City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Saskatoon,
SK Division 11 Canada |
Brighton Blvd. / Taskamanwa St. / McOrmond Dr. (52.12011, -106.54988) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2024 | "Brighton Birds" sculpture in center island. |
Lévis,
QC Lévis Canada |
Rue de Saint-Denis / Rue de Bernières (46.69436, -71.30060) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2019 | Add-lane right-turn bypass lane on southeast leg. Southwest leg stubbed. |
Saint-Augustin-de-Desmaures,
QC Capitale-Nationale Canada |
Chemin de la Butte / Chemin du Lac (46.74119, -71.40780) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2013 | Left-turn-only lane on west leg. Right-turn-only lanes on east and north legs. |
Candiac,
QC Roussillon Regional County Municipality Canada |
Boulevard Jean-Leman / Avenue des Chênes / Rang Saint-André (45.36467, -73.50839) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Newport,
MI Monroe Co. United States |
Swan Creek Rd. / Newport Rd. / I-75 SB Ramps (42.00705, -83.31515) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Yield-controlled right-turn bypass lane on southwest leg. Year Completed estimated (2022-2023). https://www.monroenews.com/story/news/traffic/2022/01/24/work-new-interchange-roundabouts-75-newport-set-spring/6625998001/. |
Waterville,
ME Kennebec Co. United States |
Washington St. / Campus Dr. / Rice Rips Rd. (44.56576, -69.66692) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | |
Thief River Falls,
MN Pennington Co. United States |
US 59 / Center St. E (CR 3) (48.01959, -96.05493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Las Cruces,
NM Dona Ana Co. United States |
Sonoma Ranch Blvd. / Arroyo Rd. (32.41740, -106.73863) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2016-2019). |
Santa Fe,
NM Santa Fe Co. United States |
Las Soleras Dr. / (unknown) (35.61991, -106.02561) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 2 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). South and east driveways added 2023-2024. |
Easley,
SC Pickens Co. United States |
Crestview Rd. / Sheffield Rd. (34.80448, -82.54993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Completed August 2024. https://www.foxcarolina.com/video/2024/06/15/construction-roundabout-easley-causes-significant-backups/ |
Rock Hill,
SC York Co. United States |
Bird St. / University Dr. (34.94354, -81.00143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2008 | Year completed estimated (2006-2010). |
Syracuse,
NY Onondaga Co. United States |
E Brighton Ave. / E Glen Ave. / I-481 WB Exit Ramp / I-81 NB Entrance Ramp (43.00895, -76.13260) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
2024 | https://dailyorange.com/2024/09/new-york-transportation-completes-syracuse-roundabout/ |
Edwards,
CO Eagle Co. United States |
US 6 / Hillcrest Dr. (39.65388, -106.62911) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.eaglecounty.us/news_detail_T24_R433.php. |
Genoa Township,
MI Livingston Co. United States |
Challis Rd. / Bauer Rd. (42.54205, -83.81326) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | West leg of Challis Road realigned to south at roundabout. https://www.livingstondaily.com/story/news/local/community/genoa-township/2024/09/02/roundabout-at-challis-bauer-roads-in-genoa-township-now-open/75001158007/ |
St Leo,
FL Pasco Co. United States |
SR 52 / Pompanic St. / College Ave. (28.33559, -82.27027) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | SR 52 makes 90-degree turn at roundabout (south and east legs). https://www.msn.com/en-us/autos/news/new-county-road-52-roundabout-in-pasco-county-now-open/ar-AA1p8sW3?ocid=BingNewsVerp&apiversion=v2&noservercache=1&domshim=1&renderwebcomponents=1&wcseo=1&batchservertelemetry=1&noservertelemetry=1# |
Baxter,
MN Crow Wing Co. United States |
Highland Scenic Rd. (CSAH 48) / Cypress Dr. (46.33797, -94.23156) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | |
Pontiac,
IL Livingston Co. United States |
Belmont Rd. / (parking) (40.87097, -88.66806) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2019-2022). |
Springfield,
KY Washington Co. United States |
US 150-KY 555 / KY 528 (Lincoln Park Rd.) (37.69899, -85.22166) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Henderson,
KY Henderson Co. United States |
KY 54-KY 351 (2nd St.) / US 41 SB Ramps (37.83090, -87.56729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Raindrop shaped. https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon. |
Smiths Grove,
KY Warren Co. United States |
