City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Lakewood Ranch,
FL Manatee Co. United States |
Crossland Trl. / Silver Falls Run (27.43461, -82.41965) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2018 | |
Lakewood Ranch,
FL Manatee Co. United States |
Crossland Trl. / New Haven Blvd. (27.43743, -82.41733) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 58.5216 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | |
Buena Vista,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 SB Ramps (43.41453, -83.89324) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lane on north leg. Replaced cloverleaf interchange. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Saginaw,
MI Saginaw Co. United States |
M-46 (E Holland Rd.) / I-75-US 23 NB Ramps (43.41447, -83.88874) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Replaced cloverleaf interchange. Merging right-turn bypass lane on east leg. https://www.michigan.gov/mdot/news-outreach/pressreleases/2022/03/30/i-75-m-46-work-in-saginaw-county-resumes-april-4-for-final-phase |
Traverse City,
MI Grand Traverse Co. United States |
Keystone Rd. S / Beitner Rd. / River Rd. W (44.67776, -85.62668) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.4048 |
Other (At-Grade) Single-Lane |
2022 | https://www.traverseticker.com/news/keystone-road-reopens-saturday-to-two-way-traffic/ |
Blue Ash,
OH Hamilton Co. United States |
Hunt Rd. / Plainfield Rd. (39.22691, -84.39426) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 53.0352 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | https://www.wcpo.com/news/local-news/hamilton-county/blue-ash/blue-ash-police-new-roundabout-while-confusing-some-is-reducing-crashes |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Gerald Ave. (42.63809, -83.09578) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Pittsburgh,
PA Allegheny Co. United States |
Coral St. / Stratford Ave. (40.46221, -79.93260) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.wtae.com/article/traffic-circles-now-part-of-some-pittsburgh-neighborhoods/35982820 |
Pittsburgh,
PA Allegheny Co. United States |
Coral St. / S Fairmount St. (40.46240, -79.93351) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.wtae.com/article/traffic-circles-now-part-of-some-pittsburgh-neighborhoods/35982820 |
Pittsburgh,
PA Allegheny Co. United States |
Coral St. / Roup Ave. (40.46268, -79.93471) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.wtae.com/article/traffic-circles-now-part-of-some-pittsburgh-neighborhoods/35982820 |
Pittsburgh,
PA Allegheny Co. United States |
Coral St. / S Atlantic Ave. (40.46369, -79.93873) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.wtae.com/article/traffic-circles-now-part-of-some-pittsburgh-neighborhoods/35982820 |
Pittsburgh,
PA Allegheny Co. United States |
Coral St. / S Pacific Ave. (40.46396, -79.94014) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.wtae.com/article/traffic-circles-now-part-of-some-pittsburgh-neighborhoods/35982820 |
Orlando,
FL Orange Co. United States |
(connector to Cargo Rd.) / Jeff Fuqua Blvd. Ramps (28.44101, -81.30795) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 42.9765 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | At Orlando International Airport. |
Grandview,
MO Jackson Co. United States |
US 71 NB Frontage Road / I-49-US 71 NB Ramps (38.86704, -94.52594) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
US 71 SB Frontage Rd. / I-49-US 71 SB Ramps (38.87725, -94.52680) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
Main St. / US 71 Frontage Rd. (38.88876, -94.52422) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Unknown |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
Lawnbale St. / E 139th St. (38.87251, -94.52865) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
South Fulton,
GA Fulton Co. United States |
Stonewall Tell Rd. / Butner Rd. (north) (33.65148, -84.59440) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Two single-lane roundabouts replaced single, skewed intersection. https://www.mdjonline.com/neighbor_newspapers/south_metro/news/dual-roundabouts-opened-in-city-of-south-fulton/article_921e127e-8dce-11ed-92b5-a370f676eb67.html |
South Fulton,
GA Fulton Co. United States |
Stonewall Tell Rd. / Butner Rd. (south) (33.65079, -84.59496) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Two single-lane roundabouts replaced single, skewed intersection. https://www.mdjonline.com/neighbor_newspapers/south_metro/news/dual-roundabouts-opened-in-city-of-south-fulton/article_921e127e-8dce-11ed-92b5-a370f676eb67.html |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Harrison Ave. (42.63763, -83.09821) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. NE / I-80 WB Ramps (41.67198, -91.44380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was entrance ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. SE / I-80 EB Ramps (41.67099, -91.44629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was exit ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Rocklin,
