City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Yakima,
WA Yakima Co. United States |
E. Valley Mall Blvd. / I-82 EB Ramps (46.56298, -120.47290) |
Roundabout Existing |
Unknown Unknown |
5 Approaches 0 Driveways 54.1971 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Yakima,
WA Yakima Co. United States |
E. Valley Mall Blvd. / I-82 WB Ramps (46.56298, -120.47170) |
Roundabout Existing |
Unknown Unknown |
3 Approaches 0 Driveways 98.5403 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Cheyenne,
WY Laramie Co. United States |
High Plains Rd. / I-25 SB Ramps (41.06202, -104.87730) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.4293 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Cheyenne,
WY Laramie Co. United States |
High Plains Rd. / I-25 NB Ramps (41.06046, -104.87620) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 55.8337 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Only 3 of the 5 approaches are currently in service. One is under construction for the new Southeast Wyoming Welcome Center. The last is a future extension of High Plains to the east. ICD estimated from Google Maps linework. |
Cheyenne,
WY Laramie Co. United States |
Vandehei Ave. / I-25 NB Ramps / Hynds Blvd. (41.18365, -104.83710) |
Roundabout Existing |
All-Way Yield None |
6 Approaches 0 Driveways 46.7405 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Cheyenne,
WY Laramie Co. United States |
Vandehei Ave. / I-25 SB Ramps / Bishop Blvd. (41.18365, -104.83900) |
Roundabout Existing |
All-Way Yield None |
6 Approaches 0 Driveways 44.9428 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Blaine,
WA Whatcom Co. United States |
I-5 SB Ramps / Peace Portal Dr. / Marine Dr. (48.99723, -122.75250) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 26.6422 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | May 2010. Roundabout is ~200 ft from railroad crossing. ICD estimated from Google Maps linework. |
Blaine,
WA Whatcom Co. United States |
I-5 NB Ramps / D St. / 2nd St. (48.99810, -122.75140) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.6939 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | May 2010. ICD estimated from Google Maps linework. |
Burlington,
WA Skagit Co. United States |
SR 11 (Chuckanut Dr.) / I-5 SB Ramps / Josh Wilson Rd. (48.48585, -122.33867) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Right-turn-only lanes on east and west legs. Replaced two T-intersections. September 2010. |
Burlington,
WA Skagit Co. United States |
SR 11 (Chuckanut Dr.) / I-5 NB Ramps / Old Hwy 99 (48.48359, -122.33559) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | October 2010. Right-turn-only lanes on south and east legs. Merging right-turn-bypass lane on west leg. |
Walla Walla,
WA Walla Walla Co. United States |
Myra Rd. / SR 12 EB Ramps (46.06933, -118.36979) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Raindrop shaped. July 2010. ICD estimated from Google Maps linework. |
Walla Walla,
WA Walla Walla Co. United States |
Myra Rd. / SR 12 WB Ramps (46.07040, -118.36987) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Raindrop shaped. July 2010. |
Woodland,
WA Cowlitz Co. United States |
Dike Access Rd. / I-5 NB Ramps (45.92780, -122.75522) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Raindrop shaped. December 2010. |
Woodland,
WA Cowlitz Co. United States |
Dike Access Rd. / I-5 SB Ramps (45.92699, -122.75780) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | December 2010. |
Carmel,
IN Hamilton Co. United States |
E 136th St. / Keystone Pkwy NB Ramps (39.98598, -86.11404) |
Roundabout Existing |
All-Way Yield Metering Signal |
3 Approaches 0 Driveways 38.1000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Part of tight diamond interchange with raindrop shape central island. Modified in 2016-2017 to add metering signals. Northbound ramp from Keystone Pkwy has a metering signal (PHB) that activates during peak hours when triggered by a long westbound queue. Eastbound approach has a metering signal (PHB) that activates during peak hours when triggered by a long northbound queue. 21442 |
Carmel,
IN Hamilton Co. United States |
E 136th St. / Keystone Pkwy SB Ramps (39.98581, -86.11488) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.1134 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Part of tight diamond interchange with raindrop shape central island. ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
E 126th St. / Keystone Pkwy. NB Ramps (39.97122, -86.11223) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Right-turn-only lane on south leg. Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 126th St. / Keystone Pkwy. SB Ramps (39.97122, -86.11327) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Right-turn-only lane on north leg. Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. NB Ramps (39.96208, -86.11313) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E Carmel Dr. / Keystone Pkwy. SB Ramps (39.96198, -86.11397) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2010 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 116th St. / Keystone Pkwy. NB Ramps (39.95663, -86.11353) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2009 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 116th St. / Keystone Pkwy. SB Ramps (39.95665, -86.11430) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 106th St. / Keystone Pkwy. NB Ramps (39.94169, -86.11259) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Part of tight diamond interchange. |
Carmel,
IN Hamilton Co. United States |
E 106th St. / Keystone Pkwy. SB Ramps (39.94140, -86.11354) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Right-turn-only lane on north leg. Raindrop shaped. Part of tight diamond interchange. |
Rice Lake,
WI Barron Co. United States |
CTH O (18 1 / 2 Ave.) / US 53 NB Ramps (45.47319, -91.75753) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5006 |
Freeway Ramps (Grade-Separated) Single-Lane |
2006 | Opened June 1, 2006 ICD estimated from Google Maps linework. |
Rice Lake,
WI Barron Co. United States |
CTH O (18 1 / 2 Ave.) / US 53 SB Ramps (45.47325, -91.76021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5005 |
Freeway Ramps (Grade-Separated) Single-Lane |