KY 101 (Smiths Grove-Scottsville Rd.) / (parking) (37.03988, -86.21051) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Right-turn bypass lane on north leg. Double left turn on west leg. https://www.wnky.com/kytc-announces-smiths-grove-road-projects-near-buc-ees/ |
Henderson,
KY Henderson Co. United States |
KY 54-KY 351 (2nd St.) / US 41 NB Ramps (37.83052, -87.56569) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2024 | Raindrop shaped. Replaces PARCLO B ramp with diamond ramp and shifts intersection approximately 200 ft west. |
Henderson,
KY Henderson Co. United States |
KY 351 (2nd St.) / KY 2084 (Southside Dr.) / (entrance to North Middle School) (37.83126, -87.56895) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://news.wnin.org/2024-07-25/henderson-roundabouts-to-open-soon |
Seymour,
WI Outagamie Co. United States |
STH 54 / Ivory St. (CR C) (44.50057, -88.32917) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://projects.511wi.gov/54seymour/full-project-overview/ |
Seymour,
WI Outagamie Co. United States |
STH 54 / STH 55 (S Main St.) (44.50064, -88.33077) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://projects.511wi.gov/54seymour/full-project-overview/ |
Hurricane,
UT Washington Co. United States |
100 N / 700 W / Birchview Ln. (37.17802, -113.30065) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Cave Spring,
VA Roanoke Co. United States |
Starkey Rd. / Buck Mountain Rd. (37.20302, -79.99099) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | https://www.vdot.virginia.gov/projects/salem-district/route-904-starkey-road-and-route-679-buck-mountain-road-roundabout----roanoke-county/ |
South Lebanon,
OH Warren Co. United States |
Grandin Rd. / King Ave. / (parking) (39.35121, -84.24123) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=yhm7HUcqkV0 |
Kings Mills,
OH Warren Co. United States |
King Ave. / Kings Ct. (39.35752, -84.24552) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
2023 | https://www.youtube.com/watch?v=yhm7HUcqkV0 |
Merrifield,
MN Crow Wing Co. United States |
CSAH 3 / CSAH 4 (46.48182, -94.17288) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.instagram.com/crowwingcountymn/p/C8sK5DXvURa/ |
Gordonville,
MO Cape Girardeau Co. United States |
SR 25 / CR K (37.31757, -89.66588) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.msn.com/en-us/autos/news/rte-25k-roundabout-at-gordonville-finished-early/ar-AA1rkPGt |
Watertown,
NY Jefferson Co. United States |
Coffeen St. / N Hycliff Dr. / Gaffney Dr. (43.99017, -75.93460) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | On campus of Jefferson Community College. Year Completed estimated (2020-2022). |
Amherst,
NY Erie Co. United States |
John James Audubon Pkwy. / Frontier Rd. (43.00764, -78.78133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Buffalo,
NY Erie Co. United States |
Freeman Rd. / Salvatore Pkwy. / (parking) (42.95226, -78.69540) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2009 | |
Rochester,
NY Monroe Co. United States |
Airport Way / Airport Rd. (43.12927, -77.67145) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2022 | At Rochester airport. Airport Road is one-way eastbound. Constructed with temporary bypass road around construction site. https://www.rocairport.com/news-2022-06-24-roundabout. |
Brighton,
NY Monroe Co. United States |
E Henrietta Rd. / (unklnown) (43.09657, -77.60624) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2014 | Merging right-turn bypass lane on south leg. |
Canandaigua,
NY Ontario Co. United States |
CR 46 / Smith Rd. (42.88614, -77.22771) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2020-2023). |
Moseley,
VA Chesterfield Co. United States |
SR 604 (Genito Rd.) / Otterdale Rd. (37.44694, -77.70821) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Matoaca,
VA Chesterfield Co. United States |
Matoaca Rd. / Hickory Rd. (37.26110, -77.48372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
Goose Creek,
SC Berkeley Co. United States |
Alder Dr. / Clayburne Dr. (33.01052, -80.01501) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Mount Pleasant,
SC Charleston Co. United States |
Harry M Hallman Jr Blvd. / Bayfront Dr. / Grafton St. (32.79978, -79.90208) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Charleston,
SC Charleston Co. United States |
St Johns Woods Pkwy. / Edwins Crossing (32.72292, -80.06569) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2003). |
Farragut,
TN Knox Co. United States |
Northshore Dr. / Choto Rd. (35.82968, -84.16750) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2014-2015). |
Farragut,
TN Knox Co. United States |