CA Placer Co. United States |
Rocklin Rd. / Pacific St. (38.79073, -121.23610) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | Yield-controlled right-turn bypass lanes on west and south legs; add-lane right-turn bypass lane on east leg. https://www.rocklin.ca.us/roundabout |
(unincorporated),
NE Sarpy Co. United States |
S 180th St. / Cornhusker Rd. (41.16150, -96.19661) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Lakewood,
WA Pierce Co. United States |
North Gate Rd. SW / Edgewood Ave. SW / Winona St. SW (47.14678, -122.56385) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.kiro7.com/news/south-sound-news/stolen-car-stopped-by-wet-cement-lakewood/GDU77T3M6NC2RKBPTKKY5N53SA/ |
Kalispell,
MT Flathead Co. United States |
US 2 / Springcreek Rd. / Dern Rd. (48.19696, -114.37378) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | https://www.mdt.mt.gov/pubinvolve/dernspring/ |
Viviers-du-Lac,
Auvergne-Rhône-Alpes Savoie France |
D1202 (Les Rives du Lac) / D1201a (Route du Bourget) / D17b (Route du Lac) (45.64779, 5.89304) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Two entries have two lanes both designated as through movements but with single-lane exits throughout. | |
Viviers-du-Lac,
Auvergne-Rhône-Alpes Savoie France |
D1201 (Les Rives du Lac) / D50 / Chemin du Port (45.65105, 5.89320) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Voglans,
Auvergne-Rhône-Alpes Savoie France |
D1201 (Route d'Aix) / D17 / Route de l'Aéroport (45.63766, 5.89217) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Voglans,
Auvergne-Rhône-Alpes Savoie France |
D1504 / D1201 Ramps (45.61639, 5.88404) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 96.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Chambéry,
Auvergne-Rhône-Alpes Savoie France |
Avenue de Villarcher / Rue des Marais (45.61489, 5.88752) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Chambéry,
Auvergne-Rhône-Alpes Savoie France |
Avenue de Villarcher / Rue des Marais (45.61268, 5.88781) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Chambéry,
Auvergne-Rhône-Alpes Savoie France |
Rue de Belle Eau / Avenue de Villarcher (45.61041, 5.88918) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
||
Waynesville,
MO Pulaski Co. United States |
Historic Route 66 / Hwy T (37.81205, -92.23491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2018). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / Raider Rd. / US 67 SB Ramps (37.91037, -90.53216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Elliptical shaped. ICD = 155 ft x 145 ft. Year Completed estimated (2007-2009). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / US 67 NB Ramps (37.91294, -90.53029) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Lino Lakes,
MN Anoka Co. United States |
Birch St. / Tomahawk Trl. (45.14236, -93.11531) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Completed October 2021. |
Lino Lakes,
MN Anoka Co. United States |
Birch St. / Shadow Lake Dr. (45.14228, -93.10960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Completed October 2021. |
Afton,
VA Albemarle Co. United States |
US 250 (Rockfish Gap Turnpike) / SR 151 (Critzers Shop Rd.) (38.02982, -78.80684) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.blueridgelife.com/2022/11/17/250-151-roundabout-is-active-so-far-so-good-but-its-early/ |
Kansas City,
MO Clay Co. United States |
N Shoal Creek Pkwy. / Maplewoods Pkwy. (39.28995, -94.55702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Merging right-turn bypass lane lane on west leg. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 106th St. / NE Staley Ferris Dr. (39.28508, -94.55712) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Peanut shaped. Replaced two offset T-intersections. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / New Mark Dr. / NE 100th St. (39.27475, -94.55715) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 96th St. (39.26747, -94.55716) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | East leg stubbed. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Platte Co. United States |
Line Creek Pkwy. / Tiffany Springs Rd. (39.25957, -94.61010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Kansas City,
MO Clay Co. United States |
N Booth Ave. / NE Shoal Creek Valley Dr. / Commercial Dr. (39.24626, -94.47674) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Yield-controlled right-turn bypass lane on west leg. Year Completed estimated (2020-20210. |
Kansas City,
MO Clay Co. United States |
