City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Plainfield,
IN Hendricks Co. United States |
E County Road 600 S / Sugar Grove Rd. (39.67425, -86.39889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2013 | |
Avon,
IN Hendricks Co. United States |
E County Road 200 S / S County Road 200 S (39.73367, -86.38084) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.5972 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Avon,
IN Hendricks Co. United States |
E County Road 100 N / N County Road 900 E (39.77814, -86.36245) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.1401 |
Other (At-Grade) Unknown |
2018 | ICD estimated from Google Maps linework. |
Monticello,
IN White Co. United States |
E County Rd. 150 S / S 6th St. / S County Rd. 500 E / Gordon Rd. (40.73002, -86.77565) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.5819 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Cordes Junction,
AZ Yavapai Co. United States |
E Cordes Lakes Rd. / E Arcosanti Rd. / AZ 69 NB On-ramp (34.33270, -112.12483) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.3949 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | date: https://www.azdot.gov/mobile/media/news/2013/07/24/modernized-cordes-junction-traffic-interchange-aids-local-regional-travel ICD estimated from Google Maps linework. |
Fresno,
CA Fresno Co. United States |
E Copper River Ave. / N Knotting Hill Dr. / N Maple Ave. (36.89703, -119.74733) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.4742 |
Other (At-Grade) Single-Lane |
2006 | ICD estimated from Google Maps linework. |
Grand Blanc,
MI Genesee Co. United States |
E Cook Rd. / Dort Hwy. (42.90188, -83.65195) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.mlive.com/news/flint/2020/11/dort-highway-extension-roundabouts-now-open-to-traffic.html |
Crystal Lake,
IL McHenry Co. United States |
E Congress Pkwy. / Exchange Dr. (42.23256, -88.30131) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2023 | https://www.crystallake.org/your-government/departments/community-development/engineering/roundabout-information |
Scottsdale,
AZ Maricopa Co. United States |
E Columbine Dr. / N 122nd St. (33.59757, -111.81675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 20.8910 |
Other (At-Grade) Single-Lane |
2007 | ICD estimated from Google Maps linework. |
Oak Creek/Cudahy,
WI Milwaukee Co. United States |
E College Ave. / S Ace Industrial Dr. (42.92994, -87.88328) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.2257 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Buchanan,
WI Outagamie Co. United States |
E College Ave. / Eisenhower Dr. (44.25832, -88.34698) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 58.1658 |
Other (At-Grade) Multilane (3+ Lane) |
2015 | ICD estimated from Google Maps linework. |
Buchanan,
WI Outagamie Co. United States |
E College Ave. / Debruin Rd. (44.25703, -88.29306) |
Roundabout Existing |
All-Way Yield Other |
4 Approaches 0 Driveways 47.9023 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Eagle,
ID Ada Co. United States |
E Colchester Dr. / E Fishing Creek Dr. / S Cliff Brook Ln. (43.66616, -116.34462) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Eagle,
ID Ada Co. United States |
E Colchester Dr. / E Eagles Gate Dr. (43.66859, -116.35005) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2014). |
Beech Grove,
IN Marion Co. United States |
E Churchman Bypass / S Arlington Ave. (39.71247, -86.06358) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 63.3935 |
Other (At-Grade) Single-Lane |
2020 | Right-turn-only lane on west leg. Statue of hornet (local high school mascot) in center island. ICD estimated from Google Maps linework. |
Adrian,
MI Lenawee Co. United States |
E Church St. / S Broad St. / Union St. (41.89704, -84.03490) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 31.1148 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Chubbuck,
ID Bannock Co. United States |
E Chubbuck Rd. / Sacajawea Dr. (42.92042, -112.44502) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.2351 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Fitchburg,
WI Dane Co. United States |
E Cheryl Pkwy. / Fahey Glen (43.00451, -89.41212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2002 | Year Completed estimated (2000-2004). Third leg added 2018-2019; future fourth leg. |
Canton,
GA Cherokee Co. United States |
E Cherokee Dr. / Gaddis Rd. / Chadwyck Ln. (34.23514, -84.35690) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2017 | |
Cary,
NC Wake Co. United States |
E Chatham St. / E Durham Rd. (35.79015, -78.77221) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 24.2199 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Springfield,