Iron Plow Dr. / Branch Hook Rd. / Wagon Hitch Rd. (west) (35.84614, -84.18296) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2024). |
Farragut,
TN Knox Co. United States |
Iron Plow Dr. / Branch Hook Rd. / Wagon Hitch Rd. (east) (35.84531, -84.18085) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2024). |
Bossier City,
LA Bossier Par. United States |
Walter O. Bigby Carriageway / Hamilton Rd. (32.52940, -93.72630) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.shreveporttimes.com/story/news/local/2024/10/01/walter-o-bigby-carriageway-opens-in-bossier-city/75455416007/ |
Bossier City,
LA Bossier Par. United States |
Walter O. Bigby Carriageway / Shed Rd. (32.53213, -93.72376) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.shreveporttimes.com/story/news/local/2024/10/01/walter-o-bigby-carriageway-opens-in-bossier-city/75455416007/ |
Lincoln,
NE Lancaster Co. United States |
W A St. / SW 31st St. (40.79933, -96.76701) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | https://www.lincoln.ne.gov/files/sharedassets/public/v/1/ltu/projects/westa/2024-05-30-displays.pdf |
Cedar Rapids,
IA Linn Co. United States |
Ellis Blvd. NW / F Ave. NW (41.97904, -91.68202) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.facebook.com/Matthew25MinistryHub/posts/the-roundabout-at-f-ave-and-ellis-blvd-near-the-cultivate-hope-corner-store-is-n/5906539946051568/ |
Hortonville,
WI Outagamie Co. United States |
STH 15 (Greenville Dr.) / CR JJ (W Broadway Dr.) (44.32965, -88.60005) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Yield-controlled right-turn bypass lane on southwest leg. Intersection was moved about 400 feet to the southeast. Year Completed estimated (2023-2024). |
Hortonville,
WI Outagamie Co. United States |
STH 15 / CR T (44.34801, -88.67547) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://projects.511wi.gov/wis15expand/full-project-overview/ |
Dover,
WI Racine Co. United States |
US 45 (N Raynor Ave. / Washington Ave.) / STH 20 (Washington Ave.) / N Raynor Ave. (42.74204, -88.07155) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2023 | https://racinecountyeye.com/2023/05/03/highway-20-resurfacing-project/ |
Lincoln,
NE Lancaster Co. United States |
W A St. / SW 36th St. (40.79929, -96.77267) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | https://www.lincoln.ne.gov/files/sharedassets/public/v/1/ltu/projects/westa/2024-05-30-displays.pdf |
Lake Cormorant,
MS De Soto Co. United States |
SR 301 / Star Landing Rd. (34.90410, -90.10037) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | https://mdot.ms.gov/portal/news_release_view/1575 |
Town of Maine,
WI Marathon Co. United States |
CR K / CR WW (45.02727, -89.69047) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Mineral,
VA Louisa Co. United States |
US 522 (Zachary Taylor Hwy.) / SR 208 (New Bridge Rd.) (38.08007, -77.87956) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | West leg stubbed. Year Completed estimated (2024-2025). |
Spokane,
WA Spokane Co. United States |
E 57th Ave. / S Freya St. (47.60212, -117.35739) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.spokanecounty.org/4935/57th-and-Freya-Roundabout. |
Port Orchard,
WA Kitsap Co. United States |
SRR 166 (Bay St. / Bethel Ave.) / Bay St. (47.54197, -122.62705) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | https://wsdot.wa.gov/construction-planning/search-projects/sr-166-bethel-bay-maple-intersection-roundabout-complete-july-2024 |
West St Paul,
MN Dakota Co. United States |
Thompson Ave. E (CR 6) / Oakdale Ave. (CR 73) (44.90155, -93.07054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 130 ft x 100 ft. https://www.co.dakota.mn.us/Transportation/CurrentConstruction/ThompsonOakdale. |
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Ave.) / US 52 EB Ramps (38.53856, -82.67758) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
Ironton,
OH Lawrence Co. United States |
SR 93 (Park Dr.) / US 52 WB Ramps (38.53950, -82.67593) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.facebook.com/photo.php?fbid=611157614528583&id=100069030495739&set=a.176172631360419 |
Findlay,
OH Hancock Co. United States |
US 68 / SR 15 EB Ramps / CR 80 (40.98862, -83.65067) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | New exit ramp from SR 15 coming in from the east. Former exit ramp from SR 15 (from the west) is now connected to County Road 80. https://wfin.com/local-news/opening-of-new-findlay-roundabout-pushed-back-a-few-days/ . |
Toledo,
OH Lucas Co. United States |
Ottawa River Rd / 108th St (41.70892, -83.49333) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
