City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Edina,
MN Hennepin Co. United States |
Hazelton Rd. / (parking lot) (44.87402, -93.32624) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 27.9303 |
Other (At-Grade) Single-Lane |
2014 | Under construction in Aug 2014 (streetview). ICD estimated from Google Maps linework. |
Richfield,
MN Hennepin Co. United States |
Lyndale Ave. S / W 67th St. (44.88179, -93.28738) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | |
Dayton,
MN Hennepin Co. United States |
Brockton Ln. N / Territorial Rd. (45.16258, -93.52163) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2020 | |
Edina,
MN Hennepin Co. United States |
Eden Ave. / Arcadia Ave. / Normandale Rd. (STH 100 Frontage Rd.) (44.90952, -93.35224) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Year Completed estimated (2022-2023). |
Hastings,
MN Dakota Co. United States |
STH 316 (Red Wing Blvd.) / Tiffany Dr. (44.71337, -92.84315) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | http://www.dot.state.mn.us/metro/projects/hwy316/ |
Hastings,
MN Dakota Co. United States |
STH 316 (Red Wing Blvd.) / Spiral Blvd. (44.71779, -92.84744) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | https://www.startribune.com/hastings-pleased-with-hwy-316-redo/600121652/ |
Edina,
MN Hennepin Co. United States |
Interlachen Blvd./ Blake Rd. (44.91393, -93.38343) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Year Completed estimated (2023-2024). https://www.youtube.com/watch?v=dm2G51ZohRY |
Cottage Grove,
MN Washington Co. United States |
65th St. S / Goodview Ave. S (44.85509, -92.97948) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0928 |
Other (At-Grade) Single-Lane |
2018 | North approach is currently a stub for future development as of 2019. Constructed in conjunction with adjacent middle school. ICD estimated from Google Maps linework. |
Maplewood,
MN Ramsey Co. United States |
Legacy Pkwy / (unknown) (45.03324, -93.03310) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.0089 |
Other (At-Grade) Single-Lane |
2004 | Functional Class: Local ICD estimated from Google Maps linework. |
Buffalo,
MN Wright Co. United States |
Caitlin St. / Commerce Cir. (45.19446, -93.87541) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.9327 |
Other (At-Grade) Single-Lane |
2008 | ICD estimated from Google Maps linework. |
Lakeville,
MN Dakota Co. United States |
Kenrick Ave. / 175th St. W (44.69593, -93.28402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 26.3186 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / (west parking entrance) (44.87635, -93.32676) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.2365 |
Other (At-Grade) Single-Lane |
2007 | Series of 3 roundabouts as part of road diet. ICD estimated from Google Maps linework. |
Minneapolis,
MN Hennepin Co. United States |
W 70th St. / (east parking entrance) (44.87636, -93.32317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.2365 |
Other (At-Grade) Single-Lane |
2007 | Series of 3 roundabouts as part of road diet. ICD estimated from Google Maps linework. |
Edina,
MN Hennepin Co. United States |
Eden Ave. / Wilson Rd. / Dale Dr. (44.91042, -93.34835) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2023 | Series of 2 roundabouts. Roundabout located 75 feet from roundabout to the west. |
St Michael,
MN Wright Co. United States |
Frankfort Pkwy. NE / Maciver Ave. NE (45.21727, -93.64424) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | |
Richfield,
MN Hennepin Co. United States |
Lyndale Ave. S / W 70th St. (44.87632, -93.28918) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | https://www.hometownsource.com/sun_current/community/richfield/lyndale-avenue-road-construction-continues-in-richfield/article_4df9bdb4-817f-11e9-9352-733310e3eaf2.html |
Hastings,
MN Dakota Co. United States |
STH 316 (Red Wing Blvd.) / Tuttle Dr. (44.70766, -92.83693) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | https://www.hastingsstargazette.com/news/highway-316-in-hastings-to-fully-reopen-by-nov-6/article_f2f45cfe-358f-11ec-a5d8-23c91c675b20.html |
Maple Lake,
MN Wright Co. United States |
Division St. / Elm Ave. / CR 8 (45.22951, -93.99437) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 25.2338 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | http://www.minnesotatzd.org/events/conference/2019/documents/powerpoints/27_Stein.pdf -- https://maplelakemessenger.com/2018/07/work-begins-on-mini-roundabout/ ICD estimated from Google Maps linework. |
Anoka,
MN Anoka Co. United States |
