blaine/Lino Lakes,
MN Anoka Co. United States |
Sunset Rd. / Apollo Dr. / 109th Ave. NE (45.17093, -93.14284) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.4157 |
Other (At-Grade) Single-Lane |
2016 | On border of Blaine and Lino Lakes. 109th Ave NE realigned to meet this roundabout. https://www.hometownsource.com/abc_newspapers/news/local/blaine-council-approves-jpa-for-project-on-sunset/article_d5f8c687-b440-55a0-916a-79189ad336d1.html ICD estimated from Google Maps linework. |
Blaine,
MN Anoka Co. United States |
105th Ave. NE / Irvin Pkwy. (45.16076, -93.22538) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.6337 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://blainemn.gov/Blog.aspx?IID=37&ARC=20 ICD estimated from Google Maps linework. |
Blaine,
MN Anoka Co. United States |
105th Ave. NE/(National Sports Center entry) (45.16079, -93.22210) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.8436 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | https://blainemn.gov/Blog.aspx?IID=37&ARC=20 ICD estimated from Google Maps linework. |
Blaine,
MN Anoka Co. United States |
Club West Pkwy. / 113th Ave. (45.17343, -93.23103) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.2014 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Blaine,
MN Anoka Co. United States |
Lakes Pkwy. / Harpers St. (45.19327, -93.19199) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0332 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Blaine,
MN Anoka Co. United States |
Austin St. / 108th Ave. (45.16552, -93.16653) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
Blaine,
MN Anoka Co. United States |
99th Ave. NE / Baltimore St. NE (45.14987, -93.23354) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2023 | Add-lane right-turn bypass lane on north leg. https://www.youtube.com/watch?v=HgVsQEb1_00 |
Bemidji,
MN Beltrami Co. United States |
Irvine Ave. NW / Anne St. NW (47.50495, -94.88522) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.bemidjipioneer.com/news/local/new-roundabout-at-irvine-avenue-anne-street-intersection-now-open-to-traffic |
Bemidji,
MN Beltrami Co. United States |
US 71 / Anne St. NW (47.50510, -94.90640) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2022 | Right-turn-only lanes on north and south legs. https://www.dot.state.mn.us/d2/projects/hwy71-bemidji/index.html |
Bemidji,
MN Beltrami Co. United States |
Division St. W / Becida Rd. / (school parking) (47.46885, -94.93801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | https://www.youtube.com/watch?v=5t_phfsvxx0 |
Bemidji,
MN Beltrami Co. United States |
Division St. W / Adams Ave. NW / Adams Ave. SW (47.46861, -94.92737) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | https://www.youtube.com/watch?v=5t_phfsvxx0 |