2023 | Signs in central island. https://www.wtol.com/article/news/local/road-closed-ottawa-river-road-in-point-place-closes-for-roundabout-construction-detour-traffic/512-a28041a7-4232-4dfb-99aa-e106e6681237. |
(unincorporated),
UT Kane Co. United States |
SR 9 (Zion Park Scenic Byway) / North Fork Rd. (37.23921, -112.83215) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://kmyu.tv/news/local/udot-construction-projects-this-spring-summer-fall-autumn-2024-mountain-view-corridor-completion-date-i-15-travel-conditions-why-arent-potholes-being-filled-repaired-new-roads-traffic-forecast |
Santa Fe,
NM Santa Fe Co. United States |
Oshara Blvd. / Falcon Way (35.61812, -105.98968) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.santafecountynm.gov/news/detail/county-celebrates-early-completion-of-landmark-ne-se-connector-roads-project |
Santa Fe,
NM Santa Fe Co. United States |
Rabbit Rd. / Falcon Way (35.62208, -105.99127) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.santafecountynm.gov/news/detail/county-celebrates-early-completion-of-landmark-ne-se-connector-roads-project. |
Statesboro,
GA Bulloch Co. United States |
Langston Chapel Rd. / Harville Rd. / Bethel Church Rd. (32.39523, -81.75920) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.statesboroherald.com/local/a-friday-surprise-harville-roadlangston-chapel-road-roundabout-opens/ |
Montrose,
CO Montrose Co. United States |
Niagara Rd. / Hillcrest Dr. (38.46724, -107.85663) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.montrosepress.com/hillcrest-and-niagara-roundabout-opens/image_bc92464a-3aea-11ef-be15-b79f08cef2a5.html |
Montrose,
CO Montrose Co. United States |
Grand Ave. / N 9th St. (38.48349, -107.88856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Elliott,
SC Lee Co. United States |
US 401 (Darlington Hwy.) / SC 341 (Lynchburg Hwy.) (34.11931, -80.14440) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Completed Nov. 2024 https://www.wistv.com/2024/02/13/scdot-install-all-way-stop-sc-341-us-401-lee-county-intersection/ |
Bear,
DE New Castle Co. United States |
Denny Rd. / Lexington Pkwy. / Airdrie Dr. (39.57173, -75.74234) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2024 | Year Completed estimated (2023-2024). |
Florence,
AZ Pinal Co. United States |
SR 79 Business / E Florence Heights Dr. (33.01869, -111.38695) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Intersection shifted approximately 200 ft to south. https://azdot.gov/projects/southcentral-district-projects/state-route-28779b-roundabout-florence |
Wentzville,
MO St. Charles Co. United States |
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd. (38.80935, -90.87713) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Mankato,
MN Blue Earth Co. United States |
STH 22 / Augusta Dr. (44.18859, -93.94948) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.keyc.com/video/2024/10/04/roundabout-highway-22-augusta-drive-mankato-opens-october-5/ |
Goochland,
VA Goochland Co. United States |
US 522 (Sandy Hook Rd.) / Fairgrounds Rd. (37.69816, -77.88842) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=tTjky2-2958 |
Thibodaux,
LA Lafourche Par. United States |
SR 20 (Canal Blvd.) / Jackson St. / Thompson Pl. / Gerald T Peltier Dr. (29.78750, -90.82301) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://houmatimes.com/news/city-of-thibodaux-announces-official-completion-of-canal-boulevard-roundabout/ |
Fairfield,
OH Butler Co. United States |
Tylersville Rd. / Seward Rd. (39.36256, -84.49156) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
South Haven,
MI Allegan Co. United States |
Blue Star Hwy. / N Shore Dr. (42.42646, -86.25553) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2006-2011). |
Independence,
MI Oakland Co. United States |
Clintonville Rd. / Waldon Rd. (42.73447, -83.34991) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=7dLM3y1e23U |
New Castle,
DE New Castle Co. United States |
Airport Rd. / I-95 NB Exit Ramp (39.69593, -75.61570) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | https://www.facebook.com/FirstStateUpdate1/photos/-i-95-offramp-to-airport-road-has-re-opened-after-new-roundabout-installed-/1135316878598748/?_rdr |
Enumclaw,
WA King Co. United States |
Suntop Blvd. / Bondgard Ave. E / (parking) (47.19554, -121.97087) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Lexington Park,
MD St. Mary's Co. United States |
FDR Blvd. / MacArthur Blvd. (38.28609, -76.48549) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://thebaynet.com/new-section-of-fdr-boulevard-opened-to-the-public/ |
Lexington Park,
MD St. Mary's Co. United States |