S 4th Ave. / Washington St. / Military Rd. (45.19165, -93.38535) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 24.4090 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2017 | Painted pumpkin in center: https://www.facebook.com/CityofAnokaMN/photos/a.340051602702875/1707805759260779/?type=3. ICD estimated from Google Maps linework. |
Prior Lake,
MN Scott Co. United States |
Village Lake Dr. SE / Duluth Ave. SE (44.70560, -93.42980) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | http://tzd.state.mn.us/events/conference/2019/documents/powerpoints/27_Stein.pdf |
Richfield,
MN Hennepin Co. United States |
Lyndale Ave. S / W 68th St. (44.87985, -93.28791) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | |
Edina,
MN Hennepin Co. United States |
Eden Ave. / Grange Rd. (44.91059, -93.34897) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2023 | Series of 2 roundabouts. Roundabout located 75 feet from roundabout to the east. |
New Prague,
MN Scott Co. United States |
12th St. NE / Columbus Ave. N (44.55790, -93.57412) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | https://www.scottcountymn.gov/DocumentCenter/View/12888/Project-Update14 |
New Prague,
MN Le Sueur Co. United States |
Main St. E / Columbus Ave. (44.54358, -93.57342) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Year Completed estimated (2021-2023). |
New Prague,
MN Le Sueur Co. United States |
Main St. E / 1st Ave. NE-1st Ave. SE (44.54359, -93.57559) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | |
Winona,
MN Winona Co. United States |
Gilmore Ave. / W Service Dr. / US 14 Connector (44.04862, -91.67639) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.0359 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2016 | https://www.winonadailynews.com/news/local/govt-and-politics/glimmer-for-gilmore-gridlock-main-winona-intersection-at-gilmore-hwy/article_1fc8ebc1-b84a-5bbc-8b4b-6317a3140a01.html ICD estimated from Google Maps linework. |
Rochester,
MN Olmsted United States |
36th Ave. NW / 4th Pl. NW (44.02855, -92.51911) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 22.8600 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Driveway serves elementary school. |
Rochester,
MN Olmsted United States |
Clarkia Dr. NW / Gaillardia Dr. NW (44.09824, -92.50562) |
Traffic Calming Circle Existing |
Uncontrolled None |
4 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-Lane |
2006 | |
Rochester,
MN Olmsted Co. United States |
Bella Terra Rd. NE / Shannon Oaks Blvd. NE (44.03676, -92.41353) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Mini-roundabout. |
Elk River,
MN Sherburne Co. United States |
Railroad Dr. / 3rd St NW / Irving Ave. NW (45.30419, -93.56545) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.6806 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | ICD estimated from Google Maps linework. |
Rochester,
MN Olmsted Co. United States |
18th Ave. NW / 48th St. NW (44.07167, -92.48888) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.3103 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2018 | https://kttc.com/2018/08/18/rochesters-first-mini-roundabout-set-to-debut-thursday-on-18th-avenue-nw/ ICD estimated from Google Maps linework. |
Owatonna,
MN Steele Co. United States |
E Rose St. / N Grove Ave. (44.08791, -93.22101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | Year Completed estimated (2019-2020). |
Forest Lake,
MN Washington Co. United States |
Broadway Ave. / (unknown) (45.27910, -92.98416) |
Other Existing |
Unknown None |
3 Approaches 0 Driveways 20.1695 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Detroit Lakes,
MN Becker Co. United States |
US 59-STH 34 / Willow St. (46.81162, -95.87125) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.6175 |
Other (At-Grade) Single-Lane |
2014 | Elliptical shape. ICD estimated from Google Maps linework. |
Shakopee,
MN Scott Co. United States |
CR 79 (Spencer St. S) / Vierling Dr. (44.78335, -93.52016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.6495 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2014 | ICD estimated from Google Maps linework. |
Savage,
MN Scott Co. United States |
S Park Dr. / Louisiana Ave. S (44.73930, -93.36903) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 16.9670 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2016 | http://www.minnesotatzd.org/events/conference/2019/documents/powerpoints/27_Stein.pdf ICD estimated from Google Maps linework. |
St James,
MN Watonwan Co. United States |
1st Ave. S / Armstrong Blvd. N (43.98198, -94.62838) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 13.7502 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2017 | ICD estimated from Google Maps linework. |