MO Greene Co. United States |
E Central St. / E. Pythian St. / N Sherman Ave. (37.21745, -93.28107) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.9950 |
Other (At-Grade) Single-Lane |
2017 | Replaced roundabout that had been in place since early 2000s. East leg realigned to connect to E Pythian St rather than E Central St. ICD estimated from Google Maps linework. |
Bel Aire,
KS Sedgwick Co. United States |
E Central Park Ave. / N Prestwick Ave. (37.77802, -97.24728) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
Pedestrian access to central island. | |
Bel Aire,
KS Sedgwick Co. United States |
E Central Park Ave. / (unknown) (37.77968, -97.24947) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
Pedestrian access to central island. | |
Bel Aire,
KS Sedgwick Co. United States |
E Central Park Ave. / N St James St. (37.77664, -97.25902) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
Pedestrian access to central island. | |
Provo,
UT Utah Co. United States |
E Center St. / N 7 Peaks Blvd. (40.23369, -111.64067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.2649 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2013). ICD estimated from Google Maps linework. |
El Paso,
TX El Paso Co. United States |
E Cave Ave. / Glitter Point St. (31.77308, -106.22216) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
2012 | Painted splitter islands. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. SB Ramps (39.96198, -86.11397) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. NB Ramps (39.96208, -86.11313) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Gilbert,
AZ Maricopa Co. United States |
E Carla Vista Dr. / S Sanders Dr. (33.31172, -111.69972) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0037 |
Other (At-Grade) Single-Lane |
2006 | No splitter islands. |
Jackson,
MS Hinds Co. United States |
E Capitol St. / West St. (32.29975, -90.18412) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.1714 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2014 | ICD estimated from Google Maps linework. |
Jackson,
MS Hinds Co. United States |
E Capitol St. / Lamar St. (32.30000, -90.18602) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 14.1333 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2014 | ICD estimated from Google Maps linework. |
Provo,
UT Utah Co. United States |
E Campus Dr. / E 1100 N (40.24846, -111.64583) |
Other Existing |
All-Way Yield None |
2 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2014 | Parking along circulatory roadway. Year Completed estimated (2013-2015). |
Danville,
IN Hendricks Co. United States |
E Campus Blvd. / (Hendricks County Work Release Facility entrance) (39.75803, -86.50260) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Garland,
TX Dallas Co. United States |
E Campbell Rd. / E Brand Rd. (32.97963, -96.62387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2009-2011). |
Sulphur,
LA Calcasieu Par. United States |
E Burton St. (Old Spanish Trl.) / Coach Williams Dr. (30.24400, -93.32542) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2020 | https://www.calcasieuparish.gov/Home/Components/News/News/4747/30?recordid=382&npage=9 |
Milwaukee,
WI Milwaukee Co. United States |
E Brown St. / N Hubbard St. (43.05646, -87.90837) |
Traffic Calming Circle Existing |
Uncontrolled None |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-Lane |
Installed before February 2005. | |
Milwaukee,
WI Milwaukee Co. United States |
E Brown St. / N Hubbard St. (43.05646, -87.90838) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Lafayette,
LA Lafayette Par. United States |
E Broussard Rd. (LA 733) / Kaliste Saloom Rd. (30.13670, -92.06574) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | https://developinglafayette.com/wp/lafayettes-two-lane-super-roundabout-opens-today-at-9-am-see-information-photos/ |
Spokane Valley,
WA Spokane Co. United States |
E Broadway Ave. / N Flora Rd. (47.66424, -117.17510) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.1305 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2009-2011). ICD estimated from Google Maps linework. |
Newnan,
GA Coweta Co. United States |
E Broad St. / Lower Fayetteville Rd. / Greison Trl. / E Newman Rd. (33.36807, -84.77920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2008 | Opened Oct. 28, 2008. $520,838 construction cost. |
Azusa,
CA Los Angeles Co. United States |
E Boxwood Ln. / Ortuno Dr. (34.14304, -117.89763) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Pedestrian access to central island. | |
Fort Worth,
TX Tarrant Co. United States |