NE Shoal Creek Valley Dr. / (unknown) (39.24673, -94.47459) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | |
Sedalia,
MO Pettis Co. United States |
Rte Y (W 16th St.) / Winchester Dr. (38.69957, -93.27763) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. (38.63617, -121.09165) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. / Alder Creek Pkwy (38.64059, -121.09212) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
(unincorporated),
OH Delaware Co. United States |
Eagles Landing Dr. / Liberty Grand Blvd. (40.20685, -83.10250) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
Delaware,
OH Delaware Co. United States |
SR 521 / Byxbe Pkwy. (40.30186, -83.02598) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://engineer.co.delaware.oh.us/image_slider/byxbe-campus-project-2022/ |
Avila Beach,
CA San Luis Obispo Co. United States |
Avila Beach Dr. / Palisades Rd. / US 101 SB Ramps (35.17977, -120.70042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening in fall of 2024. | |
Santa Barbara,
CA Santa Barbara Co. United States |
Olive Mill Rd. / Coast Village Rd. / N Jameson Ln. / US 101 Ramps (34.42156, -119.63993) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 46.3296 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
Montecito,
CA Santa Barbara Co. United States |
San Ysidro Rd. / N Jameson Ln. / US 101 NB Ramps (34.42287, -119.63152) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 53.6445 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | This is an unique kidney shaped single-lane roundabout (approx. varying ICD 176' x 116'). Opened May 2024. https://www.youtube.com/watch?v=QKQzLS7q3iw |
San Juan Bautista,
CA San Benito Co. United States |
SR 156 (San Juan Hollister Rd.) / Bixby Rd. (36.84096, -121.49042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 68.2749 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
ICD 224 ft x 211 ft. Anticipated opening year in 2025. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 EB Ramps (36.76908, -121.73823) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.7573 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. Future 3rd leg is planned to connect to BlackieRd. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 WB Ramps (36.77058, -121.73771) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. | |
Castroville,
CA Monterey Co. United States |
Castroville Blvd. / (unknown) (36.77419, -121.74051) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.3776 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2025. | |
Fisherman Flats,
CA Monterey Co. United States |
SR 68 / Josselyn Canyon Rd. (36.58359, -121.85655) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / Olmsted Rd. (36.58399, -121.84976) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.6344 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Del Rey Oaks,
CA Monterey Co. United States |
SR 68 / Canyon del Rey Blvd. / Monterra Rd. (36.58090, -121.82797) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 52.5780 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / York Rd. (36.57156, -121.80839) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 ./ Pasadera Dr. / Boots Rd. (36.56766, -121.77857) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.9087 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Laureles Grade Rd. (36.56964, -121.75566) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.5427 |
Other (At-Grade) Single-Lane |
Future 4th leg connects to Laguna Seca Entrance. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Corral de Tierra Rd. / Cypress Church Dr. (36.57854, -121.72709) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.1772 |
Other (At-Grade) Single-Lane |
Oval shaped. ICD = 151.5 ft x 141.5 ft. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / San Benancio Rd. (36.57977, -121.72073) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.2323 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 SB Ramps / Theatre Dr. (35.56644, -120.70261) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.8909 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
New Haven,
CT New Haven Co. United States |
Chapel St. / Yale Ave. (41.31448, -72.95891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Peanut shaped. Replaces skewed intersection. https://www.fox61.com/video/news/local/new-haven-county/new-haven/first-of-its-kind-peanut-shaped-roundabout-opens-in-new-haven/520-3db77500-495f-4ae7-a441-ed85863cd327 |
Raymore,
MO Cass Co. United States |
MO 58 / Ward Rd. (38.80255, -94.40147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.raymore.com/Home/Components/News/News/2466/ |
Raymore,
MO Cass Co. United States |
S Madison St. / (park access) (38.78857, -94.45769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2009-2010). |