FDR Blvd. / (parking) / (future road) (38.28732, -76.48888) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2023 | South leg stubbed. https://thebaynet.com/new-section-of-fdr-boulevard-opened-to-the-public/. |
Lexington Park,
MD St. Mary's Co. United States |
FDR Blvd. / Buck Hewitt Rd. (38.28398, -76.48121) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2023 | https://thebaynet.com/new-section-of-fdr-boulevard-opened-to-the-public/ |
(unincorporated),
SC Berkeley Co. United States |
US 176 (State Rd.) / Mudville Rd. (33.20839, -80.25724) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://info2.scdot.org/SCDOTPress/Lists/Posts/Post.aspx?ID=3627 |
Winfield,
IN Lake Co. United States |
E 109th Ave. / Green Pl. (41.42020, -87.26608) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.instagram.com/mattscottmedia/reel/DDNztI8hQq3/ |
Richmond,
RI Washington Co. United States |
SR 138 (Kingstown Rd.) / SR 112 (Richmond Townhouse Rd.) / Carolina Nooseneck Rd. (41.50041, -71.65955) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.turnto10.com/news/local/ridot-completes-richmond-roundabout-project-southern-new-england-rhode-island-massachusetts-november-26-2024 |
Red Deer County,
AB Division 8 Canada |
Hwy 20 / Memorial Trl. / Township Road 384 (52.29009, -114.07341) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 39.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Completed in October 2024. RRFB is located on the north leg only. Currently, Memorial Trail is only one lane in each direction, but can be upgraded to two lanes in the future. |
Whitby,
ON Durham Canada |
Coronation Rd. / Twin Streams Rd. (43.90073, -78.98366) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2023 | Converted from neighborhood traffic calming circle in 2022-2024. |
Martinsburg,
WV Berkeley Co. United States |
Tavern Rd. / Rock Cliff Dr. (39.47342, -77.97015) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://panhandlenewsnetwork.com/2024/04/05/bcems-director-offers-detours-as-rock-cliff-drive-tavern-road-intersection-closed-all-weekend-to-prep-for-roundabout/ |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 EB Ramps (35.98033, -77.89689) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / US 64 WB Ramps (35.98205, -77.89806) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
N Old Carriage Rd. / (school entrance) (35.97561, -77.89630) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.rockymounttelegram.com/news/local/detour-ahead-on-us-64-former-north-old-carriage-bridge-to-be-demolished/article_81fd3eee-0756-11ef-8d51-4f49a3f92086.html |
Oak Level Township,
NC Nash Co. United States |
Sunset Ave. / Arrow Rd. (35.97106, -77.89111) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2023-2024). https://www.rockymounttelegram.com/news/local/sunset-avenue-upgrade-project-in-final-months-of-work/article_3236f4cc-66ce-11ef-ad06-df36fba02b65.html. |
Burlington,
WI Racine Co. United States |
STH 11 (Durand Ave). / CR J (English Settlement Ave.) (42.68366, -88.18849) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://projects.511wi.gov/11roundabout/full-project-overview/ |
Ishpeming,
MI Marquette Co. United States |
US 41-M-28 / Lakeshore Dr. (46.49855, -87.68279) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.michigan.gov/mdot/news-outreach/pressreleases/2024/10/22/major-work-on-us-41-m-28-roundabout-project-in-ishpeming |
Tompkins Township,
MI Jackson Co. United States |
Springport Rd. / Minard Rd. (42.33710, -84.54673) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.mlive.com/news/jackson/2024/09/new-roundabout-opens-in-northern-jackson-county.html |
Bainbridge Island,
WA Kitsap Co. United States |
SR 305 / NE Seabold Rd. / NE Port Madison Rd. (47.70104, -122.55759) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://wsdot.wa.gov/about/news/2023/safety-improvement-project-sr-305-bainbridge-island-begins-oct-23 |
Bainbridge Island,
WA Kitsap Co. United States |
SR 395 / NE Adas Will Ln. (47.70562, -122.56059) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://wsdot.wa.gov/about/news/2023/safety-improvement-project-sr-305-bainbridge-island-begins-oct-23 |
Florence,
AZ Pinal Co. United States |
SR 287 / SR 79 Business (Main St.) (33.01978, -111.38809) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Replaced channelized at-grade interchange. https://azdot.gov/projects/southcentral-district-projects/state-route-28779b-roundabout-florence |
Hanover,
ON Grey Canada |
Grey Road 4 / Grey Road 3 (44.15682, -80.95434) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/CountyOfGrey/videos/grey-road-3-4-roundabout/1307920140569289/?_rdr |