E Bonds Ranch Rd. / US 81 NB Service Road (32.92414, -97.35663) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3877 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2017 | Right-turn-only lane on east leg wraps along circulatory roadway in north quadrant, but there is no section of three conflicting circulating lanes. |
Fort Worth,
TX Tarrant Co. United States |
E Bonds Ranch Rd. / (unknown) (32.92422, -97.35417) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | Year Completed estimated (2019-2020). |
Palmer,
AK Matanuska-Susitna Borough United States |
E Bogard Rd. / Silver Creek Dr. (61.61008, -149.21842) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.7756 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | http://dot.alaska.gov/stwddes/dcstraffic/roundabouts.shtml ICD estimated from Google Maps linework. |
Gibsonton,
FL Hillsborough Co. United States |
E Bay Rd. / Nundy Ave. / New East Bay Rd. (27.84654, -82.35124) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2016-2017). |
Barre,
VT Washington Co. United States |
E Barre Rd. (US 302) / Mill St. (VT 110) / Cobble Hill Rd. (44.16088, -72.44848) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 34.2718 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
Rochester,
MI Oakland Co. United States |
E Avon Rd. / Dequindre Rd. (42.67168, -83.09685) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Bridge to the east and roundabout at Avon and Dequindre is under construction November 2021. http://www.rcocweb.org/606/Avon-Road-Dequindre-to-23-Mile-Road The one driveway is a utility drive. Note: Popular Cider mill is to the east as well with another roundabout planed for 2022 at Dequindre and 23 Mile Rd. |
Shelby Township,
MI Macomb Co. United States |
E Avon Rd. / 23 Mile Rd. (42.67368, -83.09389) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Roundabout constructed after completion of bridge and roundabout to the west is completed. |
Fountain Hills,
AZ Maricopa Co. United States |
E Avenue of the Fountains / La Montana Dr. (33.60524, -111.72150) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2020 | https://www.fhtimes.com/news/local_news/roundabout-open-as-work-wraps/article_822c6808-1881-11eb-b0a4-4be0daa131cf.html |
Lancaster,
CA Los Angeles Co. United States |
E Avenue L / Challenger Way (34.66048, -118.11226) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.3833 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Cedar Rapids,
IA Linn Co. United States |
E Ave. NW / Ellis Blvd. NW / 6th St. NW (41.97796, -91.68196) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | At-grade rail crossing approximately 200 feet east of roundabout. https://www.thegazette.com/news/ellis-boulevard-extension-opens-to-traffic-in-northwest-cedar-rapids/ |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Harrison Ave. (42.63763, -83.09821) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Gerald Ave. (42.63809, -83.09578) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Sunrise,
FL Broward Co. United States |
E Aragon Blvd. / NW 24th Pl. (26.15855, -80.24427) |
Other Existing |
All-Way Stop None |
4 Approaches 0 Driveways 23.5841 |
Other (At-Grade) Single-Lane |
Stop control on entries, no splitter islands. Functional Class: Local ICD estimated from Google Maps linework. | |
Layton,
UT Davis Co. United States |
E Antelope Dr. / N Church St. (41.08892, -111.94493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.3057 |
Other (At-Grade) Single-Lane |
2014 | Skewed intersection. Elliptical shape. Year Completed estimated (2013-2015). ICD estimated from Google Maps linework. |
Ann Arbor,
MI Washtenaw Co. United States |
E Ann St / Observatory St. / (hospital access) (42.28240, -83.73114) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 3 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). |
Nampa,
ID Canyon Co. United States |
E Amity Rd. / S Robinson Blvd. (43.56137, -116.49376) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.5418 |
Other (At-Grade) Single-Lane |
2019 | Completed in May 2019. Initial build is 160' ICD, expandible outward to 2x1 (160'x180') in the future. ICD estimated from Google Maps linework. |
Salinas,
CA Monterey Co. United States |
E Alisal St. / Quilla St. / Skyway Blvd. (36.67223, -121.61774) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.4013 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2016 | ICD estimated from Google Maps linework. |
Salinas,
CA Monterey Co. United States |
E Alisal St. / Alisal Rd. / Bardin Rd. (36.67331, -121.60192) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Walla Walla,
WA Walla Walla Co. United States |
E Alder St. / S Palouse St. (46.06761, -118.33330) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Oval shaped. ICD = 115 ft x 80 ft. https://www.wallawallawa.gov/Home/Components/News/News/2394/ |
Carthage,
MO Jasper Co. United States |