New Ulm,
MN Brown Co. United States |
N Highland Ave. / Oak St. (44.31628, -94.48602) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 13.6726 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | https://newulmeagle.com/16324/uncategorized/new-year-new-roundabout/ ICD estimated from Google Maps linework. |
St James,
MN Watonwan Co. United States |
1st Ave. S / 7th St. S (43.98246, -94.62703) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 11.1720 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2017 | ICD estimated from Google Maps linework. |
Hutchinson,
MN McLeod Co. United States |
S Grade Rd SW / (parking lots) (44.87807, -94.37705) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | Year Completed estimated (2018-2021). |
North Mankato,
MN Nicollet Co. United States |
Lookout Dr. / US 14 EB Ramps (44.18021, -94.05378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2016 | Year Completed estimated (2015-2017). |
North Mankato,
MN Nicollet Co. United States |
Lookout Dr. / US 14 WB Ramps (44.18184, -94.05374) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2016 | Year Completed estimated (2015-2017). |
Norwood Young America,
MN Carver Co. United States |
CR 33 / CR 34 (44.78632, -93.92955) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | https://www.co.carver.mn.us/departments/public-works/projects-studies/highway-33-34-roundabout-project |
Mankato,
MN Blue Earth Co. United States |
CR 12 (586th Ave.) / Hoffman Rd. (44.15578, -93.93909) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2019). |
Mankato,
MN Blue Earth Co. United States |
Hoffman Rd. / Prairie Winds Dr. (44.15592, -93.94483) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2019). |
Bemidji,
MN Beltrami Co. United States |
Irvine Ave NW / US 71 NB Ramps (47.54234, -94.88501) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2019 | https://www.dot.state.mn.us/d2/projects/2019/hwy71-bemidji/index.html |
Nicollet,
MN Nicollet Co. United States |
461st Ave. / US 14 WB Ramps (44.26645, -94.19045) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Year Completed estimated (2016-2018). |
Nicollet,
MN Nicollet Co. United States |
461st Ave. / US 14 EB Ramps (44.26470, -94.19047) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Teardrop shape. Year Completed estimated (2016-2018). |
New Ulm,
MN Brown Co. United States |
US 14 / Front St. Connector (44.32395, -94.45755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2015-2020). Replaced ramps of PARCLO AB interchange. https://www.isginc.com/portfolio/us-highway-14-roundabout |
Chaska,
MN Carver Co. United States |
Lyman Blvd. / Peavey Rd. (44.84901, -93.59468) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.swnewsmedia.com/chaska_herald/news/local/highway-41-to-reopen-this-weekend-with-new-roundabout-at-lyman-boulevard/article_c9bc706b-49d8-5a8c-8286-e7b9d6127258.html |
Chaska,
MN Carver Co. United States |
STH 41 (N Chestnut St.-Hazeltine Blvd.) / Lyman Blvd. (44.84905, -93.59701) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.swnewsmedia.com/chaska_herald/news/local/highway-41-to-reopen-this-weekend-with-new-roundabout-at-lyman-boulevard/article_c9bc706b-49d8-5a8c-8286-e7b9d6127258.html |
Prior Lake,
MN Scott Co. United States |
STH 13 / Eagle Creek Ave. / Credit River Rd. (CR 21) (44.71331, -93.42281) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.scottcountymn.gov/1851/CH-21TH-13-Reconstruction |
Baxter,
MN Crow Wing Co. United States |
Cypress Dr. / Excelsior Rd. (46.35480, -94.23405) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | |
Wanamingo,
MN Goodhue Co. United States |
STH 60 / STH 57 (Main St.) (44.29785, -92.79077) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://kdhlradio.com/wanamingo-roundabout-opens-tomorrow-morning/ |
St Cloud,
MN Stearns Co. United States |
33rd St. S / Cooper Ave. S (45.51500, -94.17814) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Year Completed estimated (2016-2019). |
Thief River Falls,
MN Pennington Co. United States |
CR 17 (Pennington Ave.) / CR 61 (150th St. NE) / Basswood Trailer Ct. (48.09357, -96.17601) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.grandforksherald.com/news/traffic-and-construction/6752941-Thief-River-Falls-roads-open-after-construction-completed |
Thief River Falls,
MN Pennington Co. United States |
US 59 (3rd St. W) / Barzen Ave. (48.11988, -96.19783) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.dot.state.mn.us/d2/newsrels/20/11/6-thiefriverfalls.html https://www.dot.state.mn.us/d2/newsrels/20/11/3rd%20and%20Barzen%20roundabout.JPG |