2006 | Opened June 1, 2006 ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 41 SB Ramps (43.28170, -88.19557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.3868 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 41 NB Ramps (43.28247, -88.19345) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7780 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 45 SB Ramps (43.28387, -88.18716) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.5606 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 45 NB Ramps (43.28380, -88.18485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4301 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
24 Rd. / I-70 WB Ramps (39.11454, -108.60820) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.7732 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | ICD estimated from Google Maps linework. |
Grand Junction,
CO Mesa Co. United States |
24 Rd. / I-70 EB Ramps (39.11333, -108.60820) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.0672 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | ICD estimated from Google Maps linework. |
Pilot Mountain,
NC Surry Co. United States |
NC 268 (S Key St.) / US 52 EB Ramps / Black Mountain Rd. (36.37565, -80.48758) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.5027 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Pilot Mountain,
NC Surry Co. United States |
NC 268 (S Key St.) / US 52 WB Ramps (36.37640, -80.48578) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.6560 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Cleveland,
OH Cuyahoga Co. United States |
Quigley Rd. / W. 14th St. / I-71 NB Offramp / I-71 SB Onramp (41.46614, -81.69114) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.1181 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | Opened August 21, 2006. ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
W Main St. (STH 19) / STH 26 NB Ramps (43.19772, -88.76607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3091 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
W Main St. (STH 19) / STH 26 SB Ramps (43.19772, -88.76804) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.6971 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Watertown,
WI Dodge Co. United States |
BUS 26 (N Church St.) / STH 16 WB Ramps / Provimi Rd. (43.21918, -88.73837) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.5177 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Dodge Co. United States |
BUS 26 (N Church St.) / STH 16 EB Ramps (43.21605, -88.73625) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.2976 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
CTH Y (S Church St.) / STH 26 NB Ramps (43.15562, -88.74126) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7217 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Watertown,
WI Jefferson Co. United States |
CTH Y (S Church St.) / STH 26 SB Ramps (43.15450, -88.74223) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3362 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Anderson,
CA Shasta Co. United States |
Factory Outlets Dr. / I-5 NB Ramps / Locust St. / Deschutes Rd. (40.43782, -122.28600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.0869 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Freeway off-ramp added with roundabout. Previously controlled by one-way stop ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 SB Ramps (44.01089, -88.58318) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
W 9th Ave. / US 41 NB Ramps (44.01078, -88.58145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Oshkosh,
WI Winnebago Co. United States |
US 45 / US 41 SB Ramps (44.06074, -88.57443) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 SB Ramps (44.15623, -88.48662) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1274 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |
Neenah,
WI Winnebago Co. United States |
Breezewood Ln. / US 41 NB Ramps (44.15602, -88.48505) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.4139 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. |
Barksdale,
WI Bayfield Co. United States |
STH 13 / US 2 WB Ramps (46.58774, -90.95454) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.9645 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
CTH G (Main Ave.) / US 41 NB Ramps (44.45238, -88.08887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | |
De Pere,
WI Brown Co. United States |
CTH G (Main St.) / US 41 SB Ramps (44.45374, -88.09212) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.5943 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 EB Ramps (43.06063, -88.44229) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.9046 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Summit,
WI Waukesha Co. United States |
CTH P (N Sawyer Rd.) / I-94 WB Ramps (43.06174, -88.44228) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.1203 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. |
Middleton,
WI Dane Co. United States |
Parmenter St. / US 12 WB Off-Ramp / Discovery Dr. (43.10221, -89.51196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.3928 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2006 | Opened October 2006. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Reedsburg Rd. / US 12 WB Ramps (43.53249, -89.78612) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5617 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
Reedsburg Rd. / US 12 EB Ramps (43.53258, -89.78800) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.7569 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
STH 33 / US 12 WB Ramps (43.51445, -89.78288) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5741 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
STH 33 / US 12 EB Ramps (43.51449, -89.78516) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7080 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 WB Ramps (43.11037, -89.19930) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.6200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Cottage Grove,
WI Dane Co. United States |
CTH N / I-94 EB Ramps (43.10877, -89.19923) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.3649 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 NB Ramps (44.89208, -87.89580) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
Oconto,
WI Oconto Co. United States |
STH 22 (Charles St.) / US 41 SB Ramps (44.89205, -87.90080) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.9203 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 7, 2009. ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 NB Ramps (44.94889, -92.69390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.5014 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Hudson,
WI Saint Croix Co. United States |