E Airport Dr. / S Grand Ave. / Fairlawn Ave. (37.14749, -94.31065) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 50.4549 |
Other (At-Grade) Single-Lane |
2000 | Year Completed estimated (1997-2003). ICD estimated from Google Maps linework. |
East Little Rock,
AR Pulaski Co. United States |
E 9th St. / Picton St. / Concord Ave. (34.73856, -92.23172) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2013 | Left-turn-only lane on north leg; spiral marking in circulatory roadway. |
Coralville,
IA Johnson Co. United States |
E 9th St. / E 2nd Ave. (41.68169, -91.56306) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.coralville.org/887/E-9th-Street |
Tallahassee,
FL Leon Co. United States |
E 9th Ave. / Colonial Dr. (30.45978, -84.27234) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.2092 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Merrillville,
IN Lake Co. United States |
E 98th Ave. (Connecticut Dr.) / (future road) (41.43973, -87.33358) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2003-2005). |
American Fork,
UT Utah Co. United States |
E 980 N / N 800 E (40.39768, -111.77392) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | Painted splitter islands. Year Completed estimated (2011-2013). |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Sargent Rd. (39.92707, -86.00638) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Open June 8, 2020. https://twitter.com/DriveFishers/status/1270045736265297922 |
Carmel,
IN Hamilton Co. United States |
E 96th St. / Priority Way (39.92689, -86.10676) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 49.4579 |
Other (At-Grade) Unknown |
2018 | ICD estimated from Google Maps linework. |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Lantern Rd. (39.92738, -86.01380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (3+ Lane) |
2017 | On boundary between Fishers and Indianapolis and between Hamilton County and Marion County. |
Carmel,
IN Hamilton Co. United States |
E 96th St. / Keystone Pkwy. SB Ramps (39.92691, -86.11276) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 40.2990 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2019 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
E 96th St. / Keystone Pkwy. NB Ramps (39.92691, -86.11185) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.3832 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2019 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
E 96th St. / Hazel Dell Pkwy. (39.92697, -86.07933) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.7102 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
E 96th St. / Haverstick Rd. (39.92692, -86.11748) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | http://carmellink.com/project.php?title=96th%20Street%20and%20Haverstick%20Road%20Roundabout http://carmellink.com/images/projects/96th-St-and-Keystone-Pkwy-Exhibit.2017.01.jpg Scheduled for completion by July 4 2020. |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Fall Creek Rd. (39.92678, -85.97557) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Single-Lane |
2011 | On boundary between Fishers and Indianapolis and between Hamilton County and Marion County. Year completed estimated (2010-2012). |
Carmel,
IN Hamilton Co. United States |
E 96th St. / Delegates Row (39.92687, -86.09948) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 28.3925 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2019 | ICD estimated from Google Maps linework. |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Cumberland Rd. / Mud Creek Rd. (39.92701, -85.99493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2016 | On boundary between Fishers and Indianapolis and between Hamilton County and Marion County. |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Allisonville Rd. (39.92704, -86.06626) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Replaced intersection that used "Michigan Lefts" on the border between Fishers in Hamilton County and Indianapolis in Marion County. Fully open in late October 2024. https://fishersin.gov/next-chapter/allisonville-road-corridor-revitalization/96th-st-allisonville-rd-roundabout/ |
Henderson,
CO Adams Co. United States |
E 96th Ave. / I-76 WB Ramps / Brighton Rd. / I-76 Service Rd. (39.87079, -104.90301) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 65.0813 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Year Completed estimated (2008-2010). ICD estimated from Google Maps linework. |
Henderson,
CO Adams Co. United States |
E 96th Ave. / I-76 NB Ramps / Brighton Rd. / I-76 Frontage Rd. (39.87074, -104.90024) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 68.7479 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Year Completed estimated (2008-2010). ICD estimated from Google Maps linework. |