Thief River Falls,
MN Pennington Co. United States |
US 59 (3rd St. W) / Brooks Ave. (48.11919, -96.19095) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Rail crossing on east leg. https://content.govdelivery.com/accounts/MNDOT/bulletins/29c2517 |
Inver Grove Heights,
MN Dakota Co. United States |
70th St. E (CR 26) / STH 3 (S Robert Trl.) (44.84800, -93.08523) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | https://zh-cn.facebook.com/cityofinvergroveheights/posts/happy-about-the-roundabout-the-new-roundabout-at-county-road-26-70th-street-and-/2895506770462163/ |
Byron,
MN Olmsted Co. United States |
7th St. NE / 10th Ave. NE (44.03618, -92.62845) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.facebook.com/WeAreByron/posts/the-roundabout-is-officially-complete-at-the-intersection-of-10th-ave-7-street-n/3517592178291647/ |
Owatonna,
MN Steele Co. United States |
26th St. NE (CR 34) / N Cedar Ave. (CR 1) (44.10977, -93.22666) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | |
Brainerd,
MN Crow Wing Co. United States |
Jackson St. / NW 4th St. / Riverside Dr. (46.36038, -94.21800) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.brainerddispatch.com/news/traffic-and-construction/7065388-NW-4th-roundabout-opens-road-reconstruction-continues |
Elko New Market,
MN Scott Co. United States |
Main St. (CR 2) / Natchez Ave. (CR 91) (44.57304, -93.33860) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | https://www.newpraguetimes.com/new-prague-times/content/enm-roundabout-schedule |
St Cloud,
MN Stearns Co. United States |
CR 4 / CR 120 (45.58656, -94.23933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | |
Mankato,
MN Blue Earth Co. United States |
Stadium Rd. / Pohl Rd. (44.14510, -93.97611) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Opened August 29, 2020. https://www.keyc.com/2020/08/28/mankatos-newest-roundabout-open-saturday/ |
St Louis Park,
MN Hennepin Co. United States |
Cedar Lake Rd. / Zarthan Ave. (44.96544, -93.35534) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | |
Waconia,
MN Carver Co. United States |
Waconia Pkwy. / CR 10 (44.84217, -93.81903) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Monticello,
MN Wright Co. United States |
E 7th St. / Fallon Ave. NE (45.29661, -93.78431) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Monticello,
MN Wright Co. United States |
Chelsea Rd. / Fallon Ave. NE (45.29370, -93.78557) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Monticello,
MN Wright Co. United States |
E 7th St. / Washington St. (45.29817, -93.78709) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Zumbrota,
MN Goodhue Co. United States |
180th Ave. / S Main St. / E 18th St. / US 52 WB Ramps (44.28223, -92.66933) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Year Completed estimated (2015-2018). |
Zumbrota,
MN Goodhue Co. United States |
180th Ave. / County 10 Blvd. / US 52 EB Ramps (44.28087, -92.67098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2017 | Year Completed estimated (2015-2018). |
Park Rapids,
MN Hubbard Co. United States |
US 71 (Park Ave.) / Industrial Park Rd. / Crocus Hill St. (46.90736, -95.05838) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | http://www.dot.state.mn.us/d2/projects/2019/hwy71-parkrapids/index.html |
Detroit Lakes,
MN Becker Co. United States |
Washington Ave. / North Shore Dr. (46.80765, -95.84584) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | https://www.dl-online.com/news/traffic-and-construction/6760752-Washington-Avenue-reopens-at-last-after-brutal-October-weather-slows-construction-in-Detroit-Lakes |
Detroit Lakes,
MN Becker Co. United States |
Washington Ave. / Willow St. (46.81135, -95.84564) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2020 | https://www.dl-online.com/news/traffic-and-construction/6760752-Washington-Avenue-reopens-at-last-after-brutal-October-weather-slows-construction-in-Detroit-Lakes |
Northfield,
MN Rice Co. United States |
STH 246 (Division St. S) / Jefferson Pkwy. (44.44068, -93.16070) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Pedestrian tunnels under all four legs. https://www.ci.northfield.mn.us/1070/Highway-246-and-Jefferson-Parkway-Inters |
Willmar,
MN Kandiyohi Co. United States |
US 12 / 30th St. SW (CR 5) (45.12227, -95.08369) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2019-2021). https://www.dot.state.mn.us/d8/projects/willmarwye/index.html |
Willmar,
MN Kandiyohi Co. United States |