Lafayette,
LA Lafayette Par. United States |
Dulles Dr. / N Domingue Ave. (30.21055, -92.08378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Ottawa,
ON Ottawa Canada |
Greenbank Rd. / Half Moon Bay Rd. (45.25555, -75.73742) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2023). |
Novi,
MI Oakland Co. United States |
W 9 Mile Rd. / Taft Rd. (42.45158, -83.49410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.candgnews.com/news/novi-council-approves-lighting-for-new-roundabout-635 |
Le Claire,
IA Scott Co. United States |
Wisconsin St. / 35th St. SW / (parking) (41.59770, -90.39139) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Replaced offset T intersections. https://www.leclaireiowa.gov/340/Wisconsin-Street-and-35th-Street-Reconst |
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Panama City Beach,
FL Bay Co. United States |
Front Beach Rd. / S Arnold Rd. (30.22327, -85.89081) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Triangular section of roads converted to roundabout with two of the former triangle sides to be converted to large-radius right-turn bypass lanes. https://www.pcbfl.gov/Home/Components/News/News/4818/ https://www.newsherald.com/story/news/local/2023/01/20/panama-city-beach-opens-a-new-lane-on-front-beach-road-roundabout/69820095007/ |
Stockton,
CA San Joaquin Co. United States |
E Miner Ave. / N San Joaquin St. (37.95611, -121.28804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Bicycle lanes leading into roundabout with bicycle sharrows on outer edge of circulatory roadway beyond each entry. https://twitter.com/stocktonupdates/status/1407046118156947458 |
Santa Clara,
CA Santa Clara Co. United States |
(shopping center entrance) / (parking) (37.35667, -121.93755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.svvoice.com/coleman-costco-installing-roundabout/ |
Ramara,
ON Simcoe Canada |
Hwy 12 / CR 169 / Concession Road 6 (44.57153, -79.18908) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Moses Lake,
WA Grant Co. United States |
SR 17 / Grape Dr. (47.14957, -119.29411) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://wsdot.wa.gov/construction-planning/search-projects/sr-17-grape-drive-intersection-improvements https://columbiabasinherald.com/news/2022/sep/06/grape-dr-roundabout-nears-completion/ |
Steamboat Springs,
CO Routt Co. United States |
Mount Werner Dr. / Steamboat Blvd. / Bangtail Way (40.45897, -106.81287) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.engagesteamboat.net/roundabout |
Steamboat Springs,
CO Routt Co. United States |
Central Park Dr. / Alpine Plaza / (parking) (40.46194, -106.82118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Entrance to Central Park Plaza shopping center. Year Completed estimated (2015-2018). |
Woodland,
CA Yolo Co. United States |
Road 25A / Parkland Ave. (38.64099, -121.74450) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | |
Woodland,
CA Yolo Co. United States |
Road 25A / Miekle Ave. (38.64078, -121.73624) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Woodland,
CA Yolo Co. United States |
Hunt St. / Heritage Pkwy. (38.64945, -121.74580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Knoxville,
TN Knox Co. United States |
Moss Grove Blvd. / Amberleigh Bluff Way (35.90592, -84.09103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Knoxville,
TN Knox Co. United States |
Montlake Dr. / Lakemoor View Rd. / US 129 SB Exit Ramp (35.92067, -83.95729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Meridian,
ID Ada Co. United States |
S Vanguard Way / S Wayfinder Ave. / (parking) (43.59800, -116.43116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Right-turn-only lane on northeast leg. |
Meridian,
ID Ada Co. United States |
S Wayfinder Ave. / W Cobalt Dr. (43.60115, -116.42905) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Missoula,
MT Missoula Co. United States |
Mullan Rd. / Mary Jane Blvd. (46.88725, -114.05372) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. / Grove Dr. (53.55573, -113.86097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / Copperhaven Dr. / Harvest Ridge Dr. (53.55575, -113.95196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / (unknown) (53.55467, -113.95664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. (Range Road 271) / Fenwyck Blvd. (53.55121, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd (Range Road 271) / (unknown) (53.54856, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / 218th St. NW (53.52741, -113.69339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / Secord Blvd. NW (53.52657, -113.70582) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / (unknown) (53.52650, -113.70143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2019). |