Hanley Rd. / STH 35 SB Ramps (44.94890, -92.69675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0372 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 NB Ramps (42.76902, -88.92310) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Milton,
WI Rock Co. United States |
STH 59 / STH 26 SB Ramps (42.76911, -88.92484) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Opened October 2009. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 NB Ramps (42.53960, -88.94841) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.6798 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
Beloit,
WI Rock Co. United States |
E Hart Rd. / I-43 SB Ramps (42.54142, -88.94933) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0787 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.6788 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
(unincorporated),
WI Sauk Co. United States |
CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.5437 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 WB Ramps (42.91764, -89.36607) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2309 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
STH 138 / US 14 EB Ramps (42.91774, -89.36817) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1083 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 EB Ramps (42.95128, -89.37859) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7217 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oregon,
WI Dane Co. United States |
CTH MM / US 14 WB Ramps (42.95272, -89.37769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9591 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.1058 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Oshkosh,
WI Winnebago Co. United States |
STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 140.8193 |
Freeway Ramps (Grade-Separated) Multilane (3+ Lane) |
2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 EB Ramps (44.95862, -92.55999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.1723 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Roberts,
WI Saint Croix Co. United States |
STH 65 / I-94 WB Ramps (44.96036, -92.55952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.7061 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Janesville,
WI Rock Co. United States |
N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Interchange replaced single at-grade two-way stop-controlled intersection. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave. / US 10-US 61 EB Ramps / W Point Douglas Rd. (44.81452, -92.93504) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.6128 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Cottage Grove,
MN Washington Co. United States |
Jamaica Ave. / US 10-US 61 WB Ramps (44.81586, -92.93379) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.2780 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A EB Ramps (34.63499, -112.39830) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 52.0821 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Prescott,
AZ Yavapai Co. United States |
Grande Dame Pkwy. / SR 89A WB Ramps (34.63643, -112.39710) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.0985 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | ICD estimated from Google Maps linework. |
Mesa,
AZ Maricopa Co. United States |
E McKellips Rd. / Loop 202 SB Ramps (33.45145, -111.67100) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.8421 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Mesa,
AZ Maricopa Co. United States |
E McKellips Rd. / Loop 202 NB Ramps (33.45142, -111.66850) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.8492 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | ICD estimated from Google Maps linework. |
Edwards,
CO Eagle Co. United States |
Edwards Access Rd. / Beard Creek Rd. / I-70 WB Ramps (39.64991, -106.58720) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.3812 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Edwards,
CO Eagle Co. United States |
Edwards Access Rd. / I-70 EB Ramps (39.64891, -106.58780) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7034 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2010 | ICD estimated from Google Maps linework. |
Avoca Borough,
PA Luzerne Co. United States |
William St. / I-81 SB Ramps (41.33570, -75.73790) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.2188 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Avoca Borough,
PA Luzerne Co. United States |
SR 315 / I-81 SB Ramps (41.33392, -75.73889) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 65.5320 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2016 | |
Avoca Borough,
PA Luzerne Co. United States |
SR 315 / I-81 NB Ramps / Navy Way Rd. (41.33429, -75.73450) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.4971 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2015 | Fifth leg is departure only to I-81 NB on-ramp. ICD estimated from Google Maps linework. |
Moon Township,
PA Allegheny Co. United States |
SR 3070 / Resurrection Rd. / I-376 SB Ramps (40.48070, -80.20240) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.4290 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Warrensburg,
MO Johnson Co. United States |
SR 13 / US 50 WB Ramps (38.77480, -93.68554) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.9690 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Warrensburg,
MO Johnson Co. United States |
SR 13 / US 50 EB Ramps (38.77151, -93.68568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.9709 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Carmel,
IN Hamilton Co. United States |
Clay Terrace Blvd. / Circle Dr. / Range Line Rd. / US 31 SB Off-Ramp (39.99264, -86.12840) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. SB Ramps (39.97844, -86.11319) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Carmel,
IN Hamilton Co. United States |
E Main St. / Keystone Pkwy. NB Ramps (39.97843, -86.11238) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2009 | Raindrop shaped. Year Completed estimated (2008-2010). |
Westfield,
IN Hamilton Co. United States |
E 161st St. / US 31 NB Ramps (40.02195, -86.13092) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2013 | Raindrop shaped. Series of 3 roundabouts. |
Westfield,
IN Hamilton Co. United States |
E 161st St. / US 31 SB Ramps (40.02183, -86.13259) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 50.2920 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2013 | Raindrop shaped. Series of 3 roundabouts. |