US 12 / (unknown) (45.12091, -95.09405) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2019-2021). https://www.dot.state.mn.us/d8/projects/willmarwye/index.html |
Winona,
MN Winona Co. United States |
US 14-US 61 / STH 43 (44.02956, -91.62216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | https://www.youtube.com/watch?v=xA9c17OwsGk |
Rosemount,
MN Dakota Co. United States |
Duck Crossing Way / Eaglewood Ln. / Duck Trail Ln. (44.72366, -93.16284) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
Buffalo,
MN Wright Co. United States |
10th St. NE / Calder Ave. NE (45.16556, -93.84756) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Stillwater,
MN Washington Co. United States |
Abercrombie Ln. (45.06748, -92.86077) |
Other Existing |
Uncontrolled None |
2 Approaches 8 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Waconia,
MN Carver Co. United States |
Waconia Pkwy. / Pond Ln. / Wildflower Way (44.84055, -93.81376) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Bemidji,
MN Beltrami Co. United States |
Division St. W / Becida Rd. / (school parking) (47.46885, -94.93801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | https://www.youtube.com/watch?v=5t_phfsvxx0 |
Bemidji,
MN Beltrami Co. United States |
Division St. W / Adams Ave. NW / Adams Ave. SW (47.46861, -94.92737) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | https://www.youtube.com/watch?v=5t_phfsvxx0 |
Bemidji,
MN Beltrami Co. United States |
Division St. W / (high school parking) (47.46851, -94.92187) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2018 | https://www.youtube.com/watch?v=5t_phfsvxx0 |
Alexandria,
MN Douglas Co. United States |
CTH 8 NW / CTH 40 (45.90464, -95.49110) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.voiceofalexandria.com/news/local/new-douglas-county-roundabout-is-open/article_ba70536a-1195-11ec-bfe3-e3abc879177f.html |
Jordan,
MN Scott Co. United States |
STH 282 (2nd St. W) / Creek Ln. S (44.66886, -93.63533) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.facebook.com/CityofJordanMN/posts/the-roundabout-at-282creek-lane-is-open-today-please-see-our-website-for-the-det/1727211754155592/ |
Monticello,
MN Wright Co. United States |
Fenning Ave. NE / School Blvd. / Jason Ave. NE (45.28518, -93.77081) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Opened September 2021. |
Cambridge,
MN Isanti Co. United States |
STH 95 / STH 47 (45.58695, -93.38894) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.hometownsource.com/county_news_review/free/highway-95-west-of-cambridge-is-now-open/article_2f9f27ac-376f-11ec-8e8a-830df18e853a.html |
Mankato,
MN Blue Earth Co. United States |
N Riverfront Dr. / US 14 WB Ramps (44.18921, -93.98149) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. https://www.youtube.com/watch?v=umJ5m7CeN3k. |
Mankato,
MN Blue Earth Co. United States |
N Riverfront Dr. / US 14 EB Ramps (44.18788, -93.98280) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Raindrop shaped. https://www.youtube.com/watch?v=umJ5m7CeN3k. |
Delano,
MN Wright Co. United States |
CSAH 30 / Tiger Dr. (45.05002, -93.77685) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Entrance to Delano Schools campus. https://www.delano.k12.mn.us/district/communication/in-the-news/blog-post/roundabout-construction-begins-july-6 |
Delano,
MN Wright Co. United States |
CR 30 SE / Davidson Ave. (45.03593, -93.81248) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
Anoka,
MN Anoka Co. United States |
Green Haven Rd. / Jacob Ln. / US 10-US 169 WB Ramps (45.20655, -93.40067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Anoka,
MN Anoka Co. United States |
W Main St. / US 10-US 169 EB Ramps / Church St. (45.20504, -93.40072) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Year Completed estimated (2022-2023). |
Lakeville,
MN Dakota Co. United States |
Dodd Blvd. / 210th St. W (44.64514, -93.25296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.facebook.com/CityOfLakeville/ |
Woodbury,
MN Washington Co. United States |
Lake Rd. / Pioneer Dr. (44.90533, -92.92898) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.youtube.com/watch?v=tdzDUNk2Mi0 |
Welch,
MN Goodhue Co. United States |
US 61 / STH 316 (44.60080, -92.77233) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | Merging right-turn bypass lane on east leg. https://www.dot.state.mn.us/d6/projects/hwy61-hwy316/index.html |
Farmington,
MN Dakota Co. United States |
STH 3 (Chippendale Ave. W) / Vermillion River Trl. (44.64928, -93.13672) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2022 | https://www.dot.state.mn.us/news/2022/07/01-metro-hwy3.html |