City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Stuart,
FL Martin Co. United States |
SE Pomeroy St. / SE Pennington St. (27.14684, -80.24643) |
Other Unknown |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
||
San Juan Bautista,
CA San Benito Co. United States |
SR 156 (San Juan Hollister Rd.) / Bixby Rd. (36.84096, -121.49042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 68.2749 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
ICD 224 ft x 211 ft. Anticipated opening year in 2025. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 EB Ramps (36.76908, -121.73823) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.7573 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. Future 3rd leg is planned to connect to BlackieRd. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 WB Ramps (36.77058, -121.73771) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. | |
Castroville,
CA Monterey Co. United States |
Castroville Blvd. / (unknown) (36.77419, -121.74051) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.3776 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2025. | |
Fisherman Flats,
CA Monterey Co. United States |
SR 68 / Josselyn Canyon Rd. (36.58359, -121.85655) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / Olmsted Rd. (36.58399, -121.84976) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.6344 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Del Rey Oaks,
CA Monterey Co. United States |
SR 68 / Canyon del Rey Blvd. / Monterra Rd. (36.58090, -121.82797) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 52.5780 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / York Rd. (36.57156, -121.80839) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 ./ Pasadera Dr. / Boots Rd. (36.56766, -121.77857) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.9087 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Laureles Grade Rd. (36.56964, -121.75566) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.5427 |
Other (At-Grade) Single-Lane |
Future 4th leg connects to Laguna Seca Entrance. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Corral de Tierra Rd. / Cypress Church Dr. (36.57854, -121.72709) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.1772 |
Other (At-Grade) Single-Lane |
Oval shaped. ICD = 151.5 ft x 141.5 ft. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / San Benancio Rd. (36.57977, -121.72073) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.2323 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 SB Ramps / Theatre Dr. (35.56644, -120.70261) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.8909 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
Berkeley,
CA Alameda Co. United States |
Gilman St. / I-80 EB Ramps / Eastshore Hwy. (37.87826, -122.30681) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Opening 2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/d4-alameda-80-gilman-interchange-improvement-project | |
Berkeley,
CA Alameda Co. United States |
Gilman St. / I-80 WB Ramps / Frontage Rd. (37.87808, -122.30769) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Unknown |
Opening 2024 https://dot.ca.gov/caltrans-near-me/district-4/d4-projects/d4-alameda-80-gilman-interchange-improvement-project | |
Edmonton,
AB Division 11 Canada |
66 St. NW / 167 Ave. NW (53.62867, -113.44284) |
Roundabout Unknown |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
To be constructed 2024. | |
Edmonton,
AB Division 11 Canada |
132 Ave. NW / 90 St. NW (53.59214, -113.47971) |
Unknown Unknown |
Unknown Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
To be constructed 2026. | |
(unincorporated),
WA King Co. United States |
Redmond Ridge Dr. / NE Alder Crest Dr. (47.69211, -122.03572) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://kingcounty.gov/en/dept/local-services/transit-transportation-roads/roads-and-bridges/projects-and-programs/redmond-ridge-dr-ne-roundabout (open to traffic, but final paving delayed by weather until Spring 2024) |
Carmel,
IN Hamilton Co. United States |
W 111th St. / Spring Mill Ln. / Slade Ave, (39.94893, -86.16236) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Opened August 25, 2023. https://content.govdelivery.com/accounts/INCARMEL/bulletins/367b416#:~:text=111TH%20STREET%20AND%20SPRING%20MILL%20ROAD%20ROUNDABOUT |
Warrington,
England United Kingdom |
College Place: A574 (Birchwood Way) / B5210 (Woolston Grange Ave.) / Crab Ln. (53.41361, -2.54326) |
Signalized Roundabout/Circle Unknown |
Signal Pedestrian Signal (red-yellow-green to drivers) |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (3+ Lane) |
Pedestrian access to central island. | |
Edmonton,
AB Division 11 Canada |
97 St. NW / 66 Ave. NW (53.50289, -113.47947) |
Traffic Calming Circle Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2015 | No splitter islands. |
Val-d’Or,
QC La Vallée-de-l'Or Regional County Municipality Canada |
Boulevard Barrette / 7e Rue (48.08434, -77.79004) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2024 | Here's the construction tender: https://seao.ca/OpportunityPublication/ConsulterAvis/Categorie?ItemId=5993fe76-ad0e-4a4c-9002-bcbf9ee6f299&SubCategoryCode=C02&callingPage=4&searchId=f5dcd1ec-11bf-4860-b7dc-6c1ddd425347 A news article: https://www.lecitoyenrouynlasarre.com/article/2024/05/27/7e-rue%E2%80%AF-un-carrefour-giratoire-pret-d-ici-la-mi-septembre A Facebook post from the city: https://www.facebook.com/villedevaldor/posts/pfbid02e5dS7vEpjSSTvz1i4nsAhbWzrQ2qFr4V825kPb5f9L6V3rpqaaNV4ZjohEgx5gWpl |