Provo,
UT Utah Co. United States |
E 900 S / Nevada Ave. / S 1350 E / S 1400 E (40.22206, -111.63470) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 26.4459 |
Other (At-Grade) Single-Lane |
2005 | ICD estimated from Google Maps linework. |
Charlotte,
NC Mecklenburg Co. United States |
E 8th St. / Lamar Ave. (35.21570, -80.81996) |
Traffic Calming Circle Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 82.9388 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Kansas City,
MO Jackson Co. United States |
E 87th St. / I-435 SB Ramps / Hillcrest Rd. (38.96747, -94.52084) |
Other Existing |
Other None |
4 Approaches 1 Driveways 78.0019 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Elliptical shape. HIllcrest Road south leg has painted splitter island and no signed or marked control. ICD estimated from Google Maps linework. |
Kansas City,
MO Jackson Co. United States |
E 87th St. / I-435 NB Ramps / Benjamin Plaza Ct. (38.96739, -94.51883) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 65.0017 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Orem,
UT Utah Co. United States |
E 850 North / N Palisade Dr. (40.31273, -111.66490) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.4997 |
Other (At-Grade) Single-Lane |
2001 | ICD estimated from Google Maps linework. |
Monticello,
MN Wright Co. United States |
E 7th St. / Washington St. (45.29817, -93.78709) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Monticello,
MN Wright Co. United States |
E 7th St. / Fallon Ave. NE (45.29661, -93.78431) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Coralville,
IA Johnson Co. United States |
E 7th St. / E 2nd Ave. (41.67892, -91.56378) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.7092 |
Other (At-Grade) Single-Lane |
2019 | Opened to traffic August 2019. East leg will re-open October 2019; north leg open to traffic summer 2020. ICD estimated from Google Maps linework. |
Indianapolis,
IN Marion Co. United States |
E 79th St. / Dean Rd. (39.89772, -86.09835) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Opened Aug 1 2024. https://www.wthr.com/article/traffic/traffic-news/new-north-indianapolis-roundabout-open-vehicle-traffic-dean-road-east-79th-street/531-d781784c-0459-49da-9e80-ca4039c81e42 |
Park City,
KS Sedgwick Co. United States |
E 77th St. N / N Broadway Ave. (37.82510, -97.33587) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://m.facebook.com/cityofparkcityks/videos/333467111808262/?locale2=fo_FO |
Taku/Campbell,
AK Anchorage Borough United States |
E 76th Ave. / Homer Dr. (Seward Hwy SB Frontage Rd.) (61.15196, -149.85660) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.6087 |
Freeway Ramps (Grade-Separated) Single-Lane |
2018 | CFHWY00162 Seward Hwy - Dimond to Dowling Phase 1 ICD estimated from Google Maps linework. |
Long Beach,
California Los Angeles United States |
E 6th St. / Molino Ave. (33.77353, -118.16115) |
Traffic Calming Circle Existing |
One-Way/Two-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Conway,
AR Faulkner Co. United States |
E 6th St. / Central Landing Blvd. (35.08420, -92.42236) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.7531 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Conway,
AR Faulkner Co. United States |
E 6th St. / 1st Ave. / Bruce St. (35.08422, -92.42807) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0705 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Carson City,
NV Carson City Co. United States |
E 5th St. / Fairview Dr. (39.16090, -119.72790) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
1999 | |
Anderson,
IN Madison Co. United States |
E 59th St. / E 60th St. / Applewood Center Dr. / (parking) (40.05542, -85.65411) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2014-2015). |
Hutchinson,
KS Reno Co. United States |
E 56th Ave. / N Plum St. (38.11560, -97.92245) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2009 | Completed September 2009. |
Whitestown,
IN Boone Co. United States |
E 550 S / S 475 E (39.96035, -86.37942) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Unknown |
2023 | |
Austin,
TX Travis Co. United States |
E 51st St. / I-35 SB Ramps (30.31028, -97.71149) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 67.0548 |
Other (At-Grade) Multilane (3+ Lane) |
2018 | . |
Leawood,
MO Newton Co. United States |
E 50th St. / (parking) (37.03321, -94.50215) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2009-2010). |
Logan,
UT Cache Co. United States |
E 500 N / N 600 E (41.74069, -111.81931) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 36.5378 |
Other (At-Grade) Single-Lane |
2018 | ICD estimated from Google Maps linework. |